ML073240582

From kanterella
Jump to navigation Jump to search
(NPDES Permit No. Ga 0026786) Quarterly Operational Monitoring Report
ML073240582
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/26/2002
From: Carr W C
Southern Nuclear Operating Co
To: Creason M S
Office of Nuclear Reactor Regulation, State of GA, Environmental Protection Div
References
ENV-02-081, NL-07-2097
Download: ML073240582 (444)


Text

{{#Wiki_filter:Southern Nuclear Operating Company, Inc.r O.Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN A..COMPANY Energy to Serve lOur World'M ENV-02-081 April 26, 2002 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Pennit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the first quarter of 2002 as required by the above referenced NPDES pennit.Ifyoll have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure ENV-02-081 Mr.Michael S.Creason State of Georgia Envirorunental Protection Division Page Two bee: w/o Enclosure J.B.Beasley, Jr.W.F.Kitchens J.A.Bailey I.A.Koehery B.D.Carter M.E.Wilder wi Enclosure J.T.Gasser S.Sundaram C.M.Burke REES Route: T.C.Moorer I K.W.McCracken/A.H.Lovoy ES File E.03.04 SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 21Month'*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE ill:!HYDRAZINE 01-02 7.7'*None requested this quarter.01-15 7.9 01-29 8.3 02-12 8.3 02-20 8.3 02-26 8.5 03-11 8.2 03-25 7.7 Page 1 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:1/Week1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM 01-02 0 0-0 0.40 0.0 01-09 0 0-0 01-16 0 13 min.-0.04 01-16 0 0 01-21*01-28 0 0-0 02-05 0 0-0 02-12 0 0-0 02-20 0 0-0 0.64 0.0039 02-25*03-03 0 0-0 03-04 0.18 25 min.-0.31 03-04 0.10 0.29 03-04 0 0 03-05**0 0-0*No chlorination occurred this week.**No chlorination occurred after 03-05 due to refueling outage.Page 2 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM Month of January No.of Samples**: 18 18 1 1 Average of Value: 0 0.00 0.40 0.0 Max.Value: 0 13 min.-0.04 0.40 0.0 Min.Value: 0 0 0.40 0.0 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 15 15 1 1 Average of Value: 0 0 0.64 0.0039 Max.Value: 0 0 0.64 0.0039 Min.Value: 0 0 0.64 0.0039 Limits Exceeded: 0 0 0 0 Month of March No.of Samples**: 33 33 Average of Value: 0.01 0.02 Max.Value: 0.18 25 min.-0.31 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: MUltiple Grabs Multiple Grabs Grab Grab Frequency: 1IWeek 1IWeek 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DAtE FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM 01-02 0 0-0 0.35 0.0030 01-09 0 0-0 01-16 0 0-0 01-21*01-28 0 0-0 02-05 0 0-0 02-12 0 0-0 02-20 0 0-0 0.70 0.026 02-25*03-06 0 0-0 03-13 0 0-0 03-19 0 0-0 03-22 0 0-0 03-25 0 0-0 03-26 0 0-0 03-27 0 0-0 03-28 0 0-0*No chlorination occurred this week.Page 5 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM Month of January No.of Samples**: 20 20 1 1 Average of Value: 0 0 0.35 0.0030 Max.Value: 0 0 0.35 0.0030 Min.Value: 0 0 0.35 0.0030 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 15 15 1 1 Average of Value: 0 0 0.70 0.026 Max.Value: 0 0 0.70 0.026 Min.Value: 0 0 0.70 0.026 Limits Exceeded: 0 0 0 0 Month of March No.of Samples**: 44 44 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs l/Week FAC mgll 50064*0.02 mg/I*Overflow Multiple Grabs l/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab l/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab l/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)01-09 3.51.0 01-24 2.3 1.6 02-08 2.3 1.4 02-20 2.0 8.1 03-07 2.7 2.7 03-20 1.3 3.3 Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded 2 2 2.9 1.3 3.5 1.6 2.31.0 0 0 2 2 2.2 4.8 2.3 8.1 2.0 1.4 0 0 Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.0 2.7 1.3 o Page 8 of 15 2 3.0 3.3 2.7 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (a/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (a/G)01-09 3.0:5:1.0 01-24 2.4 6.7 02-08 2.4:5:1.0 02-20 4.8 3.1 03-07 3.2 4.5 03-20 15.1 8.9 Month of January No.of Samples: 2 2 Average of Value: 2.7 3.9 Max.Value: 3.0 6.7 Min.Value: 2.4:5:1.0 Limits Exceeded: 0 0 Month of February No.of Samples: 2 2 Average of Value: 3.6 2.1 Max.Value: 4.8 3.1 Min.Value: 2.4:5: 1.0 Limits Exceeded: 0 0 Month of March No.of Samples: 2 2 Average of Value: 9.2 6.7 Max.Value: 15.1 8.9 Min.Value: 3.2 4.5 Limits Exceeded: 0 0 Page 9 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 10 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-14 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)S 1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)S 1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 S 1.0 S 1.0 S 1.0 o Page 11 of 15 1 s 1.0 S 1.0 s 1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-11 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)11.2 1 11.2 11.2 11.2 o Page 12 of 15 Discharge Line Grab 1/Quarter Oil&Grease mg/I (a/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (a/G):::;1.0 1:::;1.0:::;1.0:::;1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.DATE FAC MGtl No discharge this quarter.Page 13 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 January Date Quantity No sludge removed.February Date Quantity No sludge removed.Page 14 of 15 March Date Quantity No sludge removed. QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-02 To: 03-31-02 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. J.T.Gasser General Manager Nuclear Plant Vogtle Electric Generating Plant Page 15 of 15 Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN'\. COMPANY Energy to Serve Your World'" ENV-02-152 July 26, 2002 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Pennit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110Atlanta,Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the second quarter of 2002 as required by the above referenced NPDES pennit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, Wayne C.Carr, Manager Environmental Services WCC/GDE:aW Enclosure ENV-02-152 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: w/o Enclosure J.B.Beasley, Ir.W.F.Kitchens 1.A.Bailey I.A.Kochery B.D.Carter M.E.Wilder wi Enclosure 1.T.Gasser S.Sundaram C.M.Burke REES Route: T.C.Moorer I K.W.McCracken/A.H.Lovoy ES File£.03.04 SNC Document Management -Vogtle (Return Receipt) ..'***r...I.*QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 0&30-02 Permit No.: GA0026786 Discharge Location: 001*Final Plant Discharge (Combined Plant Waste Streams Units1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month"As requested by EPD Parameter: pH Hydrazine pes Code: 400 81313 Limits: Min.G.O Non-Detectable Max.9.0 DATE QH HYDRAZINE 04-08 7.7'None requested this quarter.04-23 7.4 04-30 8.3 05-08 8.7 05-20 8.4 Q6..03 8.1 06-06 8.7*06-18 7.9'*Sample results from"split sample" obtained during EPD sampling.Page 1 of 15 TDTAL P.Pl1 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GAOO26786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgtl 50064*0.02 mgtl*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TAC Avg.(Min-mgtl) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl"NOTE: If dechlorinator is not in use.multiple grabs will be at BaslnlFlume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 04-04 0 0-0 04-05 0 0-0 04-06 0 0-0 04-11 0.024 0.0068 04*12 0 0-0 0.36 0.0 04-13 0 0-0 04-15**0.34 0.0 04*23 0 0-0 04-25 0 0-0 04-30 0 0-0 05-03 0 0-0 05-07 0 0-0 05-10 0 0-0 05-14 0 0-0 05-17 0 0-0 05-23 0 0-0 05-28 0 0-0 05-30 0 0-0 06-03 0 0-0 06-06 0" 0-0" 06-07 0 0-0 06-10 0 0-0 06-17 0 0-0 06-20 0 0-0 06*25 0 0-0 06-27 0 0-0*Sample from samDle" obtained during EPD sampling.**No chlorinatl0n occurred thlS week.Page 2 of 15 .---_..-----..-b"'"..-*t...J r--."" QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 002*Unit 1 Cooling Tower Slowdown*(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall Multiple Grabs l/Week FAC mg/I 50064"0.02 mg/I"Final Outfall Multiple Grabs l/Week Total Time of*TRC ReI&TRC Avg.(Min-mg/I) 81400*50060 120 min.lday Basin/Flume Grab l/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab l/Quarter Chromium 1034 Max 0.2 mg/I"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples"*: 36 36 3 3 Average of Value: 0 0 0.241 0.0023 Max.Value: 0 0 0.36 0.0068 Min.Value: 0 0 0.024 0.0 Limits Exceeded: 0 0 0 0 Month of May No.of Samples u: 32 32 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples.....: 29 29 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 H Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 15 _.._..

  • _lCJ-*-QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04*01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 002A*Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency:

Parameter: PCS Code: Limits:*Overtlow Multiple Grabs 1/Week FAC mg/l 50064"0.02 mg/I'Overflow Multiple Grabs i/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034.Max 0.2 mg/l"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 15 --0---QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham. Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: pes Code: Limits: "Final Outfall Multiple Grabs 1/Week FAC mgll 50064"0.02 mg/I*FinalOutfall Multiple Grabs l/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll"NOTE: If dechlorinator is not in use.multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/1.DATE 04-01 04-02 04-05 04-09 04-11 04-16 04-18 04-23 04-25 04-30 05*03 05-07 05-10 05*14 05-17 05-23 05-28 05-30 06-03 06-07 06-10 06-17 06-20 06-25 06-27 FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 0.57 0.0035 0 0-0 0 0-0 0 0-0 0 0-0 a 0-0 0 0-0 a 0-0 0 0-0 0 0-0 a 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 a 0-0 a 0-0 0 0-0 0 0-0 a 0-0 0 0-0 0 0-0 0 0-0 0 0-0 Page 5 of 15

  • <o-J_, v Il;.;;;.;:Io

-.V&"".£.C IVU OLO-.;:>...J-r.;:> QUARTERLY OPERATIONAL MONITORING REPORT p.(Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GAOO26786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall Multiple Grabs l/Week FAC mg/I 50064"'0.02 mg/I"Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060

  • 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume.

These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples**: 46 46 1 1 Average of Value: 0 0 0.57 0.0035 Max.Value: 0 0 0.57 0.0035 Min.Value: 0 0 0.57 0.0035 Limits Exceeded: 0 0 0 0 Month of May No.of Samples"": 38 38 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples**: 30 30 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unlessnotedotherwise. Page 6 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 003A*Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mgll"Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.FAC MG/L TRC-AVG.(MIN..MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 15 QUARTERLY OPERATIONAL MONITORING REPORT I--Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06*30-02 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/1 (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)04-03 s;1.0 2.6 04*17 1.4 9.8 05-01 2.8 1.0 05*15 10.1 4.0 06-12 8.5 2.7 06-27 2.9 3.6 Month of April No.of Samples: 2 2 Average of Value: 1.2 6.2 Max.Value: 1.4 9.8 Min.Value::;1.0 2.6 Limits Exceeded: 0 0 Month of May No.of Samples: 2 2 Average of Value: 6.5 2.5 Max.Value: 10.1 4.0 Min Value: 2.8 1.0 Limits Exceeded 0 0 Month of June No.of Samples: 2 2 Average of Value: 5.7 3.2 Max.Value: 8.5 3.6 Min.Value: 2.9 2.7 Limits Exceeded: 0 0 Page 8 of 15 QUARTERLY OPERATIONAL MONITORING REPORT r"............ Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/l (TSS)Oil&Grease mg/l (O/G)pes Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)04-03 5.8 5.5 04-17 5.0 6.6 05-01 4.8 3.8 05-15 21.8 8.6 06-12 8.8 6.8 06-27 3.3 3.4 Month of April No.of Samples: 2 2 Average of Value: 5.4 6.1 Max.Value: 5.8 6.6 Min.Value: 5.0 5.5 Umits Exceeded: 0 0 Month of May No.of Samples: 2 2 Average of Value: 13.3 6.2 Max.Value: 21.8 8.6 Min.Value: 4.8 3.8 Limits Exceeded: 0 0 Month of June No.of Samples: 2 2 Average of Value: 6.1 5.1 Max.Value: 8.8 6.8 Min.Value: 3.3 3.4 Limits Exceeded: 0 b Page 9 of 15 ---_.------_.-----"-0-"'-.-........_L........-.J-.JI...., QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 006*Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 10 of 15

._-----_.-QUARTERLYOPERATIONALMONITORING REPORT r".J.L.Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge Location: 007liquid Raetwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 1/Quarter Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS):;1.0 Discharge Une Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)::5: 1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1$1.0::5: 1.0::5: 1.0 o Page 11 of 15 1::5: 1.0::5: 1.0::5: 1.0 o ..--_._--_.--------0---._-........... ,......QUARTERLYOPERATIONALMONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GAOO26786 Discharge Location: 008-liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-10 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)12.0 1 12.0 12.0 12.0 o Page 12 of 15 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)$1.0 1 S 1.0 S 1.0 S 1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 Discharge location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1tDischarge Event FAC mgtl 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgll.DATE FACMG/I No discharge this quarter.Page 13 of 15 .', QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 04-01-02 To: 06-30-02 Permit No.: GAOO26786 April Date No sludge removed.May Date Quantity No sludge removed.Page 14 of 15 June Date Quantity No sludge removed.

  • _0 0--.._Q.......___......................

__1_QUARTERL VOPERATIONALMONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-02 To: 06-30-02 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.Page 15 of 15

)Oumern NUClear Operating Company.Inc.P.O Box 1295 Birmingham, Alabama 35201-1295 Tel 205.9925000 SOUTHERN A COMPANY Energy to Serve Your WorldS" ENV-02-233 October 25, 2002 FEDERAL EXPRESS Vogtle ElectricGeneratingPlant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the third quarter of 2002 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,/-Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure ENV-02-233 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure J.T.Gasser W.F.Kitchens N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder A.Harris wi Enclosure G.R.Frederick S.Sundaram C.M.Burke."ES:FtIe£.03;04 .....*. ...SNC Document Management -Vogtle (Return Receipt) aUARTERL Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 001*Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-DetectableMax.9.0 DATE Q!j HYDRAZINE 07-02 8.3*None requested this quarter.07-16 7.9 08-05 8.6 08-16 8.2 08-26 8.6 09-09 8.5 09-23 8.5 Page 1 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall Multiple Grabs 1/Week FAC mg/I 50064"0.02 mgll"Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/l) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgIJ.DATE 07-03 07-05 07-08 07-11 07-15 07-18 07-22 07-24 07-29 08-01 08-08 08-12 08-15 08-20 08-22 08-26 08-29 09-03 09-05 09-09 09-13 09-17 09-19 09-23 09-26 09-30 FAC MG/L TRC-AVG.(MIN.MG/U ZINC 0 0-0 0 0-0 0 0-0 0.45 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 Page 2 of 15 CHROMIUM 0.0046 QUARTERLY OPERATIONAL MONITORING REPORT SouthernNuclearOperating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mgll*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/l) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/Ll ZINC CHROMIUM Month of July No.of Samples**: 33 33 1 1 Average of Value: 0 0 0.45 0.0046 Max.Value: 0 0 0.45 0.0046 Min.Value: 0 0 0.45 0.0046 Limits Exceeded: 0 0 0 0 Month of August No.of Samples**: 14 14 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 13 13 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results werezero(0)unless noted otherwise. Page 3 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/l 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter:PCSCode: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/l 50064*0.02 mg/l*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/l) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE 07-02 07-03 07-05 07-08 07-11 07-15 07-18 07-22 07-25 07-30 08-01 08-06 08-08 08-12 08-15 08-20 08-22 08-26 08-29 09-03 09-05 09-09 09-12 09-17 09-19 09-24 09-26 FAC MG/L o o o o o o o o o o o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/Ll ZINC 0-0 0-0 0-0 0-0 0.37 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0-0-0 0-0 Page 5 of 15 CHROMIUM 0.0035 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*FinalOutfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM Month of July No.of Samples**: 42 42 1 1 Average of Value: 0 0 0.37 0.0035 Max.Value: 0 0 0.37 0.0035 Min.Value: 0 0 0.37 0.0035 Limits Exceeded: 0 0 0 0 Month of August No.of Samples**: 35 35 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 41 41 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 15 aUARTERL Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/l 50064*0.02 mg/l*Overflow Multiple Grabs 1/Week Total Time of TRC ReJ.&TRC Avg.(Min-mg/l) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgll.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box*1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-10 07-24 08-07 08-21 09-04 09-18 Discharge Line Grab 21Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL nSS)7.4 5.4 4.8 4.2 3.2 1.9 Discharge Line Grab 2/Month Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (DIG)14.1 2.2 3.6 8.0 8.1 7.3 Month of July No.ofSamples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.ofSamples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 6.4 7.4 5.4 o 2 4.5 4.8 4.2 o 2 2.6 3.2 1.9 o Page 8 of 15 2 8.2 14.1 2.2 o 2 5.8 8.0 3.6 o 2 7.7 8.1 7.3 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCSCode: Limits: DATE 07-10 07-24 08-08 08-21**08-21 08-23 09-04 09-18 Discharge Line Grab 2/Month Suspended Solids mglJ (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)3.9 4.2 23.0 4.9 10.1 1.6 13.0 Discharge Line Grab 2/Month Oil&Grease mglJ (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)5.2 3.8 12.5 21.3 7.4 9.3 12.0 3.4 Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 4.1 4.2 3.9 o 3 12.7 23.0 4.9 o 2 7.3 13.0 1.6 o 2 4.5 5.2 3.8 o 4 12.6 21.3 7.4 1 2 7.7 12.0 3.4 o**NOTE: The Oil&Grease exceedance on 8/21/02 was verbally reported to the EPD on 8/22/02 and the S-day written report was waived.A summary of this event is included with this report.Page 9 of 15 .'QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCSCode: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGDl There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 10 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 07-04 Discharge Line Grab 1/Quarter Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)6.0 Discharge Line Grab 1/Quarter Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 6.0 6.0 6.0 o Page 11 of 15 11.01.01.0 o ,.QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 008*Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 07-01 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L<TSS):s;1.0 1:s;1.0:s;1.0:s;1.0 o Page 12 of 15 Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)2.3 1 2.3 2.3 2.3 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: pes Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/l 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/I.DATE FAC MGtl No discharge this quarter.Page 13 of 15 " QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 July Date Quantity No sludge removed, August Date Quantity No sludge removed.Page 14 of 15 September Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-02 To: 09-30-02 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. ...G.R.Frederick General Manager Nuclear Plant Vogtle Electric Generating Plant Page 15 of 15 Vogtle Electric Generating Plant NPDES Permit No.GA0026786 Description of Event On August 21, 2002, Vogtle Electric Generating Plant (VEGP)was performing routine sampling of the Unit 2 Waste Water Retention Basin (WWRB)in accordance with requirements of NPDES Permit No.GA0026786, OSN 005.The Oil and Grease (O&G)result from this sample was 21.3 mgll, which exceeds the 20.0 mglllimit provided in the NPDES permit.Immediate corrective action was taken to halt discharge from the WWRB.A second sample was collected at 14:15, with a result of7.35 mgll.In accordance with permit condition II.A.2, the required 24 hour verbal notification was provided to the Environmental Protection Division (Mr.Mike Creason)on August 22, 2002.Mr.Creason acknowledged the 24 hour notification and waived the 5-day written report, as allowed by permit condition III.B.18.Cause of Event The Unit 1 and Unit 2 WWRBs collect liquid wastes from floor drains, equipment drains, laboratory sinks, turbine building sumps, etc.Due to the diverse nature of influent to the WWRB it is difficult to ascertain the exact cause/source of the spike in O&G.No direct cause for the August 21, 2002, exceedance has been determined. A review is being performed to determine if basin cleaning is required.Duration of Event The initial O&G sample was collected at 08:50.A follow-up sample was collected at 14:15 which demonstrated that the O&G was within permitted limits.Therefore, the maximum event duration was 5 hours and 25 minutes.Actions Taken to Prevent Recurrence A plant Condition Report (CR)was initiated to document this event and to ensure implementation of necessary corrective action.The Unit 2 WWRB and/or the sumps and oily waste separator that feed the WWRB will be cleaned.An evaluation of the most effective cleaning process is in progress. Vogtle Electric Generating Plant NPDES Permit No.GA0026786 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a systemdesignedto assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best ofmyknowledge and belief, true, accurate and complete.I am aware that there are significant penalties for submitting false information, including the possibility of a fine and imprisonment for knowing violations. Date of Signature flln f'WiUIII.fll I 11.Southern Nuclear Operating Company, Inc.42 Inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN..\..COMPANY Energy to Serve Your World"" File: E.03.04 Log: EV-07-1480 July 27, 2007 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the second quarter of 2007 as required by theabovereferenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264./Sincerely, (,1--,',// ..Environmental Affairs v.JMG/GDE:ahl Enclosure I.i-IT"t flU n n,-n H ,@wrwMrt EV-07-1480 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure T.E.Tynan N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wi Enclosure C.R.Dedrickson D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE Qt!HYDRAZINE 04-02 7.40*None requested this quarter.04-16 7.52 04-30 7.42 05-03 05-14 05-29 06-04 06-05 06-06 06-07 06-11 06-26 7.17 8.43 8.60 8.14 8.74 8.52 8.48 8.72 8.72 Page 1 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location:*Final Outfall*Final OutfallBasin/FlumeBasin/Flume Type Sample: Multiple Grabs MUltiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mgtl) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mgtl 120 min.lday Max 1.0 mgtl Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 04-02 0 0-0 04-05 0 0-0 04-09 0 0-0 04-12 0 0-0 04-16 0 0-0 04-19 0 0-0 04-23 0 0-0 04-26 0 0-0 04-30 0 0-0 05-03 0 0-0 05-07 0 0-0 05-10 0 0-0 05-14 0 0-0 05-17 0 0-0 05-21 0 0-0 05-24 0 0-0 05-29 0 0-0 05-31 0 0-0 06-04 0 0-0 06-07 0 0-0 06-11 0 0-0 06-14 0 0-0 06-18 0 0-0 06-21 0 0-0 06-25 0 0-0 06-28 0 0-0 0.054::;0.0020 Page 2 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mgll) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mgll 120 min.lday Max 1.0 mgll Max 0.2 mgll*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/Ll ZINC CHROMIUM Month of April No.of Samples**: 12 12 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of May No.of Samples**: 13 13 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples**: 15 15 1 1 Average of Value: 0 0 0.054 SO.0020 Max.Value: 0 0 0.054 SO.0020 Min.Value: 0 0 0.054 SO.0020 Limits Exceeded: 0 0 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 17 _______,_.*_1'._-.1........*__QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow MUltiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgtl.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 17 QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgtl 50064*0.02 mgtl*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgtl.DATE 04-12 04-16 04-23 04-26 04-30 05-03 05-07 05-10 05-11 05-14 05-17 05-21 05-24 05-29 05-31 FAC MG/L o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 CHROMIUM 06-04 06-07 06-11 06-14 06-18 06-21 06-25 06-28 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0.056 SO.0020 Page 5 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 003*Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall MUltiple Grabs 1IWeek FAC mgll 50064*0.02 mgll*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.Month of April No.of Samples**Average of Value: Max.Value: Min.Value: Limits Exceeded: FAC MG/L*7 o o o o TRC-AVG.(MIN.MG/U ZINC 7 o o o o CHROMIUM Month of May No.of Samples**: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of June No.of Samples**: Average of Value: Max.Value: Min.Value: Limits Exceeded: 13 o o o o 13 o o o o 13 o o o o 13 o o o o 1 0.056 0.056 0.056 o 1 SO.0020 SO.0020 SO.0020 o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise.

