ML081620265

From kanterella
Jump to navigation Jump to search
Revisions to Technical Specifications Bases Manual
ML081620265
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/24/2008
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2008-22341
Download: ML081620265 (71)


Text

Apr. 24, 2008 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-22341 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANTMTTTAT, TmFOPMATTONN TO: GERLACH*ROSE M 04/24/2008 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 04/21/2008 ADD MANUAL TABLE OF CONTENTS DATE: 04/23/2008 CATEGORY: DOCUMENTS TYPE: TSB2 Atc

Apr. 24, 2008 Page 2 of 2 ID: TEXT 3.8.1 ADD: REV: 7 REMOVE: REV:6 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT 3.8.3 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT LOES ADD: REV: 90 REMOVE: REV:89 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT TOC ADD: REV: 13 REMOVE: REV:12 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: 04/23/2008 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 90 04/23/2008

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 13 04/23/2008

Title:

TABLE OF CONTENTS TEXT 2.1.1 3 10/04/2007

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS ,,

TEXT 2.1.2 1 10/04/2 007,1\

Title:

SAFETY LIMITS-(SLS) REACTOR COOLANT SYSTEM (RCS) PRESSURE SL TEXT 3.0 2 ' ,10/12/2006 Ti : LG CO F-. /

Title:

LIMITING CONDITION FOR(OPERAiTION-(LCO) APPLICABILITY TEXT 3. 1.1 ">03/24/2005

Title:

REACTIVITY CONTROL SYSTEMS SHUTDOWN -MARGIN (SDM)

TEXT 3.1.2 - 0 11/18/2002

Title:

REACTIVITY' ýCONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 1 07/06/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 3 09/29/2006

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2' 03/24/2005

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Report Date: 04/23/08 Pagel1 Page of of 8

.8 Report Date: 04/23/08

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 3 10/04/2007

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 2 10/04/2007

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 3 04/09/2007

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 2 04/03/2007

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 1 10/04/2007

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 3 04/Q9/2007

Title:

INSTRUMENTATION REACTOR.PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 1 04/09/2007

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 04/09/2007

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 0 11/18/2002

Title:

INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 6 12/17/2007

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 0 11/18/2002

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION*

Page 2 .of8 Report D.-te':<. 04/23,/08

SSES MANUAL Manual Name: TSB2 Manual Title% TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 0 11/18/2002

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 3 07/06/2005

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/18/2002

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 3 10/04/2007

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 2 10/04/2007

Title:

INSTRUMENTATION-SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 1 -io/G4/2007

Title:

INSTRUMENTATION CONTROLROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 3 12/17/2007

Title:

INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/18/2002

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 3 04/09/2007

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 1 01/16/2006

Title:

REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)

TEXT 3.4-4 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE Report Date: 04/23/08 Page Page33 of 8 of8 Report Date::- 04/}213/ 08-

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.5 2 04/19/2007

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 10/04/2007

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN.COOLING SYSTEM

- HOT SHUTDOWN TEXT 3.4.9 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- COLD SHUTDOWN TEXT 3.4.10 2 -05/10/2006

Title:

REACTOR COOLANT SYSTEMI.(RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/18/2Z002

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 3 01/16/2006

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/18/2002

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM.ECCS - SHUTDOWN TEXT 3.5.3 1 04/18/2005

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 2 10/04/2007

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3.6.1.2 0 11/18/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK Report Date: 04/23/08 Page Page44 8 of .8 Report Date: -04/23;/08

SSES' ANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.3 8 01/23/2008

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3.6.1.4 0 11/18/2002

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/18/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 2 12/17/2007

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/18/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/18/2002

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/18/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 10/04/2007

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT

... Report Date:04/23/08 Page 5 of 8 Reor.a.:.4230

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.4.2 2 01/03/2005

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 4 09/21/2006

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 1 12/17/2007

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 1 11/09/2004

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 0 11/18/2002

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/18/2002

Title:

PLANT SYSTEMS CONTROL ROOM.FLOOR COOLING SYSTEM TEXT 3.7.5 1 10/04/2007

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 1 01/17/2005

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 10/04/2007

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 7 04/23/2008

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2 0 11/18/2002

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3 1 04/23/2008

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR Report Date: 04/23/08 Page66 Pagý of of 8 8 .Report Date- 04/23/'08

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.4 2 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT-3.8.7 3 03/31/2006

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/18/2002

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING EQUIPMENT-INTERLOCKS TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD'POSITION TEXT 3.9.4 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 1 10/04/2007

Title:

.REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 0 11/18/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL Report Date: 04/23/08 Page Page77 of'*8.

ofr8 Report Date: 04/23/08

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.8 0 11/18/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/18/2002

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/.18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 -11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/18/2002

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 1 03/24/2005

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 2 04/09/2007

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Report Date: 04/23/08 Page8 Page 8 of 8 8 Report Date: 04/23/08

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS BASES)

B2.0 SAFETY LIM ITS (SLs) ............................................................................ TS/B2.0-1 B2.1.1 Reactor C ore SLs ..................................................................... TS/B2.0-1 B2.1.2 Reactor Coolant System (RCS) Pressure SL ....................... TS/B12.0-6 B3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY ........ TS/B3.0-1 B3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ..................... TS/B3.0-10 B3.1 REACTIVITY CONTROL SYSTEMS .................................................... B3.1-1 B3.1.1 Shutdow n Margin (S DM ) ................................................................ B3.1-1 B3.1.2 Reactivity A nom alies ....... ........................................ .................. B3.1-8 B3.1.3 Control Rod OPERABILITY .................................. . ... ........... B3.1-13 B3.1.4 Control Rod Scram Times ................................. <.. .... . TS/B3.1-22 83.1.5 Control Rod Scram Accumulators .............. TS/B3.1-29 B3.1.6 Rod Pattern Control .............................. TS/B3.1-34 B3.1.7 Standby Liquid Control (SLC) System..... ............. TS/B3.1-39 B3.1.8 Scram Discharge Volume (SDV) Vent/and DrainValves ......... TS/B3.1-47 B3.2 POWER DISTRIBUTION LIMITS .... \ - . TS/B3.2-1 B3.2.1 Average Planar Linear Heat Generation' Rate (APLHGR) ........ TS/B3.2-1 B3.2.2 Minimum Critical Power Ratio(_(MC\PR),....................... TS/B3.2-5 B3.2.3 Linear Heat Generation Rate (LHG'R. . . TS/B3.2-10 B3.3 ~

B3.3 ~INSTRUMENTATION.:.,."

IN*,

ST ~R ~ AT1 . ,..........".................TS/B3.3-1

......%............. ........................................ T / 3 -1 B3.3.1.1 Reactor Protection System (RPS) Instrumentation ......... TS/B3.3-1 B3.3.1.2, Source Range-Mo'nitor (SRM) Instrumentation ......................... TS/B3.3-35

../

B3.3.2.1 Control Rod'Blo6k In\strumentation ........................................... TS/B3.3-44 B3.3.2.2 Feedwater;- MIain Turbine High Water Level Trip Instrum entation ........................................................................ B 3.3-55 B3.3.3.1 PostAccident Monitoring (PAM) Instrumentation .............. TS/B3.3-64 B3.3.3.2 (Remote Shutdown System ................. ... ........ B3.3-76 B3.3.4.1 End*Of &ycle Recirculation Pump Trip (EOC-RPT)

I*-nstrumentation ................................. B3.3-81 B3.3.4.2 _,Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation .............................. 83.3-92 B3.3.5.1 Emergency Core Cooling System (ECCS)

Instrum entation ................................................................... TS/B3.3-101 B3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrum entation ......................................................................... B3 .3-135 B3.3.6.1 Primary Containment Isolation Instrumentation .............................. B3.3-147 83.3.6.2 Secondary Containment Isolation Instrumentation ................... TS/B3.3-180 B3.3.7.1 Control Room Emergency Outside Air Supply (CREOAS)

System Instrum entation ............................................................ B3.3-192 (continued)

SUSQUEHANNA - UNIT 2 TS / B TOC - 1 Revision 13

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS BASES)

B3.3 INSTRUMENTATION (continued)

B3.3.8.1 Loss of Power (LOP) Instrumentation ....................................... TS/B3.3-206 B3.3.8.2 Reactor Protection System (RPS) Electric Power Mo nitoring ............................................................................... B 3 .3-2 14 B3.4 REACTOR COOLANT SYSTEM (RCS) ................... TS/B3.4-1 B3.4.1 Recirculation Loops Operating ................................................. TS/B3.4-1 B 3 .4 .2 Jet P um ps ...................................................................................... B 3 .4-10 B3.4.3 Safety/Relief Valves (S/RVs) .................................................... TS/B3.4-15 B3.4.4 RCS Operational LEAKAGE ........................................................... B3.4-19 B3.4.5 RCS Pressure Isolation Valve (PIV) Leakage ................................. B3.4-24 B3.4.6 RCS Leakage Detection Instrumentation ........................................ B3.4-30 B3.4.7 RCS Specific Activity ............................. TS/B3.4-35 B3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown ........................................................... B3.4-39 B3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown ......................................................... B3.4-44 B3.4.10 RCS Pressure and Temperature (P/T) Limits ........................... TS/B3.4-49 B3.4.11 Reactor Steam Dome Pressure TS/B3.4-58 B3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISQLATION COOLING (RCIC) SYSTEM ......................... TS/B3.5-1 B3.5.1 ECCS - Operating ..............-........ .................... TS/B3.5-1 B3.5.2 ECC S - Shutdow n ............................. ,.......................................... B3.5-19 B3.5.3 RC IC System ........................................ ................................... TS/B3.5-25 B3.6 CONTAINMENT SYSTEMS .......................................................... TS/B3.6-1 B3.6.1.1 Primary Containment ................................................................. TS/B3.6-1 B3.6.1.2 Primary Containment Air Lock ........................................................ B3.6-7 B3.6.1.3 Primary Containment Isolation Valves (PCIVs) ......................... TS/B3.6-15 B3.6.1.4 Containment Pressure ................................................... ................ 8B3.6-40 B3.6.1.5 Drywell Air Temperature .............................................. TS/B3.6-43 B3.6.1.6 Suppression Chamber-to-Drywell Vacuum Breakers ................ TS/B3.6-46 B3.6.2.1 Suppression Pool Average Temperature ........................................ B3.6-52 B3.6.2.2 Suppression Pool Water Level ....................................................... B3.6-58 B3.6.2.3 Residual Heat Removal (RHR) Suppression Pool C o o lin g ..................................................................................... B3 .6-6 1 B3.6.2.4 Residual Heat Removal (RHR) Suppression Pool Spray ................ B3.6-65 B3.6.3.1 Not Used ................................................................................ T S /B 3.6-69 B3.6.3.2 Drywell Air Flow System ................................................................. B3.6-75 B3.6.3.3 Primary Containment Oxygen Concentration .................................. B3.6-80 B3.6.4.1 Secondary Containment ........................................................... TS/B3.6-83 B3.6.4.2 Secondary Containment Isolation Valves (SCIVs) .................... TS/B3.6-90 B3.6.4.3 Standby Gas Treatment (SGT) System .................................... TS/B3.6-100 (continued)

SUSQUEHANNA - UNIT 2 TS / B TOC - 2 Revision 13

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS BASES)

B3.7 PLA NT SYSTEM S ......................................................................... TS/B 3.7-1 B3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS) ...................................... TS/B3.7-1 B3.7.2 Emergency Service Water (ESW) System ................................ TS/B3.7-7 B3.7.3 Control Room Emergency Outside Air Supply (C REOAS) System ............................................................. TS/B3.7-12 B3.7.4 Control Room Floor Cooling System ........................................ TS/B3.7-19 B3.7.5 Main Condenser Offgas ........................................................... TS/B3.7-24 B3.7.6 Main Turbine Bypass System ................................................... TS/B3.7-27 B3.7.7 Spent Fuel Storage Pool Water Level ...................................... TS/B3.7-31 B3.8 ELECTRICAL POWER SYSTEM ......................................................... B3.8-1 B3.8.1 AC Sources - O perating ................................................................ B3.8-1 B3.8:2 AC Sources - Shutdown ................................................................ B3.8-39 B3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air ................................ TS/B3.8-47 B3.8.4 DC Sources - Operating ........................................................... TS/B3.8-56 B3.8.5 DC Sources - Shutdown ................................................................ B3.8-70 B3.8.6 Battery Cell Param eters ................................................................. B3.8-77 B3.8.7 Distribution Systems - Operating ................................................... B3.8-84 B3.8.8 Distribution Systems - Shutdown .................................................. B3.8-94 B3.9 REFUELING OPERATIONS...... ................................. TS/B3.9-1 B3.9.1 Refueling Equipment Interlocks................................................. TS/B3.9-1 B3.9.2 Refuel Position One-Rod-Out Interlock .......................................... B3.9-5 B3.9.3 C ontrol Rod Position ..................................................................... B3.9-9 B3.9.4 Control Rod Position Indication ...................................................... B3.9-12 B3.9.5 Control Rod OPERABILITY- Refueling ......................................... B3.9-16 B3.9.6 Reactor Pressure Vessel (RPV) Water Level ........................... TS/B3.9-19 B3.9.7 Residual Heat Removal (RHR) - High Water Level ........................ B3.9-22 B3.9.8 Residual Heat Removal (RHR) - Low Water Level ......................... B3.9-26 B3.10 SPECIAL OPERATIONS ............................................................... TS/B3.10-1 B3.10.1 Inservice Leak and Hydrostatic Testing Operation ................... TS/B3.10-1 B3.10.2 Reactor Mode Switch Interlock Testing .......................................... B3.10-6 B3.10.3 Single Control Rod Withdrawal - Hot Shutdown ............................. B3.10-11 B3.10.4 Single Control Rod Withdrawal - Cold Shutdown ........................... B3.10-16 B3.10.5 Single Control Rod Drive (CRD) Removal -,Refueling ................... B3.10-21 B3.10.6 Multiple Control Rod Withdrawal - Refueling .................................. B3.10-26 B3.10.7 Control Rod Testing - Operating .................................................... B3.10-30 B3.10.8 SHUTDOWN MARGIN (SDM) Test- Refueling ............................. B3.10-34 TSB2 TOC.doc 4/1/08 SUSQUEHANNA - UNIT 2 TS / B TOC - 3 Revision 13

