RESPONSE TO NOVEMBER 18,
- 1977, LETTER FROM EDSON G.
CASE TO GODWIN WILLIAMS, JR.
"ELECTRICAL CONNECTOR ASSEMBLIES" This response provides the environmental qualification information for the electrical connectors used in the Browns Ferry Nuclear Plant, as requested by the November 18, 1977, letter from Edson G.
Case to Godwin Williams, Jr., which references IE Bulletins 77-05 and 77-05A, dated November 8 and November 15, 1977, respectively.
Also, this response includes TVA's justification for continued operation of the facilities without creating undue risk to the health and safety of the
.pub3.ic, This response is divided into the following:
Part I Identification of Systems, Components, and Associated Electrical Connectors Required to Function to Mitigate Design Basis Events.
Part II Environmental Qualification of Electrical Connectors Part III Justification for Continued Operation
Part I Identification of Systems, Components, and Associated Electrical Connectors Required to Function to M.tigate Design Basis Events, Table 1 lists the-safety systems and components required to function to mitigate a postulated design basis event or accident outside containment.
Those systems containing electrical connectors are so designated in this table.
These systems or portions of systems and components have been categorized as being either inside primary containment or outside primary conta'inment.
Table 2 lists those:electrical connectors for each Browns Ferry unit that are inside the primary containment and are a part of a safety system as listed in Table 1.
Table 2 identifies the electrical penetration through the primary containment that each electrical connector is located on, the type of connector, the number of wires to the connector, the system whose circuits pass through the connector, the system component associated with the circuits, and the function of the circuits.
Table 3
lists those electrical connectors for all three Browns Ferry units that are outside the primary containment and are a part of a safety system circuit.
Only those safety systems which are required to function to mitigate a postulated design basis event or accident outside containment where the event itself could adversely affect the ability of the system to perform its safety function have been considered and listed in Tables 2 and 3.
For units 1 and 2, only one type of connector is used inside the primary containment in the identified safety circuits.
This connector was supplied by Physical Sciences Corporation and is an integral part of the penetration.
It has '.g8 pins, has gold-plated surfaces on both the pins and the female receptacles, utilizes a Neoprene '0'ing as a sealing surface where the plug shell and 'receptacle shell interface, and has the insulated conductors potted in the shell.
Both the plug shell and the receptacle shell are metallic.
C" ll I.
0 0
For unit 3, two types of connectors are used inside the primary containment in identified safety circuits.
These were supplied by Bendix and are similar to each other in design:
Part No. 10-214636-78S or P, 14 contacts (2Nos.l6, 12Nos.8);
and Part No. 10-214628-51S or P, 12 contacts (Nos.12).
The types of connectors used outside of the primary containment in identified safety circuits are of various types as shown in Table 3.
TABLE 1 Page 1 of 3 SYSTEMS AND COMPONENTS REQUIRED TO FUNCTION TO t
MITIGATE DESIGN BASIS EVENTS X., INSIDE PRIMARY COMTAINMEiVZ (+ Denotes Systems, with Connectors)..
, inboard Main Steam Isolation Valve Circuits
,~Automatic Depressurization Relief Valve Circuits
<nboard Containmeht Isolation Valve Circuits (See note 1)
~Oxygen and Hydrogen Monitoring Systems
%uppression Pool to Drywell Vacuum Breakers
.Wecirculation System Suction and. Dis'ahaxge Valves (See Note 1)
Residual Heat Removal System Head. Spxay Plow'ontrol.. Valves (See Note 1)
"High Pressure Coolant Injection System Steam Supply Va1ve (See Note 1) reactor Core Isolation Cooling System Steam Supp+ Valve (See Note 1)
XX.
OUTSIDE PRIMARY CONTAINMENT
.A.
Xnside Secondary Containment
(~ Denotes Systems with Connectors)
%fain Steam Xsolation Va1ve Cixcuits (See Note 2)
'"Automatic.Depressurization Relief Va1ve Circuits (See Note 2)
'".Containment Xsolation'alve Circuits (See Note 2)
- Oxygen and. Hy'drogen Monitoring Systems (See Note 2) 4 IQf and. 480 V Boards (See Note 3)
Diesel Generations and. Process Auxiliaries (See Note Q) 4 le and. 480 V System Circuits ll 250 VDC.System Circuits Control Bay Ventilation System Circuits (See Note 4)
Coxner Room'(Elev 519) Ievel Switch Circuits (See Note p)
'%adiation Monitoring Systems
~- Main Steam Vault
~- HIE SH Efl'lucnt
+-
ROCCL'I
"- RON 1>JTlucnt
TABLE 1
CONT.)
Vl.
Diesel-Generator Shutdown Board. Room Ventilation Sysbem Circuits
',(See Mote 4)
- RCIC Cix'cuits (See Mote 6)
Circuits for 0thex Essential Systems (See Note 7)
Automatic Depressurization System Primary Containment Isolation
-Containment Inerbing Reacbor Build.ing Isolation Reactor Building Vacuum Relief Standby Gas Treatment RE1R
- R1BSW
- RHR Room Coolers
- RECT
- CS
- CS Room Coolex's HPCI Reactox Protection System (Excluding Neutron Monitoring System, Control Rod Drive and Position Indicating Systems)
Reactor Building Closed Cooling Mater Fuel Pool Cooling Reactor Water Cleanup (Isolation Punction Only)
Torus Water Level and. Temperatuxe
'. Control Bay The control bay environment is controlled. by the control bay ventilation system.
The environment for ecLuipment within the control bay is no more severe during design basis events than that to which.it is exposed.
hurri.ng normal unit operations.