  • Note: Unit 2 was in a refueling outage with the Unit 2 circulating water system drained until the second week of April.Page 6 of 17 M QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency:

Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1IWeek FAC mgtl 50064*0.02 mgtl*Overflow Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgtl.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 17 QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: pes Code: Limits: 04-04 04-25 Discharge Line Grab 2/Month Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)3.0 2.0 Discharge Line Grab 2/Month Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) 05-02 5.0:::;5.0 05-15 6.0:::;5.0 05-29 7.0:::;5.0 06-11 7.0:::;5.0 06-19 5.0:::;5.0 Page 8 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (D/G)Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.5 3.0 2.0 o 3 6.0 7.0 5.0 o 2 6.0 7.0 5.0 o Page 9 of 17 2 s5.0 s5.0 s5.0 o 3 S5.0 s5.0 s5.0 o 2 s5.0 S5.0::::5.0 o IH iii QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 005*Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-04 05-10 05-15 05-22 05-29 06-11 06-19 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSSl 29.0 8.0 3.0 6.0 8.0 7.0 6.0 Discharge Line Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)§.O§.O:::;5.0 Only one sample was pulled in April because the Unit 2 Wastewater Retention Basin was isolated and removed from service during a refueling outage.The basin was returned to service in May.Page 10 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 005*Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 29.0 29.0 29.0 o 4 6.3 8.0 3.0 o 2 6.5 7.0 6.0 o Page 11 of 17 1 s5.0 s5.0 s5.0 o 4 s5.0 s5.0 SS.O o 2 SS.O SS.O:::;5.0 o QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 LA.IJIIJ QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 007*Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-01 04-06 Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)42.0:51.0 Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)10.7:55.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 21.0 42.0 o Page 13 of 17 2 7.9 10.7 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 008*Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-03 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS):::;1.0 1:::;1.0:::;1.0:::;1.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):::;5.0 1:::;5.0:::;5.0:::;5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogtleElectricGenerating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 Discharge Location: 009*Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/I No discharge this quarter.Page 15 of 17

    • QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month)

From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 April Date Quantity No sludge removed.May Date Quantity No sludge removed.Page 16 of 17 June Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogtleElectricGenerating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-07 To: 06-30-07 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. ssell Dedrickso Plant Manager Vogtle Electric Generating Plant Page 17 of 17 I, I I I Southern Nuclear Operating Company, Inc.42 Inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN A COMPANY Energy to Serve Your V0Jrld;', April 27, 2007 FEDERAL EXPRESS File: E.03.04 Log: EV-07-0904 VogUe Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the first quarter of 2007 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, J.M.Godfrey, Manager Environmental Affairs..IMG/GDE:ahl Enclosure EV-07-0904 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure T.E.Tynan N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wi Enclosure C.R.Dedrickson D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 01-02 01-08 01-17 01*22 02*06 02-20 03-05 03-20 Final Outfall Grab 2/Month pH 400 Min.6.0 Max.9.0 J2!:!.7.94 8.12 8.24 7.94 7.21 7.37 6.95 7.25 Grab Page 1 of 17 Final Outfall*As requested by EPD Hydrazine 81313 Non-Detectable HYDRAZINE*None requested this quarter. QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown location:*Final Outfall"Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/0uarter 1/0uarter Parameter: FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mgtl) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mgtl 120 min./day Max 1.0 mgll Max 0.2 mg/l"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.DATE FAC MG/l TRC-AVG.(MIN.MG/l)ZINC CHROMIUM 01-02 0 0-0 01-03 0.091:50.0020 01-08 0 0-0 01-15 0 0-0 01-22 0 0-0 01-29 0 0-0 02-05 0 0-0 02-12 0 0-0 02-19 0 0-0 02-26 0 0-0 03-08 0 0-0 03-12 0 0-0 03-18 0 0-0 03-19 0 0-0 03-20 0 0-0 03-21 0 0-0 03-22 0 0-0 03-23 0 0-0 03-24 0 0-0 No chemical treatment occurred during the week of March 25.Page 2 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 002*Unit 1 Cooling Tower Blowdown*(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mgll*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll°NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM Month of January No.of Samples**: 5 5 1 1 Average of Value: 0 0 0.091:::0.0020 Max.Value: 0 0 0.091:::0.0020 Min.Value: 0 0 0.091:::0.0020 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 6 6 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples**: 38 38 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples, taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 002A*Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: "'Overflow

  • Overflow Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:

1/Week 1/Week1/Quarter1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits: "'0.02 mgll 120 min.lday Max 1.0 mgll Max 0.2 mgll"'NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM 02-15 0 0-0 0.017 Page 4 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown Location:*FinalOutfall

  • Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:

1IWeek 1IWeek 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM 01-02 0 0-0 01-03 0.099 SO.0020 01-08 0 0-0 01-15 0 0-0 01-22 0 0-0 01-29 0 0-0 02-05 0 0-0 02-12 0 0-0 02-19 0 0-0 02-22 0 0-0 02-25 0 0-0 02-26 0 0-0 02-27 0 0-0 02-28 0 0-0 03-01 0 0-0 03-02 0 0-0 03-03 0 0-0 Page 5 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 003-Unit 2CoolingTower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1tWeek FAC mgll 50064*0.02 mgll*Final Outfall Multiple Grabs 1tWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/L)CHROMIUM Month of January No.of Samples**: 6 6 1 Average of Value: 0 0 0.099 Max.Value: 0 0 0.099 Min.Value: 0 0 0.099 Limits Exceeded: 0 0 0 Month of February No.of Samples**: 26 26 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March#No.of Samples**: 13 13 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 1:::0.0020:::0.0020 SO.0020 o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise.

  1. The Unit 2 Circulating Water System has been drained for routine maintenance during a refueling outage.The system was drained following the 03103/07 chlorination.

Page 6 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow*Overflow Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab1/Week1/Week1/Quarter1/Quarter FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mgll 120 min.lday Max 1.0 mgll Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/Ll CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 17. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01*01*07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 21Month 21Month Parameter: Suspended Solids mgll (TSS)Oil&Grease mgll (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MGlL (O/G)01-09 9.0§.O 01-23 7.0§.O 02-06 7.0 02-20 6.0 03-06 21.0§.O 03-20 4.0§.O Page 8 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (ISS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of January No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded 2 8.0 9.0 7.0 o 2::;5.0::;5.0::;5.0 o Month of February No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of March No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded 2 2 6.5:s5.0 7.0::;5.0 6.0::;5.0 0 0 2 2 12.5::;5.0 21.0:s5.0 4.0:s5.0 0 0 Page 9 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 21Month 21Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 QAIf SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)01-09 13.0§.O 01-23 16.0:::5.0 02*06 22.0:::5.0 02-20 15.0:::'5.0 03-06 24.0:::5.0 03-20 13.0§.O Page 10 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, AlaQama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100.SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 21Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 14.5 16.0 13.0 o 2 18.5 22.0 15.0 o 2 18.5 24.0 13.0 o Page 11 of 17 2 o 2 95.0 o 2 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab l/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate l/Discharge Flow Flow (MGDl There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 007*Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)32.0 Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)6.4 Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 32.0 32.0 32.0 1 1 o 1 6.4 6.4 6.4 o On January 17, 2007, the quarterly NPDES sample from the Unit 1 liquid radioactive waste system was pulled and sent to the Georgia Power Central Lab for analysis.Results of the suspended solids were completed on January 22.2007, however the results were not forwarded to the facility until February 1,2007.The 32 MG/L suspended solids represented an exceedance of the Daily Average specification. SNC Environmental Affairs was notified of the exceedance on February 2.The analysis result was confirmed on February 7, and verbal notification was provided to Georgia EPD on February 7 at 15:16 Eastern.The 5-day written report was waived in lieu of this summary in the quarterly OMR.No indications of an adverse environmental impact were observed in the Savannah River.Follow-up actions included sampling the next available release for this discharge point to ensure that the processing system was functioning properly.This was accomplished on February 17, 2007.The sample was analyzed by the Georgia Power Central Lab and resulted in a suspended solids value of MG/L.Additional actions included having the Georgia Power Central Lab change their protocols to immediately notify the plant when sample results are completed such that more timely follow-up samples can be obtained in the event of an exceedance. Page 13 of 17


_.

'-"'--'-" QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 Discharge Location: 008*Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 01-03 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab l/Quarter Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1::;1.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) 1::;5.0::;5.0 o

_.QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-07 To: 03-31*07 Permit No.: GA0026786 Discharge Location: 009*Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1tDischarge Event FAC mgtl 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Dally Average 0.2 mgll and Dally Max.0.5 mgn.DATE FAC MGtl No discharge this quarter.Page 15 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month) From: 01-01-07 To: 03-31-07 Permit No.: GA0026786 January Date Quantity No sludge removed.February Date Quantity No sludge removed.Page 16 of 17 March Date Quantity No sludge removed.


_

.."..-.QUARTERLYOPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01*01*07 To: 03-31-07 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knOWledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. C.R Dedrickson Plant Manager VogUe Electric Generating Plant Page 17 of 17 Southern Nuclear Operating Company.hie, 42 Inverness Center Parkway Birmingham, JiJaiJama 35242 SOUTHERN A COlMPANY Energy to Serve Your World SM File: E.03.04 Log: EV-07-0181 January 26, 2007 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program Environmental Protection Division 4244 International Parkway, Suite 11 0 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric;Generating Plant for the fourth quarter of 2006 as required by the above referenced NPDES permit..If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,.'7 J''.\.i./.,/1/;:'1.'/-)1 f/t/fJ.... A Environmental Affairs/JMG/GDE:ahl Enclosure EV-07-0181 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure T.E.Tynan N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wI Enclosure C.R.Dedrickson D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) .. --_.------".,.. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10.,.01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units1&2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-03 10-17 10-31 11-07 11-13 11-28 12-05 12-12 12-19 Final Outfall Grab 2/Month pH 400 Min.6.0 Max.9.0 7.29 7.41 7.27 8.13 8.22 8.04 7.37 8.09 8.11 Page 1 of 17 Final Outfall Grab*As requested by EPD Hydrazine 81313 Non-Detectable HYDRAZINE*None requested this quarter. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs MUltiple Grabs Grab Grab Frequency: 1/Week..1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 10-23 0 0-0 10-24 0 0-0 10-25 0 0-0 10-26 0 0-0 11-01 0 0-0 11-06 0 0-0 11-09 a 0-0 11-13 0 0-0 11-15 0 0-0 11-20 a 0-0 11-21 0 0-0 11-22 a 0-0 11-23 0 0-0 11-24 a 0-0 11-27 a 0-0 11-30 a 0-0 0.063:50.002 12-04 a 0-0 12-09 a 0-0 12-11 0 0-0 12-18 a 0-0 12-19 0 0-0 12-27 0 0-0 Page 2 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 1 To: Permit NO.:GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont"d)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400 7 50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quartm Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These.limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of October No.of Samples**: 10 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 Month of November No.of Samples**: 25 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 Month of December No.of Samples**: 7 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 10 o o o a 25 o a o o 7 a o a o 1 0.063 0.063 0.063 o 1::;0.002::;0.002::;0.002 o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. The Unit 1 Circulating Water System was drained for the first three weeks of October due to normal maintenance performed during a refueling outage.Page 3 of 17----- QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC Ret&.TRCAvg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily 0.2 mgtl and Daily Max.0.5 mgt\.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 10-02 0 0-0 10-05 0 0-0 10-09 0 0-0 10-13 0 0-0 10-23 0 0-0 10-26 0 0-0 11-01 0 0-0 11-06 0 0-0 11-09 0 0-0 11-13 0 0-0 11-15 0 0-0 11-20 0 0-0 11-21 0 0-0 11-22 0 0-0 11-23 0 0-0 11-30 0 0-0 0.085 0.0026 12-04 0 0-0 12-09 0 0-0 12-11 0 0-0 12-18 0 0-0 12-19 0 0-0 12-27 0 0-0 Page 5 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/l 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of October No.of Samples**Average of Value: Max.Value: Min.Value: Limits Exceeded: 10 a o a o 10 o a o o Month of November No.of Samples**: 18 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: a Month of December No.of Samples**: 6 Average of Value: a Max.Value: 0 Min.Value: a Limits Exceeded: 0 18 o o o o 6 o o o o 1 0.085 0.085 0.085 o 1 0.0026 0.0026 0.0026 o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10..,01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 003A;..Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains*Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quart*lr Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Ovelilow to Storm Drains during the quarter.Page 7 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern NuclearOperatingCompany VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-03 10-19 11-02 11-14 11-28 12-12 12-27 Discharge Line Grab 2/Month Suspended Solids mg/I(TSS)530 Daily Avg.30 Daily Max.1 00 SUSPENDED SOLIDS MG/L (T8S)1.0:::;1.0 6.0 3.0:::;1.0 3.0 5.0 Page 80f 17 Discharge Line Grab*2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)$5.0$5.0$5.0 $5.0 QUARTERLY OPERATIONAL MONITORING REF*ORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10..;01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of October No.of Samples: Average of Value Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 1.0 1.0 1.0 o 3 3.3 6.0::;1.0 o 2 4.0 5.0 3.0 o Page 9 of17 2::;5.0::;5.0::;5.0 o 3::;5.0::;5.0::;5.0 o 2::;5.0::;5.0::;5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.1 00 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L I'D/G)10-03 14.0 10-19 5.0 11-02 3.0$5.0 11-14 7.0$5.0 11-28 6.0$5.0 12-12 8.0 12-27 7.0 Page 10 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily.Avg. 15 Daily Max.20..OIL&GREASE MG/L I[O/G)Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 9.5 14.0 5.0 o 3 5.3 7.0 3.0 o 2 8.0 10.0 6.0 o Page 11 of 17 2$5.0$5.0$5.0 o 3::;5.0::;5.0::;5.0 o 2::;5.0$5.0:::;5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 1 0-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/OverfJow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-02 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS):::;1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):::;5.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1:::;1.0:::;1.0:::;1.0 o Page 13 of 17 1:::;5.0:::;5.0:::;5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Uni1t 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-03 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L lTSS):::;1.0 1:::;1.0::;1.0:::;1.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mg/I (0/13)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):::;5.0 1:::;5.0::;5.0::;5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-:01-06 To: 12-31-06 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the bloVlfdown. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgtl.DATE FAC MG/I No discharge this quarter.Page 15 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 10-01-06 To: 12-31-06 Permit No.: GA0026786 October Date Quantity No sludge removed.November Date Quantity No sludge removed.Page 16 of 17 December Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-06 To: 12-31-06.Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, inclUding the possibility of fine and imprisonment for knowing violations. =Thomas E.Tynan Vice President Nuclear Plant Vogtle Electric Generating Piant Page 17 of 17 Southern Nuclear Operating Company, Inc..42 Inverness Center Parkway Birmingham, Alabama 35242".,.Your World"" October 26, 2006*'Filet.e:Cls.04 ......*Log:'EV-06-2467 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the third quarter of 2006 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, JMG/GDE:ahl J.M.Godfrey, Manager I Environmental Affairs//J Enclosure EV-'06-2467 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wi Enclosure T.E.Tynan D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) From: To: PermIt GiA<H Discharge I.ocation; 001Final Plant Discharge: (Combined Plant Waste Streams Units 1&2)QUARTERLY OPERATIONAL MONITORING Southern Nuclear Opel"ating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham. Alabama 35201 Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month.*As requested by Parameter: pH Hydrazine PCSCode: 400 81313 limits: Min.6.0 Non-Detectable Max.9.0 DATE rili HYDRAZINE 07-12 7.47"'None 07-25 8.20 08-07 8.34 08-23 8.24 09-05 7.05 09-19 7.16 Page 1 of 18 QUARTERL.V OPERATIONAL MONITORING RE::PORT Southern Nuclear Oper'ating Company Vogtle Electric Genera-jng Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-0H)6 To: 09-30-06 Permit No.: GA0026786 Disch31rge Location: 002-Unit 1 Cooling Tower Slowdown Location: "Final Outfa.1I"Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1JWeek 1/Week 1/Quarter 1/Quarter Parameter: FACmg/1 Total Time of Zinc Chromium TRe ReI.&TRC Avg.(Min-mg/I) PCSCode: 50064 81400-50060 1092 1034 Limits: "0.02 mg/l'20 min./day Max 1.0mgll Max 0.2 mgll"'NOTE: If dechloriMtor is not in use, multiple grabs will be at BasIn/Flume. These limits will be Daily Average O.:Z mgll and Daily Max.0.5 mgll.DATE FAC MG/L TRe-AVa.(MIN.MG/L)ZINC CHROMIUM 07*03 0 0-0 0 0-0 07-10 0 0-0 0 0 0-0 0 0-0 07-24 0 0-0 0 0-0 0 0-0 08-'0 0 0-0 08-14 0 0-0 08-17 0 0-0 08-18 0.06:!:>0.O07 08-21 0 0-0 08-24 0 0-0 08-31 0 0-0 09-05 0 0-0 09-11 a 0-0 09-12 0 0-0 0 09-14 0 0-0 09-15 0 0-0 09-16 0 0-0 Page 2 of 18 QUARTERL.V OPERATIONAL MONITORINGRE:PQR'J' Southern Nuclear Operating Company Vogtle Electric Generaling Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01;.()6**;* To: 09-30-06.' .....Permit No,:.

'::"";",',-':0::'",'-"":':;<" Discharge Location: 002..Unit 1 Cooling Tower.Location: Type Sample: Frequency:

Parameter: PCSCode: Limits: "'Final Outhll Multiple Grabs 1/Week FAC mg/l 50064*0.02 mgll*Final Outfall MUltiple Grabs 1rweek Total Time of TAe ReI.&TRO Avg.(Min-mgll) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0mg/1 Orab'. .Chromium*1034...,*.....Max 0;:2 mgll"NOTE: If dechlorinntor is not in use, multIple grabs will be at Daily Average mg/l and Daily Max.0.5 mg/l.:-:,:,.'......./,....',c':*.':0',;:':',':

>",".DATE FAC MGiJ", TRC-AVG.(MIN.MGIU ZINC CHRQllAllJM

..Month of July No.of Samples 8 8 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: a a Month of August No.of Samples"II: 12 12 1 1 Average of Value: 0 0 0.06 sO.007 Max.Value: 0 a 0.06 S:0.OO7 Min.Value: 0 0 0.06 SO.007 Limits Exceeded: 0'0 0 0 Month of September No.of Samples......: 41 Average of Value: 0 Max.Value: a Min.Value: 0 Limits Exceeded: 0 41 o o o o...*Note: 'No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0) noted otherwise. Page 3 of 18 QUARTERL.Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 09-30-06 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCSCode: Limits: "Overflow Multiple Grabs 1/Week FAC mg/l*50064"'0.02 mg/l"'Ovetflow MUltiple Grabs 1/Week Total Time of TRC Rei.&TRC Avg.(Min-mg/l) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/QUlarter Chromium 1034 Max 0.2 mgll"'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mgt!.TRC-AVG.(MIf::J.MG/U ZINC CHROMIUM There were no oV$r1low:s; of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 18 QUARTERLY OPERATIONAL MONITORINGRll:eOR .....Bas Grab....*....1IQuarter>** .Chromiurn..........1034.'*.., Max 0.2 mgll From: 07-01*;06.To: '.. Basin/Flume Grab 1/Quarter Zinc 1092.Max 1.0 mgl1*Final Outfall Multiple Grabs 1/Week Total Time of TRG ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Disch:uge Location: 003-Unit 2 Cooling Tower Blowd<J*Finsl Outhll Multiple Grabs 1/Week FAC mg/l 50064"0.02 mgt!Southern Nuclear Operating Company Vogtle Electric GeneraHng Plant P.O.Box 1295 Birmingham, Alabama 35201 PCS Code: Limits: Location: Type Sample: Frequency: Parameter: <",.:.:..."',.,:,..,...:.,.,,-,..:....'*.,.,*.*NOTE: If dechlorinator is not in use, mUltiple grabs will be at will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.,;;.p; ..*""\\ii.: OATs 07-03 07-06 07-10 07-13 07-17 07-20 07-24 07-31.FAC MG.t]b o o o o o o o o TRC-AVG.(MIN.MGLL)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 08-07 08-10 08-14 08-17 08-18 08-21 08-24 08-28 o o o o o o o 0-0 0-0 0-0 0.072 0-0 0-0 0-0 Page 5 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric GeneraHng Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01**06 To: 09-30**06 Permit No.: GAOQ26786 Disch:nge Location: 003-Unit 2 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCSCode;Limits: "'Final Outf 3.11 MUltiple Grabs 1/Week FAC mgtl 50064"0.02 m911"'Final Outfall Multiple Grabs 1fWeek Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl"'NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgfl and Daily Max.0.5 mg/l.09-05 09-18 09-25 09"26 09-27 09-28 09-29 09-30 EACMG/j.,. o o o o a o o o o o o TRC-AVG.(MIN.MGl\..)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 6 of 18 CHROMIUM QUARTERLY OPERATIONAL MONITORINGtREeORT Southern Nuclear Operating Company Vogtle Electric Generanng Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-06'" To: __;. Permit No.:'* Discharge r*.ocation: 003*Unit 2 Cooling Tower Slowdown .Location: Type Sample: Frequency: Parameter: pes Code: Limits:*Final Outf:?111 MUltiple Grabs 1/Week FAG mg/l 50064....0.02 mgll"'Final Outfall Multiple Grabs 1IWeek T otar Time of TRCtel.&TAC vg.(Min-mg/I) 81400 J 50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flcime' . ",..Chromium.*** 1034..'.Max 0.2 mgll ,-:!:',-..--NOTE: If dechlorinator is not in se, multiple grabs will be at Basin/Flume:Tneselimits will be Daily Average 0.2 mg I and Daily Max.0.5 mgtl..'DATE FAC TRC-ZINC.qI::lR()MIUM Month of JUly No.of Samples**9 9 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of August No.of Samples**: 11 11 1 Average of Value: 0 0 0.072 sO'.007 Max.Value: 0 0 0.072:!iO.OO7 Min.Value: 0 0 0.072 50.007 Limits Exceeded: 0 0 0 0 Month of September No.of Samples**: 42 42 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taKen each day.Samples were taken on the dates indioated. All results were zero (0) noted otherwise. Page 7 of 18 QUARTERL.Y OPERATIONAL MONITORING REPORT Southern.Nuclear Open-J,ting Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-06 To: 09-30-06 Permit No.: GiA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: pes Code: Limits:*Overllow MUltiple Grabs 1/Week FAC mgll 50064*0.02mg/l"Overflow Multiple Grabs 1/Week Total Time of TAC ReI.&TRC Avg. 81400-50060 120 minJday Basin/Flume Grab 1JQuarter Zinc 1092 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l"'NOTE: If dechlor;nator is not in use, multiple grabs will be at Basin/Flume. 'These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mgt!.FAC MGdl,;TRC-AVG.(MIN.MGlL)ZINC There were no oveJ1lows of the Unit 2 Cooling Tower Blowdown Emergency to Storm Drains during the quarter.Page 8 of 18 QUARTERL.Y OPERATIONAL MONITORING REPeRT Dischar';le Location: 004*Unit 1 Waste Water Southern Nuclear Opera.ting Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 09-30-09",/,'Permit No.: '.Location: Type Sample: Frequency: Parameter: pes Code: Limits: 07-25 08-09 08-22 09-05 09-20 Dil:;Charge Line Grab 2tlVlonth Suspended Solids mgtl (TSS) Avg.30 Duily Max.100 SUSr:,ENDEP SOLIDS MG/L (TSSJ 3,0 2.0 3.0 3.0 7.0 13.0 Page 9 of 18 Discharge Line Grab 2/Month Oil&Grease m91I(O'f§)"i!/ 550......Daily Avg.15 Daily Max.20 OIL&GREASE*MG/I;;(O/G) $5.0:55,0$5.0 s5.0 s5.0$5.0 QUARTERL.Y OPERATIONAL MONITORING REPORT Southem Nuclear Operating Company Vogtle Electric Generafing Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-*06 To: 09-30**06 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin'Location: Type Sample: Frequency: Parameter: pes Code: Limits: Di::;charge Line Grab 2frVlonth SLlspended Solids mgtl (TSS)52.0 Dully Avg.30 Max.100.SUSPENDED SOLIDS MG/L (TSS)Discharge line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg, 15 Daily Max.20 OIL&GREASE MGll (O/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: A.verage of Value: Max.Value: Min Value: Limits Exceeded Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.5 3.0 2.0 o 2 3.0 3.0 3.0 o 2 10.0 13.0 7.0 o Page 10 of 18 2 o 2:$5.0 S;5.0 o 2§.O o QUARTERLY OPERATIONAL MONITORINGRIEPQRT Southern Nuclear Operating Company Vogtle Electric Genera.ting Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07*01°06 To: 09':30..06 Permit No.: Discharge location;005..Unit 2 Waste Water Location: Type Sample: Frequency: Pa.rameter: pes Code: Limits: DATE 07*11 07-25 08-09 08*22 09-05 09-20 Dkl;charge Line Grab 2/Month Suspended Solids mgll (TSS)52,0 Daily Avg.30 Max.100 SUSJ?,ENDED SOUDS MG/L (TSS)15.0 7.0 7.0 9.0'0.0 6.0 Page l'of 18 Discharge Line Grab 2/Month Oil&GreasemQlI(Clh!G) 550 Daily Avg.15 Daily Max.20 OIL'&GREASEMG1L::(,OJG)