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision TOC Table of Contents 13 B 2.0 SAFETY LIMITS BASES Page TS/B 2.0-1 1 Page TS / B 2.0-2 3 Page TS / B 2.0-3 4 Page TS / B 2.0-4 6 Page TS / B 2.0-5 1 Pages TS / B 2.0-6 through TS / B 2.0-8 1 B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 1 Pages TS / B 3.0-2 through TS / B 3.0-4 0 Pages TS / B 3.0-5 through TS / B 3.0-7 1 Pages TS / B 3.0-8 through TS / B 3.0-9 2 Page TS / B 3.0-10 1 Page TS / B 3.0-11 2 Page TS / B 3.0-11 a 0 Page TS / B 3.0-12 -1 Pages TS / B 3.0-13 through TS / B 3.0-15 -2 Pages TSI B 3.0-16 and TS / B 3.0-17 0 B 3.1 REACTIVITY CONTROL BASES_

Pages B 311-1 through B 3.1 0 Page TS / B 3.1-5 1 Pages TS / B 3.1-6 and TS / B 3.1-7 2 Pages B 3.1-8 through B 3.1-13 0 Page TS / B 3.1-14 1 Pages 8 3.1-15 through B 3.1-21 0 Page TS / B 3.1-22 0 Page TS / B 3.1-23 1 Page TS / B 3.1-24 0 Page TS / B 3.1-25 1 Page TS / B 3.1-26 0 Page TS / B 3.1-27 1 Page TS / B 3.1-28 2 Page TS / 3.1-29 1 Pages B 3.1-30 through B 3.1-33 0 Pages TS / B 3.1.34 through TS / B 3.1-36 1 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages TS / B 3.1-39 and TS / B 3.1-40 2 Page TS / B 3.1-40a 0 Page TS / B 3.1-41 1 Page TS / B 3.1-42 2 Pages TS / B 3.1-43 1 Page TS / B 3.1-44 0 SUSQUEHANNA - UNIT 2 TS / B LOES-1 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.1-45 3 Page TS / B 3.1-46 0 Page TS / B 3.1-47 1 Pages TS / B 3.1-48 and TS / B 3.1-49 1 Page B 3.1-50 0 Page TS / B 3.1-51 2 B 3.2 POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1 2 Page TS / B 3.2-2 1 Page TS / B 3.2-3 3 Page TS / B 3.2-4 1 Pages TS / B 3.2-5 and TS / B 3.2-6 3 Page TS / B 3.2-7 2 Pages TS / B 3.2-8 and TS / B 3.2-9 4 Page TS / B 3.2-10 2 Pages TS / B 3.2-11 through TS / B 3.2-13 1 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 - 1 Pages TS / B 3.3-7 through TS./ B 3.3-12 3 Page TS / B 3.3-13 2 Page TS / B 3.3-14. 3 Pages TS / B 3.3-15 and TS / B 3.3-16 2 Pages TS / B 3.3-17 and TS / B 3.3-18 3 Pages TS / B 3.3-19 through TS / B 3.3-27 2 Pages TS / B 3.3-28 through TS / B 3.3-30 3 Page TS / B 3.3-31 2 Page TS/ B 3.3-32 4 Page TS / B 3.3-33 3 Page TS / B 3.3-34 2 Pages TS / B 3.3-34a though TS / B 3.3-34i 0 Pages TS / B 3.3-35 and TS / B 3.3-36 2 Pages TS / B 3.3-37 through TS / B 3.3-43 1 Pages TS / B 3.3-44 through TS / B 3.3-54 3 Pages TS / B 3.3-54a through TS / B 3.3-54e 0 Pages B 3.3-55 through B 3.3-63 0 Pages TS / B 3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67 3 Page TS / B 3.3-68 4 Page TS / B 3.3.69 5 Page TS / B 3.3-70 4 SUSQUEHANNA - UNIT 2 TS / B LOES-2 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Page TS / B 3.3-75a 6 Pages TS / B 3.3-75 b and TS / B 3.3-75c 5 Pages B 3.3-76 and TS / B 3.3-77 0 Page TS / B 3.3-78 1 Pages B 3.3-79 through B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-103 1 Page TS / B 3.3-104 2 Pages TS / B 3.3-105 and TS / B 3.3-106 1 Page TS / B 3.3-107 2 Page TS / B 3.3-108 1 Page TS / B 3.3-109 2 Pages TS / B 3.3-110 through TS / B 3.3-112 1 Page TS / B 3.3-113 2 Page TS / B 3.3-114 1 Page TS / B 3.3-115 through TS / B 3.3-118 2 Pages TS / B 3.3-119 through TS / B 3.3-120 1 Pages TS / B 3.3-121 and TS I B3.3-122 2 Page TS / B 3.3-123 1 Page TS / B 3.3-124 2 Page TS / B 3.3-124a 0 Page TS / B 3.3-125 1 Page TS / B 3.3-126 2 Page TS / B 3.3-127 3 Page TS / B 3.3-128 2 Pages TS / B 3.3-129 through TS I B 3.3-131 1 Page TS / B 3.3-132 2 Pages TS / B 3.3-133 and TS / B 3.3-134 1 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS/ B 3.3-150 and TS / B 3.3-151 1 Page TS / B 3.3-152 2 Page TS / B 3.3-153 1 Page TS / B 3.3-154 2 Page TS / B 3.3-155 1 Pages TS / B 3.3-156 through TS / B 3.3-158 2 Pages TS / B 3.3-159 through TS / B 3.3-161 1 Page TS / B 3.3-162 1 Page TS / B 3.3-163 2 Page TS / B 3.3-164 1 Pages TS / B 3.3-165 and TS / B 3.3-166 2 Pages TS / B 3.3-167 and TS / B 3.3-168 1 SUSQUEHANNA - UNIT 2 TS / B LOES-3 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.3-169 and TS / B 3.3-170 2 Pages TS / B 3.3-171 through TS / B 3.3-177 1 Page TS / B 3.3-178 2 Page TS / B 3.3-179 3 Page TS / B 3.3-179a 2 Page TS / B 3.3-180 1 Page TS / B 3.3-181 3 Page TS / B 3.3-182 1 Page TS / B 3.3-183 2 Page TS / B 3.3-184 1 Page TS / B 3.3-185 2 Page TS / B 3.3-186 1 Pages TS / B 3.3-187 and TS /B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Page TS / B 3.3-192 0 Page TS / B 3.3-193 1 Pages TS / B 3.3-194 and TS / B 3.3-195 0 Page TS / B 3.3-196 1 Pages TS / B 3.3-197 through TS / B 3.3-205 0 Page TS / B 3.3-206 -1 Pages B 3.3-207 through B 3.3-209 0 Page TS / B 3.3-210 1 Page TS / B 3.3-211 2 Pages TS / B 3.3-212 and TS I [ 3.3-213 1 Pages B 3.3-214 through B 3.3-220 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages TS / B 3.4-1 and TS / B 3.4-2 1 Pages TS / B 3.4-3 and TS / B 3.4-4 4 Pages TS / B 3.4-5 and TS / 8 3.4-9 3 Pages B 3.4-10 through B 3.4-14 0 Page TS / B 3.4-15 1 Pages TS / B 3.4-16 through TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-27 0 Pages TS / B 3.4-28 and TS / B 3.4-29 1 Pages B 3.4-30 through B 3.3-31 0 Page TS / B 3.4-32 1 Page B 3.4-33 and B 3.4-34 0 Pages TS / B 3.4-35 and TS / B 3.4-36 1 Page TS / B 3.4-37 2 Page B 3.4-38 1 Pages B 3.4-39 and B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Revision 90 UNIT 22 TS / B. LOES-4 SUSQUEHANNA - UNIT SUSQUEHANNA -

TS / B. LOES-4 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.4-49 3 Pages TS / B 3.4-50 through TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3.4-54 and TS / B 3.4-55 2 Page TS / B 3.4-56 1 Page TS / B 3.4-57 2 Pages TS / B 3.4-58 through TS / B 3.4-60 1 B 3.5 ECCS AND RCIC BASES Pages TS / B 3.5-1 and TS / B 3.5-2 1 Pages TS / B 3.5-3 through TS / B 3.5-6 2 Pages TS / B 3.5-7 through TS / B 3.5-10 1 Pages TS / B 3.5-11 and TS / B 3.5-12 2 Pages TS / B 3.6-13 and TS / B 3.5-14 1 Pages TS / B 3.5-15 and TS / 8.3.5-16 2 Page TS / B 3.5-17 3 Page TS / B 3.5-18 1 Pages B 3.5-19 through 8 3.5-24 0 Pages TS / 8 3.5-25 through TS / 8 3.5-27 1 Pages 8 3.5-28 through RB3.5-31 0 8 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / 8 3.6-1a 3 Page TS / B 3.6-2-and TS / B 3.6-3. 3 Page TS / 8 3.6-4 4 Page TS / B 3.6-5 3 Page TS / B 3.6-6 4 Pages TS / B 3.6-6a and TS / B 3.6-6b 2 Page TS./ B 3.6-6c 0 Pages 8 3.6-7 through 8 3.6-14 0 Page TS / 8 3.6-15 3 Page TS / B 3.6-15a 0 Page TS / B 3.6-15b 2 Pages TS / 8 3.6-16 and TS / B 3.6-17 2 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS / B 3.6-19 1 Page TS'/8 3.6-20 2 Page TS / B 3.6-21 3 Pages TS / 8 3.6-21a and TS /8 3.6-21b 0 Pages TS / B 3.6-22 and TS / B 3.6-23 2 Pages TS / B 3.6-24 and TS / B 3.6-25 1 Page TS / 8 3.6-26 3 Page TS / 8 3.6-27 3 Page TS / B 3.6-28 6 SUSQUEHANNA - UNIT 2 TS / B LOES-5 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.6-29 3 Page TS / B 3.6-29a 0 Page TS / B 3.6-30 2 Page TS / B 3.6-31 3 Page TS / B 3.6-32 1 Page TS / B 3.6-33 2 Page TS / B 3.6-34 1 Page TS / B 3.6-35 3 Pages TS / B 3.6-36 and TS B 3.6-37 2 Page TS / B 3.6-38 3 Page TS / B 3.6-39 7 Pages B 3.6-40 through B 3.6-42 0 Pages TS / B 3.6-43 and TS / B 3.6-44 1 Page TS / B 3.6-45 2 Pages TS / B 3.6-46 through TS / B 3.6-50 1 Page TS / B 3.6-51 2 Pages B 3.6-52 through B 3.6-55 0 Pages TS / B 3.6-56 and TS / B 3.6-57 2 Pages B 3.6-58 through B 3.6-62 0 Pages TS / B 3.6-63 and TS / B 3.6-64 1 Pages B 3.6-65 through B 3.6-68' 0 Pages B 3.6-69 througti B 3.6-71 1 Page TS / B 3.6-72 - . 2 Pages TS / B 3.6-73 and TS / B 3.6 1 Pages B 3.6-75 and B 3.6 0 Page TS / B 3.6-77 1 Pages B 3.6-78 through B 3.6-82 0 Page TS / 83.6-83 3 Page TS / B 3.6-84 2 Page TS /B 3.6-85 4 Page TS / B 3.6-86 through TS / B 3.6-87a 2 Page TS / 83.6-88 4 Page TS /B 3.6-89 2 Page TS /B 3.6-90 3 Pages TS / B 3.6-91 through TS / B 3.6-95 1 Page TS / B 3.6-96 2 Pages TS / B 3.6-97 and TS / B 3.6-98 1 Page TS / B 3.6-99 2 Page TS / B 3.6-99a 0 Pages TS /B 3.6-100 and TS /B 3.6-101 1 Pages TS / 83.6-102 and TS /B 3.6-103 2 Page TS / B 3.6-104 3 Page TS / B 3.6-105 2 Page TS / B 3.6-106 3 Revision 90 UNIT 2 TS I B LOES-6 SUSQUEHANNA SUSQUEHANNA -UNIT-2 TS / B LOES-6 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision B 3.7 PLANT SYSTEMS BASES Page TS / B 3.7-1 3 Page TS / B 3.7-2 4 Pages TS / B 3.7-3 through TS / B 3.7-5 3 Page TS / B 3.7-5a 1 0 Page TS / B 3.7-6 and TS / B 3.7-6a 2 Pages TS / B 3.7-6b and TS / B 3.7-6c 1 Page TS / B 3.7-7" 3 Page TS / B 3.7-8 2 Pages B 3.7-9 through B 3.7-11 0 Pages TS / B 3.7-12 and TS / B 3.7-13 1 Pages TS / B 3.7-14 through TS / B 3.7-18 2 Page TS / B 3.7-18a 0 Pages TS / B 3.7-19 through TS / B 3.7-24 1 Pages TS / B 3.7-25 and TS / B 3.7-26 0 Pages TS / B 3.7-27 through TS / B 3.7-29 2 Pages TS / B 3.7-30 and TS / B 3.7-31 1 Page TS / B 3.7-32 0 Page TS / B 3.7-33 1 B 3.8 ELECTRICAL POWER SYSTEMS BASES Pages B 3.8-1 through B 3.8-3 0 Page TS / B 3.8-4 .. 1 Pages TS / B 3.8-4a and TS / B 3.8-4b* 0 Pages TS / B 3.8-5-and TS / B-3.8-6 3 Page TS / B 3.8-6a I Pages B 3.8-7 and B 3.8-8 0 Page TS / B 3.8-9 2 Pages TS / B 3.8-10 and TS / B 3.8-11 1 Pages B 3.8-12 through B 3.8-18 0 Page TS / B 3.8-19 1 Pages B 3.8-20 through B 3.8-22. 0 Page TS / B 3.8-23 1 Page B 3.8-24 0 Pages TS / B 3.8-25 and TS / B 3.8-26 1 Pages B 3.8-27 through B 3.8-35 0 Page TS / B 3.8-36 1 Page TS / B 3.8-37 0 Page TS / B 3.8-38 1 Pages TS / B 3.8-39 through TS / B 3.8-46 0 Page TS / B 3.8-47 1 Pages TS / B 3.8-48 through TS / B 3.8-50 0 Page TS / B 3.8-51 1 Pages TS / B 3.8-52 through TS / B 3.8-55 0 SUSQUEHANNA - UNIT 2 TS / B LOES-7 Revision 90

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.8-65 3 Page TS / B 3.8-66 4 Pages TS / B 3.8-67 and TS / B 3.8-68 3 Page TS / B 3.8-69 4 Pages TS / B 3.8-70 through TS / B 3.8-83 1 Pages TS / B 3.8-83A through TS / B 3.8-83D 0 Pages B 3.8-84 through B 3.8-85 0 Page TS / B 3.8-86 1 Page TS / B 3.8-87 2 Pages TS / B 3.8-88 through TS / B 3.8-93 1 Pages B 3.8-94 through B 3.8-99 0.