~
C.
Unit 1, 2, and. 3 Diesel-Generator Shutdown Board. Rooms The diesel-generator shutdown board. room envixonments are control.ed.
by the board. room ventilation sysbems.
The envixonment for equipment within these board. rooms is no more severe during design basis events than that to which they are exposed. during normal unit operation.
i'age 3 oi TABLE 1 (CONT.)
Notes:
1 ~ 'onnections at motor operated valves were excluded since these connections were qualified. in conjunction with qua1ification of the valves and.
associated.
motor operators.
42.
Circuits for any safety-related.
components outside containment were investigated..
Xn addition, circuits outside containment serving safety-relatecL components which are located. insi.de containment were investigated..
Pailure of these components that are requixed. for onsi<<power distribution was analyzecL previous.
See "Concluding Reporb on the Effects of Postulated.
Pipe Pailure OutsicLe of Containment for Unit 1
,of the Browns Perry Nuclear Plant" BED-TM-PZ1 (Octobex 1$, 1973) ancL "Concluding Reporb on the Effects of Postulated.
Pipe Pailure Outside of Containment for the Browns Perry Nuclear Plant Units 2 and. 3" DED-TM-PZ2 (March 1, 3.974).
These circuits were investigated. for any exbensions outsicLe of the control bay or shutcLown board. rooms into the boundari.es of secondary containment.
5.
These rooms contain vital HPCX, RCXC, CS, and.
RHR equipment.
The level switch circuits investigabed.
are those which waxn of floocLing internal to these rooms.
6.
Xn terms of function and. objective, the RCXC system is not actu~ a safety system.
However, with regard. to engineering anuses, fabrication, and. erection processes, and. quality assurance. control E
and. documerrbation, this system received. the same attention as the safety-related.
systems.
Por this reason, RCXC was evaluatecL using the same criteria as for the safety-related.
systems.
7.
The investigation includes any wall sockets or wall power ou'blets associ.ated, with these circuits.
Page 1 of 6 TABLE 2 UNIT 1
'>> PENETRATION CONNECTORS INSIDE.PRIMARY CONTAINMENT MANUFACTURER PHYSICAL SCIENCES,"48 PIN, NO.
12 PLUG NO. 6448-2 RECEPTACLE NO. 6445-2 e ~ I I~*
Penetration Connector No.
No.*
G2-2G Svstem Recirculation Discharge Recirculation Suction Recirculation Discharge
~Com onent Penn@ion FCV-68-79. Logic FCV-68-77 Logic FCV-68-79 Logic No. of
'Wires 7
7 2
G3-3G Relief Valve Hecixculation Dischaxge HPCI Steam Supply PSV-1-30 FCV-68-79 FCV-73<<2 Power Logic Logic 2
.2 7
G4-4G RHR Head Spray Recirculation Sampling MS Drain X57CU Letdown FCV-74-78 FCV>>43-13 FCV-1-55 FCV-69-1 Logic Power 8; Logic Logic Logic 7
5 7
7
,0 G5-5G e
G7-7G G,8-8G Relief Valve Main Steam.Xsolation Main Steam Xsolation Main Steam Isolation Main Steam Isolation Main Steam Isolation Main Steam Isolation RHR Letdown Supply PSV-1-5 FCV-1-14 FCV-1-37 FCV>>l-14 FCV-1-26
, FCV-1-37 FCV-1-51 FCV-74-48 Sol Valve Powex Logic Logic Powex 8: Logic Power 5 Logic Power 8c Logic Power 5 Logic power 8c Logic 2
2 9
9 9
9 11 G9-99 RNCU Letdown KS-69>>1 Logic EC G4-4G
. Relief Valve Relief Valve PSV-1-19 Power PSV-1-33.,-
Power 2
2 ED G9-9G Main Steam Xsolation Main Steam Xsolation Relief Valve Relief Valve H2E 02E FCV-1-14 FCV>>1>>26 PSV-1-22 PSV-1-34 EK 76-39 OE 76-43
'ogic.
Logic Power Power Xnstx umentat ion Xnstrumentation 2
2 2
2 4
G4-4G RHR Letdown Supply HCIC Steam Suoply FCV-74-48 Logic FCV-71<<2 Logic 7
G6-6G Drywell Equipment Sump FCV-77-143 Powex
&: Logic G7-7G Main Steam Isolation Main Steam Xsolation FCV-1-26'CV-1-51 Logic Logic 2
2
0 r,
C
TABLE 2 (CONT. )
Page 2 of 6
'UNIT l >> CONNECTORS INSIDE CONTAINMENT 0
Penetration Connector No.
No.*
. a8-8G
~Sseem Main Steam Isolation Main Steam Isolation Comoonent PCV>>1-37 PCV-1<<51 G9-gG Recirculation Suction PCV-68-1 Recirculation Discharge PCV-68-3 Punction Logic Logic Logic Logic No.
oX'13.res 2
2 7ll
- The penetrations have connectors on both ends, only 'the inboard connectors are listed since they experience the worst environment.
h
~
h.
i' I
lE I
TABLE 2 "(CONT.)
UNIT 2 PENETRATION CONNECTORS INSIDE PRIMARY CONTAINMENT MANUFACTURER - PlESXCAL SCXENCES, 48 PIN~
NO. 12 PLUG NO. 6440-2 RECEPTACLE NO.'445-2 Page 3 of 6 Penetration
'Connector
'o.
No.*
System
~Com onenb Function
-No. of
'I(ines EB G2-2G Recix culation Discharge FCV-60-79 Logic Recirculation Suction FCV-68-77 Logic Recix culation Discharge FCV-68-79 Logic 7
7.