55.0:::;5.0 S5.0 S:5.0,:::;5.0::;5.0 QUARTERL,Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Genera1'ing Plant P.O, Box 1295 Birmingham, Alabama 35201 From: 07-01..06 To: 09-30*06 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin location: Type Sample: Frequency:

Parameter: PGS Code: limits: Di:5charge Line Grab 2/Month Sl.]spended Solids mgtl (TSS) Oiaily Avg.30 Dally Max.100 SUSI'ENDED SOLIDS MG(j,JTSS) Discharge Line Grab 2/Month Oil&Grease mgtl (O/G)550 Daily15 Daily Max, 20 QIL&GREASE MGLL{O/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min.Value: limits Exceeded: Month of No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 11.0 15.0 7.0 o 2 8.0 9.0 7.0 o 2 8.0 10.0 6.0 o Page 12 of 18 2$5.0 o 2:::;5,0 o 2$5.0 S5.0 o QUARTERL,V OPERATIONAL MONITORING REPORT e Discharge Location: 006Sewage Treatment Overflow to Savannah River Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Location: Type Sample: Frequency: Parameter: pes Code: Limits: Sewage IOverflow Grab 1/)ischarge BOD mg/I 310 Daily Avg.30 Max.45 Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.g.O There were no overflows of the Sewage Treatment Plant to the Savannah Fliverdurlng the quarter.Page 13 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham l Alabama 35201 From: 07-01**06 To: 09-30**06 Permit No.: GA0026786 Discharge Location: 007-liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCSCode: Limits: 07-06 Discharge Line Grab 1/Quarter:3uspended Solids mg/l (TSS)330 Daily Avg.30 Daily Max.1 00 SUSI::lENDED SOLIDS MB/L (TSS):5:1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/l (O/G)550.Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (DIG)g).O No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1$1.0$1.0::;1.0 o Paqe 14 of 18 1:55.0 S).O$5.0 o QUARTERLY OPERATIONAL MONITORING REPOR-r Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01*;06 To: Og.:..SO;;Op Permit "..'-""'".-;i';b:,'-' Discharge L.ocation: 008*Liquid Radwaste Systems Location: Type Sample: Frequency: Parameter: pes Code: Limits: Di5charge Line Grab 1/Quarter Suspended Solids mg/l (TSS) Daily Avg.30 100 DischargeGrab 1/Quarter Oil&Greaserng!l(OtS}*** 550.Daily AV9.15 Daily Max.20 DATE SOLIDS MGfL aSS}07-26::;1.0 No.of Samples: 1 Average of Value:$1.0 Max.Value:.:51.0 Min.Value:;$1.0 Limits Exceeded: 0 Page 15 of 18 OIL&GREASE MgfL (QjG). j;.,:55:0*§.(j SS.O o QUARTERL,Y OPERATIONAL MONITORING RlepORT Southern Nuclear Operating Company Vogtle Electric Generai"lng Plant P,O.Box 1295 Birmingham, Alabama 35201 From: 07-01-06 To: 09-30-06 Permit No.: GA0026786 Discharge".oeation: 009-Nuclear Service Cooling Tower Blowdlown (Units 1 and 2)Location: Type Sample: Frequenoy: Parameter: PCS Code: Limits: "Final Outfall 13rab 1/Discharge Event=AC mg/I 50064'0.02 mgtl*NOTE: If dechlof'inator is not in use, grab samples will be at the blll)wdown. These limits will beDailyAverage O.2mg/l and Daily Max.0.5 mgJl.DATE FAC MGII No discharge this quarter.Page 16 of 18 ,'....'-, QUARTERL.V OPERATIONAL MONITORINGREPC>R"I" Southern Nuclear Operating Company Vogtle Eleotric Geners':ing Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month) From: To: 09"30,J)$' Permit No.:GAOO2678a July Date Quantity No sludge removed.August Date No sludge removed.Page 17 of 18 September.Date.'C1Uantity No sludge removed. QUARTERL.Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07*010-06 To: Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed!to assure that qualified personnel properly gather and evaluate the information submiUed.Based on my inquiry of the person or persons who manage the system!or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Thomas E.Tynan General Manager Nuclear Plant Vogtle Electric Generating Plant Page 18 of 18

  • Southern Nuclear Operating Company, Inc.42 Inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN A COMPANY Energy to Serve Your Worid SM File: E.03.04 Log: EV-06-1608 July 24, 2006 FEDERAL EXPRESS Vogtle Electric GeneratingPlant(NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the second quarter of 2006 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,./f r ( \J.M.Godfrey Manager, Environmental A JMG/GDE:ahl Enclosure

  • EV-06-1608 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wI Enclosure T.E.Tynan D.G.Goodwin SNC Document Management

-Vogtle (Return Receipt) QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric GenE rating Plant P.O.Box 1295 Birmingham, Alabarr:a 35201 From: 04-01-06 To: Permit No.: GA0026786 Discharge Location: 001*Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 21Month"'As requested by EPD Parameter: pH Hydrazine pes Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE ill:!HYDRAZINE 04-05 8.32*None requested this quarter.04-17 7.40 05-02 8.26 05-15 8.33 06-08 8.17 06-15 8.37 06-29 8.22 Page 1 af 17 QUARTEBl Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric GenE rating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Discharge Location: 002*Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: pes Code: Limits:-FinalOLtfaIJ Multiple 3rabs 1/Week FAC mg/I 50064"0.02 mgJl"'Final Outfall MUltiple Grabs l/Week Total Time of TRC ReI.&TAC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab l/Quarter Chromium 1034 Max 0.2 mg/I"NOTE: DAT,&04-06 04-07 04-13 04-20 04-27 05-01 05-04 05-08 05-11 05-15 05*18 05-23 05-24 05-25 05-26 05-27 05-29 06-02 06-05 06-12 06-15 06-19 06-22 06-26 06-30 If dechlorir,ator is not in use.multiple grabs will be at Basin/Flume. These limits will be Daily Averagemg/I and Daily Max.0.5 mgll.FAC TAC-AVG.(MIN.MG/L)ZINC CHROMIUM a 0-0 0.10 0.022 0 0-0 a 0-0 0 0-0 a 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 a 0-0 0 0-0 a 0-0.Page 2 of 17 QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Gene rating Plant P.O.Box 1295 Birmingham, Arabarr'a 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown..(cont'd)Location: Type Sample: Frequency: Parameter: pes Code: Limits: "Final Outfall Multiple Grabs 1JWeek FAC mgl'50064"0.02 mg/l*Final Outfall MUltiple Grabs 1lWeek Total TIme of TAe ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll If dechlorinator is not in use, mUltiple grabs wilt be at Basin/Flume. These limits will be Daily Average 0..2 mgn and Daily Max.0.5 mg/I.DATE FAC MG,'k(MIN.MG/U ZINC CHROMIUM Month of April No.of Samples**: 4 4 1 1 Average of Value: 0 0 0.10 0.022 Max.Value: 0 0 0.10 0.022 Min.Value: 0 0 0.10 0.022 Limits Exceeded: 0 0 0 0 Month of May No.of Samples**: 49 49 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples...: 10 10 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 U Note: "No.01 samples" illdicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 17 QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabarr1a 35201 From: 04-01-05 To: Permit No.: GA0026786 Discharge Location: 002A*Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "'Overflol/lr MUltiple Grabs 1/Week FAC mgll 50064*0.02 mg/I"'Overflow Multiple Grabs 1/Week Total Time of TAC ReI.&TAC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mglJ Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl"'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily jJ verage 0.2 mg/l and Daily Max.0.5 mgll.FAC MG:L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 17 QUARTEBL Y OPERATIONAL MONITORING REPORT Southem Nuclear Operating Company Vogtle Electric Gene rating Plant P.O.Box 1295 Birmingham, Alabarra 35201 From: To: 06-30-06 Permit No.: GA0026786 Discharge Location: 003Unit 2 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/I"'Final Outfall Multiple Grabs 1/Week Total Time of TRC Rei.&TRe Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mglJ*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgt!.DATE 04-06 04-07 04-13 04-20 04-27 05-01 05-04 05-08 05-11 05-15 05-19 05-22 05-29 06-02 06-05 06*06 06-07 06*08 06-09 06-10 06-12 06-15 06*19 06-22 06-26 06*30 FAC MG/L TRC-AVG.(MIN.MOIL)ZINC CHROMIUM 0 0-0 0.092 0.015 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 a 0-0 0 0-0 0 0-0 0 a-a 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 a a a-a 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 Page 5 of 17 QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Gene rating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Location: 003-Unit 2 Cooling Tower SlOwdown-(cont'd)Location: Type Sample;Frequency: Parameter: pes Code: Limits: "Final OL Hall MUltiple 3rabs 1/Week FAC mQlI 50064"0.02 mgll*Final Outfall Multiple Grabs 1/We.ek Total Time of TRC ReI.&TRC Avg.(Min-mg/l) 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use.mUltiple grabs will be at Basin/Flume. These limits will be Daily fl verage 0.2 mgtl and Daily Max.0.5 mgtL DATE FAC MG/h IRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples**4 4 1 1 Average of Value: 0 0 0.092 0.015 Max.Value: 0 0 0.092 0.015 Min.Value: 0 0 0.092 0.015 Limits Exceeded: a a 0 0 Month of May No.of Samples**: 14 14 Average of Value: a a Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples......: 40 40 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0*"'Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 17 QUARTEBLV OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Gene rating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: pes Code: Limits:*OverflolJll Multiple Grabs 1/Week FAC mgtl 50064*0.02 mgt"Overflow Multiple Grabs 1/Week Total Time of TRG ReI.&TRC Avg.(Min-mglJ) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/l<<oNOTE: If dechlorhator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 17 QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogtJe Electric Generating PlantP.O.Box 1295 Birmingham, 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Dischiuge Location: 004..Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month Parameter: Solids mg/l (TSS)Oil&Grease mgll (O/G)pes Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 C'aily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (ISm OIL&GREASE MG/L (O/m 04-05 4.0:510.0 04-18 1.0:$5.9 05-02 2.0 Sl.O 05-17 1.0$5.0 05-31 4.0 8.2 06-14$5.0 5.0 06-27 10.0$5.0 Page 8 of 17

V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric GenE rating Plant P.O.Box 1295 Birmingham, Alabarra 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Disch:lrge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: pes Code: Limits: Discharge Line Grab Solids mg/I (TSS)530 Daily Avg.30 C;aily Max.100 SUSI:..ENDEP SOLIDS MG/L (TSS)Discharge Une Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL& (O/ID Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.5 4.0 1.0 o 3 2.3 4.0 1.0 o 2 7.5 10.0 g).a o Page 9 of 17 2$7.95 s10.0 SS.9 o 3 6.1 8.2::;5.0 o 2 5.0 5.0:$5.0 o QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabarr a 35201 From: 04-01-06 To: 06-30.06 Permit No.: GA0026786 Dischl3lrge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month Parameter: Suspended Solids mg/l (T$5)Oil&Grease mgll (O/G)pes COde: 530 550 Limits:['aily Avg.30 Daily Avg.15 Caily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)QJL&GREASE MGlL (O/G)04-05 2.0 04-18 3.0$6.4 05-02 5.0 55.0 05-17 5.0:S5.0 05-31 9.0 6.4 06-14 12.0$5.0 06-27 7.0§.O Page 10 of 17 QUARTEBL V OPERATIONAL MONITORING REPORT Southem Nuclear Operating Company Vag tIe Electric Gene rating Plant P.O.Box 1295 Birmingham, AlabafT a 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Disch;:rrge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: pes Code: Limits: Discharge Line Grab c'fMonth E,uspended Solids mg/l (TSS)530 ('aily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS}Discharge Line Grab 2/Month Oil&Grease mgll (DIG)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (OLG)Month of April No.of Samples: Average of Value: Max.Value: Min.Value: limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.5 3.0 2.0 o 3 6.3 9.0 5.0 o 2 9.5 12.0 7.0 o Page 11 of 17 2 s7.9 S6.4 o 3 5.5 6.4 o 2 S>.O 55.0 o QUARTEnL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, AlabalTa 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Dis':harge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: /Overflow Sewage/Overflow Type Sample: Grab Grab Frequency: 1/Discharge 1/Discharge Parameter: EOD mgll pH pes Code: 310 400 Limits: CaHy Avg.30 Min.6.0 Daily Max.45 Daily Max.9.0 DATE BODMG/L m:I 06*24 16.4 6.9 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)0.0003 A total of 300 gallons was discharged from this outfall.Page 12 of 17 QUARTEBL V OPERATIONAL MONITORING REPORT Southsrn Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabarra 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: pes Code: Limits: DATE 04-10 Discharge Line Grab 1/Quarter Suspended Solids mgtl (TS8)530 Daily Avg.30 Daily Max.'00 SUSPENDED SOLIDS MOIL (TSSl$1.0 Discharge Line Grab 1!Ouarter Oil&Grease mgll (O/G)550 Daily Avg.1S Daily Max.20 OIL&GREASE MG/L{O/Gj S).2 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1;$1.0 S1.0 o Page 13 of 17 1 S).2 o QUAATEHLV OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabarra 35201 From: 04-01-06 To: 06-30-06 Permit No.: GA0026786 DischargE-Location: 008-liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: pes Code: Limits: No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 C aily Max.100 SOLIDS MGIL (TSS):::1.0 ,:s:1.0$1.0$1.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L lO/G)SS.O 1$5.0 55.0 o QUARTEBL Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Gene rating Plant P.O.Box 1295 Birmingham, Alabarrla 35201 From: -06 To: 06-30*06 Permit No.: GA0026786 Discharg l;'Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: pes Code: Limits: "'Final Outfall Grab 1IDischarge Event FAC mgll 50064"0.02 mgll*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.DATE FAC MG/I No discharge this quarter.Page 15 of 17

  • QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric GenErating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month)

From: To: 06-30-06 Permit No.: GA0026786 April Date Ouantity No sludge May Date No sludge removed.Page 16 of 17 June Date Ouantity No sludge removed.

  • QUARTEBLY OPERATIONAL MONITORING REPORT Southern Nuclear O:Jerating Company VogtJe Electric GenE'rating Plant P.O.Box 1295 Birmingham, AlabalTla 35201 From:

-06 To: Permit No.: GA0026786 I certify, under penalty of law , that this document and all attachments were prepared under the direction of supeNision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the pe rson or persons who manage the system, or those persons directly responsible for 9ath::ring the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I.am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. cJj Thomas E.Tynan General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17 Southern Nuclear Operating Company, Inc.42 Inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN A COMPANY EllelKJI to Serve YOUI'WorldS" April 25, 2006 FEDERAL EXPRESS File: E.03.04 Log: EV-06-0769 VogtleElectricGenerating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program*Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the first quarter of 2006 as requiredbythe above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,/','.",._/'/,f ,7 r,..".,:-:-'./.'._'J Ii'L.{{/n t{..,)../*Li20/' \.......-/I IJ.M.Godfrey, Manager,.1 Environmental Affairs v:/JMG/GDE:ahl Enclosure EV-06-0769 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette P.D.Rushton N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wi Enclosure T.E.Tynan D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 03/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 03-31-06 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month"'As requested by EPD Parameter: pH Hydrazine pes Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE Q.t:t HYDRAZINE 7.34"'None requested this quarter.01*24 8.44 02 w 01 7.65 02-06 7.56 8.35 8.36 03-23 7.05 Page 1 of 17 04/25/2006 10:54 7068263787 VEGP:2ND FLOOR SERV PAGE 04/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-06 To: Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location: "'Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs MUltiple Grabs Grab Grab Frequency: tMleek 1JWeek 1/Quarter 1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC Rei.&TRC Avg.(Min-mg/I) PCS Code: 50064 1092 1034 Limits: "'0.02 mgll 120 min.lday Max 1.0 mgll Max 0.2 mgll"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgt!.....QATE FAG MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 01-05 0 0-0 01-06 0.10 0.0049 01-12 0 0-0 01-13 0 01-20 0 0-0 02-03 0 0-0 02-14 0 0-0 02-23 0 0-0 03 w 02 0 0-0 03-08 0 0-0 03-16 0 0-0 03-23 0 0-0 03-30 0 0-0 Page 2 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 05/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-06 To: 03-31-06 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown(cont'd)Location: Type Sample: Frequency: Parameter: PC$Code: Limits: "'Final Outfall Multiple Grabs 1/Week FAC mg/I 50064"'0.02 mgtl"'Final Outfall Multiple Grabs 1tWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll"'NOTE;If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of January No.of Samples""": 21 21 1 1 Average of Value: 0 0 0.10 0.0049 Max.Value: 0 0 0.10 0.0049 Min.Value: 0 0 0.10 0.0049 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 7 7 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples"': 9 9 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0"'*Note: 'No.of samples" indIcates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. No treatments occurred the weeks of January 22-28 and February 5-11.Page 3 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 05/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01*06 To: 03-31-06 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "'Overflow Multiple Grabs 1/Week FAG mg/I 50064"'0.02 mg/l"Overflow Multiple Grabs 1/Week Total Time of TRG ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll"'NOTE: It dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/1.FAC MG/L TRG-AVG.(MIN J MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergenoy Overflow to Storm Drains during the quarter.Page 4 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 07/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 03-31-06 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall....Final Outfall Basin/Flume Basin/Flume Type Sample: MUltiple Grabs Multiple Grabs Grab Grab Frequency: 1IWeek 1/Week 1/Quarter 1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81 400-50060 1092 1034 Limits:....0.02 mgll 120 min.lday Max 1.0 mg/I Max 0.2 mg/I....NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mgll.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 01-05 0 0-0 01-06 0.10 0.0047 01-13 0 0-0 01-20 0 0-0 02-03 0 0-0 02-14 0 0-0 02-16 0 0-0 02-23 0 0-0 03-02 0 0-0 03-08 0 0-0 03-16 0 0-0 03-29 0 0-0 03-30 0 0-0 Page 5 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 08/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-06 To: Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: pes Code: Limits: "Final Outfall*Final Outfall Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1IWeek 1/Week 1/Quarter 1/Quarter FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034"0.02 mg/l 120 min.lday Max 1.0 mg/1 Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgl1 and Daily Max.0.5 mgl1.F'AC MG/L TRC-AVG.(MIN.MG/L)CHROMIUM Month of January No.of Samples**: 19 19 1 Average of Value: 0 0 0.10 Max.Value: 0 0 0.10 Min.Value: 0 0 0.10 Limits Exceeded: 0 0 0 Month of February No.of Samples**: 10 10 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples"'*: 11 11 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 1 0.0047 0.0047 0.0047 o...."Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. No treatments occurred the weeks of January 22 M 28, February 5-11, and March 19-25.Page 6 of 17 04/25/2006 10:54 7068263787 VEGP:2ND FLOOR SERV PAGE 09/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-06 To: 03-31-06 Permit No.: GA0026786 Discharge Location: 003A*Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: pes Code: Limits:*Overflow"Overflow Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1IWeek 1lWeek 1/Quarter 1tQuarter FAC mg/I Total Time of Zinc Chromium TRe ReI.&TRe Avg.(Min-mgl1) 50064 81400-50060 1092 1034"0.02 mg/I 120 min.lday Max 1.0 mg/l Max 0.2 mgtl"'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/1.FAC MGLL TRC-AVG.(MIN.MG/L)CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains dUring the quarter.Page 7 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 10/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 03-31 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mgll (TS8)Oil&Grease mg/l (D/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MGLL (TSS)OIL&GREASE MG/L (O/G)01-10 3.0 01*24 5.0:;:;10.0 02-08 2.0:S10.0 02-21 3.0 03-07 7.0 S5.0 03-25 1.0 Page 8 of 17 04/25/2006 10:54 7068263787 VEGP:2ND FLOOR SERV PAGE 11/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01 To: 03-31-06 Permit No.: GA0026786 Discharge Location: 004Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.1 00 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of January No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded 2 4.0 5.0 3.0 o 2 57.8 S10.0::;5.6 o Month of February No.of Samples: Average at Value: Max.Value: Min Value: Lim its Exceeded Month of March No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded 2 2 2.5 sa.6 3.0 S10.0 2.0 9.1 0 0 2 2 4.0 9.5 7.0:::10.0 1.0 0 0 Page 9 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 12/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mgll (T8S)Oil&Grease mgll (O/G)pes Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOUDS MG/L (TSSj OIL&GREASE MGlL (G/G)01-10 4.0:SS.6 01-24 7.0:£10.0 02-08 3.0 S10.0