B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-2 1 Page TS / B 3.9-2a 1 Pages TS / B 3.9-3 and TS / B 3.9-4 1 Pages B 3.9-5 through B 3.9-18 0 Pages TS / B 3.9-19 through TS / B 3.9-21 1 Pages B 3.9-22 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10 2 Pages TS / B 3.10-2 through TS / B 3.10-5 1 Pages B 3.10-6 through B 3.10 0 Page TS / B 3.10-33 2 Page B 3.10-34 0 Page B 3.10-35 1 Pages B 3.10-36 and B 3.10-37 0 Page B 3.10-38 1 Page TS / B 3.10-39 2 TSB2 Text LOES.doc 4/4/08 Revision 90 TS / B LOES-8 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT2 TS / B LOES-8 Revision 90

PPL Rev. 7 AC Sources-Operating B 3.8.1 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.1 AC Sources-Operating BASES BACKGROUND The unit Class 1 E AC Electrical Power Distribution System AC sources consist of two offsite power sources (preferred power sources, normal and alternate), and the onsite standby power sources (diesel generators (DGs) A, B, C and D). A fifth diesel generator, DG E, can be used as a substitute for any one of the four DGs A, B, C or D. As required by 10 CFR 50, Appendix A, GDC 17 (Ref. 1), the design of the AC electrical power system provides independence and redundancy to ensure an available source of power to the Engineered Safety Feature (ESF) systems.

The Class 1 E AC distribution system is divided into redundant load groups, so loss of any one group does not prevent the minimum safety functions from being performed. Each load group has connections to -

two preferred offsite power supplies and a single DG.

The two qualified circuits between the offsite transmission network and the onsite Class 1E AC. Electrical Power Distribution System are supported by two independent offsite power sources. A 230 kV line from the Susquehanna T10 230 kV switching station feeds start-up transformer No. 10; and, a 230 kV tap from the 500-230 kV tie line feeds the startup transformer No. 20.

The two independent offsite power sources are supplied to and are shared by both units. These two electrically and physically separated circuits provide AC power, through startup transformers (ST) No. 10 and ST No. 20, to the four 4.16 kV Engineered Safeguards System (ESS) buses (A, B, C and D) for both Unit 1 and Unit 2. A detailed description of the offsite power network and circuits to the onsite Class 1 E ESS buses is found in the FSAR, Section 8.2 (Ref. 2).

An offsite circuit consists of all breakers, transformers, switches, automatic tap changers, interrupting devices, cabling, and controls required to transmit power from the offsite transmission network to the onsite Class 1 E ESS bus or buses.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-1 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES BACKGROUND ST No. 10 and ST No. 20 each provide the normal source of power to (continued) two of the four 4.16 kV ESS buses in each Unit and the alternate source of power to the remaining two 4.16 kV ESS buses in each Unit.

If any 4.16 kV ESS bus loses power, an automatic transfer from the normal to the alternate occurs after the normal supply breaker trips.

When off-site power is available to the 4.16 kV ESS Buses following a LOCA signal, the required ESS loads will be sequenced onto the 4.16 kV ESS Buses in order to compensate for voltage drops in the onsite power system when starting large ESS motors.

The onsite standby power source for 4.16 kV ESS buses A, B, C and D consists of five DGs. DGs A, B, C and D are dedicated to ESS buses A, B, C and D, respectively. DG E can be used as a substitute for any one of the four DGs (A, B, C or D) to supply the associated ESS bus. Each DG provides standby power to two 4.16 kV ESS buses-one associated with Unit 1 and one associated with Unit 2.

The four "required" DGs are those aligned to a 4.16 kV ESS bus to provide onsite-standby power for both Unit 1 and Unit 2.

A DG, when aligned to an ESS bus, starts automatically on a loss. of -

coolant accident (LOCA) signal- (i.e., low reactor water level signal or high drywell pressure signal) or on an ESS bus degraded voltage or undervoltage signal. After the DG has started, it automatically ties to its respective bus after offsite power is tripped as a consequence of ESS bus undervoltage or degraded voltage, independent of or coincident with a LOCA signal. The DGs also start and operate in the standby mode without tying to the ESS bus on a LOCA signal alone.

Following the trip of offsite power, non-permanent loads are stripped from the 4.16 kV ESS Buses. When a DG is tied to the ESS Bus, loads are then sequentially connected to their respective ESS Bus by individual load timers. The individual load timers control the starting permissive signal to motor breakers to prevent overloading the associated DG.

In the event of loss of normal and alternate offsite power supplies, the 4.16 kV ESS buses will shed all loads except the 480 V load centers and the standby diesel generators will connect to the ESS busses. When a DG is tied to its respective ESS bus, loads are then sequentially connected to (continued)

SUSQUEHANNA - UNIT 2 B 3.8-2 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES BACKGROUND the ESS bus by individual load timers which control the permissive and (continued) starting signals to motor breakers to prevent overloading the DG.

In the event of a loss of normal and alternate offsite power supplies, the ESS electrical loads are automatically connected to the DGs in sufficient time to provide for safe reactor shutdown and to mitigate the consequences of a Design Basis Accident (DBA) such as a LOCA.

Certain required plant loads are returned to service in a predetermined sequence in order to prevent overloading of the DGs in the process.

Within 286 seconds after the initiating signal is received, all automatic and permanently connected loads needed to recover the unit or maintain it in a safe condition are returned to service. Ratings for the DGs satisfy the requirements of Regulatory Guide 1.9 (Ref. 3).

DGs A, B, C and D have the following ratings:

a. 4000 kW-continuous,
b. 4700 kW-2000 hours, DG E has the following ratings:
a. 5000 kW-continuous,
b. 5500 kW-2000 hours.

APPLICABLE The initial conditions of DBA and transient analyses in the FSAR, SAFETY ANALYSES Chapter 6 (Ref. 4) and Chapter 15 (Ref. 5), assume ESF systems are OPERABLE. The AC electrical power sources are designed to provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to ESF systems so that the fuel, Reactor Coolant System (RCS), and containment design limits are not exceeded. These limits are discussed in more detail in the Bases for Section 3.2, Power Distribution Limits; Section 3.4, Reactor Coolant System (RCS); and Section 3.6, Containment Systems.

The OPERABILITY of the AC electrical power sources is consistent with the initial assumptions of the accident analyses and is based upon meeting the design basis of the unit and supporting safe shutdown of the other unit. This includes maintaining the onsite or offsite AC sources (continued)

SUSQUEHANNA - UNIT 2 B 3.8-3 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES APPLICABLE OPERABLE during accident conditions in the event of an assumed SAFETY ANALYSES loss of all offsite power or all onsite AC power; and a worst case single (continued) failure.

AC sources satisfy Criterion 3 of the NRC Policy Statement (Ref. 6).

LCO Two qualified circuits between the offsite transmission network and the onsite Class 1 E Distribution System and four separate and independent DGs (A, B, C and D) ensure availability of the required power to shut down the reactor and maintain it in a safe shutdown condition after an anticipated operational occurrence (AOO) or a postulated DBA. DG E can be used as a substitute for any one of the four DGs A, B, C or D.

Qualified offsite circuits are those that are described in the FSAR, and are part of the licensing basis for the unit. In addition, the required automatic load timers for each ESF bus shall be OPERABLE.

The Safety Analysis for Unit 2 assumes the OPERABILITY of some equipment that receives power from U-nit 1 AC Sources. Therefore, Unit 2 Technical Specifications establish requirements for the -

OPERABILITY of the DG(s) and qualified offsite circuits needed to support the Unit 1 onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.7, Distribution Systems-Operating.

Each offsite circuit must be capable of maintaining rated frequency and voltage, and accepting required loads during an accident, while connected to the ESS buses.

One OPERABLE offsite circuit exists when all of the following conditions are met: F

1. An energized ST. No. 10 transformer with the load tap changer (LTC) in automatic operation.
2. The respective circuit path including energized ESS transformers 101 and 111 and feeder breakers capable of supplying three of the four 4.16kV ESS Buses.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-4 Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES LCO 3. Acceptable offsite grid voltage, defined as a voltage that is (continued) within the grid voltage requirements established for SSES. The grid voltage requirements include both a minimum grid voltage and an allowable grid voltage drop during normal operation, and for a predicted voltage for a trip of the unit.

The Regional Transmission Operator (PJM), and/or the Transmission Power System Dispatcher, PPL EU, determine, monitor and report actual and/or contingency voltage (Predicted voltagqe) violations that occur for the SSES monitored offsite 230kV and 500kV buses.

The offsite circuit is inoperable for any actual voltage violation, or a contingency voltage violation that occurs for a trip of a SSES unit, as reported by the transmission RTO or Transmission Power System Dispatcher.

The offsite circuit is operable for any other predicted grid event (i.e., loss of the most critical transmission line or the largest supply) that does not result from the generator trip of a SSES unit. These conditions do not represent an impact on SSES operation that has been caused by a LOCA and subsequent -

-generator trip. The design basis does not require entry into LCOs for predicted grid conditions that cannot result in a LOCA,

-delayed LOOP.

The other offsite circuit is Operable when all the following conditions are met:

1. An energized ST. No. 20 transformer with the load tap changer (LTC) in automatic operation.
2. The respective circuit path including energized ESS transformers 201 and 211 and feeder breakers capable of supplying three of the four 4.16kV ESS Buses.
3. Acceptable offsite grid voltage, defined as a voltage that is within the grid voltage requirements established for SSES.

The grid voltage requirements include both a minimum grid voltage and an allowable grid voltage drop during normal operation, and for a predicted voltage for a trip of the unit.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-4a Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES LCO The Regional Transmission Operator (PJM), and/or the (continued) Transmission Power System Dispatcher, PPL EU, determine, monitor and report actual and/or contingency voltage (Predicted voltage) violations that occur for the SSES monitored offsite 230kV and 500kV buses.

The offsite circuit is inoperable for any actual voltage violation, or a contingency voltage violation that occurs for a trip of a SSES unit, as reported by the transmission RTO or Transmission Power System Dispatcher.

The offsite circuit is operable for any other predicted grid event (i.e., loss of the most critical transmission line or the largest supply) that does not result from the generator trip of a SSES unit. These conditions do not represent an impact on SSES operation that has been caused bya LOCA and subsequent generator trip. The design basis does not require entry into LCOs for predicted grid conditions that cannot-result in a LOCA, delayed LOOP.

Both offsite-circuits are OPERABLE provided each meets the criteria described above and provided that no 4.16kV ESS Bus has less than one OPERABLE-offsite circuit (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-4b Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES LCO capable of supplying the required loads. If no OPERABLE offsite (continued) circuit is capable of supplying any of the 4.16 kV ESS Buses, one offsite source shall be declared inoperable. Unit 2 also requires Unit 1 offsite circuits to be OPERABLE.

If a Unit 1 4.16 kV bus is de-energized solely for the purpose of performing maintenance, it is not required to declare an offsite source or diesel generator inoperable.

Four of the five DGs are required to be Operable to satisfy the initial assumptions of the accident analyses. Each required DG must be capable of starting, accelerating to rated speed and voltage, and connecting to its respective ESS bus on detection of bus undervoltage after the normal and alternate supply breakers open. This sequence must be accomplished within 10 seconds. If a Unit 1 4.16 kV bus is isolated from its DG solely for the performance of bus maintenance, the DG is not required to be declared inoperable. Each DG must also be capable of accepting required loads within the assumed loading sequence intervals, and must continue to operate until offsite power can be restored to the ESS buses. These capabilities are required to be met-from a variety of initial conditions, such as DG in standby with-the engine hot and DG.in normal standby conditions. Normal standby conditions for a DG mean that the diesel engine oil is being continuously circulated and engine coolant is circulated as necessary to maintain temperature consistent with manufacturer recommendations. Additional DG capabilities must be demonstrated to meet required Surveillances, e.g., capability of the DG to revert to standby status on an ECCS signal while operating in parallel test mode.