2 G4-4G Relief Valve HPCI Steam Supply RHR Head Spray Recirculation Sampling Main Steam Drain RWCU Letdown PSV-1-30 FCV-73>>2 FCV-74-78 FCV-43-13 FCV-1-55 FCV>>69-3.,
Power Logic Logic Pointer 5 Logic Logic Logic 7
'7 Relief Valve PSV-1-5 Powex EC G8-8G G9-9G G4-4G G9-9G J3-3J Main Steam Isolation Main Steam Isolation Main Steam Isolation Main Steam Xsolat'ion Main Steam Isolation Main Steam Isolation RHR Letdown Supply RHCU Letdown Relief Valve Relief Valve Main Steam Isolation Main Steam Xsolation Relief Valve
'elief Valve H2E 02E FCV-1-14 FCV-1-37 FCV-3.>>14 FCV-1-26 FCV-1-37 FCV-1-51 FCV-74-48 ZS-69-1 PSV-1-19 PSV-1-31.
FCV>>1-lip FCV-1>>26 PSV-1-22 PSV-1-34 H2E-76-j9 0, 3 Logic Logic Logic Logic Logic Logic Logic Logic Power Power Logic Logic Power Power Instrumentation Xnstrumentation 2
2 9
9 9
9ll 2
2 2
2 2
2 G4-4G RHR Letdown Supply RCE Steam Supply FCV-74-48 Logic FCV-71-2 Logic 4
7 G5-5G Recirculation Discharge FCV-68-3 Logic 2
G6-6G Dxywell Equipment Sump FCV-77-14B Power 8c Logic
TABLE 2 (CONT.)
I UNIT 2 - PENETRATION CONNECTORS INSIDE URINARY CONTAINMENT penetration Connector No.
No. *
~Sseem
~Com onen5 pnnceion Page 4 of 6 No.
oi'i'res G7-7G Jfain Steam Xsolation Main Steam Isolation rCV-1-26 I'CV-1-51 Logic Logic 2
2 G8-8G Main Steam Isolation Main Steam Xsolation PCV-1-37 Logic 1'CV-1-51
. Logic G9-9G Recirculation Suction FCV-68-1 Recirculation Discharge PCV-68-3 Logic Logic
- The penetrations have connectors on both ends, only the inboard connectors are listed since they experience the worst environment.
I
TABLE 2 (CONT.)
UNIT 3 CONNECTORS INSIDE PRIMARY CONTAINMENT MANUFACTURER - BENDIX Page 5 of 6 penetration Connector
'2 No.
No.
~l e
~S stem
~Com onent Punction No.
of'ires ZA Jl J6 J7 J8 J9 1
HPCX Steam Supply 1
Recirculation Dischaxge
. 1 Recirculation Discharge
. Recirculation Suction Main Steam Drain RWCU Letdown 1
RHR Head. Spray RHR Letdown Supply PCV-73-2 PCV-68-79 PCV-68-79 PCV-68-77 PCV-1-55 PCV<<69-1 "PCV-74-78
'Pcv-74-48 power Logic Power Power Power Power Power Powex 3
3 3
Jl J2 2
Relief Valve 2
Relief Valve PSV-1-18 Powex PSV-1-41 Power J3 2
. Relief Valve PSV-1<<5 Power J7 2
Recix culat ion Discharge PCV-68-79 Logic J8 2
Recirculation Discharge II Suction 2
HHCU Letdown E5?CU Letdown.
Pcv-68-79 Pcv-68-77 PCV>>69-1 ZS-69>>1 Logic Logic Logic 2
7 7
l)
J12 2
HPCX Steam Supply PCV<<73-2 Logic 2
RHR Head. Spxay Recirculation Sampling Pcv-74-78 PCV-43-13 Logic Powex
&; Logic J19 J20 2
RHR Letdo~rn Supply 2
Main Steam Xsolation Pcv-74-48 Logic PCV-1-14 Power 8 Logic J21 I
J22 2
Main Steam Xsolation PCV-1"26 2
Main Steam Isolation
- PCV-1-37 Power h Logic Power
&, Logic 2
Main Steam Xsolation J29 2
Main Steam Drain PCV-1-51 Power 8o Logic PCV-1-55 Logic 2
Mai.n Steam Isolati.on Main Steam Isolation PCV-1-14 PCV>>1>>37 Logic Logic 2
2
IIHI l 0
~TA33LH 2 CO~NT.
'Pope 6 of. 6 UNIT 3 - CONNL'CmI.'Ott'NSII)V. I'I<'EIIAIIY.
CONTAXHIILEN'I,'cnetxation No ZC Connector No
'I'yye
~SS3i oil>>
J16 2
Relief Valve
~Com onent PSV-1-3.9 I"unction Power No.
of'lire!>
>> ~
'l
>>I Ii r
<<>>3 ~ 1 t3
>>f
'l
>> l J18 2
. Relief Valve Relief Va3.ve 25 2-.Main Steam Xsolation Main'team Xsolation PSV-1-22 PSV-1-34 Powex Power'CV-1-14 Logic I"CV-3.-26 Logic 2
2 2
2 J3.3 2
16 042 HP-"(6-39 02L'-76-43 Main Steam Xsolation 13CV-1-26 Main Steam Xso3.ation I'CV-3.-53.
Xnstx umentation 4
Xnstrumentation 3
- Logic, 2
Logic 2
Logic Logic J9 2
J10;2 HEIR Letdown Supply RCXC Steam Supply
.- I'CV-74-48 logic I"CV-71-2
- Logic, J3.. 2, Recirculation Dischar ge PCV-68-3.