£1.0:57.1 12.0 g;.O 03-25 5.0:£10.0 Page 10 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 13/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-06 To: 03-31-06 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency:

Parameter: PCS Code: Limits: Discharge Line Grab 21MonthSuspendedSolids mgll (TSS)530 Daily Avg.30 Daily Max.100 SOLIDS MG/L (TSS)Discharge Line Grab 21Month Oil&Grease mg/I (GIG)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 5.5 7.0 4.0 o 2 2.0 3.0 o 2 8.5 12.0 5.0 o Page 11 of 17 2:::;10.0::;5.6 o 2 sa.6 o 2 S5.0 o 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 14/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 B.,9D MGlL Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 15/19 Y OPERATIONAL MONITORING REPORT Southern Nuolear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 03"31-06 Permit No.: GA0026786 Discharge Location: 007..Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: pes Code: Limits: 01-04 Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 f'USPENDED SOLIDS MG/L (TS,.S).:51.0 Discharge Line Grab 1/Quarter Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 QIL&GBEASE MG/L (O/G) No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1:51.0 o Page 13 of 17 1$5.0;SS.O$5.0 o 04/25/2005 10:54 7058253787 VEGP:2ND FLOOR SERV PAGE 15/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-06 To: 03-31"06 Permit No.: GA0026786 Discharge Location: OOB-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: pes Code: Limits: DATE 01-03 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mgt'l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS.l:S1.0 1::;1.0:;;1.0 o Page 14 of 17 Discharge Une Grab 11Quarter Oil&Grease mgll (OIG)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) 1§.O SS.O o 04/25/2006 10:54 7068263787 VEGP:2ND FLOOR SERV PAGE 17/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01*01-06 To: 03*31*06 Permit No.: GA0026786 Discharge Location: 009*Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: pes Code: Limits: "'Final Outfall Grab 1tDischarge Event FAC mgll 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.DATE FAC MGtl No discharge this quarter.Page 15 of 17 04/25/2006 10:54 7068263787 VEGP:2ND FLOOR SERV PAGE 18/19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 01-01-06 To: 03-31-06 Permit No.: GA0026786 January Date Quantity No sludge removed.February Date Quantity No sludge removed, Page 16 of 17 March Date Quantity No sludge removed. 04/25/2006 10:54 7068263787 VEGP:2ND FLOOR SERV PAGE 19/19 Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01*06 To: Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qua.lified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. T.E.Tynan General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17 Southern Nuclear Operating Company.Inc.42 Inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN..A. COMPANY Energy to Serve}Our World SM January 25, 2006 FEDERAL EXPRESS File: E.03.04 Log: EV-06-0155 Voatle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vog'Ue Electric Generating Plant for the fourth quarter of 2005 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.*Sincerely,\Jr j; -////L/v V\....(/,-,///J.M.Godfrey, .Environmental Affairs , JMG/GDE:ahl Enclosure EV-06-0155 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette P.D.Rushton N.J.Stringfellow C.L.Buck S.Sundaram T.D.Blalock B.R.Evans wi Enclosure T.E.Tynan D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE Qtl HYDRAZINE 10-04 7.56*None requested this quarter.10-12 7.70 10-18 8.12 11-01 8.18 11-15 8.31 12-01 8.52 12-09 7.90 12-16 7.30 12-27 7.80 Page 1 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC Rei.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.'(MIN.MG/Ll ZINC CHROMIUM 10-04 0 0-0 10-07 0 0-0 10-11 0 0-0 10-14 0 0-0 10-18 0 0-0 0.092 10-19 0 0-0 10-21 0 0-0 10-25 0 0-0 10-28 0 0-0 11-01 0 0-0 11-04 0 0-0 11-08 0 0-0 11-11 0 0-0 11-16 0 0-0 11-18 0 0-0 11-23 0 0-0 11-28 0 0-0 12-05 0 0-0 12-09 0 0-0 12-16 0 0-0 12-20 0 0-0 12-28 0 0-0 Page 2 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgtl*NOTE: If dechlorinator is not in use, mUltiple grabs will beatBasin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of October No.of Samples**: 23 23 1 1 Average of Value: 0 0 0.092::;0.0040 Max.Value: 0 0 0.092::;0.0040 Min.Value: 0 0 0.092::;0.0040 Limits Exceeded: 0 0 0 0 Month of November No.of Samples**: 10 10 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of December No.of Samples**: 8 8 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow*Overflow Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1/Week 1/Week1/Quarter1/Quarter FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/I*FinalOutfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE 10-18 10-21 10-25 10-28 11-01 11-04 11-08 11-11 11-18 11-23 11-28 12-05 12-09 12-17 12-20 12-28 FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 0 0-0 0.13 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 0 0-0 Unit 2 was in a refueling outage during the'first half of October.The Circulating Water basin was either drained or isolated during this period.Page 5 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall*FinalOutfall Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1/Week 1/Week 1/Quarter 1/Quarter FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mg/I 120 rnin.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.FAC MG/L TRC-AVG.(MIN.MG/L)CHROMIUM Month of October No.of Samples**: 9 9 1 Average of Value: 0 0 0.13 Max.Value: 0 0 0.13 Min.Value: 0 0 0.13 Limits Exceeded: 0 0 0 Month of November No.of Samples**: 11 11 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of December No.of Samples**: 6 6 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 10.00400.0040 o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow*Overflow Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1IWeek 1IWeek 1/Quarter 1/Quarter FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.12-17 FAC MG/L TRC-AVG.(MIN.MG/L)o 0-0 Page 7 of 17 0.042 CHROMIUM:s0.040 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE.SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (a/G)10-18 1.0 10-25 3.0 11-01 4.0 11-15 3.0 12-13 1.0 12-28 1.0 Page 8 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.0 3.0 1.0 o 2 3.5 4.0 3.0 o 2 1.0 1.0 1.0 o Page 9 of 17 2 o 2 o 2 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)10-18 6.0§.6 10-25 5.0 11-01 3.0 11-15 3.0 12-13 3.0 s10.0 12-28 2.0 Page 10 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 21Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 5.5 6.0 5.0 o 2 3.0 3.0 3.0 o 2 2.5 3.0 2.0 o Page 11 of 17 2 s5.5 s5.6 s5.3 o 2 s6.0 o 2 s7.5 s10.0 s5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-02 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 o Page 13 of 17 1 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-03 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)::;1.0 1::;1.0::;1.0::;1.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)::;5.3 1::;5.3::;5.3

5.3 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From
10-01-05 To: 12-31-05 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location: Type Sample: Frequency:

Parameter: PCS Code: Limits:*Final Outfall Grab 1 tDischarge Event FAC mgtl 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.-rhese limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.DATE FAC MG/I No discharge this quarter.Page 15 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month) From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 October Date Quantity No sludge removed.November Date Quantity No sludge removed.Page 16 of 17 DeceIT.ber Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-05 To: 12-31-05 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and irnprisonment for knowing violations. T.E.Tynan General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17 Southern Nuclear Operating Company, Inc.42 Inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN A COMPANY Energy to Serve Your World SM October 21, 2005 FEDERAL EXPRESS File: E.03.04 Log: EV-05-1841 Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the third quarter of 2005 as requiredbythe above referenced NPDES permit.If you have any questions, pleasecontactGreg Elmore at (205)992-5264.Sincerely,//- /J.M.Godfrey, Mager Environmental A fairs JMG/GDE:ahl Enclosure EV-05-1841 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette P.D.Rushton N.J.Stringfellow C.L.Buck S.Sundaram T.D.Blalock B.R.Evans wI Enclosure T.E.Tynan D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (ColTlbined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE Qtl HYDRAZINE 07-05 8.14*None requested this quarter.07-12 7.90 07-25 8.22 08-09 7.82 08-22 7.94 09-02 8.18 09-15 8.06 09-19 8.33 Page 1 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location:*FinalOutfall

  • FinalOutfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:

1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC Rei.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 07-05 0 0-0 07-06 0 0-0 07-07 0 0-0 07-08 0 0-0 07-11 0.18 0.0066 07-12 0 0-0 07-14 0 0-0 07-19 0 0-0 07-22 0 0-0 07-25 0 0-0 07-28 0 0-0 08-01 0 0-0 08-04 0 0-0 08-08 0 0-0 08-09 0 0-0 08-12 0 0-0 08-16 0 0-0 08-19 0 0-0 08-26 0 0-0 08-30 0 0-0 Page 2 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*NOTE:*FinalOutfall

  • FinalOutfall Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1/Week 1/Week 1/Quarter 1/Quarter FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mgtl 120 min.lday Max 1.0 mg/I Max 0.2 mg/I If dechlorinator is not in use, multiple grabs will be at Basin/Flume.

These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE 09-02 09-06 09-07 09-09 09-12 09-16 09-19 09-22 09-26 09-27 09-28 09-29 FAC MG/L o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 3 of 19 CHROMIUM QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 002*Unit 1 Cooling Tower Blowdown*(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*FinaIOutfa.1I Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of July No.of Samples**: 18 18 1 1 Average of Value: 0 0 0.18 0.0066 Max.Value: 0 0 0.18 0.0066 Min.Value: 0 0 0.18 0.0066 Limits Exceeded: 0 0 0 0 Month of August No.of Samples**: 19 19 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 41 41 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 4 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow*Overflow Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1/Week 1/Week 1/Quarter 1/Quarter FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mgtl 120 min.lday Max 1.0 mgtl Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/Ll ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 5 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall*FinalOutfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1IWeek 1/Quarter 1/Quarter Parameter: FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mgtl Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 07-05 0 0-0 07-06 0 0-0 07-07 0 0-0 07-08 0 0-0 07-11 0.14 0.0054 07-12 0 0-0 07-14 0 0-0 07-19 0 0-0 07-22 0 0-0 07-25 0 0-0 07-28 0 0-0 08-01 0 0-0 08-04 0 0-0 08-08 0 0-0 08-09 0 0-0 08-12 0 0-0 08-16 0 0-0 08-19 0 0-0 08-26 0 0-0 08-30 0 0-0 Page 6 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCS Code: Lirnits:*FinalOutfall

  • FinalOutfall Basin/Flume Basin/Flume Multiple Grabs Multiple Grabs Grab Grab 1/Week 1/Week 1/Quarter 1/Quarter FAC mgtl Total Time of Zinc Chromium TRC Rei.&TRe Avg.(Min-mg/I) 50064 81400-50060 1092 1034*0.02 mg/I 120 min.lday Max 1.0 mgtl Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume.

These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgt!.DATE 09-02 09-06 09-07 09-09 09-12 09-13 09-14 09-15 FAC MG/L o o o o o o o o TRC-AVG.(MIN.MG/Ll ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 CHROMIUM Unit 2 was shut down on 09/18105 for a refueling outage and remained shut down for the duration of the month.Page 7 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GAOO26786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*FinalOutfall Multiple Grabs 1/Week Total Time of TRC Rei.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/0uarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/0uarter Chromium 1034 Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of July No.of Samples**: 18 18 1 1 Average of Value: 0 0 0.14 0.0054 Max.Value: 0 0 0.14 0.0054 Min.Value: 0 0 0.14 0.0054 Limits Exceeded: 0 0 0 0 Month of August No.of Samples**: 18 18 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**:.31 31 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 8 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location:*Overflow*Overflow Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC Rei.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 09-19 0 0-0 0.044 Page 9 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mg/I (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)07-14 10.0§.9 07-26 9.0§.9 08-10 3.0§.9 08-23 9.0§.9 09-06 2.0§.9 09-20 2.0§.9 Page 10 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 9.5 10.0 9.0 o 2 6.0 9.0 3.0 o 2 2.0 2.0 2.0 o Page 11 of 19 2 o 2 o 2 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-14 07-26 07-28 07-29 08-08 08-23 09-20 09-26 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)13.0 48.0 43.0 4.0 11.0 10.0 3.0 6.0 Page 12 of 19 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)::;5.9::;5.9::;5.9::;5.9::;5.9::;5.9 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-0S To: 09-30-0S Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgtl (TSS)S30 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)SSO Daily Avg.1S Daily Max.20 OIL&GREASE MG/L (O/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Lim its Exceeded: 4 27.0 48.0 4.0 o 2 10.S 11.0 10.0 o 2 4.S 6.0 3.0 o Page 13 of 19 2 SS.9 SS.9 SS.9 o 2 sS.9:::;S.9:::;S.9 o 2 SS.9 SS.9 SS.9 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 14 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-06 Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1:::1.0 o Page 15 of 19 1 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant p.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 07-03 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1 o Page 16 of 19 Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)§.O 1§.O§.O§.O o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.DATE FAC MG/I No discharge this quarter.Page 17 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month) From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 July Date Quantity No sludge removed.August Date Quantity No sludge removed.Page 18 of 19 September Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-05 To: 09-30-05 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather andevaluatethe information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. T.E.Tynan General Manager Nuclear Plant Vogtle Electric Generating Plant Page 19 of 19 Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN A.COMPANY*Energy to Serve Your WOrld'" July 27, 2005 FEDERAL EXPRESS File: E.03.04 Log: EV-05-1312 Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division i 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the second quarter of 2005 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, ,/).1 J r/,/(" J.M.Godfrey, Manager/Environmental Affairs (.<JMG/GDE:ahl Enclosure EV-05-1312 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette P.D.Rushton N.J.Stringfellow C.L.Buck S.Sundaram T.D.Blalock B.R.Evans wi Enclosure T.E.Tynan D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 03 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04"01"05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine pes Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0.Q.8TI;Q.ti HYDRAZINE 04-04 7.40*None requested this quarter.04-19 7.54 05-02 8.50 05-17 7.62 OSM24 8.05 06-10 7.70 06-17 7.66 Page 1 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 04 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 002..Unit 1 Cooling Tower Blowdown Location: "'Final Outfall"'Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1IWeek 1/Quarter 1/Quarter Parameter: FAC mgtl Total Time of Zinc Chromium TRC ReI.&TAC Avg.(Min-mgll) pes Code: 50064 81400-50060 1092 1034 Limits: "0.02 mgll 120 min.lday Max 1.0 mgll Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Dally Max.0.5 mgtl.DATE FAC MG/L TRC-AVG, (MIN.MG/l)ZINC QHAOMIUM 04-01 0 0-0 0 0-0 04-03 0 0-0 04-04 0 04-08 a a-a 04-14 0 0-0 04-15 0.22 0.0052 0 0-0 04-25 0 0-0 04-27 0 0-0 04-28 0 0-0 04-29 0 0-0 05-02 0 0-0 05-06 0 0-0 05-09 0 0-0 05-13 0 0-0 05-17 0 0-0 05-20 0 0-0 05-24 0 0-0 05-27 0 0-0 05-31 0 0-0" See event summary attachment -U1 Potential Chlorinated Discharge (Outfall 002)Page 2 of 20 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 05 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/l*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI-&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.DATE 06-03 06-06 06-07 06-08 06-09 06-10 06-14 06-16 06-20 06-27 06-30 FAC MG/L o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)0-0 o-q 0-0 I 0-0 0-0 0-9 0-01 0-0, 0-0 0-0 0-0 0-0 Page 3 of 20 CHROMIUM 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 05 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall Multiple Grabs 1/Week FAC mg!l 50064*0.02 mgtl*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use.multiple grabs will be at BasinlFlume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.FAC TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples"': 33 33 1 Average of Value: 0 0 0.22 Max.Value: 0 0 0.22 Min.Value: 0 0 0.22 Limits Exceeded: 0 0 0 Month of May No.of Samples**: 25 25 Average of Value: 0 0 Max.Value: 0 0 MIn.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples"': 26 26 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 1 0.0052 0.0052 0.0052 o....Note: 'No.of samples!'indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 4 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 07 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/l 50064"'0.02 mg/l"'Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab 1/Quartar Chromium 1034 Max 0.2 mg/I"'NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 5 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 08 QUARTERLY OPERATIONAL MONITORING REPORT SouthernNuclearOperating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 06-30-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown Location: "Final Outfall"Final OutfallBasin/FlumeBasin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mgJl Total Time of Zinc Chromium TRC Rei.&TRC Avg.(Min-mg/I) pes Code: 50064 81400*50060 1092 1034 Limits:*0.02 mgtl 120 min.lday Max 1.0 mgtl Max 0.2 mgtl"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/1 and Daily Max.0.5 mgt!.DATE FAC MGtL TBQ-AVG.(MIN.MG/L)ZINC CHROMIUM 04*01 0 0-0 04-02 0 0-0 04-08 0 0-0 04-13 0 0-0 04-15 0.15:sO.004 04-19 0 0-0 04-26 0 0-0 04-27 0 0-0 04-28 0 0-0 04-29 0 0-0 05-03 0 0-0 05-06 0 0-0 05-09 0 0-0 05*13 0 0-0 05-17 a 0-0 05-20 0 0-0 Page 6 of 20 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 09 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 003*Unit 2 Cooling Tower Blowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/l*Final Outfall Multiple Grabs 1IWeek Total Time of TRC Rei.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll"'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.DATE 06-06 06-07 06-08 06-09 06-14 06-16 06-20 06-22 06-27 06-30 FAC MGIL o o o o o o o o o o o TRC-AVG.(MIN.MGtL)ZINC 0-0 I 0-0 0-0 , 0-0\0-0 I 0-0 0-0 0-0 0-0 0-0 0-0 Page 7 of 20 CHROMIUM 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 10 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: Permit No.: GA0026786 Discharge Location: 003Unit 2 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "'Final Outfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/l"'Final Outfall Multiple Grabs 1/Week Total Time of TAC Ael.&TRC Avg. 81400-50060 120 min/day BasinlFlume Grab 1/Quarter Zinc 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgll.DATE FAC MG/L TAG-AVG.(MIN.MG/l)ZINC CHROMIUM Month of April No.of Samples"': 30 30 1 1 Average of Value: 0 0 0.15$0.004 Max.Value: 0 0 0.15:::0.004 Min.Value: 0 0 0.15 Limits Exceeded: 0 0 0 0 Month of May No.of Samples*": 22 22 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples H: 23 22 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0*"Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 8 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 11 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: "'Overflow "'Overflow Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:1/Week1/Week 1/Quarter 1/Quarter Parameter: FAC mgtl Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code;50064 81400-50060 1092 1034 Limits:*0.02 mgtl 120 min.lday Max 1.0 mg/l Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgt!.DATE FAG MG/L(MIN.MG/L)ZING CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 9 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 12 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.o.Box 1295 Birmingham, Alabama 35.201 From: 04-01-05 To: Permit No.: GA0026786 Discharge Location: 004*Unit 1 Wasta Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-07 04-.21 05-05 05-19 06-0.2 06-16 06-30 Discharge Line Grab 2/Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL (T88)1.0 6.0 4.0 3.0 3.0 3.0 4.0 Page 10 of 20 Discharge Line Grab 2/Month Oil&Grease mgJI (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)SS.9:s5.9 G;.9::;5.9::;5.9 SS.9 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 13 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 21Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded: Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 3.5 6.0 1.0 o 2 3.5 4.0 3.0 o 3 3.3 4.0 3.0 o Page 11 of 20 2 S5.9 S5.9 o 2 S5.9 g).9 g;.9 o 3§.9§.9 o ...-._----_.-------- 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 14 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 005*Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 21Month 2/Month Parameter: Suspended Solids mgll (TSS)Oil&Grease mg/I (a/G)PCS Code: 530 550 Limits: Daily Avg.30 Dally Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENPED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)04-07 8.0 gi.9 04-21 5.0 os-os 6.0 05-19 7.0 06*02 4.0 06-16 6.0 06-30 14.0 Page 12 of 20 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: To: 06-30-05 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mgtl (O/G)550 Dally Avg.15DailyMax.20 OIL&GREASE MG/L (O/G)Month of April No.01 Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 6.5 8.0 5.0 o 2$5.9$5.9 S5.9 2 Month of May No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2 6.5 g).9 7.0:SS.9 6.0 S5.9 0 0 3 3 8.0 14.0:::5.9 4.0:::5.9 0 0 Page 13 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 16 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: pes Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mgll 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 14 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04*01*05 To: Permit No.: GA0026786 Discharge Location: 007-Liquid RadwasteSystems Discharge Unit'Location: Type Sample: Frequency: Parameter: PCS Code: Limits;Discharge Line Grab 1/Quarter Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) Discharge Line Grab 1/Quarter Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 o Page 15 of 20 1 o 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 008-Liquid Radw8ste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-11 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Une Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)::S1.0 1::::1.0;$1.0::::1.0 o Page 16 of 20 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (a/G) 1:SS.O§.O:$5.0 o 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: 06-30-05 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mgll.DATE FAC MGtl No discharge this quarter.Page 17 of 20 07/26/2005 09:13 7068263787 SVC BLDG 2ND FLOOR PAGE 20QUARTERLYOPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 04-01*05 To: 06-30-05 Permit No.: GA0026786 April Date Quantity May Date Quantity June Date Quantity No sludge removed.05*17 59,500 pounds No sludge removed.05-18 29,750 pounds NOTE: The sludge was removed from the sewage treatment plant and disposed at the City of Waynesboro sewage treatment facility.Page 18 of 20 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 21 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-05 To: Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, I and complete.I am aware that there are significant penalties for submitting false including the possibility of fine and imprisonment for knowing violations. Thomas E.Tynan General Manager Nuclear Plant Vogtle Electric Generating Plant Page 19 of 20 07/25/2005 09:13 7058253787 SVC BLDG 2ND FLOOR PAGE 22 Attachment to Second Quarter OMR, N PDES Permit#GA0026786 Unit 1 Potential Chlorinated Discharge (Outfall 002)The Plant Vogtle Chemistry Department treated the Unit 1 circulating water system with bleach on Friday 4/1/2005.At the time of treatment, Chemistry contacted the control room and verified that Unit 1 cooling tower blowdown was closed.Chemistry advised the control room that the Unit 1 circulating water system was being chemically treated, and that blowdown should not be opened without concurrence from Chemistry. The dechlorination system was not in service at this time.At 08:00 (Eastern)on 4/2/2005, Chemistry contacted the control room to verify that the Unit 1 cooling tower blowdown was still closed.Chemistry was informed that Unit 1 cooling tower blowdown was opened to 15%demand.Immediate sampling indicated that residual levels of chlorine (0.30 mg/I Total Residual Chlorine)were still present in the Unit 1 cooling tower basin, and the dechlorination system was successfully started.It is believed that the chlorine may have been present in uncirculated"pockets," as the system was stagnant at the time of bleach addition.Sampling was also performed at the mixing box (manway)with a result of<0.01 mgll Total Residual Chlorine (TRC)and<0.01 mgll Free Available ChlorIne (FAC), indicating that detectable levels of chlorine were not present In the main plant discharge. No adverse effects were observed in the receiving water body (Savannah River)during this time.Based on the sample data available from 4/1/2005 and 4/212005, no numerical limits for the amount of chlorine present would have been exceeded if a chlorine discharge occurred.However, detectable levels of chlorine can be discharged for no more than 120 minutes per day per unit.Therefore, the time that the Unit 1 cooling tower blowdown was opened is needed in order to determine the potential duration of any chlorine discharge. There was no log entry by Operations for when the blowdown was opened, and no procedures were perlormed by Operations on 4/1/2005 or 4/212005 that specifically required the opening of cooling tower blowdown.TheOperationsdepartment interviewed their personnel, and no one recalled opening the blowdown and no one recalled receiving a request to open blowdown.Each of the Unit 1 circulating water pumps were started duringthistimeframe, but manipulation of cooling tower blowdown is not required to support pump startup or operation. Based on this information, the time that cooling tower blowdown was opened has not been established. The plant procedure addressing operation of the circulating water system and manipulation of cooling tower blowdown requires logging of blowdown manipulation as well as coordination with Chemistry when blowdown adjustments are made.Despite this guidance, there is no record available to indicate when cooling tower blowdown was opened, and no personnel have a recollection of manipulating blowdown.Unless additional information is obtained, this event is not being characterized as a non-compliance as there is not any evidence to support that blowdown was open for more than 120 minutes.Plant procedures are being revised to add controls that will prevent occurrence of a similar event in the future.Southern Nuclear Environmental Affairs (EA)contacted Mr.Mike Creason of the Georgia Environmental Protection Division (EPD)at 14:20 (Central)on 4/4/2005 to provide an initial notification of a potential NPDES non-compliance. After being informed by Operations that the time of opening blowdown could not be established, Mr.Creason was again contacted by EA at 14: 10 (Central)on 4/5/2005.Mr.Creason requested that SNC complete investigation of the incident and provide a summary description with the second quarter NPDES Operational Monitoring Report (OMR), Page 20 of 20 Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205.992.5000 SOUIHERNA COMPANY Energy to Serve Your World SM April 19, 2005 FEDERAL EXPRESS File: E.03.04 Log: EV-05-0746 Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the first quarter of 2005 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.J.M.Godfrey, Man er Environmental Affairs JMG/GDE:ahl Enclosure EV-05-0746 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure D.E.Grissette P.D.Rushton N.J.Stringfellow C.L.Buck S.Sundaram T.D.Blalock B.R.Evans wI Enclosure W.F.Kitchens D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE Qti HYDRAZINE 01-14 8.22*None requested this quarter.01-25 7.59 02-01 02-15 02-22 03-04 03-14 03-22 7.70 7.82 7.90 7.94 7.87 7.23 Page 1 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 002*Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mgtl Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 01-04 0 0-0 01-05 0 0-0 01-06 0 0.0 01-10 0.23:50.014 01-12 0 0-0 01-21 0 0-0 02-02 0 0-0 02-04 0 0-0 02-11 0 0-0 02-17 0 0-0 02-18 0 0-0 02-19 0 0-0 02-20 0 0-0 02-25 0 0-0 03-03 0 0-0 03-07 0 0-0 03-08 0 0-0 03-09 0 0-0 03-10 0 0-0 03-28 0 0-0 03-29 0 0-0 03-30 0 0-0 03-31 0 0-0 Page 2 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:1/Week1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM Month of January No.of Samples**: 5 5 1 1 Average of Value: 0 0 0.23 S;0.014 Max.Value: 0 0 0.23 S;0.014 Min.Value: 0 0 0.23 S;0.014 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 8 8 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples**: 33 33 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.ofsamples"indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling TowerSlowdownEmergency Overflow to Storm Drains during the quarter.Page 4 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall*Final OutfallBasin/FlumeBasin/Flume Type Sample: Multiple Grabs MUltiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 01-04 0 0-0 01-05 0 0-0 01-06 0 0-0 01-10 0.28:::0.014 01-12 0 0-0 01-21 0 0-0 02-02 0 0-0 02-04 0 0-0 02-11 0 0-0 02-17 0 0-0 02-18 0 0-0 02-19 0 0-0 02-20 0 0-0 02-25 0 0-0 03-03 0 0-0 03-07 0 0-0 03-15 0 0-0 03-22 0 0-0 03-23 0 0-0 03-24 0 0-0 03-25 0 0-0 03-26 0 0-0 03-28 0 0-0 03-29 0 0-0 03-30 0 0-0 03-31 0 0-0 Page 5 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of January No.of Samples**: Average of Value: Max.Value: Min.Value: Limits Exceeded: 5 o o o o 5 o o o o 1 0.28 0.28 0.28 o 1:::;0.014:::;0.014:::;0.014 o Month of February No.of Samples**: 9 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 Month of March No.of Samples**: 41 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 9 o o o o 41 o o o o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste WaterRetentionBasin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-05 01-12 02-03 02-24 03-10 03-24 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)6.0 5.0 6.0 4.0 2.0 Page 8 of 17 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)§.O§.O§.O§.O§.O QUARTERLY OPERATIONAL MONITORING REPORT Southern NuclearOperatingCompany Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste WaterRetentionBasin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded: Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 3.5 6.0:$1.0 o 2 5.5 6.0 5.0 o 2 3.0 4.0 2.0 o Page 9 of 17 2:$5.0:$5.0:$5.0 o 2:$5.0:$5.0:$5.0 o 2:$5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-05 01-12 02-03 02-24 03-10 03-24 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)5.0 3.0 5.0 5.6 10.0 9.0 Page 10 of 17 Discharge Line Grab 2/Month Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) 6.0 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 4.0 5.0 3.0 o 2§.O§.O::;5.0 o Month of February No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2 5.3 5.5 5.6 6.0 5.0§.O 0 0 2 2 9.5::;5.0 10.0§.O 9.0§.O 0 0 Page 11 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 006*Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-03 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L lTSS)::;1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L lO/G}::;5.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1::;1.0::;1.0::;1.0 o Page 13 of 17 1::;5.0::;5.0::;5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-07 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) 1 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MGtl 03-30 0 Page 15 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 April Date Quantity No sludge removed.May Date Quantity No sludge removed.Page 16 of 17 June Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-05 To: 03-31-05 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there aresignificantpenalties for sUbmitting false information, including the possibility of fine and imprisonment for knowing violations. W.F.Kitchens General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17 Southern Operating Company, Inc.P.O.Box 1295'Birmingham, Alabama 35201-1295 TeI205.992.5000 'January 26, 2005 FEDERAL EXPRESS.,, ,'j,"."" , ,.SOUTHERNA* COMPANY, Energy to Serve:Your World'M File: E.03.04 Log:.EV-05-0046 ..'., i',,'j'.." Vogtle Electric Generating Plant (NPDES PermitGA 0026786)Quarterly Operational Monitoring Report...'Mr.Michael S.Creason, P.E.Unit CoordinatOr Industrial Wastewater Unit EnvironmentalProtection Division 4244 International Parkway, Suite 110'.Atlanta, Georgia 30354