Although not normally aligned as a required DG, DG E is normally maintained OPERABLE (i.e., Surveillance Testing completed) so that it can be used as a substitute for any one of the four DGs A, B, C or D.

Proper sequencing of loads, including tripping of nonessential loads, is a required function for DG OPERABILITY.

The AC sources must be separate and independent (to the extent possible) of other AC sources. For the DGs, the separation and independence are complete. For the offsite AC sources, the separation and independence are to the extent practical. A circuit may be connected to more than one ESS bus, with automatic transfer capability to the other circuit OPERABLE, and not violate separation criteria. A circuit that is not connected to an ESS bus is required to (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-5 Revision 3

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES LCO have OPERABLE automatic transfer interlock mechanisms to each (continUed) ESS bus to support OPERABILITY of that offsite circuit. If a Unit 1 -

4.16 kV bus is de-energized solely for the purpose of performing maintenance, automatic transfer interlock mechanisms for the de-energized bus are not required to be operable.

APPLICABILITY The AC sources are required to be OPERABLE in MODES 1, 2, and 3 to ensure that:

a. Acceptable fuel design limits and reactor coolant pressure boundary limits are not exceeded as a result of AOOs or abnormal transients; and
b. Adequate core cooling is provided and containment OPERABILITY and other vital functions are maintained in the event of a postulated DBA.

The AC power requirements for MODES 4 and 5 are covered in LCO 3.8.2, "AC Sources-Shutdown."

ACTIONS A Noteprohibits the application of LCO 3.0.4.b to an inoperable DG.

There is-an increased risk associated with entering a MODE or other specified condition in the Applicability with an inoperable DG and the-provisions of LCO 3.0.4.b, which allow entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, should not be applied in this circumstance.

The ACTIONS are modified by a Note which allows entry into associated Conditions and Required Actions to be delayed for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when an OPERABLE diesel generator is placed in an inoperable status for the alignment of diesel generator E to or from the Class 1 E distribution system. Use of this allowance requires both offsite circuits to be OPERABLE. Entry into the appropriate Conditions and Required Actions shall be made immediately upon the determination that substitution of a required diesel generator will not or can not be completed.

When Note 3 is in effect, the following restrictions (Reference 14) shall occur:

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-6 Revision 3

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS 1.) No maintenance or testing that affects the reliability of the (continued) remaining OPERABLE Unit 1 and Unit 2 4160 V subsystems shall be scheduled. If any testing or maintenance activities must be performed during this time, an evaluation shall be performed in accordance with Title 10 to the Code of FederalRegulations (10 CFR) Section 50.65(a)(4).

2.) The required systems, subsystems, trains, components, and devices that depend on the remaining 4160 V buses shall be verified OPERABLE.

3.) The Unit 2 safety-related HPCI and RCIC pumps shall be controlled as "protected equipment" and not taken out of service for planned maintenance while a Unit 1 4160 V bus is out of service for extended maintenance.

Note 3 modifies the ACTIONS by allowing a Unit 1 4160 V subsystem (4.16 kV bus) to be de-energized for bus maintenance when Unit 1 is in Modes 4 or 5 and Unit 2 is in Modes 1, 2, or 3 without requiring either offsite circuit or the associated diesel generator to be declared inoperable. - Only entry into LCO 3.8.7 Condition C is required for this-maintenance-activaty. While in this configuration, immediate entry into LCO 3.8.1 is required for any offsite circuit or DG that becomes inoperable. Note 3 no longer applies.

A.1 To ensure a highly reliable power source remains with one offsite circuit inoperable, it is necessary to verify the availability of the remaining required offsite circuit on a more frequent basis. Since the Required Action only specifies "perform," a failure of SR 3.8.1.1 acceptance criteria does not result in a Required Action not met.

However, if a second required circuit fails SR 3.8.1.1, the second offsite circuit is inoperable, and Condition C, for two offsite circuits inoperable, is entered.

(continued)

SUSQUEHANNA - UNIT 2R TS / B 3.8-6a Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS A.2 (continued)

Required Action A.2, which only applies if one 4.16 kV ESS bus cannot be powered from any offsite source, is intended to provide assurance that an event with a coincident single failure of the associated DG does not result in a complete loss of safety function of critical systems. These features (e.g., system, subsystem, division, component, or device) are designed to be powered from redundant safety related 4.16 kV ESS buses. Redundant required features failures consist of inoperable features associated with an emergency bus redundant to the emergency bus that has no offsite power. The Completion Time for Required Action A.2 is intended to allow time for the operator to evaluate and repair any discovered inoperabilities.

This Completion Time also allows an exception to the normal "time zero" for beginning the allowed outage time "clock." In this Required Action, the Completion Time only begins on discovery that both:

a. A 4.16 kV ESS bus has no offsite power supplying its loads; and
b. A redundant required feature on another 4.16 kV ESS bus is inoperable.

If, at any time during the existence of this Condition (one offsite circuit inoperable) a required feature subsequently becomes inoperable, this Completion Time would begin to be tracked.

Discovering no offsite power to one 4.16 kV ESS bus on the onsite Class 1E Power Distribution System coincident with one or more inoperable required support or supported features, or both, that are associated with any other emergency bus that has offsite power, results in starting the Completion Times for the Required Action.

Twenty-four hours is acceptable because it minimizes risk while allowing time for restoration before the unit is subjected to transients associated with shutdown.

The remaining OPERABLE offsite circuits and DGs are adequate to supply electrical power to the onsite Class 1 E Distribution System. Thus, on a component basis, single failure protection may have been lost for the required feature's function; however, function is not lost. The 24 (continued)

SUSQUEHANNA - UNIT 2 B 3.8-7 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS A.2 (continued) hour Completion Time takes into account the component OPERABILITY of the redundant counterpart to the inoperable required feature. Additionally, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, a reasonable time for repairs, and the low probability of a DBA occurring during this period.

A.3 According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition A for a period that should not exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. With one offsite circuit inoperable, the reliability of the offsite system is degraded, and the potential for a loss of offsite power is increased, with attendant potential for a challenge to the plant safety systems. In this condition, however, the remaining OPERABLE offsite circuit and DGs are adequate to supply electrical power to the onsite Class 1 E Distribution System.

The 72-hour Completion Time takes into account the capacity and capability of the remaining AC sources, reasonable time for repairs, and the low probability of a DBA occurring during this period.

The second Completion Time for Required Action A.2 establishes a limit on the maximum time allowed for any combination of required AC power sources to be inoperable during any single contiguous occurrence of failing to meet the LCO. If Condition A is entered while, for instance, a DG is inoperable, and that DG is subsequently returned OPERABLE, the LCO may already have been not met for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This situation could lead to a total of 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />, since initial failure to meet the LCO, to restore-the offsite circuit. At this time, a DG could again become inoperable, the circuit restored OPERABLE, and an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (for a total of 9 days) allowed prior to complete restoration of the LCO. The 6 day Completion Time provides a limit on the time allowed in a specified condition after discovery of failure to meet the LCO. This limit is considered reasonable for situations in which Conditions A (continued)

SUSQUEHANNA - UNIT 2 B 3.8-8 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS A.3 (continued) and B are entered concurrently. The "AND" connector between the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 6 day Completion Times means that both Completion Times apply simultaneously, and the more restrictive Completion Time must be met.

As in Required Action A.2, the Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." This exception results in establishing the "time zero" at the time the LCO was initially not met, instead of at the time that Condition A was entered.

B. 1 To ensure a highly reliable power source remains with one required DG inoperable, it is necessary to verify the availability of the required offsite circuits on a more frequent basis. Since the Required Action -

only specifies "perform," a failure of SR 3.8.1.1 acceptance criteria does not result in a Required Action being not met. However, if a circuit fails to pass SR 3.8.1.1, it is inoperabre. Upon offsite circuit inoperability, -additional.Conditions must then be entered.

8.2 Required Action B.2 is intended to provide assurance that a loss of offsite power, during the period that a DG is inoperable, does not result in a complete loss of safety function of critical systems. These features are designed with redundant. safety related divisions (i.e.,

single division systems are not included). Redundant required features failures consist of inoperable features associated with a division redundant to the division that has an inoperable DG.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-9 Revision 2

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS B.2 (continued)

The Completion Time is intended to allow the operator time to evaluate and repair any discovered inoperabilities. This Completion Time also allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." In this Required Action the Completion Time only begins on discovery that both:

a. An inoperable DG exists; and
b. A required feature powered from another diesel generator (Division 1 or 2) is inoperable.

If, at any time during the existence of this Condition (one required DG inoperable), a required feature subsequently becomes inoperable, this Completion Time begins to be tracked.

Discovering one required DG inoperable coincident with one or more inoperable required support or supported features, or both, that are associated with the OPERABLE DGs results in starting the Completion Time for the Required Action. Four hours from the discovery of these events existing concurrently is acceptable because it minimizes risk while allowing time for restoration before subjecting the unit to transients associated with shutdown.

The remaining OPERABLE DGs and offsite circuits are adequate to supply electrical power to the onsite Class 1 E Distribution System.

Thus, on a component basis, single failure protection for the required feature's function may have been lost; however, function has not been lost. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time takes into account the component OPERABILITY of the redundant counterpart to the inoperable required feature. Additionally, the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, reasonable time for repairs, and low probability of a DBA occurring during this period.

B.3.1 and B.3.2 Required Action B.3.1 provides an allowance to avoid unnecessary testing of OPERABLE DGs. If it can be determined that the cause of the inoperable DG does not exist on the OPERABLE DG, SR 3.8.1.7 does not have to be performed. If the cause of inoperability exists on other DG(s), they are declared inoperable upon discovery, and Condition E of (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-10 -Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS B.3.1 and B.3.2 (continued)

LCO 3.8.1 is entered. Once the failure is repaired, and the common cause failure no longer exists, Required Action B.3.1 is satisfied. If the cause of the initial inoperable DG cannot be determined not to exist on the remaining DG(s), performance of SR 3.8.1.7 suffices to provide assurance of continued OPERABILITY of those DGs. However, the second Completion Time for Required Action B.3.2 allows a performance of SR 3.8.1.7 completed up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to entering Condition B to be accepted as demonstration that a DG is not inoperable due to a common cause failure.

In the event the inoperable DG is restored to OPERABLE status prior to completing either B.3.1 or B.3.2, the plant corrective action program will continue to evaluate the common cause possibility. This continued evaluation, however, is no longer under the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> constraint imposed while in Condition B.

According to Generic Letter 84-15 (Ref. 8), 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is a reasonable time to confirm that the OPERABLE DGs are not affected by the same problem as the inoperable DG.-

B.4 --

According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition B for a period that should not exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. In Condition B, the remaining OPERABLE DGs and offsite circuits are

. adequate to supply electrical power to the onsite Class 1 E Distribution System. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, reasonable time for repairs, and low probability of a DBA occurring during this period.

The second Completion Time for Required Action B.4 establishes a limit on the maximum time allowed for any combination of required AC power sources to be inoperable during any single contiguous occurrence of failing to meet the LCO. If Condition B is entered while, for instance, an offsite circuit is inoperable and that circuit is subsequently restored OPERABLE, the LCO may already have been not met for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This situation could lead to a total of 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />, since initial failure of the LCO, to restore the DG. At this time, an offsite circuit could again become inoperable, the DG restored OPERABLE, and an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (for a total of 9 days) allowed prior to (continued)

SUSQUEHANNA-UNIT2 TS / B 3.8-11 Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS B.4 (continued) complete restoration of the LCO. The 6 day Completion Time provides a limit on the time allowed in a specified condition after discovery of failure to meet the LCO. This limit is considered reasonable for situations in which Conditions A and B are entered concurrently. The "AND" connector between the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 6 day Completion Times means that both Completion Times apply simultaneously, and the more restrictive must be met.

As in Required Action B.2, the Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." This exception results in establishing the "time zero" at the time that the LCO was initially not met, instead of the time that Condition B was entered.

C.1 Required Action C.1 addresses actions to be taken in the event of concurrent inoperability of two offsite circuits. The Completion Time for Required Action C.1 is intended to allow the operator time to evaluate and-repair any discovered inoperabilities.

According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition C for a period that should not exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This level of degradation means that the offsite electrical power system does not have the capability to effect a safe shutdown and to mitigate the effects of an accident; however, the onsite AC sources have not been degraded. This level of degradation generally corresponds to a total loss of the immediately accessible offsite power sources.

Because of the normally high availability of the offsite sources, this level of degradation may appear to be more severe than other combinations of two AC sources inoperable that involve one or more DGs inoperable. However, two factors tend to decrease the severity of this degradation level:

a. The configuration of the redundant AC electrical power system that remains available is not susceptible to a single bus or switching failure; and (continued)

SUSQUEHANNA - UNIT 2 B 3.8-12 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS C.1 (continued)

b. The time required to detect and restore an unavailable offsite power source is generally much less than that required to detect and restore an unavailable onsite AC source.

With both of the required offsite circuits inoperable, sufficient onsite AC sources are available to maintain the unit in a safe shutdown condition in the event of a DBA or transient. In fact, a simultaneous loss of offsite AC sources, a LOCA, and a worst case single failure were postulated as a part of the design basis in the safety analysis.

Thus, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time provides a period of time to effect restoration of one of the offsite circuits commensurate with the importance of maintaining an AC electrical power system capable of meeting its design criteria. According to Regulatory Guide 1.93 (Ref. 7), with the available offsite AC sources two less than required-by the LCO, operation may continue for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If two offsite sources are restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unrestricted operation may continue. If .

only one offsite source is restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, power operation continues in accordance with Condition A.