J2 2
Recirculation Discharge I'CV-68-3 Drywel3. ZtIuipment Sump I3'CV-77-14B Recirculation Discharge PCV-68-3 Power h Logic Power 8 Logic 25 Main Steam Xso3.ation Main Steam Xsolation I3'CV-1-37 Logic I'CV-1<<51 Logic 2
.J4 Recirculation.Dischar'ge Recirculation Discharge rCV-68-1 13CV-68-3 Power Power HCXC Steam Supp3.y Power J7 I'
1 Recirculation Discharge I"CV-68-3 Logic 1.
NOTE:
Type
- 3. >> Bendix Part No. 10-214636-78S ox P, 14 Contacts (2Nos.J6
~ 12Nos.8),
Type 2 - 13endix Part No. 10-214628-51S or P, 12 Contacts (Nos'.12)',
NOTE:
The penetrations have connectors on both ends that: are not: part of the pressure
- boundary, only the'inboard connect:ors are listed 'since they experience the worst environment.
4
TABLE 3
~-
CONNECTORS OUTSIDE OF CONTAINMENT Page 1 of tern Function Unit No. of Devices/
Unit Manufacturer Temperature F
0 Environ-
~Dee1 n ment Main Steam 'nstrumentation.',2,3 Line Rad Mon Amphenol B2-816 350 300 Reactor Water Isolation Cleanup and Primary Containment 1,2,3 2
Amphenol MS3106-A-20-4P MS3102-A-20-4S 257 170 Main Steam Isolation Line Leak Detectors
& Pri Containment 1,2,3 16 Amphenol 16 Amphenol MS3102-A-20-4F MS3102-A-20-4S 257*
550 RHR Heat Exch Instrumentation Disch Rad'on Raw.Water
'Znstrumentation
-Effluent
';Red Mon Instrumentation
'.RCIC Leak s'~Instrumentation Detectors
,.Reac Bldg
'Closed Cool r Effluent t
HPCI Steam
- Instrumentation
~ Leak Detectors 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 6
2 2
16 16 16 16 Amphenol Amphenol Amphenol Amphenol Amphenol Amphenol Amphenol Amphenol Amphenol Amphenol Amphenol-Amphenol Amphenol UG1213/U '
UG932/U UG260/U UG1213/U UG260/U UG932/U UG1213/U UG932/U UG260/U 3106A-20-4P 3102A-20-4S 3106A-20-14P 3102A-20-4S 185 150
'50 150'85 150 185 150 185 150 350 150 185 115 350 115 185
- 115, 257 550 257*
550 RCIC Backup Test Control Center 1,2,3
'1 Amphenol 69-OB-18-15 '57+'15 Fuel Pool Cooling Instrumentation 1,2,3 1
Amphenol Rept 69-OR16-105-C100 257 Plug 69-6R-16-10P 115
+See Part II, Section C
- Wg 4-0 I
Part II Environmental Qualification of Electrical Connectors A.
Ori inal Testin The original'qualification tests (i.e., pressure, temperature) conducted on the Browns Ferry penetrations and associated connectors were described during a meeting with NRC representatives on November 16, 1977.
These tests did not include qualification for the electrical connectors for the environment resulting from a postulated design basis event or accident outside~containment.
B.
Steam Environment Test Based on the discussions held during the November 16, 1977, meeting and on the November 18, 1977, letter, TVA decided to conduct a preliminary environmental test on selected samples of the electrical connector types used in containment in identified safety systems to determine if they could continue to function in a steam environment of a design basis event.
These samples were taken.,from the plant stock of spares and were not thermally or radiation preaged.
Attachment 1 describes the test proce-dures
- used, the connector samples
- tested, the test facility, the I
environmental conditions used in the test, the electrical loadings
- used, and the test results.
The actual test conditions exceeded those that would be expected in the case of an actual design basis event for Browns Ferry Nuclear Plant.
The electrical connectors satisfactorily passed the steam environment test.
The purpose of this test was to provide a rapid assessment of the performance in a steam environment of the electrical connectors within primary containment.
't t'll
% CW
C.
Evaluation of Connectors Outside Primar Containment The critical electrical connectors outside containment are those that are associated with the main steam, HPCI, and RCIC leak detectors.
The postulated accident environment temperature can exceed the design temperature of these connectors.
These are identified in Table 3 with an asterisk (*).
These circuits are provided to detect and initiate isolation signals in the event of a pipe break.
Since the signal to initiate isolation is set at 200 F and is well below the design temperature of 257o F for the electrical connectors, these connectors will have performed their safety function before any potential environmental degradation.
These sensors and associated electrical connectors are not required to function following the initiation of the isolation signal.
D.
Evaluation of Radiation Effects The Physical Science and Bendix connectors were specified to withstand a nuclear radiation of 10 R.
In actuality, the threshold for damage of organic materials generally is greater than 10 R, with embrittlement beginning above approximately five times this value.
The integrated dose to affected connectors would not be expected to exceed 10 R during the time interval in which they are needed following an LOCA, and the exposure from operation to the present time is extremely small by comparison.
Therefore, radiation damage to these connectors is not a concern related to operation during the next few months.
(See Item E).
E.
Tests to.Determine uglified Life Future Additional Tests)
TVA intends to establish the qualified life of all electrical connectors both inside and'utside p'rimary containment used in safety-related
circuits at Bxowns Ferry using the requirements of IEEE Standard 323-1974, "IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations."