Dear Mr.Creason:

." t.,',," ,I I'.'I"*..Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the fourth quarter of 2004 as required bytfle above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,?: Alvin Harris, Manager Engineering Services AH/GDE:ahl Enclosure .>,.EV-05-0046 , Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two.bcc: wlo Enclosure D.E.G rissette P.D.Rushton N.J.Stringfellow C.L.Buck S.Sundaram T.D.Blalock B.R.Evans wi Enclosure W.F.Kitchens D.G.Goodwin I*SNC Document Management -Vogtle (Return Receipt)I,'. ,..QUARTERLY OPERATIONAL MONITORING REPORT , ,"..'\.',""',.Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama.35201 ,".',".From: 10-01-04 To: 12-31-04 Permit No.: GA0026786 ,"., , , ,'Discharge Location: 001-Final,P18nt Discharge (Combined Plant Waste 1&2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-12 10-18 11-02 11-17 12-01 12-20 12-30 Final Outfall Grab 2/Month pH 400 Min.6.0 Max.9.0 Qti 8.63 8.66 8.78 8.50 8.48 8.44 8.35 Final OutfallGrab',*;As requested by EPD Hydrazine 81313 Non-I:)etectable , HYDRAZINE'i, ,'*None requested this quarter.,.,I Page 1 of 17 ," QUARTERLY OPERATIONAL MONITORING REPORT..>, Permit No.: '-.'Squthern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-04 To: 12-31-04'." I," Discharge Location: 002-Un,it 1 Cooling Tower Slowdown PCS Code: , l-imits:*Final Outfall MUltiple Grabs llWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs llWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Ba'sin/Flume Grab l/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab l/Quarter Chromium 1034 Max 0.2 mgllI**NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.'DATE 10-01 10-05 10-12 10-15 10-21 10-25 10-26 10-27 10-28 11-02 11-04 11-11 11-18 11-30 12-06 12-07 12-08 12-14 12-21 12-28 FAC MG/L o o o o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0.32 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 2 of 17 CHROMIUM 0.0066' , , , QUARTERLY OPERATIO'NALMONITORING REPORT,".<), ,'("', , Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 ," ," , 1,-,: , From:.10-01-04 To:.12-31-04 Permit No.: GA0026786 i'." Discharge Location: 002-Unit 1 Cooling Tower slowdown-Location: Type Sample: Frequency: Parameter: I PCS Code: Limits:*Final Outfall MUltiple Grabs 1/Week'FAC mg/I 50064*0.02.'mgtl*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgtl) 81400-50060 120 min.lday Basin/Flume Grab, , Zinc, 1092",

0, mgt!'Basin/Flume Grab 1/Quarter Chromium', 1034 Max 0.2 mg/I , , , ,"*NOTE: , , If dechlorinator is not in use, mUltiple gra,bg.will be at'Hasin/Flume.

These Iin:iits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!."" FAC MG/L TRC-AVG.(MIN.MG/L)ZING, CHROMIUM Month of October No.of Samples**: 10 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 Month of November No.of Samples**: 5 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 Month of December No.of Samples**: 6 Average of Value: 0 Max.Value: 0 Min.Value: 0 Limits Exceeded: 0 10 o o o o 5 o o o o 6 o o o o I,',I'".'1'0';32 0.32 0.32'0 1 0.0066 0.0066 0.0066 o**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 17 .,.QUARTERLY OPERATIONAL MONITORING REPORT., , Permit No.: GA0026786 Southe'rn Nuclear Operating Company Vogtle Electric Generating Plant P.O. 1295 Birmingham, Alabama 35201" I, From: 10-01-04 To: 12-31-04..." Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains'Location:' Type Sample: , Frequency:, Parameter: PCS Code:'Limits:I**Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be, Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 17 ,,, QUARTERL V OPERATIO'NALr\lJONIJORING REPORT\'(','." Southern Nuclear Company Vogtle Electric Generating Plant P.O.Box 1295 , Birmingham, Alabama ,35201.', ,;From: ,10-01-04 To: '12-31-04 Permit No.: GA0026786 ," Discharge Location: 003-Unit 2'Cooling Tower Location: Type Sample: Frequency: Pfirameter: PCS Code: Limits:*Final MUltiple Grabs 1IWeek'FAC mg/I 50064 mg/I*Final Outfall Multiple Grabs'1/Week Total Time of TRC ReI.&TRCAvg.(Min-mg/I) 81400-50060 120 min.lday Ba'sin/Flume, Zin'c'1092','Max'1mg/I Basin/Flume Grab 1/Quarter Chromium'1034 Max 0.2 mg/I ,.'.I.'"I.,.'*NOTE: If dechlorinator is not in use, mUltiple, grabs will he at Basi'n/Flume. Tt:iese limits will be Daily Average, 0,2 mgtl and Daily Max.0.5 mgt!."" DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC'CHROMIUM 10-01 0 0-0 I, ,*, I ,I 10-05 0 0-0 oAo' 10-12',0 0-0.10-15 0 0-0 10-21 0 0-0'10-25 0 0-0 10-26 0 0-0 10-27 0 0-0 10-28 0 0-0'11-02 0 0-0 11-04 0 0-0 11-11 0 0-0 11-18 0 0-0 11-30 0 0-0 12-06 0 0-0 12-07 0 0-0 12-08 0 0-0 12-09 0 0-0 12-10 0 0-0 12-14 0 0-0 12-21 0 0-0 12-28 0 0-0 Page 5 of 17 QUARTERLY OPERATIONAL MONITORING REPOR'T Permit No.: GA00267,86 .,.."," Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295.Birmingham, Alabama 35201 From: 10-01-04 To: 12-31-04.,..I,'.Discharge Location: 003*Unit 2 Cooling Tower Blowdown-(cont'd).Location: Type Sample: ,Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC Rei.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Gr'ab 1/Quarter.Zinc 1092 Max 1.0mg/1 Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2mg/1*NOTE:I*If dechlorinator is not in use, grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM" Month of October No.of Samples**: 9 9 1, 1 Average of Value: 0 0 0.40 Max.Value: 0 0 0.40 Min.Value: 0 0 0 Limits Exceeded: 0 0 0 0 Month of November No.of Samples**: 5 5 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of December No.of Samples**: 37 37 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samplestakenduring the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 17 , , , QUARTERL YOPERATI,ONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama, 35201 From: ,10-01-04"To: '12-31-04.1,." Permit No.: GA0026786 , , , Discharge Location: 003A Cooling Tower Slowdown Emergency Overflow to' Drains , ,.Basir;J/Flume Grab, 1/Quarter Zi,nc Location: Type Sample: Fr;equency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1IWeek FAC mg/I'500p4 mg/I'*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) , 81400-50060 '1 092.120 min.lday'Max\1.0 mg/I ,"'., , Basin/Flume Grab 1/Quarter' Chromium 1034 Max 0.2 mg/I.".'*NOTE: If'dechlorin,ator is not in use, multiple grabs will',at Basin/Flume. These limits will be Daily Average'0.2 mg/I and Daily Max.0.5 mg/L'"'FAC MG/L TRC-AVG.(MIN. MG/L)., ZlNQ'.*I.1 ,., ," CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown'Emergency Overflow to Storm Drains during the quarter.Page 7 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Permit No.: Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-04 To: 12-31-04 0 ,.." 0, Discharge Location: 004*Unit 1 Waste Water'Retention Basin Loca,tion: Discharge Line , ,Discharge Line Type Sample:, Grab , Grab, Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/I (TSS)Oil&Grease mgll (O/G)pes Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O&G)I*10-05 12.0:55.0 10-19 6.0 11-02 6.0 11-19 6.0 11-30 7:0 12-14 5.0 12-28 11.0 Page 8 of 17 ,, , QUARTERLY OPERATIONAL-MONITORING REPORT ,."'" I','.Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabarna'35201 ," , t, ,: , From: ,,10-01-04 To: '12-31-04 Permit No.: GA0026786 ,..,'Discharge Location: 004-Unit i Waste Water Retention Basin ,"I"" I"','I Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month'Suspended Solids mgtl (TSS)530'Daily Avg.30 Daily Max.100 ,'SUSPENDED SOLIDS MG/L (TSS)'" Di&charge Line.,,'Grab.'q'Month'Oil&Grease mg/I (O/G)'550 Daily Avg, 15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 9.0 12.0 6.0 o 3 6.33 7.0 6.0 o 2 8 11 5 o , , ,""', I'.,I" ,I ,.'",..Page 9 of 17 2:55.0§.O o 3§.O o 2§.O§.O o QUARTERLY REPORT Permit No.: GA00267aS Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birm.ingham, Alabama 35201 From: 10-01-04 To: 12-31-04.I," Discharge Location: 005-Unit 2 Waste Water ,Retention Basin Type Sample:, Frequency: Parameter: PCS Code: Limits: I.'12-02 12-09 12-29 Discharge Line Grab 2/Month Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)4.0 9.0 6.0 Discharge Line Grab, 2/Month Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)S5.0 S5.0 S5.0 The Unit 2 Waste Water Retention Basin was drained and removed from service to repair discharge pumps in mid July.The pumps were repaired and returned to service in December.All water was discharged through the Unit 1 Waste Water Retention Basin prior to being returned to service in December.Page 10 of 17 , ,.QUARTERLY OPERATIONAL MONITORING REPORT.,.,'.\'"," ,'.Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 J, ,;, From: 1'0-01-04 To: 12-31-04 Permit GA0026786 , ,'" I , Discharge Location: 005-U,nit 2 Waste Water Retention Basin'.1" Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab ,'2/Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS M,G/L (TSS)'" Discharge Line ,'Grab'2/Month dil&Grease mg/l (O/G)'550 Daily,Avg. 15 Daily Max.20"" 01'1:.GREASE MG/L (O/G)'.'," Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: o o o o o o o o o o 3 6.3 9.0 4.0 o., ," , ,'.I, I." ,I" ,I , I:.Page 11 of 17 o'0 o o o o o o o o 3 o QUARTERLY OPERATIONAL MONITORING REPORT'.'.Permit No.: GA0026786 Southern NuclearOperatingCompany Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201'.!.From: 10-01-04 To: 12-31-04.I,'.Discharge Location: 006-Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: pes Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Plant to the Savannah ,River during the quarter.Page 12 of 17 , , , QUARTERLY J\t40NI,TORING ,REPORT , , Southern Nuclear Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, '35201 ," , From: ,,10-01-04 " To: '12-31-04 Permit No.: GA0026786.""'.'I Discharge Location: 007-Liquid Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-01 10-12 Discharge Line Grab 1/Quarter Suspended Solids mgtl ,(lSS)'530'Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)::;1.0::;1.0".":'Disc;harge Line*.Grab 1/Quarter.Oil&Grease mg/I (O/G),, 550*Daily Avg.15 Max.20 Pil&GREASE MG/L (O/G)I'I, , ,::;5.0:::;5.0','.1 ,', , , ,.,..No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2::;1.0::;1.0::;1.0 o Page 13 of 17 ,.2::;5.0::;5.0::;5.0 o Permit No.: GA00267a6 Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.SOX 1295 Birmingham, Alabama 35201 From: 10-01-04 To: 12-31-04.,..I," Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2, Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 10-05 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1' o Page 14 of 17 Line Grab'1/Quarter Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (DIG) 1 o , , ,. OPERA REPORT From: ,,10-01-04 " To:.12-31-04 Southern Nuclear Opt;lrating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama'35201 I,." ," Permit No.: GA0026786 ,"" ,.'".'I , ,!**, ," Discharge Location: 009*Nuclear Service Cooling Tower Slowdown (Units 1 and 2),;, , Location: Type Sample: , Frequency: Parameter: PCS Code: Limits: Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I" ,',, ,.,..*NOTE: If dechlorinator is not in use, grab sampl'i!$will bt;!at the blQwdown.These limits will be Daily Average'0.2mgil"and Daily Max.0.5 mg/L DATE FAC MG/I ,',I',',I ,',.No discharge this quarter.Page 15 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Permit No.: GA00267eS Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201"., Sludge Monitoring (Ibslday/month) From: 10-01-04 To: 12-31-04.,..t.0.October Date Quantity No sludge removed.I'November Date Quantity No sludge removed.Page 16 of 17 December.Date Quantity No sludge removed. , , , QUARTERLY , , , Southern Nuclear Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 ,""'From: 1 0-01-04 To: 12-31-04 Permit No.: GA0026786"..'.'I certify, under penalty of law, that this, document ,and all attachments were prepared under the direction of supervision in accordance with a system, designed to assurequalifted personnel gather and evaluate the information Based on'my inquiry qf the person or who manage the system, or, persons dire¢tlygathering the information, the information submitted.'is, to,the best of my knowledge and belief, true, accurate, and complete.I am aware that are significant penalties for submitting false information;includingthe possibility of fine and for'knowing violations. , ,I ,.W.F.Kitchens General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17 Southern Nuclear Operating Company, Inc.POBox 1295 Birmingham, Alabama 35201-1295 Tel2059925000 SOUTHERN A COMPANY Energy to Serve.Your World"" File: E.03.04 Log: EV-04-2016 October 27, 2004 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the third quarter of 2004 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, Alvin Harris, Manager Engineering Services AH/GDE:ahl Enclosure EV-04-2016 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure P.D.Rushton N.J.Stringfellow C.L.Buck T.D.Blalock B.R.Evans wi Enclosure W.F.Kitchens S.Sundaram D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE QH HYDRAZINE 07-14 8.48*None requested this quarter.07-27 8.10 08-05 8.66 08-12 8.58 08-24 8.64 09-07 8.40 09-29 8.48 Page 1 of 19 QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown Location:*Final Outfall*FinalOutfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:1/Week1/Week1/Quarter1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2mg/1*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM 07-01 0 0-0 07-06 0 0-0 07-08 0 0-0 07-09 0.51 0.0041 07-14 0 0-0 07-16 0 0-0 07-20 0 0-0 07-22 0 0-0 07-26 0 0-0 07-27 0 0-0 07-29 0 0-0 08-06 0 0-0 08-10 0 0-0 08-12 0 0-0 08-17 0 0-0 08-20 0 0-0 08-24 0 0-0 08-26 0 0-0 08-27 0 0-0 08-31 0 0-0 Page 2 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 09-02 09-07 09-10 09-13 09-16 09-20 09-24 09-27 09-29 09-30 FAC MG/L o o o o o o o o o o TRC-AVG.(MIN.MG/l)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 3 of 19 CHROMIUM QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown*(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I-NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of July No.of Samples**: 20 20 1 1 Average of Value: a a 0.51 0.0041 Max.Value: a a 0.51 0.0041 Min.Value: a a 0.51 0.0041 Limits Exceeded: a aaa Month of August No.of Samples**: 15 15 Average of Value: a a Max.Value: a a Min.Value: a a Limits Exceeded: a a Month of September No.of Samples**: 10 10 Average of Value: a a Max.Value: a a Min.Value: 0 a Limits Exceeded: a a**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 4 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 5 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 07-02 07-06 07-09 07-14 07-15 07-20 07-22 07-26 07-27 07-29 08-06 08-10 08-12 08-17 08-19 08-24 08-26 08-27 08-31 FAC MG/L o o o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0-0 0.45 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 6 of 19 CHROMIUM 0.0037 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 09-02 09-07 09-10 09-13 09-16 09-20 09-24 09-27 09-29 09-30 FAC MG/L o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 7 of 19 CHROMIUM QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of July No.of Samples**: 21 21 1 1 Average of Value: 0 0 0.45 0.0037 Max.Value: 0 0 0.45 0.0037 Min.Value: 0 0 0.45 0.0037 Limits Exceeded: 0 0 0 0 Month of August No.of Samples**: 13 13 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 10 10 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 8 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 9 of 19 .'QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 07-06 07-17 07-19 08-03 08-06 08-17 08-31 09-14 09-28 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)8.5 3.0 4.0 3.0 4.0 4.0 Page 10 of 19 Discharge Line Grab 2/Month Oil&Grease mg/I (G/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)S5.0 S5.0::;5.0::;5.0 5.06::;5.0 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 5.8 8.5 3.0 o 2 3.5 4.0 3.0 o 2 4.0 4.0 4.0 o Page 11 of 19 2::::5.0::::5.0::::5.0 o 2::::5.0::::5.0::::5.0 o 2 5.03 5.06::::5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-06 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.1 00 SUSPENDED SOLIDS MG/L lTSS)8.7 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):::5.0 The Unit 2 Waste Water Retention Basin was drained and removed from service to repair discharge pumps in mid July.All waste is being discharged through the Unit 1 Waste Water Retention Basin.Page 12 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (D/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 8.7 8.7 8.7 o o o o o o o o o o o 1:::;5.0:::;5.0:::;5.0 o o o o o o o o o o o The Unit 2 Waste Water Retention Basin was drained and removed from service to repair discharge pumps in mid July.All waste is being discharged through the Unit 1 Waste Water Retention Basin.Page 13 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 14 of 19 ..QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 07-01 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)::;1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (G/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):::5.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1::;1.0::;1.0::;1.0 o Page 15 of 19 1::;5.0::;5.0

5.0 o

.'QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-16 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1 o Page 16 of 19 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G) 1 o aUARTERL Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/I No discharge this quarter.Page 17 of 19 ..QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 July Date Quantity No sludge removed.August Date Quantity No sludge removed.Page 18 of 19 September Date Quantity No sludge removed.

  • QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-04 To: 09-30-04 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. W.F.Kitchens General Manager Nuclear Plant Vogtle Electric Generating Plant Page 19 of 19 Southern Nuclear Operating Company.Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERNA COMPANY Energy to Serve Your World"'-File: E.03.04 Log: EV-04-1315 July 22, 2004 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the second quarter of 2004 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-04-1315 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure P.D.Rushton N.J.Stringfellow C.L.Buck T.D.Blalock B.R.Evans A.Harris wI Enclosure W.F.Kitchens S.Sundaram D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-05 04-19 05-04 05-18 06-01 06-15 Final Outfall Grab 2/Month pH 400 Min.6.0 Max.9.0 7.93 8.53 7.64 7.95 8.78 8.55 Page 1 of 18 Final Outfall Grab*As requested by EPD Hydrazine 81313 Non-Detectable HYDRAZINE*None requested this quarter. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 04-02 04-05 04-06 04-15 05-07 05-11 05-14 05-20 05-21 05-25 05-28 06-01 06-04 06-08 06-11 06-15 06-18 06-22 06-25 FAC MG/L o o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0.41 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 2 of 18 CHROMIUM 0.0041 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples**: 4 4 1 1 Average of Value: 0 0 0.41 0.0041 Max.Value: 0 0 0.41 0.0041 Min.Value: 0 0 0.41 0.0041 Limits Exceeded: 0 0 0 0 Month of May No.of Samples**: 15 15 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples**: 17 17 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall*Final OutfallBasin/FlumeBasin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mgtl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM 04-02 0.43 0.0 04-05 0 0-0 04-06 0 0-0 04-12 0 0-0 04-13 0 0-0 04-14 0 0-0 04-15 0 0-0 05-07 0 0-0 05-11 0 0-0 05-14 0 0-0 05-19 0 0-0 05-20 0 0-0 05-21 0 0-0 05-25 0 0-0 05-28 0 0-0 06-01 0 0-0 06-04 0 0-0 06-08 0 0-0 06-11 0 0-0 Page 5 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower 81owdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM 06-15 0 0-0 06-18 0 0-0 06-22 0 0-0 06-24 0 0-0 06-25 0 0-0 Page 6 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples**: 36 36 1 1 Average of Value: 0 0 0.43 0.0 Max.Value: 0 0 0.43 0.0 Min.Value: 0 0 0.43 0.0 Limits Exceeded: 0 0 0 0 Month of May No.of Samples**: 22 22 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples**: 17 17 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samplestakenduring the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 7 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 8 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 04-06 04-08 04-13 04-15 05-03 05-25 06-08 06-22 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)4.1 5.9 8.2 12.5 9.8 6.2 Page 9 of 18 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)12.7 6.5 5.9 5.0 5.0 5.0 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 5.0 5.9 4.1 o 2 10.4 12.5 8.2 o 2 8.0 9.8 6.2 o Page 10 of 18 2 9.6 12.7 6.5 o 2 5.5 5.9 5.0 o 2 5.0 5.0 5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-06 04-08 04-13 04-15 05-03 05-25 06-08 06-22 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)4.1 3.8 7.6 3.2 5.2 6.2 Page 11 of 18 Discharge Line Grab 21Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)12.2 8.8 5.0 5.0 5.0 5.0 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 4.0 4.1 3.8 o 2 5.4 7.6 3.2 o 2 5.7 6.2 5.2 o Page 12 of 18 2 10.5 12.2 8.8 o 2 5.0 5.0 5.0 o 2 5.0 5.0 5.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 13 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-04 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS):::;1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):::;1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1:::;1.0:::;1.0:::;1.0 o Page 14 of 18 1:::;1.0:::;1.0:::;1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-01 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1 o Page 15 of 18 Discharge Line Grab 1/Quarter Oil&Grease mg/I (D/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (D/G) 1 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/l 50064*0.02 mg/l*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.DATE FAC MG/I No discharge this quarter.Page 16 of 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 April Date Quantity No sludge removed.May Date Quantity No sludge removed.Page 17 of 18 June Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-04 To: 06-30-04 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. 7/III-/otf w.F.Kitchens General Manager Nuclear Plant Vogtle Electric Generating Plant Page 18 of 18 Southern Nuclear Operating Company,lnc. Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN.A COMPANY Energy to Serve YOllr Wol"!d'" April 26, 2004 FEDERAL EXPRESS File: E.03.04 Log: EV-04-0735 Vogtle Electric Generating Plant{NPDES Permit No.GA 0026786}Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the first quarter of 2004 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-04-0735 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure P.D.Rushton N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder B.R.Evans A.Harris wI Enclosure W.F.Kitchens S.Sundaram C.M.Burke SNC Document Management -Vogtle (Return Receipt) 04/27/2004 11:31 7058263589 VEGP NSAC PAGE 02 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04 Permit No.: GAOO26786 Discharge Location: 001-Final Plant Discharge.(Combined Plant Waste Streams Units1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine pes Code: 400 81313 Limits: Min.6.0.Non-Detectable Max.9.0 DATE J2!j HVpRAZINE 01-06 8.6*None requested this quarter.01-20 8.1 01-30 8.4 02-16 8.0 02-24 8.1 03-09 7.8 03-22 8.5 Page 1 of 17 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 03 QUARTERLY OPERATIONAL MONITORING RI;PORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04** Permit No.: GAOO26786 Discharge Location: 002*Unit 1 Cooling Tower Blowdown Location:*Final Outfall*Final Outfall BasinIFlume BasinIFlume Type Sample: Multiple Grabs MUltiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mgtl) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mgll 120 min.lday Max 1.0 mg/l Max 0.2 mg/l.*NOTE: If decl1lorinator is not in use.multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.DATE FAC MGtL TRC-AVG.(MIN.MG/L)CHROMIUM 01-05 I 0.47 0.0 01-06 a a-a 01-12 0 0-0 01-20 0 0-0 01*26 0 0-0 01-30 a 02-02 0 0-0 02-09 0 0-0 02-16 0 0*0 02-23 0 0-0 02*24 0 0-0 03-01 0 0-0 03*02 0 0-0 03-09 0 0-0 03-16 0 0-0 03-22 0 0-0 03-30 0 0-0 Page 2 of 17 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 04 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear'Operating Company Vogtle EleetricGenerating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04 Permit No.: GA0026786 Discharge location: 002*Unit 1 Cooling Tower Blowdown-(conl'd)Location: Type sample: Frequency: Parameter: PCS Code: Umits:*Final Outfall Multiple Grabs 1/Week FAC nigJI 50064*0.02 mgtl"'Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 '120 min.lday Basin/Flume Grab'1/Quarter Zinc, 1092 Max 1.0 mgtl Basin/Flume Grab 1/Quarter Chromium 1034 Max.0.2 mgll"'NOTE: If dechlorinator Is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily'Average 0.2 mg/l and Daily Max.0.5 mg/l.FAC MG{b TRC-AVG.(MIN.MGIl.), ZINC CHROMIUM Month of January No.of Samples h,: 11 11 1 Average of Value: 0 0 0.47 Max.Value: 0 0 0.47 Min.Value: 0 0 0.47*Limits Exceeded: 0 0 0 Month of February No.of Samples**: 9 9 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples**: 9 9 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 1 0.0 0.0 0.0 o.,.Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All reSUlts were zero (0)unless noted otherwise. Page 3 of 17 04/27/2004 11:31 7058253589 VEGP NSAC PAGE 05 aUARTERL Y OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To:..Permit No.: GAOO26786 Discharge location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains.Location: Type Sample: Frequency: Parameter: pes Code: Limits: ""'Overflow Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/l) 81400-50060 , 20 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/1 BasinIFlume Grab'1/Quarter Chromium 1034 Max,0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.FAC MG/l TRC-AVG.(MIN.MGIL)ZINC CHROMIUM*, There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 17 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 06 QUARTERL YOPERATIONAL MONITORING REPORT Southern Nuclear ,Operating Company Vogtle Electric Plant P.O.Box 1295 Birmingham, Alab,ama 35201 From: 01-01-04 To: 03-31-04 Permit No.: GA0026786'Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: pes Code: Limits: "Final Outfall Multiple Grabs 1/Week FAC mg/l 50064"0.02 mg/l-Final Outfall Multiple Grabs 1/Week Total Time of TAC ReI.&TAC Avg.(Min-mg/l) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc ,1092 Max 1.0 mg/l Basin/Flume Grab 1/Quarter Chromium 1034.Max 0.2 mgtl"NOTE: 'If dechlorlnator is not in use, multiple grabs will at Basin/Flume. These limits will, be Daily Average 0.2 mgtl and Daily Max.0.5 mgll.DATE 01-05 01-06 01-12 01-20 01-26 01-30 02-02 02-09 02-16 02-23 02-24 03-01 03-04 03-09 03-16 03-22 03-30 FAC MGlL o o o o o ,0 o o o o o o o o a o TBC-AVG.(MIN.MGtU , ZINC 0.54 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 5 0117 CHROMIUM 0.0 04/27/2004 11:31 7068253589 VEGP NSAC , PAGE 07 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01..01 To: 03-31-04'Permit No.: GAOO26786 Discharge Location: 003*Unit 2 Cooling Tower Blowdown-(corrt'd)Location: Type Sample: , Frequency: Parameter: pes Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgll 50064"'0.02 mgll"'Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-60060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab, 1/Quarter Chromium o 1034 Max o.2'mgll*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.FAC MG/L TRC-AVO.(MIN.MG/L)ZINC CHROMIUM Month January No.of Samples"': 9 9 1 Average of Value: 0 0 0.54 Max.Value: 0 0 0.54 Min.Value: 0 0 0.54 Limits Exceeded: 0 0 0 Month of February No.of Samples**: 8 8 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples**: 8 8 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0'1 0 0.0 0.0 0.0 o....Note;"No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page ti of 17 ".04/27/2004 11:31 7068263689 VEGP NSAC PAGE 08 QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03*31*04 ,'Permit No.: GAOO26786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains',Location: Type Sample: Frequency: Parameter: PCS Code: Umits: "Overflow Multiple Grabs 1/Week FAC mgll 50064*0.02 mgll"Overflow Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/0uarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab'1/Quarter Chromium 1034 Max ,0.2 mgll"'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.FAC MG/L TRC*AVG.(MIN.MG/UCHROMIUM, , There were no overflows of the Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 17 04/27/2004 11:31 7068263589 VEGP NSAC PAGE 09 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company vogue Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-<>4 Permit No.: GAOO26786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: pes Code: Limits: DATE 01-08 01-16 01*17 01-18 01*19 01-20 02-10 02-12 03*02 03*05 03*09 03*16 03-28"'*Discharge Line Grab 2!Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)2.2 2.0 1.2 3.4 2.8 3.5 6.0 Discharge Line Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (O/G)4.6 4.8 10.4 3.6 2.1 16.5 10.3 8.4 5.4 5.0""'Note: The TSS and OIG values for 03-28 were obtained during the bypass event documented in the Bypass Report dated April 2, 2004.The pH value was 8.32 (S.U.)for the discharge to the yard drain.Page 8 of 17 04/27/2004 11:31 7068253689 VEGP NSAC PAGE 10 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01*04 To;03-31-04'Permit No.: GAOO26786 Discharge Location: 004-Unit 1 Waste Water Retention Basin'Location: Type Sample: Frequency: Parameter: pes Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENPED SOLIDS MGIL aSS)Discharge Line Grab 2/Month Oil&Grease rngll (O/G)550', Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (O/G)Month of January No.of Samples: 2 Average of Value: 2.1 ,', Max.Value: 2.2 Min.Value: 2.0 limits Exceeded: 0 Month of February No.of Samples: 2 Average of Value: 2.3 Max.Value: 3.4 Min Value: 1.2 Limits Exceeded 0 Month of March NO.of Samples: 3 Average of Value: 3.2 Max.Value: 3.5 Min.Value: 2.8 Limits Exceeded: 0 Page 9 of 17 10 5.1 10,4 2.1 o 2 13.4 16.5 10.3 o 4 6.3 8.4 5.0 o 04/27/2004 11:31 7058253589 VEGP NSAC PAGE 11 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham. Alabama 35201 From: 01-01-04 To: 03-31*04 Permit No.: GAOO26786'Discharge Locatlon=005*Unit 2 Waste Wster Retention Basin Location: Type Sample: Frequency: Parameter: pes Code: Limits: DATE 01-08 01-14 01-15 01-18 01-19 01-20 02-10 02-17 02*19 03-02 03-05 03-10 03-16 Discharge Line Grab 2IMonth Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL ass>4.5 7.6 5.2 2.4 10.8 15.3 Page 10 of 17 Discharge Line Grab 2/Month Oil&Grease mg/l (DIG)550 Daily Avg.15 Daily Max.20 OIL&GREASE (DIG)5.9 2.0 10.9 8.8 4.2 12.5 4.8 9.3 5.4 04/27/2004 11:31 7068263589 VEGP NSAC PAGE 12 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 36201 From: 01-01-04 To: 03-31.04.Permit No.: GAOO26786 Discharge Location: 005*Unit 2 Waste Water Retention Basin'Location: Type Sample: Frequency: Parameter: .pes Code: Limits: Discharge Line Grab 2/Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL nSS)Discharge Line Grab 2JMonth Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGIL(O/G)Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 6.1 7.6 4.5 o 2 3.8 5.2 2.4 o 2 13.1 15.3 10.8 o Page 11 of 17 13 6.4 10.9 2.0 o 2 8.7 12.5 4.8 o 3 7.4 9.3 5.4 o 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 13 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Generating Plant P.O.Box 1295.Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: pes Code: Umits: Sewage/Overflow Grab*1/Discharge BOD mgll 310 Daily Avg.30.Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1IDischarge Flow Row (MGD>There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.,'"'Page 12 of 17 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 14 QUARTERLY OPERATIONAL MONITORING REP'ORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1296 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04*.* Permit No.: GAOO26786 Discharge Location: 007-Liquid Radw8ste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: pes Code: Limits: DATE 01-01 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Dally Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L nSS):s;1.0 Discharge Line Grab 1/Quarter Oil&Grease mgll (O/G)550.Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (00),$1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1$1.0$1.0$1.0 o Page 13 of 17 1 s;1.0 s;1.0:s;1.0 o 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04 Permit No.: GAOO26786'DIscharge Location: 008-liquid Radw8ste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: pes Code: Limits: 01*19 No.of SalT\ples: , Average of Value: Max.Value: , Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter , Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100.SUSPENDED SOLIDS MGIL asS)20.6 1 20.6 20.6 20.6 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGJL (O/G,)6.3 1 6.3 6.3 6.3 o '." 04/27/2004 11:31 7068263689 VEGP NSAC PAGE 16 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04.Permit No.: GAOO26786 Discharge Location: 009-Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location:.Type Sample: Frequency: Parameter: pes Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mgll 50064*0.02 mgll*NOTE: If dechlorinator Is not in use, grab samples will be at the blowdown.These limits will be Dally Average 0.2 mgll and Dally Max.0.5 mgll.DATE FAC MG/I No discharge this quarter.Page 15 of 17 04/27/2004 11:31 70682636Sg VEGP NSAC PAGE 17 QUARTERL YOPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month) From: 01-o1-()4 To: 03-31-04 Permit No.: GAOO26786 January Date Quantity No sludge removed.February Date Quantity No sludge removed.March Date Quantity 03-04, 87,287 pounds , NOTE;The sludge was removed from the sewage treatment plant and disposed at the City of Waynesboro sewage treatment facility.Page 160117 04/27/2004 11:31 7068253689 VEGP NSAC PAGE 18 QUARTERLY OPERATIONAL MONITORING Southern Nuclear Operating Company vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-04 To: 03-31-04*'* Permit No.: GAOO26786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to'assure that qualified personnel properly gather and evaluatetheinformation submitted. Based on o my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information i including the possibility of fine and imprisonment for knowing violations. W.F.Kitchens General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17 Southern Nuclear Operating Company.Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\ COMPANY Energy to Serve Your World ,,-, January 28, 2004 FEDERAL EXPRESS File: E.03.04EV-04-0088 Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for VogUe Electric Generating Plant for the fourth quarter of 2003 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-04-0088 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure P.D.Rushton N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder B.R.Evans A.Harris wI Enclosure W.F.Kitchens S.Sundaram C.M.Burke SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD.Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE Q!:i HYDRAZINE 10-07 7.8*None requested this quarter.10-20 8.1 10-21 8.0 11-07 8.9 11-17 8.4 12-03 8.1 12-16 8.4 Page 1 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week1/Quarter1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM 10-21*0 0-0 10-23 0 0-0 10-24 0 0-0 10-27 0.47 0.0 10-31 0 0-0 11-05 0 0-0 11-10 0 0-0 11-13 0 0-0 11-17 0 0-0 11-19 0 0-0 11-21 0 0-0 11-25 0 0-0 12-03 0 0-0 12-10 0 0-0 12-16 0 0-0 12-18 0 0-0 12-22 0 0-0 12-29 0 0-0*No chlorination occurred prior to 10-21 due to a refueling outage.Page 2 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern NuclearOperatingCompany Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12,.31-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L>ZINC CHROMIUM Month of October No.of Samples**: 8 8 1 1 Average of Value: 0 0 0.47 0.0 Max.Value: 0 0 0.47 0.0 Min.Value: 0 0 0.47 0.0 Limits Exceeded: 0 0 0 0 Month of November No.of Samples**: 16 16 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of December No.of Samples**: 11 11 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Sampleswere taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Overflow MUltiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/l Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM 10-08 0.48'0.0 10-16 0 0-0 10-21 0 0-0 10-23 0 0-0 10-24 0 0-0 10-31 0 0-0 11-05 0 0-0 11-10 0 0-0 11-12 0 0-0 11-13 0 0-0 11-19 0 0-0 11-21 0 0-0 11-25 0 0-0 12-03 0 0-0 12-10 0 0-0 12-16 0 0-0 12-18 0 0-0 12-22 0 0-0 12-29 0 0-0 Page 5 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/I*Final Outfall MUltiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM Month of October No.of Samples**: 10 10 1 1 Average of Value: 0 0 0.48 0.0 Max.Value: 0 0 0.48 0.0 Min.Value: 0 0 0.48 0.0 Limits Exceeded: 0 0 0 0 Month of November No.of Samples**: 24 24 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of December No.of Samples**: 10 10 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*OverfJow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-02 10-16 11-02 11-13 11-27 11-29 12-11 12-17 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)6.0 3.5 1.3 2.3 2.6 2.9 3.7 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 1.81.01.0 1.11.0 1.7

1.3 Month

of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 4.8 6.0 3.5 o 3 2.1 2.6 1.3 o 2 3.3 3.7 2.9 o Page 8 of 15 2 1.4 1.81.0 o 4 1.0 1.11.0 o 2 1.5 1.7 1.3 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-02 10-16 10-30 10-31 11-13 11-27 11-29 12-01 12-14 12-17 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)23.8 89.0 6.2 6.0 5.8 1.1 7.5 9.5 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)2.4 14.3::;;1.0 1.5 9.9 1.2 Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 4 31.3 89.0 6.0 1**2 3.5 5.8 1.1 o 2 8.5 9.5 7.5 o 2 8.4 14.3 2.4 o 2 1.3 1.5::;;1.0 o 2 5.6 9.9 1.2 o**See attached non-compliance summary Page 9 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGDl There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 10 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-01 Discharge Line Grab 1/Quarter Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)9.9 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 11.01.01.0 o Page 11 of 15 1 9.9 9.9 9.9 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-02 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)10.0 1 10.0 10.0 10.0 o Page 12 of 15 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 11.01.01.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mgll*NO"rE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.DATE FAC MG/I No discharge this quarter.Page 13 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 10-01-03 To: 12-31-03 Permit No.: GA0026786 October Date Quantity No sludge removed.November Date Quantity No sludge removed.Page 14 of 15 December Date Quantity No sludge removed. 01f28/2004 11:31 7068263689 VEGP NSAC PAGE 18 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-03 To: 12-31-03 Permit No.: GAOO26786 I certify, under penalty of law.that this document and aU attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inqUiry of the person or persons who manage the system, or those*persons directly responsible for gathering the information, the information submmed is, to the best of my knowledge and belief, true.accurate, and complete.I am aware that there are penalties for submitting false information. including the possibility of fine and impriso'\illent for knowing violations. w.F.Kitchens General Manager Nuclear Plant Vaglls Electric Generating Plant Page 15 of 15 OSN 005-Unit 2 Waste Water Retention Basin Non-Compliance Summary Sampling of the Unit 2 WWRB on October 2, 2003, showed a Total Suspended Solids (TSS)value of 23.8 mg/l.A second sample was taken on October 16, with the results of 89.0 mg/l.Additional samples were taken on October 30 and October 31 with results of 6.2 mg/l and 6.0 mg/l respectively. Although none of these values exceeded daily maximum of 100 mg/l, the resulting average of 31.3 mg/l slightly exceeded the limit of 30 mg/l.A 24-hour notification was made to Mr.Mike Creason of EPD on October 30, 2003, as required by the Vogtle NPDES permit.Mr.Creason waived the 5-day written report for the average exceedance, and requested that a summary of the condition be included in the next quarterly NPDES report.It is believed that a'bloom'of algae in the Unit 2 WWRB, generated by warm sunny weather combined with the organic nutrients present in the bottom of the basin, contributed to a temporary elevation of TSS values.As demonstrated by sampling data from November 2003 and December 2003, the Unit 2 WWRB is now in compliance with permit limitations for TSS.This report is provided as an attachment to the Fourth Quarter Operational Monitoring Report, per discussion with Mr.Mike Creason on October 30, 2003. Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\. COMPANY Enagy to Serve Your World"" File: E.03.04 Log: EV-03-2171 October 24, 2003 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the third quarter of 2003 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-03-2171 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure P.D.Rushton N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder B.R.Evans A.Harris wi Enclosure W.F.Kitchens S.Sundaram C.M.Burke SNC Document Management -Vogtle (Return Receipt) Oct 23 03 03:38p Financial Services Vogtle 706 826-3543 QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month"As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DAIE;ill::i HYDRAZINE 07-02 7.8"None requested this quarter.07-17 7.9 08-04 8.6 08-11 7.9 08-28 8.7 09-09 8.5 09-23 8.5 Page 1 of 17