D.1 and D.2 Pursuant to LCO 3&0.6, the Distribution System Actions would not be entered even if all AC sources to it were inoperable, resulting in de-energization. Therefore, the Required Actions of Condition D are modified by a Note to indicate that when Condition D is entered with no AC source to any ESS bus, Actions for LCO 3.8.7, "Distribution Systems-Operating," must be immediately entered. This allows Condition D to provide requirements for the loss of the offsite circuit and one DG without regard to whether a division is de-energized. LCO 3.8.7 provides the appropriate restrictions for a de-energized bus.

According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition D for a period that should not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In Condition D, individual redundancy is lost in both the offsite electrical power system and the onsite AC electrical power system. Since power system redundancy is provided by two diverse sources of power, however, the (continued)

SUSQUEHANNA - UNIT 2 B 3.8-13 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS D.1 and D.2 (continued) reliability of the power systems in this Condition may appear higher than that in Condition C (loss of both required offsite circuits). This difference in reliability is offset by the susceptibility of this power system configuration to a single bus or switching failure. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, reasonable time for repairs, and the low probability of a DBA occurring during this period.

E.1 With two or more DGs inoperable and an assumed loss of offsite electrical power, insufficient standby AC sources are available to power the minimum required ESF functions. Since the offsite electrical power system is the only source of AC power for the majority of ESF equipment at this level of degradation, the risk associated with continued operation for a very short time could be less than that associated with an immediate controlled shutdown. (The immediate shutdown could cause grid instability, which could result in a total loss of AC power.) Since any inadvertent unit generator trip could also result in a total loss: of offsite AC power,. however, the time allowed for continued operation is severely restricted. The intent here is to avoid the risk-associated .with an immediate controlled shutdown and to minimize the risk associated with this level of degradation.

According to Regulatory Guide 1.93 (Ref. 7), with two or more DGs inoperable, operation may continue for a period that should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

F.1 and F.2 If the inoperable AC electrical power sources cannot be restored to OPERABLE status within the associated Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are (continued)

SUSQUEHANNA - UNIT 2 B 3.8-14 .Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES ACTIONS F.1 and F.2 (continued) reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

G.1 Condition G corresponds to a level of degradation in which all redundancy in the AC electrical power supplies has been lost. At this severely degraded- level, any further losses in the AC electrical power system will cause a.loss of function. Therefore, no additional time is justified for continued operation. The unit is required by LCO 3.0.3 to commence a controlled shutdown.

SURVEILLANCE The AC sources are designed to permit inspection and testing of all REQUIREMENTS important areas and features, especially those that have a standby function, in accordance with 10 CFR 50, GDC 18 (Ref. 9). Periodic component tests are supplemented by extensive functional tests during refueling outages (under simulated adcident conditions). The.

SRs for demonstrating the OPERABILITY of the DGs are in accordance with the recommendations of Regulatory Guide 1.9 (Ref. 3), and Regulatory Guide 1.137 (Ref. 11), as addressed in the FSAR.

The Safety Analysis for Unit 2 assumes the OPERABILITY of some equipment that receives power from Unit 1 AC Sources. Therefore, Surveillance requirements are established for the Unit 1 onsite Class 1 E AC electrical power distribution subsystem(s) required to support Unit 2 by LCO 3.8.7, Distribution Systems-Operating. As Noted at the beginning of the SRs, SR 3.8.1.1 through SR 3.8.1.20 are applicable to the Unit 2 AC sources and SR 3.8.1.21 is applicable to the Unit 1 AC sources.

Where the SRs discussed herein specify voltage and frequency tolerances, the following summary is applicable. The minimum steady state output voltage of 3793 V is the value assumed in the degraded voltage analysis and is approximately 90% of the nominal 4160 V output voltage. This value allows for voltage drop to the terminals of (continued)

SUSQUEHANNA - UNIT 2 B 3.8-15 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE 4000 V motors whose minimum operating voltage is specified as 90%

REQUIREMENTS or 3600 V. It also allows for voltage drops to motors and other (continued) equipment down through the 120 V level where minimum operating Voltage is also usually specified as 90% of name plate rating. The specified maximum steady state output voltage of 4400 V is equal to the maximum operating voltage specified for 4000 V motors. It ensures that for a lightly loaded distribution system, the voltage at the terminals of 4000 V motors is no more than the maximum rated operating voltages. The specified minimum and maximum frequencies of the DG are 58.8 Hz and 61.2 Hz, respectively. These values are equal to +/- 2% of the 60 Hz nominal frequency and are derived from the recommendations found in Regulatory Guide 1.9 (Ref. 3). The lower Frequency Limit is necessary to support the LOCA analysis assumptions for low pressure ECCS pump flow rates. (Reference 12)

The Surveillance Table has been modified by a Note, to clarify the testing requirements associated with DG E. The Note is necessary to define the intent of the Surveillande Requirements associated with the integration of DG E. Specifically, the Note defines that a DG is only considered OPERABLE and required when it is aligned to the Class 1E distribution system. For example, if DG A does not meet the .

requirements- of a specific. SR, but DG E is substituted for DG A and aligned to the Class 1 E-distribution system, DG E is required to be OPERABLE to satisfy the LCO requirement of 4 DGs and DG A is not required to be OPERABLE because it is not aligned to the Class 1 E" distribution system. This is acceptable because only 4 DGs are assumed in the event analysis. Furthermore, the Note identifies when the Surveillance Requirements, as modified by SR Notes, have been met and performed, DG E can be substituted for any other DG and declared OPERABLE after performance of two SRs which verify switch -

alignment. This is acceptable because the testing regimen defined in the Surveillance Requirement Table ensures DG E is fully capable of performing all DG requirements.

SR 3.8.1.1 This SR ensures proper circuit continuity for the offsite AC electrical power supply to the onsite distribution network and availability of offsite AC electrical power. The breaker alignment verifies that each breaker is in its (continued)

SUSQUEHANNA - UNIT 2 B 3.8-16 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.1 (continued)

REQUIREMENTS correct position to ensure that distribution buses and loads are connected to an Operable offsite power source and that appropriate independence of offsite circuits is maintained. The 7 day Frequency is adequate since breaker position is not likely to change without the operator being aware of it and because its status is displayed in the control room.

SR 3.8.1.2 Not Used.

SR 3.8.1.3 This Surveillance verifies that the DGs are capable of synchronizing and accepting greater than or equal to the equivalent of the maximum expected accident loads. A minimum run time of 60 minutes is required to stabilize engine temperatures, while minimizing the time that the DG is connected to the offsite source.

Although no power factor requirements are established by this SR, the DG is normally operated ata power factor between 0.8 lagging and 1.0. The 0.8 valueis the design rating of the machine, while 1.0 is an operational limitation to ensure circulating currents are minimized. The load band is provided to avoid routine overloading of the DG. Routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY.

Note 1 modifies this Surveillance to indicate that diesel engine runs for this Surveillance may include gradual loading, as recommended by the Cooper Bessemer Service Bulletin 728, so that mechanical stress and wear on the diesel engine are minimized.

Note 2 modifies this Surveillance by stating that momentary transients because of changing bus loads do not invalidate this test. Similarly, momentary power factor transients do not invalidate the test.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-17 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.3 (continued)

REQUIREMENTS Note 3 indicates that this Surveillance should be conducted on only one DG at a time in order to avoid common cause failures that might result from offsite circuit or grid perturbations.

Note 4 stipulates a prerequisite requirement for performance of this SR. A successful DG start must precede this test to credit satisfactory performance.

Note 5 provides the allowance that DG E, when not aligned as substitute for DG A, B, C and D but being maintained available, may use the test facility to satisfy loading requirements in lieu of synchronization with an ESS bus.

Note 6 allows a single test (instead of two tests, one for each unit) to satisfy the requirements for both units, with the DG synchronized to the 4.16 kV ESS bus of Unit 1 for one periodic test and synchronized to the 4.16 kV.ESS bus of Unit 2 during the next periodic test. This is acceptable because the purpose of the test is to demonstrate the ability of the DG to operate at its continuous rating (with the exception of DG E which is only required to be tested at the continuous rating of DGs Athru D) and this attribute is tested at the required Frequency.

Each unit's circuit breakers and breaker control circuitry, which are only being tested every second test (due to the staggering of the tests), "

historically have a very.low failure rate. If a DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to only one 'unit. In addition, if the test is scheduled to be performed on the other Unit, and the other Unit's TS allowance that provides an exception to performing the test is used (i.e., the Note to SR 3.8.2.1 for the other Unit provides an exception to performing this test when the other Unit is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment),

or it is not possible to perform the test due to equipment availability, then the test shall be performed synchronized to this Unit's 4.16 kV ESS bus. The 31 day Frequency for this Surveillance is consistent with Regulatory Guide 1.9 (Ref. 3).

(continued)

SUSQUEHANNA-UNIT2 B 3.8-18 Revision 0

PPL Rev. 7 AC Sources-Operating

. B 3.8.1 BASES SURVEILLANCE SR 3.8.1.4 REQUIREMENTS (continued) This SR verifies the level of fuel oil in the engine mounted day tank is at or above the level at which fuel oil is automatically added. The level is expressed as an equivalent volume in gallons, and is selected to ensure adequate fuel oil for a minimum of 55 minutes of DG A-D and 62 minutes of DG E operation at DG continuous rated load conditions.

The 31 day Frequency is adequate to ensure that a sufficient supply of fuel oil is available, since low level alarms are provided and operators would be aware of any large uses of fuel oil during this period.

SR 3.8.1.5 Microbiological fouling is a major cause of fuel oil degradation. There are numerous bacteria that can grow in fuel oil and cause fouling, but all must have a water environment in order to survive. Removal of water from the engine mounted day tanks once every 31 days eliminates the.necessary environment for bacterial survival. This is the.

most effective means of controlling microbiological fouling. In addition, it eliminates the potential for water entrainment in the fuel oil during DG operation. Water may come from any of several sources, including condensation; ground water, rain water, contaminated fuel oil, and-breakdown of the fuel oil by bacteria. Frequent checking for and removal of accumulated water minimizes fouling and provides data regarding the watertight integrity of the fuel oil system. The Surveillance Frequencies are established by Regulatory Guide 1.137 (Ref. 11). This SR is for preventive maintenance. The presence of water does not necessarily represent a failure of this SR provided that accumulated water is removed during performance of this Surveillance.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-19 Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.6 REQUIREMENTS (continued) This Surveillance demonstrates that each required fuel oil transfer pump operates and transfers fuel oil from its associated storage tank to its associated day tank. It is required to support continuous operation of standby power sources. This Surveillance provides assurance that the fuel oil transfer pump is OPERABLE, the fuel oil piping system is intact, the fuel delivery piping is not obstructed, and the controls and control systems for automatic fuel transfer systems are OPERABLE.

The Frequency for this SR is 31 days because the design of the fuel transfer system requires that the transfer pumps operate automatically.

Administrative controls ensure an adequate volume of fuel oil in the day tanks. This Frequency allows this aspect of DG Operability to be demonstrated during or following routine DG operation.

SR 3.8.1.7 This SR helps to ensure the availability of the standby electrical power supply to mitigate DBAs and transients and maintain the unit in a.safe shutdown condition.

To minimize the wear on moving parts that do not get lubricated when the engine is not running, this SR has been modified by Note 1 to "

indicate that all DG starts for these Surveillances may be preceded by an engine prelube period (which for DGs A through D includes operation of the lube oil system to ensure the DG's turbo charger is sufficiently prelubicated to prevent undo wear and tear).

For the purposes of this testing, the DGs are started from standby conditions. Standby conditions for a DG mean that the diesel engine coolant and oil are being continuously circulated and temperature is being maintained consistent with manufacturer recommendations.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-20 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.7 (continued)

REQUIREMENTS The DG starts from standby conditions and achieves the minimum required voltage and frequency within 10 seconds and maintains the required voltage and frequency when steady state conditions are reached. The ten second start requirement support the assumptions in the design bases LOCA analysis of FSAR Section 6.3 (Ref. 12)

To minimize testing of the DGs, Note 2 allows a single test to satisfy the requirements for both units (instead of two tests, one for each unit). This is acceptable because this test is intended to demonstrate attributes of the DG that are not associated with either Unit. If the DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to one unit.

The time for the DG to reach steady state operation is periodically monitored and the trend evaluated to identify degradation.

The 31 day Frequency is consistent with Regulatory Guide 1.9 (Ref. 3). This Frequency provides adequate-assurance of DG OPERABILITY.

SR 3.8:1.8 Transfer of each 4.16 kV ESS bus power supply from the normal offsite circuit to the alternate offsite circuit demonstrates the OPERABILITY of the alternate circuit distribution network to power the shutdown loads. The 24 month Frequency of the Surveillance is based on engineering judgment taking into consideration the plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths. Operating experience has shown that these components usually pass the SR when performed on the 24 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.

This SR is modified by a Note. The reason for the Note is that, during .operation with the reactor critical, performance of the automatic transfer of unit power supply could cause perturbations to the electrical distribution systems that could challenge continued steady state operation and, as a (continued)

.SUSQUEHANNA - UNIT 2 B 3.8-21 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.8 (continued)

REQUIREMENTS result, plant safety systems. The manual transfer of unit power supply should not result in any perturbation to the electrical distribution system, therefore, no mode restriction is specified. This Surveillance tests the applicable logic associated with Unit 2. The comparable test specified in Unit 1 Technical Specifications tests the applicable logic associated with Unit 1. Consequently, a test must be performed within the specified Frequency for each unit. As the Surveillance represents separate tests, the Note specifying the restriction for not performing the test while the unit is in MODE 1 or 2 does not have applicability to Unit 1. The NOTE only applies to Unit 2, thus the Unit 2 Surveillance shall not be performed with Unit 2 in MODE 1 or 2.