Type testing will be used to establish qualified life with the effects of thermal and radiation aging included. It is anticipated that this portion of the program will be completed within 90 days.
BPS 22 7/25/7>>
a
~
I Attachment 1
Date November 22 1977Unit 0
BFSTER No.
22 Oripiriator J, E. Gibbs Cognizant Section Outage
Title:
TEST X'ROCEDURE POR BROGANS PERRY CONiNECTORS I ~
Reason for Tes or Exp rim nt':
~ I II iI To test Bendix Corporation type and Phys'ical Science type connectors used in electrical penetrations at Brogans Ferry Nuclear Plant.
Safet Related Non-Safety-Related X
'ransmitted to NGB: Date
'equired safety review and safe+y
~
PORC Review:
November 22, 1977.
Date analyses (10 CFH 50.59) have been completed for A.
Unreviewed safety oucstion
'pproved:
Plant Su" erin-encent B.
Technical specification limits DED aiDnoff Data DPP airnoff Date
~ Authorization to Per.o..:
4
~ ~
I ~
Artf4i~
Plant Su erin.eindcn-e PORC Hevie'::
'pproved:
Date Plant Superintendent November 22, 1977 Date
'uthoriz;.tion to Perform:
Plarl
'tuo:
.. QnQen plant supatintenden I I iaaf II'v'<a
'General Hevis'on
]'ate
/z ~~ rr BrSTER Ccmlr~lte+.e
~~ R~z
)1 saav e
~ ~
aav
~
~
i4.v a'ug) intcarl~.'v OFFIiCIIA4 COPY Date
~k ll I
a I~\\I ~
I lk
~k
c t
~
t
~
'3 t
,* ~
';St:.mdari Pract icc Attachment 2
~ " ,
('hect 1 of 2)
I
'I
~
Unrcvicved Safety Question Determination
~:
Bl"0 22
. 5/19/75 I
~
Originator '. E. Gibbs STER
~ Jfo.
22
~
~
Rei'crencco:,
NONE
~t I
t
'I
~
~
~I
~
~
~
t
+Test or Erperiment Summary 4
1
~ 't'...To test electricag conn'cctors Eto verify response to LOCA conditions,
..and main steam line break; E
r I
E
~
~
E ~ ~
E E ~
~ '
.'L I
I
~
I I ~
~ tt S
ll I
Unrevi eyed 8:. "c"v ".usa%ion pr(pea
> 1 '4 t'~ occttr,ence or t'ltn conttc,.tc ]E cs of a..
ccidcnt malA~nct:ion of equi~-tent im~ortm"..to safety @region"ly cva1 '".ed in.h Fir."1 Sa "eely An=1ysis R
ort inc".'eased'?
I Just'ification E
~....... Yes PD~X I
I h I
~
I
~
'L
~
This's,a'.test that; is'erfIorme4 in
~
~
a test laboratory.
~
~ 1
~M
~
~ ~
~
I
~
~
- OFFICIIPI COPY EE
~
~Revision I
l I
~
~
I*
~
~
~ E t
E E
'I
). r
~
~
~
~
Justification
~ P ~
~ t Gt'endard. Practice Page
~
'.'; -',BFS 22
'3/19/75 i
't.Cachment 2
'S1jeet 2 of 2)
,. UnrevieiecC'Safety Question Determination
~ ~ ~
~
~
> ~
Unrevised, safety ue tion (Continued.)
Xs the possibility for an accMcnt or malfunction of a different type
- than. any evaluated, previously in the Fino3. Safety Analysis Report created?'
~
Xes
~
No X
II t
This'is a test conducted at a laboratory for,.purposes of collecting data.
~
~'...
g
~
h
~
~
w ~
~
j 1
~
$ 1
~
~ 8
~
l
~ '
Q ~
, ~,
~
~,
~ ~
I h
I Xs Che,margin of safety as defined in the bas5s for anj technical specificatidn reducei?
- Xes
'o t'ustification
~
~
~ g T11is.test, is. not performers at Brogans Perry'uclear Plan't.
~
~
V
- GFFICIIA;~~
CGP"..<Unrevieved safetv question involved (PORC),
'L ~ ~
Lj, 4
+Revised Novemb'er 22 1977 Ds.t.e
~ 1
~ \\
~
~ ~
~
~
1 TEST PROCEDURE FOR BROWNS FERRY CONNECTORS Page 1
BF STER 22 ll/25/77 II 1.
,Scope s
To test connectors: used in electrical pene'trations for units 1 and 2 at Browns Ferry and to test typical connectors used for unit 3 at Browns Ferry for ability to withstand the steam temperature pressure-profile resulting from a LOCA or a pipe break.
I 2.
Material to be tested shall be:
~
48-pin connector Physical Science type contained in electrical penetration type used for Browns Ferry units 1 and 2 1 12-pin connector Bendix Corporation type 10-214-628-515 used on pigtails out of Browns Ferry unit 3 penetration V
3.
Test Setup Provide an environmental test chamber with dimensions capable of containing the test specimens (see figure 1).
The chambei shall be provided with a pressure gauge and temperature sensors for measuring the temperature inside the test: chamber.
, ~
3.1 Connect the pins of the connectors with wires so as to form a sexies parallel circuit which will give a voltage gradient within the connector as well as simulate a load (see figure 2)
The circuit, shall be loaded to approximately 5 amperes and a voltmeter and ammeter shal'1 be connected to the load.
4.
Test Procedure
-4.1 4.2 Verify the initial status of the penetration connector and the separate connector for voltage integrity.
'pin to all other pins and shell combined.
Check for current continuity through the connector.