  • Oct 23 03 03: 3Bp Financial Services Vogtle 706 826-3543 p.4 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating PlantP.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge l.ocation:

002-Unit 1 Cooling Tower Blowdown Location:*Final Outfall'Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab FreC"juency: 1!Week 1!Week 1/Quarter 1/Quarter Parameter: FAC mg/l Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/l Max 0.2 mg/I'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1. FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 07-02 0.48 0.0 07-03 0 a-a 07-08 0 0-0 07-10 0 0-0 07-14 0 0-0 07-17 0 0-0 07-22 0 0-0 07-24 0 0-0 07-28 0 0-0 07-31 0 0-0 08-04 0 0-0 08-07 0 0-0 08-11 0 0-0 08-14 a 0-0 08-18 a 0-0 08-19 0 0-0 08-21 0 0-0 08-25 0 0-0 08-28 0 0-0 Page 2 of 17 0c t 23 03 03: 54 P ,-,-.tJ..-V tIe 706 826-3543 Financial Services og p.1 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating PlantP.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final OutfallBasin/FlumeBasin/Flume Type Sample: MUltiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mgt'Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/!) PCS Code: 50064 81400-50060 1092 1034 limits:*0.02 mgtl 120 min.lday Max 1.0 mg/l Max 0.2 mgll*NOTE: It dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE FAC MG/L TRC-AVQ.(MIN.MG/L)ZINC CHROMIUM 09-02 0 0-0 09-05 0 0-0 09-08 0 0-0 09-11 0 0-0 09-15 0 0-0 09-18 0 0-0 09-19 0 0-0 09-23 0 0-0 09-24 0 0-0 09-25 0 0-0 0.43 0.0 09-26 0 0-0 Page 3 of 17 Oct 23 03 03: 38 10 Financial Services Vogtle 706 826-3543 10.5 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown-(cant'd)Location:*Final Outfall*Final OutfallBasin/FlumeBasin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1IWeek 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of linc Chromium TAC ReI.&TRC Avg.(Min-mgtl) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mgtl Max 0.2 mg/I"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mg/l.DATE;FAC_M.G/L IRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of JUly No.of Samples H: 16 16 1 1 Average of Value: 0 0 0.48 0.0 Max.Value: 0 0 0.48 0.0 Min.Value: 0 0 0.48 0.0 Limits Exceeded: a 0 0 0 Month ot August No.of Samples**: 16 16 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 31 31 1 1 Average of Value: a 0 0.43 0.0 Max.Value: 0 0 0.43 0.0 Min.Value: 0 0 0.43 0.0 limits Exceeded: 0 0 0 0....Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 4 of 17 Oct 23 03 03:39p Services Vogtle 70S 82S-3543 p.S QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: pes Code: Limits:*Overflow MUltiple Grabs l/Week FAC mg/l 50064*0.02 mg/l"'Overflow Multiple Grabs l/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/l Basin/Flume Grab l/Quarter Chromium 1034 Max 0.2 mg/I"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/1.FAC MG/L CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 5 of 17 Oct 23 03 03:40p Financial Services Vogtle 706 826-3543 p.S QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1/Week FAC mg/I 50064"0.02 mg/I*FinalOutfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.DATE 07-02 07-03 07-08 07-10 07-14 07*17 07-22 07-24 07-28 07-31 08-04 08-07 08-11 08-14 08-18 08-19 08-21 08-25 08-28 o o o o o o o o o o o o*0 o o o o o TRC-AVG.(MIN.MG/L)ZINC 0.47 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 6 of 17 CHROMIUM 0.0 _Oct 23 03 03: 4510 Financial Services Vogtle 706 826-3543 10.11 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogtJe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/l*FinalOutfall MUltiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mglJ and Daily Max.0.5 mg/1.09-02 09-05 09-08 09-11 09-15 09-18 09*19 09-22 09-26 09-30 FAC MG/L o o o o o o o o o o TRC-AVG.(MIN.MG/U ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 7 of 17 CHROMIUM Oct 23 03 03:54p Financial Services vogtle 706 826-3543 p.2 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge location: 003*Unit 2 Cooling Tower Slowdown-(cont'd)location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall MUltiple Grabs 1/Week FAG mgtl 50064"0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRG ReI.&TRG Avg.(Min-mgtl) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter linc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of July No.of Samples": 14 14 1 1 Average of Value: 0 0 0.47 0.0 Max.Value: 0 0 0.47 0.0 Min.Value: 0 0 0.47 0.0 Limits Exceeded: 0 0 0 0 Month of August No.of Samples**: 17 17 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 16 16 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day_Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 8 of 17

  • Oct 23 03 03:3Sp Financial Services Vogtle 706 826-3543 p.8 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location;003A-Unit 2 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency:

Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgll.PAJE EACMG/t.-TRC-AVG.(MIN.MG£b}ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 9 of 17 I* ,...'23 03 03:42p Financial Services Vogtle 706 826-3543 p.1 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P ,0.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: pes Code: Limits: 07-12 07-24 08-07 08-21 09-04 09-18 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SU.sPENDED SOLIDS MG/L (TSS)4.6 6.9 8.1 5.6 1.7 5.0 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)15.3 4.2 1.9 51.0 10.4 51.0 Month of JUly No.of Samples: 2 3 Average of Value: 5.8 9.8 Max.Value: 6.9 15.3 Min.Value: 4.6 4.2 Limits Exceeded: 0 0 Month of August No.of Samples: 2 2 Average of Value: 6.9 1.5 Max.Value: 8.1 1.9 Min Value: 5.6 51.0 Limits Exceeded 0 0 Month of September No.of Samples: 2 2 Average of Value: 3.4 5.7.Max.Value: 5.0 10.4 Min.Value: 1.7 51.0 Limits Exceeded: 0 0 Page 10 of 17 Oct 23 03 03:42p FInancial Services Vogtle 706 826-3543 p.2 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge location: 005*Unit 2 Waste Water Retention Basin location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 07-12 07*16 07*16 07-20 07-24 08-07 08-21 09-04 09-18 Discharge Line Grab 2/Month Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)64.3 56.7 14.6 67.0 27.4 25.5 23.0 5.5 26.8 Discharge Line Grab 2/Month Oil&Grease mgtl (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)35.8 5.21.0 5.0 9.1::;1.0 6.1 Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 5 4 46.0 14.0 67.0 35.8 14.61.0 1**1**2 2 24.3 7.1 25.5 9.1 23.0 5.0 0 0 2 2 16.2 3.6 26.8 6.1 5.5::;1.0 0 0**See attached non-compliance summary Page 11 of 17 Oct 23 03 03:42p Financial Services Vogtle 706 826-3543 p.3 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 006-SewageTreatmentEmergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/k Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow{MGD}There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 Oct 23 03 03:43p Financial Services Vogtle 706 826-3543 p.4 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: pes Code: limits: 07-08 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS):s: 1.0 Discharge Line Grab 1/Quarter Oil&Grease mgll (a/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (a/G):s: 1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1$1.0:s: 1.0:s: 1.0 o Page 13 of 17 1:s: 1.0:s: 1.0 s 1.0 o Oct 23 03 03:43p Financial Services Vogtle 706 826-3543 p.5 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 008Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-10 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/l (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL (TSS)1.0 11.0 S 1.0 s 1.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (DIG)1.0 11.01.0 s 1.0 o Oct 23 03 03:43p Financial Services Vogtle 706 826-3543 p.6 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 Discharge Location: 009*Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1tDischarge Event FAC mgtl 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mgll.No discharge this quarter.Page 15 of 17 Oct 23 03 03:43p Financial Services Vagtle 706 826-3543 p.7 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 July Date Quantity August Date Quantitv September Date Quantity No sludge removed.No sludge removed.09-19 09-20 74,817 pounds 16,626 pounds NOTE: The sludge was removed trom the sewage treatment plant and disposed at the City of Waynesboro sewage treatment facility.Page 16 of 17 Oct 23 03 03:44p Financial Services Vogtle 706 826-3543 p.8 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-03 To: 09-30-03 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. .{, iL () W.F.Kitchens General ManagerNuclearPlant Vogtle Electric Generating Plant Page 17 of 17 Oct, 23 03 03: 4410 Financial Services 706 826-3543 Attachment 1 OSN 005-Unit 2 Waste Water Retention Basin Non-Compliance Summary ro*s DUlingJuly2003, maintenance was perfonned on the Unit 2 Waste Water Retention Basin (WWRB)in order to correct a pump problem.DUling the maintenance, the Unit 2 WWRB was drained to a low level and normal flow was re-routed to the Unit 1 WWRB.Maintenance activities were completed during early July 2003, and the Unit 2 WWRB was retumed to service.Sampling of the Unit 2 WWRB on July 12, 2003, showed an Oil&Grease (O&G)Daily Maximum value of 35.8 mg/L, which is above the permitted Daily Maximum of20 mg/L for this outfall.The Total Suspended Solids (TSS)value was also elevated, but did not exceed any pennit limitations. Discharge hom the basin was halted after obtaining analysis results irom the sample, and the basin\vas placed in a recirculation mode.On July 13, 2003, the basin was sampled during a static period (no discharge occurring) with an 0&0 result of2.54 mg/L.Based on this infol111ation, the basin was cleared to resume discharge. A message was left with Mr.Mike Creason of EPD on Sunday, July 13, 2003, providing thehour verbal notification as required by the Vogtle NPDES permit.A follow-up discussion was held with Mr.Creason on Monday, July 14, 2003, and the 5-day written reportwaswaived. It is believed that repair activities on the Unit 2 WWRB contributed to a disturbance of the sludge layer in the basin which resulted in the temporary elevation ofTSS and O&G values.The Unit 2 WWRB was drained to a very low level to facilitate inspection and maintenance on one of the discharge pumps.While the basin was drained, it is believed that the bottom sludge layer was destabilized by the activation of algae and by adsorption of surface oil.As the WWRB was refilled following the maintcmmcc activities, the oil was slowly released whieh led to the higher than expected O&G values, Additionally, algae may also have been released to the water fi'OlTI the sludge layer which resulted in the elevated TSS values.Draining of the WWRB for maintenance is a vcry infrequent task.Upon averaging the sampling data at the end of the month, SNC contioned that the Daily Average limit for TSS'would be exceeded for the Unit 2 WWRB, due to the event described above.Mr.Creason was contacted on August 1, 2003, to provide 24-hour verbal notitIcation of the average exceedance. Mr.Creason also waived the 5-day written report for the average exceedance. As demonstrated by sampling data from August 2003 and September 2003, the Unit 2 WWRB is now in compliance with pennit limitations. Oct 23 03 03:44p Financial Services Vogtle 706 826-3543 p.10 Attachment 2 OSN 005-Unit 2 Waste'Vater Retention Basin Bypass with No Limit Exceedances On September 2, 2003, during startup of the Unit 2 reactor following a short, unscheduled maintenance outage, the Unit 1 and Unit 2 WWRBs experienced increased water flows and a bypass was iniliated by placing a temporary pump at the Unit 2 WWRB to begin pumping the water to the stonn drain The increased flow resulted from drain and fill activities on the steam generators to minimize contaminants during unit startup.This bypass met the definition of"Bypass not Exceeding Limitations" as defined in 40 CFR 122.3], and was perfonned in accordance with Part II.A.S of the NPDES pennit.Mr.Creason of EPD was given verbal notification on September 3, 2003, that the bypass had been initiated in order to prevent an uncontrolled overflow and to prevent physical damage to the WWRBs.By pumping from below the water line and not allowing the basins to overflow, and uncontrolled discharge of oil and grease was prevented. Samples were taken during the bypass to confinn compliance with NPDES pennit requirements. The sampling results are provided below.llnit 2 WWRB Bypass Sampling Information Ii****.*,.Date...-'),: 'i":2<

    • ,.Q&GfP'i,g!l)

., I-:""-::.c.:=___.=-,= 09/0212003 4 hours 7.6 2.6::;1.0 I'--_0_9/_0..;...3/_2_0-'03=_-_-_ -1,:_ -...::..8-=,. .-1---1.1 This report is provided as an attachment to the Third Quarter Operational Monitoring Report, per discussion with Mr.Mike Creason on September 3, 2003. Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\ COMPANY Energy to Serve Your World SM File: E.03.04 Log: EV-03-1589 July 25, 2003 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for VogUe Electric Generating Plant for the second quarter of 2003 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-03-1589 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure P.D.Rushton N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder B.R.Evans A.Harris wI Enclosure W.F.Kitchens S.Sundaram C.M.Burke SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-09 04-22 05-07 05-19 06-10 06-19 Final Outfall Grab 2/Month pH 400 Min.6.0 Max.9.0 8.1 7.8 8.1 7.9 7.9 7.8 Page 1 of 17 Final Outfall Grab*As requested by EPD Hydrazine 81313 Non-Detectable HYDRAZINE*None requested this quarter. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*FinalOutfall

  • Final OutfallBasin/FlumeBasin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:

1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/l Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max..Q.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 04-01 0.47 0.0 04-09 0 0-0 04-15 0 0-0 04-22 0 0-0 04-23 0 0-0 04-27 0 0-0 04-28 0 0-0 04-29 0 0-0 04-30 0 0-0 05-05 0 0-0 05-09 0 0-0 05-12 0 0-0 05-15 0 0-0 05-19 0 0-0 05-20 0 0-0 05-22 0 0-0 05-27 0 0-0 05-29 0 0-0 Page 2 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1lWeek FAC mgll 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 06-02 06-0 1 06-10 06-13 06-16 06-19 06-23 06-25 06-26 06-30 FAC MG/L o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 3 of 17 CHROMIUM QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/!.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples**: 24 24 1 1 Average of Value: 0 0 0.47 0.0 Max.Value: 0 0 0.47 0.0 Min.Value: 0 0 0.47 0.0 Limits Exceeded: 0 0 0 0 Month of May No.of Samples**: 11 11 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples**: 14 14 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 4 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mgll 50064*0.02 mgll*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll*NOTE: If dechlorinator is not in use, mUltiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 5 of 17-----_._-_

  • ...

QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectricGenerating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 003*Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall MUltiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 04-01 04-09 04-15 04-22 04-23 04-30 05-01 05-02 05-03 05-05 05-09 05-12 05-15 05-19 05-20 05-22 05-27 05-29 FAC MG/L o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0.49 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 6 of 17 CHROMIUM 0.0 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Final Outfall MUltiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM 06-02 0 0-0 06-04 0 0-0 06-10 0 0-0 06-13 0 0-0 06-16 0 0-0 06-19 0 0-0 06-23 0 0-0 06-25 0 0-0 06-26 0 0-0 06-30 0 0-0 Page 7 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1IWeek 1IWeek 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mgll) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of April No.of Samples**: 11 11 1 1 Average of Value: 0 0 0.49 0.0 Max.Value: 0 0 0.49 0.0 Min.Value: 0 0 0.49 0.0 Limits Exceeded: 0 0 0 0 Month of May No.of Samples**: 25 25 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of June No.of Samples**: 13 13 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 8 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating CompanyVogtleElectric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 9 of 17------------_._-- QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-04 04-18 05-01 05-16 05-30 06-12 06-26 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)4.1 4.7 2.7 4.6 7.9 2.9 11.6 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 3.21.0 3.21.01.0 1.5 Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2 4.4 2.1 4.7 3.2 4.11.0 0 0 3 3 5.1 1.7 7.9 3.2 2.71.0 0 0 2 2 7.3 1.3 11.6 1.5 2.91.0 0 0 Page 10 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 005*Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-04 04-18 05-01 05-16 05-30 06-12 Discharge Line Grab 2/Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)9.8 10.8 10.8 5.6 19.0 10.2 Discharge Line Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 3.11.0 3.4 12.91.0 Month of April No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of May No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of June No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 10.3 10.8 9.8 o 3 11.8 19.0 5.6 o 1**10.2 10.2 10.2 o 2 2.1 3.11.0 o 3 5.8 12.91.0 o 1**1.01.01.0 o**Note: Only one sample was taken during the month of June due to the basin being drained and out of service.Page 11 of 17-------"------------------------_._----- QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 12 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 04-02 Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)1.2 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.6 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 1.2 1.2 1.2 o Page 13 of 17 1 1.6 1.6 1.6 o--

  • ..*..-.._-----_..._--------------------

QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 05-05 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)1.0 11.01.01.0 o Page 14 of 17 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)2.5 1 2.5 2.5 2.5 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mgil 50064*0.02 mgil*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.DATE FAC MG/I No discharge this quarter.Page 15 of 17 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 April Date Quantity No sludge removed.May Date Quantity No sludge removed.Page 16 of 17 June Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 04-01-03 To: 06-30-03 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inqUiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, Including the possibility of fine and imprisonment for knowing violations. W.F.Kitchens General Manager Nuclear Plant Vogtle Electric Generating Plant Page 17 of 17---------------------------------- Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\ COMPANY Energy to Serve Your Worlds.File: E.03.04 Log: EV-03-0933 April 25, 2003 FEDERAL EXPRESS VogUe Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the first quarter of 2003 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely,Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-03-0933 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: w/o Enclosure W.F.Kitchens N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder A.Harris wI Enclosure G.R.Frederick S.Sundaram C.M.Burke SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-14 01-28 02-11 02-25 03-11 03-25 Final Outfall Grab 2/Month pH 400 Min.6.0 Max.9.0 7.9 7.5 8.1 8.1 8.2 7.7 Page 1 of 15 Final Outfall Grab*As requested by EPD Hydrazine 81313 Non-Detectable HYDRAZINE*None requested this quarter. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*FinalOutfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mgll 120 min.lday Max 1.0 mg/I Max 0.2 mgll*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgll.DATE FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM 01-07 0 0-0 01-08 0 0-0 01-14 0 0-0 01-17 0.28 0.0059 01-21 0 0-0 01-22 0 0-0 01-23 0 0-0 01-28 0 0-0 02-04 0 0-0 02-11 0 0-0 02-18 0 0-0 02-24 0 0-0 02-25 0 0-0 03-04 0 0-0 03-11 0 0-0 03-19 0 0-0 03-25 0 0-0 03-26 0 0-0 03-31 0 0-0 Page 2 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Blowdown-(cont'd)Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1IWeek 1IWeek 1/Quarter 1/Quarter Parameter: FAC mgll Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120'min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM Month of January No.of Samples**: 11 11 1 1 Average of Value: 0 0 0.28 0.0059 Max.Value: 0 0 0.28 0.0059 Min.Value: 0 0 0.28 0.0059 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 6 6 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples**: 7 7 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 002A*Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow MUltiple Grabs 1/Week FAC mg/l 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Blowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 01-07 0 0-0 01-09 0 0-0 01-14 0 0-0 01-17 0.23 0.0041 01-21 0 0-0 01-22 0 0-0 01-23 0 0-0 01-28 0 0-0 02-04 0 0-0 02-11 0 0-0 02-18 0 0-0 02-24 0 0-0 02-25 0 0-0 03-04 0 0-0 03-11 0 0-0 03-19 0 0-0 03-25 0 0-0 03-26 0 0-0 03-31 0 0-0 Page 5 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/l Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/l*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC CHROMIUM Month of January No.of Samples**: 11 11 1 1 Average of Value: 0 0 0.23 0.0041 Max.Value: 0 0 0.23 0.0041 Min.Value: 0 0 0.23 0.0041 Limits Exceeded: 0 0 0 0 Month of February No.of Samples**: 7 7 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of March No.of Samples**: 9 9 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were takeneachday.Samples were taken on the dates indicated. All results were zero (0)unless noteq otherwise. Page 6 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1IWeek FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 7 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-10 01-24 02-06 02-20 03-07 03-20 Discharge Line Grab 2/Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)3.5 3.6 3.1 8.9.,.13.6 7.6 Discharge Line Grab 2/Month Oil&Greasemgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 4.5 5.41.0 3.81.0 Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded 2 2 3.6 2.8 3.6 4.5 3.51.0 0 0 2 2 6.0 3.2 8.9 5.4 3.11.0 0 0 Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 10.6 13.6 7.6 o Page 8 of 15 2 2.4 3.81.0 o QUARTERLYOPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 005*Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-10 01-24 02-06 02-20 03-07 03-20 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)3.4 2.4 3.0 6.5 9.1 9.8 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 3.6 7.6 3.41.0 2.7 Month of January No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of February No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of March No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.9 3.4 2.4 o 2 4.8 6.5 3.0 o 2 9.5 9.8 9.1 o Page 9 of 15 2 2.3 3.61.0 o 2 5.5 7.6 3.4 o 2 1.9 2.71.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.'Page 10 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 007*Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-02 Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)::;;1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1::;;1.0::;;1.0::;;1.0.o Page 11 of 15 1::;;1.0::;;1.0::;;1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 01-08 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)1.0 11.01.01.0 o Page 12 of 15 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 11.01.01.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Blowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1 tDischarge Event FAC mgtl 50064*0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.DATE FAC MG/I No discharge this quarter.Page 13 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibslday/month) From: 01-01-03 To: 03-31-03 Permit No.: GA0026786 January Date Quantity No sludge removed.February Date Quantity No sludge removed.Page 14 of 15 March Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 01-01-03 To: 03-31-03 Permit No.: GAOO26786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.G.R.Frederick General Manager Nuclear Plant Vogtle Electric Generating Plant Page 15 of 15 ....'..Southern Nuclear Operating Company.Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN'\. COMPANY Energy to Serve Your World'M January 27, 2003 FEDERAL EXPRESS File: E.03.04 Log: EV-03-0177 .,;i i Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Michael S.Creason, P.E.Unit Coordinator Industrial Wastewater Unit Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Creason:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the fourth quarter of 2002 as required by the above referenced NPDES Permit.Also enclosed is a courtesy copy of the 5-day written report documenting the bypass event that occurred during the fourth quarter.The 5-day written report was previously submitted under separate letter.If you have any questions, please contact Greg Elmore at (205)992-5264.;}Ja--Wayne C.Carr, Manager Environmental Services WCC/GDE:ahl Enclosure EV-03-0177 Mr.Michael S.Creason State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure J.T.Gasser W.F.Kitchens N.J.Stringfellow I.A.Kochery B.D.Carter M.E.Wilder A.Harris wi Enclosure G.R.Frederick S.Sundaram C.M.Burke SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham. Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 limits: Min.6.0 Non-Detectable Max.9.0 DATE Q.ti HYDRAZINE 10-14 7.6*None requested this quarter.10-22 7.7 11-05 7.6 11-18 7.2 12-03 7.4 12-17 7.3 12-31 8.1 Page 1 of 15