SR 3.8.1.9 Each DG is provided with an engine overspeed trip to prevent damage to the engine. Recovery from the transient caused by the loss of a large load could cause diesel engine overspeed, which, if excessive, might result in a trip of the engine. This Surveillance demonstrates the DG load response characteristics and capability to reject the largest single load without exceeding predetermined voltage and frequency and while maintaining a specified margin to the overspeed trip. The largest-single load for each a DG is a residual heat removal (RHR) pump (1425 kW). This Surveillance may be accomplished by:

a. Tripping the DG output breaker with the DG carrying greater than or equal to its associated single largest post-accident load while paralleled to offsite power, or while solely supplying the bus; or
b. Tripping its associated single largest post-accident load with the DG solely supplying the bus.

As recommended by Regulatory Guide 1.9 (Ref. 3), the load rejection test is acceptable if the increase in diesel speed does not exceed 75%

of the difference between synchronous speed and the overspeed trip setpoint, or 15% above synchronous speed, whichever is lower. For DGs A, B, C, D and E, this represents 64.5 Hz, equivalent to 75% of the (continued)

SUSQUEHANNA - UNIT 2 B 3.8-22 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.9 (continued)

REQUIREMENTS difference between nominal speed and the overspeed trip setpoint.

The time, voltage, and frequency tolerances specified in this SR are derived from Regulatory Guide 1.9 (Ref. 3) recommendations for response during load sequence intervals. The 4.5 seconds specified is equal to 60% of the 7.5 second load sequence interval between loading of the RHR and core spray pumps during an undervoltage on the bus concurrent with a LOCA. The 6 seconds specified is equal to 80% of that load sequence interval. The voltage and frequency specified are consistent with the design range of the equipment powered by the DG. SR 3.8.1.9.a corresponds to therfhaximum frequency excursion, while SR 3.8.1.9.b and SR 3.8.1.9.c specify the steady state voltage and frequency values to which the system must recover following load rejection.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3) and is intended to be consistentwith expected fuel cycle lengths; To minimize testing of the. DGs, a Note allows a single test to satisfy the requirements for both units (instead of two tests, one for each unit). This is acceptable because this test is intended to demonstrate attributes of the DG that are not associated with either Unit. If the DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to only one unit.

SR 3.8.1.10 This Surveillance demonstrates the DG capability to reject a full load without overspeed tripping or exceeding the predetermined voltage limits. The DG full load rejection may occur because of a system fault or inadvertent breaker tripping. This Surveillance ensures proper engine generator load response under the simulated test conditions. This test simulates the loss of the total connected load that the DG experiences following a full load rejection and verifies that the DG does not trip upon loss of the load. These acceptance criteria provide DG damage protection. While the DG is not expected to experience this transient during an event, and continues to be available, this response ensures that the DG (continued)

-SUSQUEHANNA - UNIT 2 TS / B 3.8-23 Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.10 (continued)

REQUIREMENTS is not degraded for future application, including reconnection to the bus if the trip initiator can be corrected or isolated.

To minimize testing of the DGs, a Note allows a single test to satisfy the requirements for both units (instead of two tests, one for each unit). This is acceptable because this test is intended to demonstrate attributes of the DG that are not associated with either Unit. If the DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to only one unit.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3) and is intended to be consistent with expected fuel cycle lengths.

SR 3.8.1.11 As required by Regulatory Guide 1.9 (Ref. 3), this Surveillance demonstrates the as designed operation of the standby power sources during loss of the offsite source. This test verifies all actions encountered from the loss-of offsite power, including shedding of the nonessential loads.and energization of the ESS buses and respective 4.16 kV loads from the DG. It further demonstrates the capability of the DG to automatically achieve and maintain the required voltage and frequency within the specified time.

The DG auto-start time of 10 seconds is derived from requirements of the licensed accident analysis for responding to a design basis large break LOCA. The Surveillance should be continued for a minimum of 5 minutes in order to demonstrate that all starting transients have decayed and stability has been achieved.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3), takes into consideration plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.

This SR is modified by three Notes. The reason for Note 1 is to minimize wear and tear on the DGs during testing. Note 1 (continued)

SUSQUEHANNA - UNIT 2 B 3.8-24 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.11 (continued)

REQUIREMENTS allows all DG starts to be preceded by an engine prelube period (which for DG's A through D includes operation of he lube oil system to ensure the DGs turbo charger is sufficiently prelubricated). For the purpose of this testing, the DGs shall be started from standby conditions that is, with the engine oil being continuously circulated and engine coolant being circulated as necessary to maintain temperature consistent with manufacturer recommendations.

The reason for Note 2 is that performing the Surveillance would remove a required offsite circuit from service, perturb the electrical distribution system, and challenge safety systems. This Surveillance tests the applicable logic associated with Unit 2. The comparable test specified in the Unit 1 Technical Specifications tests the applicable logic associated with Unit 1. Consequently, a test must be performed within the specified Frequency for each unit. As the Surveillance represents separate tests, the Note specifying the restriction for not performing the test while the unit is in MODE 1, 2, or 3 does not have applicability to Unit 1." The Note only applies to Unit 2, thus the Unit 2 -

Surveillances shall not be performed with Unit 2 in MODES 1, 2 or 3.

This SR is also modified by Note 3. The Note specifies when this SR is required to be performed for the DGs and the 4.16 kV ESS Buses.

The Note is necessary because this SR involves an integrated test between the DGs and the 4.16 kV ESS Buses and the need for the testing regimen to include DG E being tested (substituted for all DGs for both units) with all 4.16 kV ESS Buses. To ensure the necessary testing is performed, the following rotational testing regimen has been established:

UNIT IN OUTAGE DIESEL E SUBSTITUTED FOR 2 DG E not tested 1 Diesel Generator D 2 Diesel Generator A 1 DG E not tested 2 Diesel Generator B 1 Diesel Generator A 2 Diesel Generator C 1 Diesel Generator B 2 Diesel Generator D 1 Diesel Generator C (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-25 Revision I

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.11 (continued)

REQUIREMENTS The specified rotational testing regimen can be altered to facilitate unanticipated events which render the testing regimen impractical to implement, but any alternative testing regimen must provide an equivalent level of testing.

This SR does not have to be performed with the normally aligned DG when the associated 4.16 kV ESS bus is tested using DG E and DG E does not need to be tested when not substituted or aligned to the Class 1 E distribution system. The allowances specified in the Note are acceptable because the tested attributes of each of the five DGs and each unit's four 4.16 kV ESS buses are verified at the specified Frequency (i.e., each DG and each 4.16 kV ESS bus is tested every 24 months). Specifically, when DG E is tested with a Unit 1 4.16 kV ESS bus, the attributes of the normally aligned DG, although not tested with the Unit 1 4.16 kV ESS bus, are tested with the Unit 2 4.16 kV ESS bus within the 24 month Frequency. The testing allowances do result in some circuit pathways which do not need to change state (i.e., cabling) not being tested on a 24 month Frequency. This is acceptable because these components are not required to change state to perform their safety function and when substituted--normal operation of DG Ewill ensure continuity of most of the cabling not tested.-

SR 3.8.1.12 This Surveillance demonstrates that the DG automatically starts and achieves the required voltage and frequency within the specified time (10 seconds) from the design basis actuation signal (LOCA signal) and "

operates for _>5 minutes. The 5 minute period provides sufficient time to demonstrate stability. SR 3.8.1.12.d and SR 3.8.1.12.e ensure that permanently connected loads and emergency loads are energized from the offsite electrical power system on a LOCA signal without loss of offsite power.

The requirement to verify the connection and power supply of permanent and auto connected loads is intended to satisfactorily show the relationship of these loads to the loading logic for loading onto offsite power. In certain circumstances, many of these loads cannot actually be (continued)-

SUSQUEHANNA - UNIT 2 TS / 8 3.8-26 Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.12 (continued)

REQUIREMENTS connected or loaded without undue hardship or potential for undesired operation. For instance, ECCS injection valves are not desired to be stroked open, high pressure injection systems are not capable of being operated at full flow, or RHR systems performing a decay heat removal function are not desired to be realigned to the ECCS mode of operation. In lieu of actual demonstration of the connection and loading of these loads, testing that adequately shows the capability of the DG system to perform these functions is acceptable.

This testing may include any series of sequential, overlapping, or total steps so that the entire connection and loading sequence is verified.

SR 3.8.1.12.a through SR 3.8.1.12.d are performed with the DG running. SR 3.8.1.12.e can be performed when the DG is not running.

The Frequency of 24 months takes into consideration plant conditions required to perform the Surveillance and is intended to be consistent with the expected fuel cycle lengths. Operating experience has shown-that these components usually pass the SR when performed at the 24 month Frequency. Therefore, the Frequency is acceptable from a-reliability standpoint.

This SR is modified by two Notes. The reason for Note 1 is to minimize wear and tear on the DGs during testing. Note 1 allows all DG starts to be preceded by an engine prelube period (which for DGs A through D includes operation of the lube oil system to ensure the DG's turbo charger is sufficiently prelubricated). For the purpose of this testing, the DGs must be started from standby conditions, that is, with the engine oil being continuously circulated and engine coolant being circulated as necessary to maintain temperature consistent with manufacturer recommendations.

The reason for Note 2 is to allow DG E, when not aligned as substitute for DG A, B, C or D, to use the test facility to satisfy loading requirements in lieu of aligning with the Class 1 E distribution system..

When tested in this configuration, DG E satisfies the requirements of this test by completion of SR 3.8.1.12.a, b and c only. SR 3.8.1.12.d and 3.8.1.12.e may be performed by any DG aligned with the Class 1E distribution system or by any series of sequential, (continued)

SUSQUEHANNA - UNIT 2 B 3.8-27 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.13 (continued)

REQUIREMENTS

-overlapping, or total steps so that the entire connection and loading sequence is verified.

This Surveillance demonstrates that DG non-critical protective functions (e.g., high jacket water temperature) are bypassed on an ECCS initiation test signal. The non-critical trips are bypassed during DBAs and provide an alarm on an abnormal engine condition. This alarm provides the operator with sufficient time to react appropriately.

The DG availability to mitigate the DBA is more critical than protecting the engine against minor problems that are not immediately detrimental to emergency operation of the DG.

The 24 month Frequency is based on engineering judgment, takes into consideration plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.

Operating experience has shown that these components usually pass the SR when performed at the 24 month Frequency. Therefore, the Frequency was concluded -to be acceptable from a reliability standpoint. -

The SR is modified by two-Notes. To minimize testing of the DGs, Note 1-to SR 3.8.1,13 allows a single test (instead of two tests, one for each unit) to satisfy the requirements for both units. This is acceptable because this test is intended to demonstrate attributes of the DG that are not associated with either Unit. If the DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to only one unit.

Note 2 provides the allowance that DG E, when not aligned as a substitute for DG A, B, C, and D but being maintained available, may use a simulated ECCS initiation signal.

SR 3.8.1.14 Regulatory Guide 1.9 (Ref. 3), requires demonstration once per 24 months that the DGs can start and run continuously at full load capability for an interval of not less than 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s-22 hours of which is at a load equivalent to 90% to 100% of the continuous rating of the DG, and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of which is at a load equivalent to 105% to 110% of the continuous duty rating of the DG. SSES has taken exception to this (continued)

SUSQUEHANNA-UNIT2 B 3.8-28 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.14 .(continued)

REQUIREMENTS requirement and performs the two hour run at the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating for each DG. The requirement to perform the two hour overload test can be performed in any order provided it is performed during a single continuous time period.

The DG starts for this Surveillance can be performed either from standby or hot conditions. The provisions for prelube discussed in SR 3.8.1.7, and for gradual loading, discussed in SR 3.8.1.3, are applicable to this SR.

A load band is provided to avoid routine overloading of the DG.

Routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3), takes into consideration plant conditions-required to perform the Surveillance, and is intended to be consistent -

with expected fuel cycle lengths.

This Surveillance has been modified by four Notes. Note 1 states that momentary transients due to changing bus loads do not invalidate this test.

To minimize testing of the DGs, Note 2 allows a single test (instead of two tests, one for each unit) to satisfy the requirements for both units.

This is acceptable because this test is intended to demonstrate attributes of the DG that are not associated with either Unit. If the DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to only one unit.

Note 3 stipulates that DG E, when not aligned as substitute for DG A, B, C or D but being maintained available may use the test facility to satisfy the specified loading requirements in lieu of synchronization with an ESS bus.

SR 3.8.1.15 This Surveillance demonstrates that the diesel engine can restart from a hot condition, such as subsequent to shutdown from full load temperatures and achieve the required voltage (continued)

SUSQUEHANNA-UNIT2 B 3.8-29 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.15 (continued)

REQUIREMENTS and frequency within 10 seconds. The 10 second time is derived from the requirements of the accident analysis to respond to a design basis large break LOCA.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3), takes into consideration plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.

This SR is modified by three Notes. Note 1 ensures that the test is performed with the diesel sufficiently hot. The requirement that the diesel has operated for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at full load conditions prior to performance of this Surveillance is based on manufacturer recommendations for achieving hot conditions. The load band is provided to avoid routine overloading of the DG. Routine overloads may result in more frequent teardown inspections in accordance with -

vendor recommendations in order to maintain DG OPERABILITY.

Momentary transients due to changingbus loads do not invalidate this test.

Note 2 -allows all DG starts-to be preceded by an engine prelube period (which-for DGs A through D includes operation of the lube oil system to ensure the DG's turbocharger is sufficiently prelubricated) to minimize wear and tear on the diesel during.testing.

To minimize testing of the DGs, Note 3 allows a single test to satisfy the requirements for both units (instead of two tests, one for each unit). This is acceptable because this test is intended to demonstrate attributes of the DG that are not associated with either Unit. If the DG fails this Surveillance, the DG should be considered inoperable for both units, unless the cause of the failure can be directly related to only one unit.