Energize the connectors from a 250 V dc source.
Bring the environmental chamber to the initial condition of 150 'F.
4..3 Admit steam into the environmental chamber at flow condition so as to achieve a stabilized temperature of 322 F.
Hold this condition for 5 minutes.
Record all voltmeter-,
- ammeter, pressure and temperature readin'gs at each major change in profile and each hour.
OFI-'C@II. COPV
TEST PROCEDURE FOR BRONNS FERRZ CONNECTORS Page 2
BF STER 22
'.11/2S/77 4 '
4.5 Reduce pressure at 0.7 lb/minute to reach 36 psig and 282F in 6P minutes.
Then drop the pressure imme-diately to 15 psig (apprximately 250F).
Thereafter reduce the pressure at 1.0 lb/hour until atmospheric pressure. is reached at 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> into the test (212F).
0
%hereafter drop the temperature at 7Q F/hr at'tmospheric pressure until 150oF is reached after 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />sinto the test.
The profile curve is figure 3>>.
- 5. Criteria 5.1 The connector shall carry the required load at not more than 10-o reduction in voltage 'after the full duration of the test.
OFFiiCiIAIL,COP'~
~ ~
~
~
'44'
~
t
~+r a-isurc puggy
'I 4 "
r Page 3
~BF STER 22 11/25/77 4,
4
~,
4 4
4 4
~
I
,0 ~
<cse <Azi~8a<
4 7crpg r) O'W
~ 4 1
Z~n Pin E~ndiz
~ ~ t J
~ 4 4 }
~seri 4'
jfJrC
~Pj~
+ Cv mZ C ~ T 4 ~
4 4
sf e 1/
P~vg 4 BF. STER 22 11/25/77 1
I
~
~
~
0 3
~
l I
tl t
I I<
i>
(
0 ~
~ g
~,
4
ldi C
~
~
~,
4 t
)
B22 I=
7+~Jcc Kmina4e
. 7~z+f
'ckcrelse For QO~cnufes
/mIn ll, t C
~
J00~
PJ
~
I 25DF t
~
~ZZZF ~ B6psrjr 2~~0+ ~ /5pscg drop )I'ps'/g,r" Z/2F M ~Pm
---= 200F
~t 1
~.
A'TS
/
2 9 < H 6'
8 9-/d // /2 /0 w'/5'C /i'-~~ /'/ ~~ >/
g 'cg gc/
~
\\
jme-.Pours
't Il
~
~
Page 6
BF STER 22 ll/25/77 h
y
~
THIS PAGE DELETED
~ ~
Page 7
BF STER 22 ll/2Z/77 DATA COVER SHEET 8E~IOIj This data package includes test data sheets.
'Instrument Calibrated
.8anr.
~ /
8 Wi5 X7 Veri.fied By Acceptance Criteria Net
..Yes No Data Takers/Organization e
'e Dates Test Performed
/
v P1yye~~g O'>i~ Ctp>o)
QrziJla g<
Reviewed by Cognizant Engineer Reviewerl by Re"cite Section Snperv or 4/< 6 Reviewed by Quality Assurance Supervisor Iy zy/pp tt ~g 7)
OFT( IlGL<LCOR'
STER 22 Page 8
BF STER 22 la -~5/77
!'Q TEST DATA/BROWS FERRY Co~iCTORS
/
pin Connocton STEP 4.l.a 4.1.b
"'TEM Verify propeZ hook up for connector (tes t itern Ii2, figure 2, for 48-pin connector; "test item fr'1, figure 2, for 12-pin connector)
Meggor: pin o all pins and shell combined pin to shell RESULTS 5'hms
'1 BY/DATE OK 'i.~/~
Verified 4.1.c Verify current continuity I
n OK 4.2.a 4.2.b 4.2.d Energize connector from nominal 250 VDC source (verify)
Load voltage Set load for connector so as to give load current of 5.0 + 0.5 amps (initial Values)
Initial test chamber pressure and temperature OK Q 4'7. 0 Volts Amps psig OF Verifiedc~j pggi QC
- L erif-'ed 4.3.a Admit steam,'bringing temperature to 322 + 5'.
AIso note start time of the test (to).
W 8'sig i:4S: 4-4 /
Ve 'fied 4.3.b 4.3.c Stabilize temperature and pressure at 322 + 5 F.
>Ihen stabilized, record load current and voltage.
Load'mps volts
~>>.kl
/u Vgrified '
/~/'FFI'GtlAL COPV Input volts
I
\\
~
~
Connector STEP TTEM
/gwvÃ~tg
~ RESULTS Page 9
BF STER 22 11/'25/77 BY/DATE 4.3 (Continued) 4.3.d Maintain in stabilized condition for 5 minutes; record load current and voltage at end.
Load
. 9'7 Amps N 4-7 Volts
/rz r
Tnput OFF'CtlkII. CGA I
~
II It I I
I II Ik ~
~ ~
Page 10 BF STER 22 11/25/77 Connector STEP ITEN RESULTS BY/DATE.'
4.4.a 1
~4 (4
/r~c"-
s time amps load ~QLvolts input g~d volts Reduce pressure at o.7 psig/
minute to,"282 F at 36 psig
'in one hour; record initial load current and voltage.
/o~s',o4'time gcstamps load g<-7~volts I
input
. ~~ volts Repeat, at three 5
minute inter'vals
'7 '~l verif'ed 7/
7
/,
verif ed
/>~os: s'ime
- p. q 4-amps load pg j-. lavolta input ~~
volts veri ied rr gq:ps'time
~~~gamps load ~S' volts input a.s.O volts veri ied s
.. 4.4.b
~z: ol time
~pampa
'oad ~gb~volts input
>~
volts Drop pressure immediately to 150 sig.