  • I QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency:

1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min./day Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 10-04 0 0-0 10-07 0 0-0 10-10 0 0-0 10-14 0 0-0 10-18 0 0-0 10-22 0 0-0 10-23 0 0-0 10-24 0 0-0 10-25 0 0-0 10-30 0 0-0 11-05 0 0-0 11-11 0 0-0 11-18 0 0-0 11-26 0 0-0 12-02 0 0-0 12-06 0 0-0 12-11 0 0-0 12-17 0 0-0 12-23 0 0-0 12-30 0.375 0.0 12-31 0 0-0 Page 2 of 15

  • .QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 002*Unit 1 Cooling Tower Slowdown*(cont'd)Location: Type Sample: Frequency:

Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use,multiplegrabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of October No.of Samples**: 26 26 Average of Value: a a Max.Value: a a Min.Value: a a Limits Exceeded: a a Month of November No.of Samples**: 4 4 Average of Value: a a Max.Value: a a Min.Value: a a Limits Exceeded: a a Month of December No.of Samples**: 10 10 1 1 Average of Value: a a 0.375 0.0 Max.Value: a a 0.375 0.0 Min.Value: a a 0.375 0.0 Limits Exceeded: aaa a**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 3 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-3'1-02 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page 4 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 003*Unit 2 Cooling Tower Slowdown Location:*Final Outfall*Final Outfall Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min./day Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 10-01 0 0-0 10-02 0 0-0 10-03 0 0-0 10-04*0 0-0 11-05 0 0-0 11-11 0 0-0 11-18 0 0-0 11-26 0 0-0 12-02 0 0-0 12-06 0 0-0 12-11 0 0-0 12-17 0 0-0 12-23 0 0-0 12-30 0.428 0.0 12-31 0 0-0*No chlorination occurred in October after 10-04 due to a refueling outage.Page 5 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/I.FAC MG/L TRC-AVG.(MIN.MG/l)ZINC CHROMIUM Month of October No.of Samples**: 23 23 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of November No.of Samples**: 4 4 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 MonthofDecember No.of Samples**: 10 10 1 1 Average of Value: 0 0 0.428 0.0 Max.Value: 0 0 0.428 0.0 Min.Value: 0 0 0.428 0.0 Limits Exceeded: 0 0 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 6 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location:*Overflow*Overflow Basin/Flume Basin/Flume Type Sample: Multiple Grabs Multiple Grabs Grab Grab Frequency: 1/Week 1/Week 1/Quarter 1/Quarter Parameter: FAC mg/I Total Time of Zinc Chromium TRC ReI.&TRC Avg.(Min-mg/I) PCS Code: 50064 81400-50060 1092 1034 Limits:*0.02 mg/I 120 min.lday Max 1.0 mg/I Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM 11-08 0.052 0.0 11-11 0 0-0 There was one overflow of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.On 11-08-2002, there was an overflow of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains following pulling and replacing of one of the circulating water discharge valves for maintenance. Upon system startup a leak was discovered in the bolted connection of the valve flange.The flange bolts were subsequently tightened and the leak was.resolved.Work was completed on or before 11-12-2002. Page 7 of 15

  • .QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 004-Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency:

Parameter: PCS Code: Limits: DATE 10-02 10-16 11-13 11-27 11-28 12-11 12-19 12-26 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)2.8 2.6 2.0 1.4 1.3::;;1.0 2.5

2.9 Discharge

Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)::;;1.0 2.8 2.6::;;1.0 11.9 Q.2::;;1.0 2.6 Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 2.7 2.8 2.6 o 3 1.6 2.0 1.3 o 3 2.1 2.9::;;1.0 o Page 8 of 15 2 1.9 2.8::;;1.0 o 3 5.2 11.9::;;1.0 o 3 1.9 2.6::;;1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-02 10-16 11-13 11-26 11-27 12-11 12-19 12-26 Discharge Line Grab 2/Month Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)9.9 8.6 3.4 1.8::;1.0::;1.0 2.3 5.0 Discharge Line Grab 2/Month Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)::;1.0 6.5 2.2::;1.0::;1.0::;1.0::;1.0 1.3 Month of October No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of November No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of December No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 9.3 9.9 8.6 o 3 2.1 3.4::;1.0 o 3 2.8 5.0::;1.0 o Page 9 of 15 2 3.8 6.5::;1.0 o 3 1.4 2.2::;1.0 o 3 1.1 1.3::;1.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 006-Sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE Sewage/Overflow Grab 1/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab 1/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate 1/Discharge Flow Flow (MGD)There were no overflows of the Sewage Treatment Plant to the Savannah River during the quarter.Page 10 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-0.1-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 007*Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: DATE 10-03 Discharge Line Grab 1/Quarter Suspended Solids mgll (TSS)530.Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL (TSS)s:;1.0 Discharge Line Grab 1/Quarter Oil&Grease mg/l (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (O/G)s:;1.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 s:;1.0 s:;1.0 s:;1.0 o Page 11 of 15 1 s:;1.0 s:;1.0 s:;1.0 o-

  • I**QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.:.GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency:

Parameter: PCS Code: Limits: 10-01 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mg/I (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)1.0 11.01.01.0 o Page 12 of 15 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G)1.0 11.01.01.0 o ,!QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GA0026786 Discharge Location: 009-Nuclear Service Cooling Tower Slowdown (Units 1 and 2)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Grab 1/Discharge Event FAC mg/I 50064*0.02 mg/I*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mg/l and Daily Max.0.5 mg/l.DATE FAC MG/I No discharge this quarter.Page 13 of 15 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ibs/day/month) From: 10'-01-02 To: 12-31-02 Permit No.: GA0026786 October Date Quantity November Date Quantity December Date Quantity No sludge removed.No sludge removed.12-20 12-20 12-21 12-24 12-26 35,600 pounds*33,400 pounds**19,900 pounds**43,280 pounds**18,420 pounds**NOTE: The sludge was removed from the sewage treatment plant holding pond to facilitate installation of a new liner.*Disposed at the Columbia County (GA)landfill.**Disposed at the Richmond County (GA)landfill.Page 14 of 15 -_..-.,-----_.-*'1-----'-0---1'----QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating PlantP.O.Box 1295 Birmingham, Alabama 35201 From: 10-01-02 To: 12-31-02 Permit No.: GAOO26786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted[5, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations ..{J G.R.Frederick General Manager Nuclear Plant Vogtle Electric Generating Plant Page 15 of 15-I I at, Vogtle Electric Generating Plant NPDES Permit No.GA0026786 Description of Bypass On November 24, 2002, Vogtle Electric Generating Plant (VEGP)was forced to shutdown both generating units due to a chemical intrusion event common to both units.As a result of the intrusion, a flushing process was initiated for the steam generators on both units that produced a significantly higher flow of water to the Waste Water Retention Basins (WWRBs).The majority of the water was highly pure condensate and makeup water with low levels of water treatment chemical additives. The shutdown, resulting cleanup operation, and subsequent dual unit startup produced influent flow that exceeded the capacity of the WWRBs.Under these unusual conditions, the basins were filling up faster than the installed WWRB pumps could remove the water.The amount of water entering the WWRBs could not be reduced without jeopardizing the integrity of plant equipment. A bypass under the provisions of Part II.A.5 of the NPDES permit was initiated to ensure the excess water could be appropriately managed to protect critical plant equipment. On November 25, 2002, as plans were being developed to institute a bypass (pumping directly from the WWRBs to a yard drain), the basins reached capacity and the overflow entered a yard drain.This overflow event required immediate initiation of the unanticipated bypass.VEGP obtained concurrence from Mr.Michael Creason of the EPD Industrial Branch for the initiation of the bypass.The temporary pumps were installed later to increase the capacity for water removal and provide a more controlled means of managing the bypass.The overflow duration was limited to only a few hours, and very little flow was involved.Samples were taken confirming compliance with NPDES Permit'requirements. Part II.A.5 of the NPDES Permit specifically allows for a bypass when permit limits will not be exceeded.The bypass initially consisted of an overflow, and was subsequently enhanced by placing a portable pump at the basins.The path of the bypass was the transfer of water from the WWRBs to a nearby yard drain.The pump suction was placed several feet below the waterline so that any floating material would not be discharged to a yard drain.On the day that the pump was utilized to prevent overflow of the basin, sampling was performed for pH, Total Suspended Solids (TSS), and Oil and Grease (O&G).In accordance with permit provisions, Mr.Michael Creason was informed of the bypass condition within 24 hours of initiation. The results of the bypass sampling are provided in the following table.The WWRB permit limits for TSS and O&G were not exceeded, and the pH was between 6.0 and 9.0 S.U.Bypass Sampling Information Date Duration pH (SU)TSS (mg/l)O&G (mg/l)11125/2002 <12 hours Unit 1-8.63 Unit1-1.9 Unit 1-10.5 (Overflow)(very little flow)Unit 2-8.76 Unit 2-1.5 Unit2-6.2 11126/2002 142 minutes 8.45 1.6<1.0 (Pump)(Unit 1 Only)

  • .., I..The equipment for the bypass was put in place on November 26, 2002, and was available for use until December 13, 2002, when the bypass was terminated.

In accordance with permit condition II.A.S, the required 24 hour verbal notification was provided to theEnvironmentalProtection Division (Mr.Mike Creason)on November 25, 2002.Mr.Creason confirmed that the required 5-day written report would be provided after termination of the bypass conditions. Duration of Bypass The bypass was in effect for 18 days, with flow only occurring on two of those days.Approximately 142,000 gallons of water were sent to the yard drain.On December 13, 2002, the basins were returned to a normal configuration utilizing Outfalls 004 and 005.Steps to Prevent Recurrence The simultaneous shutdown of both operating units at Plant Vogtledueto chemical intrusion is an extremely unusual event and is not anticipated to recur.As SUCh, no specific actions to prevent recurrence are deemed necessary. Lessons learned from the experience of extended high hydraulic loading of the WWRBs will be utilized, as appropriate, to enhance plant response to such events in the future. ,*.\,-Vogtle Electric Generating Plant NPDES Permit No.GA0026786 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete.I am aware that there are significant penalties for submitting false information, including the possibility of a[me and imprisonment for knowing violations. Date of Signature Southerll Operating Company, Inc.42 Parkvv2'/BlrrYJingharn, Alabalria SOUTHERN A COMPANY Energy to Sertle Your World"" File: E.03.04 Log: EV-07-1954 October 12, 2007 FEDERAL EXPRESS Vogtle Electric Generating Plant (NPDES Permit No.GA 0026786)Quarterly Operational Monitoring Report Mr.Jeff Larson Program Manager Permitting Compliance and Enforcement Program Environmental Protection Division 4244 International Parkway, Suite 110 Atlanta, Georgia 30354

Dear Mr.Larson:

Enclosed is the quarterly Operational Monitoring Report for Vogtle Electric Generating Plant for the third quarter of 2007 as required by the above referenced NPDES permit.If you have any questions, please contact Greg Elmore at (205)992-5264.Sincerely, I (li/U tcz Hi2{':U'j J.M.Godfrey, Environmental Affairs ,/)JMG/GDE:ahl Enclosure EV-07-1954 Mr.Jeff Larson State of Georgia Environmental Protection Division Page Two bcc: wlo Enclosure T.E.Tynan N.J.Stringfellow C.L.Buck S.A.Varnum T.D.Blalock B.R.Evans wi Enclosure C.R.Dedrickson D.G.Goodwin SNC Document Management -Vogtle (Return Receipt) QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 001-Final Plant Discharge (Combined Plant Waste Streams Units 1&2)Location: Final Outfall Final Outfall Type Sample: Grab Grab Frequency: 2/Month*As requested by EPD Parameter: pH Hydrazine PCS Code: 400 81313 Limits: Min.6.0 Non-Detectable Max.9.0 DATE PH HYDRAZINE 07-09 8.64*None requested this quarter.07-23 8.66 08-06 8.59 08-20 8.60 09-04 8.40 09-17 8.39Page1 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mgll*Final Outfall Multiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min./day Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 07-02 07-05 07-09 07-12 07-16 07-19 07-23 07-26 07-30 08-02 08-06 08-09 08-13 08-16 08-20 08-23 08-27 08-30 FAC MG/L o o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0.058 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 2 of 19 CHROMIUM sO.002 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company VogUe Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/l 50064*0.02 mgll*Final Outfall MUltiple Grabs 1IWeek Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll'NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mg/l.DATE 09-04 09-06 09-10 09-13 09-16 09-17 09-18 09-19 09-20 09-21 09-22 09-24 09-27 FAC MG/L o o o o o o o o o o o o o TRC-AVG.(MIN.MGlL)0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 3 of 19 CHROMIUM I!I'I I I I: I'I'F i i*!;i 1.p QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 002-Unit 1 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/I*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I"NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/l.DATE FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM Month of July No.ofSamples**: 15 15 1 1 Average of Value: 0 0 0.058 sO.002 Max.Value: 0 0 0.058 sO.002 Min.Value: 0 0 0.058 SO.002 Limits Exceeded: 0 0 0 0 Month of August No.ofSamples**: 12 12 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples**: 43 43 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise. Page 4 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 002A-Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mgJl 50064*0.02 mg/I*Overflow Multiple Grabs l/Week Total Time of TRC ReI.&TRC Avg.(Min-mgJl) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgJl Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgJl*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgtl and Daily Max.0.5 mgt!.FAC MG/L TRC-AVG.(MIN.MG/L)ZINC CHROMIUM There were no overflows of the Unit 1 Cooling Tower Slowdown Emergency Overflow to Storm Drains during the quarter.Page5 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits: "Final Outfall Multiple Grabs 1IWeek FAC mgll 50064*0.02 mgll*Final Outfall Multiple Grabs llWeek Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab l/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.DATE 07-02 07-05 07*09 07-12 07-16 07-19 07*23 07-26 07-30 08-02 08-06 08-09 08-13 08-16 08-20 08-23 08-27 08-30 FAC MG/L o o o o o o o o o o o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0.064 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0Page6 of 19 CHROMIUM SO.002 I I i L QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 003-Unit 2 Cooling Tower Slowdown Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Final Outfall Multiple Grabs 1/Week FAC mg/I 50064*0.02 mg/I*FinalOutfali Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mg/I Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mg/I and Daily Max.0.5 mg/1.09-04 09-06 09-10 09-13 09-17 09-21 09-22 09-23 09-24 09-25 09-26 09-27 FAC MG/L o o a a o o o o o o o o TRC-AVG.(MIN.MG/L)ZINC 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 0-0 Page 7 of 19 CHROMIUM QUARTERLY OPERATIONAL MONITORING REPORTSouthernNuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge location: 003*Unit 2 Cooling Tower Slowdown-(cont'd)Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*FinalOutfall Multiple Grabs 1/Week FAC mgll 50064*0.02 mg/l*Final Outfall Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mg/I) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mg/I*NOTE: If dechlorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.DATE FAC MG/L TRC-AVG.(MIN.MG/U ZINC Month of July No.of Samples**13 13 1 Average of Value: 0 0 0.064 Max.Value: 0 0 0.064 Min.Value: 0 0 0.064 Limits Exceeded: 0 0 0 Month of August No.of Samples**: 14 14 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 Month of September No.of Samples*'*: 42 42 Average of Value: 0 0 Max.Value: 0 0 Min.Value: 0 0 Limits Exceeded: 0 0 CHROMIUM 1 SO.002 sO.002 sO.002 o i I j I I I I i: i;I**Note: "No.of samples" indicates the total number of samples taken during the month.In most cases, several samples were taken each day.Samples were taken on the dates indicated. All results were zero (0)unless noted otherwise.Page8 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 003A-Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains Location: Type Sample: Frequency: Parameter: PCS Code: Limits:*Overflow Multiple Grabs 1/Week FAC mgll 50064*0.02 mgll*Overflow Multiple Grabs 1/Week Total Time of TRC ReI.&TRC Avg.(Min-mgll) 81400-50060 120 min.lday Basin/Flume Grab 1/Quarter Zinc 1092 Max 1.0 mgll Basin/Flume Grab 1/Quarter Chromium 1034 Max 0.2 mgll There were no overflows of the Unit 2 Cooling Tower Slowdown Emergency Overflow to Storm Drains durIng the quarter.If dechtorinator is not in use, multiple grabs will be at Basin/Flume. These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgll.*NOTE: FAC MGIL TRC-AVG.(MIN.MG/L)ZINC CHROMIUM I I: i i i L 1 I I I I I'\" I'I,'I it Page 9 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mglt (TSS)Oil&Grease mgll (O/G)PCS Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/G)07-18 4.0 S10.0 07*18 8.0 s10.0 08-01 3.0 s10.0 08-14 3.0 S10.0 08-28 11.0 S10.0 09-03 5.0 S10.0 09-19 8.0 s10.0 Page 10 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 004*Unit 1 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 21Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MGIL (TSS)Discharge Line Grab 21Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MGIL (O/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min Value: Limits Exceeded Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 6.0 8.0 4.0 o 3 5.7 11.0 3.0 o 2 6.5 8.0 5.0 o Page 11 of 19 2 S10.0 s10.0 s10.0 o 3 s10.0 s10.0 s10.0 o 2::10.0::10.0::10.0 o QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Discharge Line Discharge Line Type Sample: Grab Grab Frequency: 2/Month 2/Month Parameter: Suspended Solids mg/l (TSS)Oil&Grease mg/l (O/G)pes Code: 530 550 Limits: Daily Avg.30 Daily Avg.15 Daily Max.100 Daily Max.20 DATE SUSPENDED SOLIDS MG/L (TSS)OIL&GREASE MG/L (O/m 07-08 6.0 S10.0 07-18 7.0 S10.0 08-01 8.0::>10.0 08-14 8.0::>10.0 08-28 7.0 s10.0 09-03 10.0::;10.0 09-19 8.0::;10.0 Page 12 of 19).i!I!I I , I i I!'!,-I I I I i;. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 005-Unit 2 Waste Water Retention Basin Location: Type Sample: Frequency: Parameter: PCS Code: Limits: Discharge Line Grab 2/Month Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)Discharge Line Grab 2/Month Oil&Grease mgll (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (Q/G)Month of July No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of August No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Month of September No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 2 6.5 7.0 6.0 o 3 7.7 8.0 7.0 o 2 9.0 10.0 8.0 o Page 13 of 19 2 o 3

510.0 o 2 o
  • QUARTERL V OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 006*sewage Treatment Emergency Overflow to Savannah River Location: Type Sample: Frequency:

Parameter: pes Code: Limits: Sewage/Overflow Grab l/Discharge BOD mg/I 310 Daily Avg.30 Daily Max.45 BOD MG/L Sewage/Overflow Grab l/Discharge pH 400 Min.6.0 Daily Max.9.0 Sewage/Overflow Estimate l/Discharge Flow Flow (MGD)There were no overflows of the sewage Treatment Plant to the Savannah River during the quarter.Page 14 of 19 , i I I I I , QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 007-Liquid Radwaste Systems Discharge Unit 1 Location: Type Sample: Frequency: Parameter: PCS Code: Limits: 07-02 Discharge Line Grab 1/Quarter Suspended Solids mgll (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS)2.0 Discharge Line Grab 1/Quarter Oil&Grease mg/I (O/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (O/G):S10.0 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: 1 2.0 2.0 2.0 o Page 15 of 19 1:S10.0:S10.0

S10.0 o I I I QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 Discharge Location: 008-Liquid Radwaste Systems Discharge Unit 2 Location: Type Sample: Frequency:

Parameter: PCS Code: Limits: 07-10 No.of Samples: Average of Value: Max.Value: Min.Value: Limits Exceeded: Discharge Line Grab 1/Quarter Suspended Solids mgtl (TSS)530 Daily Avg.30 Daily Max.100 SUSPENDED SOLIDS MG/L (TSS) 1 o Page 16 of 19 Discharge Line Grab 1/Quarter Oil&Grease mgtl (a/G)550 Daily Avg.15 Daily Max.20 OIL&GREASE MG/L (a/G) 1 o I r: I'I I;;'I , i L Ii!I I I*I.I! QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham; Alabama 35201 From: To: 09-30-07 Permit No.: GAOO26786 Discharge location: 009-Nuclear Service Cooling Tower Blowdown (Units 1 and 2)location: Type Sample: Frequency: Parameter: PCS Code: limits: "'Final Outfall Grab 1/Discharge Event FAC mgtl 50064"'0.02 mgtl*NOTE: If dechlorinator is not in use, grab samples will be at the blowdown.These limits will be Daily Average 0.2 mgll and Daily Max.0.5 mgt!.DATE FAC MGtl No discharge this quarter.Page 17 of 19 QUARTERLY OPERATIONAL MONITORING REPORT Southern NuclearOperatingCompany Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 Sludge Monitoring (Ib.slday/month) From: 07*01*07 To: 09-30-07 Permit No.: GA0026786 July Date Quantity No sludge removed.August Date Quantity No sludge removed.Page 18 of 19 september Date Quantity No sludge removed. QUARTERLY OPERATIONAL MONITORING REPORT Southern Nuclear Operating Company Vogtle Electric Generating Plant P.O.Box 1295 Birmingham, Alabama 35201 From: 07-01-07 To: 09-30-07 Permit No.: GA0026786 I certify, under penalty of law, that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the infonnation submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false infonnation, including the possibility of fine and imprisonment for knowing violations. clef.Russell Dedr*Plant Manager Vogtle Electric Generating Plant Page 19 of 19}}