SR 3.8.1.16 As required by Regulatory Guide 1.9 (Ref. 3), this Surveillance ensures that the manual synchronization and automatic load transfer from the DG to the offsite source can be made and that the DG can be returned to ready-to-load status when offsite power is restored. It also (continued)

SUSQUEHANNA - UNIT 2 B 3.8-30 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.16 (continued)

REQUIREMENTS ensures that the auto-start logic is reset to allow the DG to reload if a subsequent loss of offsite power occurs. The DG is considered to be in ready-to-load status when the DG is at rated speed and voltage, the DG controls are in isochronous and the output breaker is open.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3), takes into consideration plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.

This SR is modified by a note to accommodate the testing regimen necessary for DG E. See SR 3.8.1.11 for the Bases of the Note.

SR 3.8.1.17 Demonstration of the test mode override ensures that the DG --

availability under accident conditions is not compromised as the result of testing. Interlocks to the LOCA sen sing circuits cause the DG to automatically reset to ready-to-load operatioh if an ECCS initiation signal is received during operation in the test mode... Ready-to-load operation is defined as theDG running at rated speed and voltage, the DG controls in isochronous, -and the DG output breaker open. These provisions for automatic switchover are required by IEEE-308 "

(Ref. 10), paragraph 6.2.6(2).

The requirement to automatically energize the emergency loads with offsite power is essentially identical to that of SR 3.8.1.12. The intent -

in the requirements associated with SR 3.8.1.17.b is to show that the emergency loading is not affected by the DG operation in test mode.

In lieu of actual demonstration of connection and loading of loads, testing that adequately shows the capability of the emergency loads to perform these functions is acceptable. This test is performed by verifying that after the DG is tripped, the offsite source originally in parallel with the DG, remains connected to the affected 4.16 kV ESS Bus. SR 3.8.1.12 is performed separately to verify the proper offsite loading sequence.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-31 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.17 (continued)

REQUIREMENTS The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3), takes into consideration plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.

This SR is modified by a note to accommodate the testing regimen necessary for DG E. See SR 3.8.1.11 for the Bases of the Note.

Under accident conditions, loads are sequentially connected to the bus by individual load timers which control the permissive and starting signals to motor breakers to prevent overloading of the AC Sources due to high motor starting currents. The load sequence time interval tolerance ensures that sufficient time exists for the AC Source to restore frequency and voltage prior to applying the next load and that safety analysis assumptions regarding ESF equipment time delays are not violated. Reference 2 provides a summary of the automatic loading of ESS buses. A list of the required timers and the associated setpoints are included in.the Bases as Table B 3.8.1-1, Unit 1 and Unit 2 Load-Timers. Failure of a timer identified as an offsite power timer-may result in-both offsite sources inoperable. Failure of any other timer may result in the associated DG being inoperable. A timer is considered failed for this SR if it will not ensure that the associated load will energize within the Allowable Value specified in Table B 3.8.1-

1. These conditions will require entry into applicable Condition of this specification. With a load timer inoperable, the load can be rendered inoperable to restore OPERABILITY to the associated AC sources. In this condition, the Conditions and Required Actions of the associated specification shall be entered for the equipment rendered inoperable.

The 24 month Frequency is consistent with the recommendation of Regulatory Guide 1.9 (Ref. 3), takes into consideration plant conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.

SR 3.8.1.18 This SR is modified by a Note that specifies that load timers associated with equipment that has automatic initiation (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-32 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.18 (continued)

REQUIREMENTS capability disabled are not required to be Operable. This is acceptable because if the load does not start automatically, the adverse effects of an improper loading sequence are eliminated. Furthermore, load timers are associated with individual timers such that a single timer only affects a single load.

SR 3.8.1.19 In the event of a DBA coincident with a loss of offsite power, the DGs are required to supply the necessary power to ESF systems so that the fuel, RCS, and containment design limits are not exceeded.

This Surveillance demonstrates DG operation, as discussed in the Bases for SR 3.8.1.11, during a loss of offsite power actuation test signal in conjunction with an ECCS initiation signal. In lieu of actual demonstration of connection and loading of loads, testing that adequately shows the capability of the DG system to perform these functions is acceptable. This testing may include any series of sequential, overlapping, or total steps so that the entire connection and loading sequence is verified. To simulate the non-LOCA unit 4.16 kV ESS Bus loads on the DG,_ bounding loads are energized on the tested 4.16 kVESS Bus after all auto connected emergency loads are energized.

The Frequency of 24 months takes into consideration plant conditions required to perform the Surveillance and is intended to be consistent with an expected fuel cycle length. V This SR is modified by three Notes. The reason for Note 1 is to minimize wear and tear on the DGs during testing. Note 1 allows all DG starts to be preceded by an engine prelube period (which for DGs A through D includes operation of the lube oil system to ensure the DG's turbo charger is sufficiently prelubricated). For the purpose of this testing, the DGs must be started from standby conditions, that is, with the engine oil being continuously circulated and (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-33 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.19 (continued)

REQUIREMENTS engine coolant being circulated as necessary to maintain temperature consistent with manufacturer recommendations.

Note 2 is necessary to accommodate the testing regimen associated with DG E.. See SR 3.8.1.11 for the Bases of the Note.

The reason for Note 3 is that performing the Surveillance would remove a required offsite circuit from service, perturb the electrical distribution system, and challenge safety systems. This Surveillance tests the applicable logic associated with Unit 2. The comparable test specified in the Unit 1 Technical Specifications tests the applicable logic associated with Unit 1. Consequently, a test must be performed within the specified Frequency for each unit. As the Surveillance represents separate tests, the Note specifying the restriction for not performing the test while the unit is in MODE 1, 2 or 3 does not have applicability to Unit 1. The Note only applies to Unit 2, thus the Unit 2 Surveillances -shall not be performed with Unit 2 in MODE 1, 2or 3.

SR 3.8.1.20 This Surveillance demonstrates that the DG starting independence has not been compromised. Also, this Surveillance demonstrates that each engine can achieve proper speed within the specified time when the DGs are started simultaneously. The 10 year Frequency is consistent with the recommendations of Regulatory Guide 1.9 (Ref. 3).

This SR is modified by two Notes. The reason for Note 1 is to minimize wear on the DG during testing. The Note allows all DG starts to be preceded by an engine prelube period (which for DGs A through D includes operation of the lube oil system to ensure the DG's turbo charger is sufficiently prelubricated.) For the purpose of this testing, the DG's must be started from standby conditions, that is, with the engine oil continuously circulated and engine coolant being circulated as necessary to maintain temperature consistent with manufacturer recommendations.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-34 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.20 (continued)

REQUIREMENTS Note 2 is necessary to identify that this test does not have to be.

performed with DG E substituted for any DG. The allowance is acceptable based on the design of the DG E transfer switches. The transfer of control, protection, indication, and alarms is by switches at two separate locations. These switches provide a double break between DG E and the redundant system within the transfer switch panel. The transfer of power is through circuit breakers at two separate locations for each redundant system. There are four normally empty switchgear positions at.DG E facility, associated with each of the four existing DGs. Only one circuit breaker is available at this location to be inserted into one of the four positions. At each of the existing DGs, there are two switchgear positions with only one circuit breaker available. This design provides two open circuits between redundant power sources. Therefore, based on the described design, it can be concluded that DG redundancy and independence is maintained regardless of whether DG E is substituted -

for any other CG.

SR 3.8:1.21 This Surveillance is provided to direct that the appropriate Surveillances for Unit 1 AC sources required to support Unit 2 are governed by the Unit 2 Technical Specifications. With the exception of this Surveillance, all other Surveillances of this Specification (SR 3.8.1.1 through SR 3.8.1.20) are applicable to the Unit 2 AC sources only. Meeting the SR requirements of Unit 1 LCO 3.8.1 will satisfy all Unit 2 requirements for Unit 1 AC sources. However, six Unit 1 LCO 3.8.1 SRs, if not required to support Unit 1 OPERABILITY requirements, are not required when demonstrating Unit 1 sources are capable of supporting Unit 2. SR 3.8.1.8 is not required if only one Unit 1 offsite circuit is required by the Unit 2 Specification.

SR 3.8.1.12, SR 3.8.1.13, SR 3.8.1.17, and SR 3.8.1.19 are not required since these SRs test the Unit 2 ECCS initiation signal, which is not needed for the AC sources to be OPERABLE on Unit 2.

SR 3.8.1.20 is not required since starting independence is not required with the DG(s) not required to be OPERABLE.

The Frequency required by the applicable Unit 1 SR also governs performance of that SR for Unit 2.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-35 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.20 (continued)

REQUIREMENTS As Noted, if Unit 1 is in MODE 4 or 5, the Note to Unit 1 SR 3.8.2.1 is applicable. This ensures that a Unit 2.SR will not require a Unit 1 SR to be performed, when the Unit 1 Technical Specifications do not require performance of a Unit 1 SR. (However, as stated in the Unit 2 SR 3.8.2.1 Note, while performance of an SR is not required, the SR still must be met).

REFERENCES 1. 10 CFR 50, Appendix A, G DC 17.

2. FSAR, Section 8.2.
3. Regulatory Guide 1.9.
4. FSAR, Chapter 6.
5. FSAR, Chapter 15.
6. Final Policy Statement on Technical Specifications lmprovements, July 22, 1993 (58 FR 39132).
7. Regulatory Guide 1.93.
8. Generic Letter 84-15.
9. 10 CFR 50, Appendix A, GDC 18.
10. IEEE Standard 308.
11. Regulatory Guide 1.137.
12. FSAR, Section 6.3.
13. ASME Boiler and Pressure Vessel Code,Section XI.
14. Letter from R. V. Guzman (USNRC) to B. T. McKinney (PPL)

"Susquehanna Steam Electric Station, Unit 2 - Issuance of Amendment Re: Electrical Power Systems Technical Specification 3.8.1 (T.A.C. MD4766)", dated February 19, 2008.

SUSQUEHANNA - UNIT 2 TS / B 3.8-36 Revision 1

PPL Rev. 7 AC Sources-Operating B 3.8.1 TABLE B 3.8.1-1 (page 1 of 2)

UNIT 1 AND UNIT 2 LOAD TIMERS NOMINAL DEVICE SETTING ALLOWABLE TAG NO. SYSTEM LOADING TIMER LOCATION (seconds) VALUE (seconds) 62A-20102 RHR Pump 1A 1A201 3 > 2.7 and _.3.6 62A-20202 RHR Pump 1B 1A202 3 Ž:2.7 and

  • 3.6 62A-20302 RHR Pump 2C 2A203 3 > 2.7 and *3.6 62A-20402 RHR Pump 2D 2A204 3 Ž2.7 and !5 3.6 E11A-K202B RHR Pump 1C.(Offsite Power Timer) 1C618 7.0 6.5 and _<7.5 E 11A-K120A RHR Pump 1C (Offsite Power Timer) 1C617 7.0 _>6.5 and _<7:5 El 1A-K1 20B RHR Pump 1 D (Offsite Power Timer) 1C618 7.0 Ž6.5 and *7.5 E11A-K202A RHR Pump 1D (Offsite Power Timer) 1C617 7.0 >6.5 and 7.5 E11A-K120A RHR Pump 2C (Offsite Power Timer) 2C617 7.0 Ž:6.5 and *7.5 El 1A-K202B RHR Pump 2C (Offsite Power Timer) 2C618 7.0 Ž6.5 and _7.5 EI1A-K1208 RHR Pump 2D (Offsite Power Timer) 2C618 7.0 Ž6.5 and <7.5 ElIA-K202A RHR Pump 2D (Offsite Power Timer) 2C617 7.0 Ž6.5 and _<7.5 E21A-K116A CS Pump 1A 1C626 10.5 >_9.4 and _<11.6 E21A-K116B CS Pump 1B 1C627 10.5 _>9.4and_*11.6 E21A-K125A CS Pump lC 1C626 10.5 > 9.4 and < 11.6 E21A-K125B CS Pump 1D 1C627 10.5 >_9.4 andl <11.6 -

E21A-K116A CS Pump 2A 2C626 10.5 _9.4and 1l.6 E21A-K116B CS Pump 2B 2C627 10.5 _9.4and 11.6 E21A-K125A CS Pump 2C -2C626 10.5 9.4 and _ 1l1.6 E21A-K125B CS Pump 2D 2C627 10.5 >9.4 and < 11.6 E21 A-K16A - CS Pump 1A (Offsite Power Timer) - 1.C626 15 >Ž14.0 and *16.0 E21 A-K1 68 CS Pump 1B (Offsite Power Timer) 1C627 15 _ 14.0 and _ 16.0 E21 A-K25A CS Pump 1C (Offsite Power Timer) 1C626 15 >_14.0 and _ 16.0-E21A-K25B CS Pump I D (Offsite Power Timer) 1C627 15 2! 14.0 and < 16.0 E21A-K16A CS Pump 2A (Offsite Power Timer) 2C626 15 _ 14.0 and < 16.0 E21 A-KI 6B CS Pump 28 (Offsite Power Timer) 2C627 15 > 14.0 and _ 16.0-E21A-K25A CS Pump 2C (Offsite Power Timer) 2C626 15 Ž:14.0 and *16.0 E21A-K25B CS Pump 2D (Offsite Power Timer) 2C627 15 > 14.0 and _ 16.0 62AX2-20108 Emergency Service Water 1A201 40 Ž 36 and

SUSQUEHANNA - UNIT 2 TS / B 3.8-37 Revision 0

PPL Rev. 7 AC Sources-Operating B 3.8.1 TABLE B 3.8.1-1 (page 2 of 2)

UNIT 1 AND UNIT 2 LOAD TIMERS NOMINAL DEVICE SETTING ALLOWABLE TAG NO. SYSTEM LOADING TIMER LOCATION (seconds) VALUE (seconds) 62X-536 DG Rm Exh Fan C 06536 120 >_54 62X-526 DG Rm Exh Fan B OB526 120 > 54 62X-516 DG Rm Exh Fan A OB516 120 Ž54 CRX-5652A DG Room Supply Fans El and E2 OB565 120 Ž54 62X2-20410 Control Structure Chilled Water System OC876B 180 _54 62X1-20304 Control Structure Chilled Water System OC877A 180 _>Ž54 62X2-2031 0 Control Structure Chilled Water System OC876A 180 2! 54 62X1 -20404 Control Structure Chilled Water System OC877B 180 " 54 62X2-20304 Control Structure Chilled Water System OC877A 210 >54 62X2-20404 Control Structure Chilled Water System OC877B 210 >54 62X-K11313 Emergency Switchgear Rm Cooling 2CB250B 260 >54 Compressor B 62X-K1 Emergency Switchgear Rm Cooling 2CB250A 260 >Ž54 6- IAB . ___ _Compressor AI SUSQUEHANNA-UNIT2R TS / B'3.8-38 Revision 1

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air BASES BACKGROUND Each diesel generator (DG) is provided with a storage tank having a fuel oil capacity sufficient to operate that DG for a period of 7 days while the DG is supplying its continuous rated load, as discussed in FSAR, Section 9.5.4 (Ref. 1). The maximum load demand is calculated using the assumption that at least three DGs are available. This onsite fuel oil capacity is sufficient to operate the DGs for longer than the time to replenish the onsite supply from outside sources.