Record load current and oltage.
SAa</J hZ NS'0 ~ //SPSsy
/K'. ct/zP/zv
'7>1 / i'd&
veri ied 4.4.c At hourly intervals; reduce the pressure by 1.0 + 0.5psig
. Record time of pressure reduction, new pressure (psig),
load current and voltage.
Repeat
'for 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> until 212 F at atmospheric piessure is obtained.
OFRGIIAL CGPV 4
t 4 4
4 ~
Connec tor J skye BF STER 22 11/2S /77
~
STEP 4.4.c (Continued)
RESULTS BY/DATE Loqd 2 4'F' V
'OZ
~ T la p
4.'l Load 2 O'-K 4'7 V
/~z':/
gg g /z~0 Load 2'tI9'. 3 V
~RO T
~
~
A
</
Load
-i g,j l7'05 '<9 T
/&.C'p W<~ A Load
'tput ~>MDIV gg.'og,'.
I ~
/
OFF~CQL CO~V
%E7 A
~Load 4 ~+'+
V Input Z 6&
V
~ ~ r
~
I
~
~
~
......., ra rr~>>
~
~
STEP ITEII lt,l<.c (Continued)
')r.
~
RES OI.TS Hl ST.jik dZ li zx/2s/77 I
~ $
8 t;DATE
.,!Ti~
I 4$ :.
'I (I ~
Xnput'9 7.w p!p5.'gq T 7
I
~Wi'
~i~
7.oad Xnput F96. 9 7AIC tI/~~/z C. ~~-p r,
j
~r, I,j I,
~rr ~,C.
3'npu t pad 2!'0
! a
~(!" ~
'/, 7 A,
E
~
Xnput V
P+ /( /iQ r.<<a R'/s-, ~
'Xnput 5 0 v
'I
~
8 d! d'K!PV p
/84 A
i ~a
~'/<0 v
Input 2 5 Ir' r
~
~
~ 4
~ ~
~
~
Connector&A
,>>, STEP T.TEN iX RESULTS Page 13 BF STER 22 11/25/77 BY/DATE t
4.4.c
'(Continued)
A
~G/.'!
p
/u a),
Load 1'npu t I
p 6 /4
~ Load Xnput
..Load N c/9
~ '7 V
V
~
Xnput Qg$ gg c((rc rr/~0/>7' put 4.5 At hourly intervals, reduce temperature by 7-'g F/hr.
Record
'ime of temperature reduction, net temperature, load current and voltage.
Repeat until 150 F
is reached after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> into the test.
0;"-Hc/AILQQP";
.Connector
~
~
l)LI 6 LL,6. *E 11/25/77 STEP TTHIf 4.5 (Continued)
I
'.4"
. ~ "
~
~
~
REsm:rs 9.'O<.'~
T
'Q,O'/ I temp
~ mad P.'/S. 6 V Xnput; QS 4 V.
.5,'Oa:~V T temp O
SY/DA1E I
~./
i
~
~
~,
~ ~
Load Xnput
/. S-G
~'/R0 v
54' g o temp
. P
)II
~
f.
jI i'/
I
~ 'v
~
~
Load
~
Xnput v
~
II~4
~ temp 4 E7' 24'8; 9' i l.
Input
~
~
Load
'Input
/- temp 4T ~ S'
.2 47. 9'.
- os' T
,F A
emp
~
~
~ ~
STHP XTEM 4 ~ 5 (Continued)
Connector ~g~rnO Sc'ESULTS 27; 0'o~ ',2 T
Page 15 BE STER 22 ll'25/77
'iY' BY/DATE
'7w 7 br' Load A
s 4
"Xnput 2 5 d,6 V
Q'7,'//, o9,,'
7 T temp i~lz.>(,
Load Xnput W
~
V Test Data Verification: /'7 Xnspector/Da
~ a ZP yp
'est Engineer'/Date
~ ~
QFF~It;j'I. ('Q'9~
r
Page T
BF STER 22
.'.l/2S/VV
~ 1
~'(Q DATA COVER SHEET
~'2 guL Tony This data package includes test data sheets.
I i
ll Instrument Calibrated Verified By
/-
Da e Acceptance Criteria Met Yes Data Takers/Organization
/d~
P7,+
c:/~o 2 p
- ,f~)
fr~)
~~levy c<.,
D I~p'Cu(.@ gc)
~~an~
~~@ y >I.< (j~e) a Dates Test Performed Reviewed by Cognizant'Engineer Reviewed by Results Section Supe sor
>> Z77g Reviewed by Quality Assurance Supervisor GI"-F'IIQ<g @GPSS
)
Page 8
BF STER 22 11/25/77 STER 22 TEST DATA/BROLlNS PERRY COWiECTORS
~Z-Pin Connector'.1.a 4.l.b 4.l.c ITEM Verify proper hook up for connector (te'st item 82, figure 2, for 48-pin connector; test item 81, figure 2, for 12-pin connector)
Hegger: pin, o all pins and shell combined pin to shell Verify current-continuity RESULTS
- / *
~S'erified Mli~<Eo J'/
CS>CcCi C
OK g;,g,~J ~/~~)
4.2.a 4.2.b 4.2.c 4.2.d Energize connector from nominal 250 VDC source (verify)
Load voltage Set load for connector so as to give load current, of 5.0 + 0.5 amps (initial values)
I'nitial test chamber pressure and temperature 4-YD Amps psig wO,/
0K erified
~ O'- Z.