Fuel oil is transferred from storage tank to day tank by a transfer pump associated with each storage tank. Independent pumps and piping preclude the failure of one pump, or the rupture of any pipe, valve, or tank to result in the loss of more than one DG. All outside tanks, pumps, and piping are located underground.

For proper operation of the standby DGs, it is necessary to ensure the proper quality of the fuel oil. Regulatory Guide 1.137 (Ref. 2) addresses -

the recommended fuel oil practices as supplemented by ANSI N195 (Ref. 3). The fuel oil properties governed by these SRs are the water and sediment content, the kinematic viscosity, specific gravity (or API gravity) and impurity level.

The DG lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated DG under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each engine oil sump contains an inventory capable of supporting a minimum of 7 days of operation. This supply is sufficient to allow the operator to replenish lube oil from outside sources.

Each DG has an air start system with two air receivers (DG E has four air receivers) and each DG air start system provides adequate capacity for five successive start cycles on the DG without recharging the air start receivers. Each bank of two air receivers for DG E has adequate capacity for a minimum of five successive start cycles.

(continued)

SUSQUEHANNA - UNIT'2 TS / B 3.8-47 Revision 1

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES (continued)

APPLICABLE The initial conditions of Design Basis Accident (DBA) and transient SAFETY ANALYSES analyses in FSAR, Chapter 6 (Ref. 4), and Chapter 15 (Ref. 5), assume Engineered Safety Feature (ESF) systems are OPERABLE. The DGs are designed to provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to ESF systems so that fuel, Reactor Coolant System, and containment design limits are not exceeded. These limits are discussed in more detail in the Bases for Section 3.2, Power Distribution Limits; Section 3.4, Reactor Coolant System (RCS); and Section 3.6, Containment Systems..

Since diesel fuel oil, lube oil, and starting air subsystem support the operation of the standby AC power sources, they satisfy Criterion 3 of the NRC Policy Statement (Ref. 6).

LCO Stored diesel fuel oil is required to have sufficient supply for 7 days of full load operation. It is also required to meet specific standards for quality.

Additionally, sufficient lube oil supply must be available to ensure the capability to operate at full load for 7 days. This requirement, in conjunction with an ability to obtain replacement supplies within 7 days, supports the availability of DGs required to shut down the reactor and to maintain it in a safe condition for an anticipated operational occurrence (AOO) -or a postulated DBA with loss of offsite power. DG day tank fuel oil requirements, as well as transfer capability from the storage tank to the day tank, are addressed in LCO 3.8.1, "AC Sources-Operating," and LCO 3.8.2, "AC Sources-Shutdown."

The starting air system is required to have a minimum capacity for five successive DG start attempts without recharging the-air start receivers.

APPLICABILITY The AC sources (LCO 3.8.1 and LCO 3.8.2) are required to ensure the availability of the required power to shut down the reactor and maintain it in a safe shutdown condition after an AOO or a postulated DBA.

Because stored diesel fuel oil, lube oil, and starting air subsystem support LCO 3.8.1 and LCO 3.8.2, stored diesel fuel oil, lube oil, (continued)

SUSQUEHANNA - UNIT 2 B 3.8-48 Revision 0

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES APPLICABILITY and starting air are required to be within limits when the associated DG is (continued) required to be OPERABLE.

ACTIONS The ACTIONS Table is modified by a Note indicating that separate Condition entry is allowed for each DG. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable DG subsystem. Complying with the Required Actions for one inoperable DG subsystem may allow for continued operation, and subsequent inoperable DG subsystem(s) governed by separate Condition entry and application of associated Required Actions.

A.1 In this Condition, the 7 day fuel oil supply for a DG is not available.

However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply. These circumstances may be caused by events such as:

a. Full load operation- required for an inadvertent start while at minimum required level; or
b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations.

This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that action will be initiated to obtain replenishment, the availability of fuel oil in the storage tank of the fifth diesel generator that is not required to be OPERABLE, and the low probability of an event during this brief period.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-49 Revision 0

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS B. 1 With lube oil sump level not visible in the sight glass, sufficient lube oil to support 7 days of continuous DG operation at full load conditions may not be available. Therefore, the DG is declared inoperable immediately.

C.1 This Condition is entered as a result of a failure to meet the acceptance criterion for particulates. Normally, trending of particulate levels allows sufficient time to correct high particulate levels prior to reaching the limit of acceptability. Poor sample procedures (bottom sampling), contaminated sampling equipment, and errors in laboratory analysis can produce failures that do not follow a trend. Since the presence of particulates does not mean failure of the fuel oil to bum properly in the diesel engine, since particulate concentration is unlikely to change significantly between Surveillance Frequency intervals, and since proper engine performance has been recently demonstrated (within 31 days), it is prudent to allow a brief period prior to declaring the associated DG inoperable. The 7 day Completion Time allows for further evaluation, resampling, and re-analysis of the DG fuel oil.

D.1 With the new fuel oil properties defined in the Bases for SR 3.8.3.3 not within the required limits, a period of 30 days is allowed for restoring the stored fuel oil properties. This period provides sufficient time to test the stored fuel oil to determine that the new fuel oil, when mixed with previously stored fuel oil, remains acceptable, or to restore the stored fuel oil properties. This restoration may involve feed and bleed procedures, filtering, or combination of these procedures. Even if a DG start and load was required during this time interval and the fuel oil properties were outside limits, there is high likelihood that the DG would still be capable of performing its intended function.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-50 Revision 0

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS E. 1 (continued)

With starting air receiver pressure < 240 psig in one or more air receivers, sufficient capacity for five successive DG start attempts can not be provided by the air start system. However, as long as all receiver pressures are > 180 psig, there is adequate capacity for at least one start attempt, and the DG can be considered OPERABLE while the air receiver pressure is restored to the required limit. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period. Entry into Condition E is not required when air receiver pressure is less than required limits following a successful start while the DG is operating.

F. 1 With a Required Action and associated -Completion Time of A through E not met, or the stored.diesel fuel oil, lube oil, or starting air not within SR -

limits for reasons other than addressed by Conditions A, B, C, D or E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.

SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate inventory of fuel oil.

in the storage tanks to support each DG's operation for 7 days at its continuous rated load. The 7 day period is sufficient time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsite location.

The 31 day Frequency is adequate to ensure that a sufficient supply of fuel oil is available, since low level alarms are provided and unit operators would be aware of any large uses of fuel oil during this period.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-51 Revision 1

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES SURVEILLANCE SR 3.8.3.2 REQUIREMENTS (continued) This Surveillance ensures that sufficient lubricating oil inventory is available to support at least 7 days of full load operation for each DG.The sump level requirement is based on the DG manufacturer's consumption values. The acceptance criteria of maintaining a visible level in the sight glass ensures adequate inventory for 7 days of full load operation without the level reaching the manufacturer's recommended minimum level.

A 31 day Frequency is adequate to ensure that a sufficient lube oil supply is onsite, since DG starts and run time are closely monitored by the plant staff.

SR 3.8.3.3 The tests listed below are a means of determining whether new fuel oil is.

of the appropriate grade and has not been contaminated with substances-that would have an immediate detrimental impact on diesel engine combustion. If results from these tests are within acceptable limits, the fuel oil may be added to-the, storage tanks without concern for contaminating the entire volume of fuel oil in the storage tanks. These .

tests are to be conducted prior to adding the new fuel to the. storage tank(s), but in no case is the time between receipt of new fuel and conducting the tests to exceed 31 days. The tests, limits, and applicable ASTM Standards are as follows:

a. Sample the new fuel oil following the guidelines of ASTM D4057-88 (Ref. 7);
b. Verify following the guidelines of the tests specified in ASTM D975-93 (Ref. 7) that the sample has a density at 15tC of > 0.816 kg/L and

< 0.876 kg/L or an API gravity of >_300 and <420, a kinematic viscosity at 40 0 C of > 1.9 centistokes and < 4.1 centistokes, and a flash point of >Ž520C; and

c. Verify that the new fuel oil has a clear and bright appearance when tested following the guidelines of ASTM D4176-91 procedure (Ref. 7), or has *<0.05% (vol) Water and sediment when tested.

following the guidelines of ASTM D1796-83 (1990) (Ref. 7).

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-52 Revision 0

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES SURVEILLANCE SR 3.8.3.3 (continued)

REQUIREMENTS Failure to meet any of the limits for key properties of new fuel oil prior to addition to the storage tank is cause for rejecting the new fuel oil, but does not represent a failure to meet the LCO concern since the fuel oil is not added to the storage tanks.

Within 31 days following the initial new fuel oil sample, the fuel oil is analyzed to establish that the other properties specified in Specification 5.5.9 and Reference 7 are met for new fuel oil when tested following the guidelines of ASTM D975-93 (Ref. 7). The 31 day period is acceptable because the fuel oil properties of interest, even ifthey were not within stated limits, would not have an immediate effect on DG operation.

This Surveillance ensures the availability of high quality fuel oil for the DGs.

Fuel oil degradation during long term storage shows up as an increase in -

particulate, mostly due to oxidation. The presence of particulate does not -

mean that the fuel oil Will not bum properdy in a diesel engine. The particulate can cause fouling of filters and fuel oil injection equipment, however, which can cause engine failure.

Particut~te concentrations should be determined following the guidelines of ASTM D2276-89 (Ref. 7), appropriately modified to increase the range to > 10 mg/l. This method involves a gravimetric determination of total particulate concentration in the fuel oil. This limit is 10 mg/I. It is acceptable to obtain a field sample for subsequent laboratory testing in lieu of field testing. The Frequency of this test takes into consideration fuel oil degradation trends that indicate that particulate concentration is unlikely to change significantly between Frequency intervals.

SR 3.8.3.4 This Surveillance ensures that, without the aid of the refill compressor, sufficient air start capacity for each DG is available.

The system design requirements provide for a minimum of five engine start cycles without recharging.

(continued)

SUSQUEHANNA - UNIT 2 B 3.8-53 Revision 0

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES SURVEILLANCE SR 3.8.3.4 (continued)

REQUIREMENTS The pressure specified in this SR is intended to reflect the lowest value at which the five starts can be accomplished. The air starting system capacity for each start cycle is calculated based on the following:

1. each cranking cycle duration should be approximately three seconds, or
2. consist of two to three engine revolutions, or
3. air start requirements per engine start provided by the engine manufacturer, whichever air start requirement is larger.

This Surveillance is modified by a Note which does not require the SR to be met when the associated DG is running. This is acceptable because once the DG is started the safety function of the air start system is performed. -

The 31 day Frequency takes into account the capacity, capability, redundancy, and diversity of the AC sources and other indications available in the control room, including alarms, to alert the operator to below normal air start pressure.

SR 3.8.3.5 Microbiological fouling is a major cause of fuel oil degradation. There are numerous bacteria that can grow in fuel oil and cause fouling, but all must have a water environment in order to survive. Removal of water from the fuel storage tanks once every 31 days eliminates the necessary environment for bacterial survival. This is the most effective means of controlling microbiological fouling. In addition, it eliminates the potential for water entrainment in the fuel oil during DG operation.

Water may come from any of several sources, including condensation, ground water, rain water, contaminated fuel oil, and from breakdown of the fuel oil by bacteria. Frequent checking for and removal of accumulated water minimizes fouling and (continued)

-SUSQUEHANNA - UNIT 2 B 3.8-54 Revision 0

PPL Rev. 1 Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES SURVEILLANCE SR 3.8.3.5 (continued)

REQUIREMENTS provides data regarding the watertight integrity of the fueloil system. The Surveillance Frequencies are established by Regulatory Guide 1.137 (Ref. 2). This SR is for preventive maintenance. The presence of water does not necessarily represent failure of this SR, provided the accumulated water is removed during performance of the Surveillance.

REFERENCES 1. FSAR, Section 9.5.4.

2. Regulatory Guide 1.137.
3. ANSI N195,1976.
4. FSAR, Chapter 6.
5. FSAR, Chapter 15.
6. Final Policy Statement on Technical Specifications Improvements, -

July 22,-1993'(58 FR 39132).

7. ASTM Standard: D4057-88; D975-93; D4176-91; D1552-90; D2622-87; D4294-90; and D2276-89.

SUSQUEHANNA - UNIT 2 B 3.8-55 Revision 0