Volts
~ &
//zc KQu
~~ ~74/
///u'QC 7g 4'9g /r.li(
Ver fied 4.3.a Admit steam,'ringing temperature to 322 + O' Also note start time of the test (t0).
psig 3Z Z F.
~-
4$
." I 4-Start time
/'~s erified 4.3.b 4.3.c Stabilize temperature and pressure at 322.+. 5 P.
0lhen stabilized, record load current and 4 P~
voltage.
Load time amps erified
'Fir 4i:',,
Input volts
'onnector ~Z S TEP ITEM 4~ rW Page 9
BP STER 22
, 13;--'25/77 HY/DATE 4.3.d Mahtain in 5 minutes;
~ voltage at 4.3 (Continued)
I'tabilized condition for record load current and endo Load
'Xnput
. P~
Amps
'~>>
i1 / Ar, C
~wO Qjj~F(Qgig QOIpp
Page l0 BP STER. 22 11/25//7 Connector STEP XTEN RESULTS BY/DATE '
.4.4.a
~ I Reduce pressure at. os7 psig/
minute toI 282 F at 36 psig
'in one hour; record initial load current and voltage.
g~gz-.a&time
~
~
~
amps load.;~cg-g~vol ts input
. ~~q volts Repeat at~ three 5-minute intervals
. Z( oz;gs time
.p/
amps load'sv. 'olts
.input ~a/
vol'ts
//'ov:~ time
~ ~jc> amps load ~g-~volts input zWG volts.
//7.
/
/+rz =c, verif ed
//r z.a veri red II II I
/P7 7//
veri 3.ed p gz
-. ~~time amps load ~g-z~volts input ~~n volts veri ied
/r/ p
~
pjf
.. 4.4;b Drop pressure immediately to 150 ps'.
Record load current:
angdoltaga.
>>I/,~z" yz.. cs/:c otime
- z. amps load ~g s volts input ~~
volts
$7 P/
/u
~
veri ied 4.4;c At hourly intervals, reduce.
the pressure by 1.0
+ 0.5psig
.Record time of pressure reduction, new pressure (psig),
load current and voltage.
Repeat for 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> until 212 P at atmospheric pressure is obtained.
~*
OFFIIC/AiLQQPY
" Connector j-Z
~gwpa~
g J l
BF STER 22 11/25 /77 STEP 4.4.c (Continued)
RESULTS
~4: IG. wl.-]g B'i'./DATE j fze
~
~
~ I
'I Load Z4-2 'f-V'nput N $ 6 V
\\ ~
/4-;DR."l /
T 3
P Load Input
~6 0 V
H g.
/ 6c 477 A
Load g 0/ E4 V
Xnput 8 S'0 V
~ ~
A
.Load Input
~ 7 V
Load
'nput
+'~7 A w~e v
'oad Xnput Z ~ P'
.. Connector STEP 1TEH
~ '.4.c (Continued)
RESULTS
~.'og. Z~
~
~
I
~
Z ed >+('4 V
input -
P V
~c':
9'.7 /
A Load AVO, 6 V
Xnput A~/ /
V e it
~
I O'S-A:.
~ -
p Load 2~/Q,O V
Input
.. 50 V
g, g '5.'gc/ T
~ ~
Input
~ ende'7 A
1/.
PVdo v
V '
! d5.'Z9' Load Input
'/ 7S A
V.
7/
~ '
~
Load Input
- f. 7'7 r.z.s v
5'C'
~
~
Connector c4 f>4 Page 13 BF STER 22 11'.125/77 4P" STEP I1TPf RESULTS BY/DATE 4.4.c (Continued) 0)
Load 9 /+ c/
Input I
p A
Load Input Load
. Input A
Load Input 4.5 I
At hourly intervals, reduce temperature by 7> F/hr.
Record time oi'emperature reduction,
~II.
new temperature, load current and voltage.
Repeat until 150 F
is reached after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> into the test.
e,Connector w Z r
0
~
~
- ~
BTBP TTBH 4-5 (Continued)
~
4v' (I
e
'".. ~
RESULTS
,'OS'C T
j temp 9.7@
~ mad R9P
. &V Xnput '
O
~l'7 g
/,7'~
A T.oad
~ /Ir 7 V
0
/
temp J)J.') xi'!!. c.c.
ll./ZS /77 RY/DATE
~ ~
Xnput, g.4
, g d~4
~ ~
/-
temp
~
~
~
evv Load Xnput C~
V
((
JL':eeIep./
\\
t OIYlitl,g,g C,Qey
~4<, e
/: temp Load
" Xnput
~4/ 4 v
Connoctor~&Z cps.rr&nJ Page 15 BP STER 22 11/25/77
'BTHP ITEM RESULTS BY/DATE 4.5 (Continued) 27'emp g
A
/// M7/i Load
- Input 7+D.
V gp,'((~,'
7 T
temp
~~k)/)
A Load Z YC. bZ V
Input v
Test Data Veri.fication:
Q Inspector/D b'
pg g.~
~r'~
~~ 2.
7P'est Engineer/Date
0
~-
Part III Justification for Continued Operation TVA considers the tests and evaluations described in Part II sufficient to permit 'the continued operation of the facility without creating undue risk to the health and safety of the public for the period it will take to fully environmentally qualify the connectors.
This position is based upon the low probability of the events that produce adverse environments, the supplemental testing that demonstrated that the connectors within containment can continue to function in a postulated steam environment, the short time required for critical connectors outside containment to function before exceeding their design temperature, and the connector resistance to a radiation environment.
~ l l