ML072920556

From kanterella
Jump to navigation Jump to search
University of Michigan Ford Nuclear Reactor Master Inspection Plan - Fiscal Year (Fy) 2008
ML072920556
Person / Time
Site: University of Michigan
Issue date: 10/18/2007
From: Louden P
NRC/RGN-III/DNMS/DB
To: Alexander T
University of Michigan
References
Download: ML072920556 (3)


Text

October 18, 2007 Mr. Terry Alexander, Executive Director Department of Occupation Safety & Environmental Health 1239 Kipke Drive University of Michigan Ann Arbor, MI 48109-1010

SUBJECT:

UNIVERSITY OF MICHIGAN FORD NUCLEAR REACTOR MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2008

Dear Mr. Alexander:

In accordance with NRC Manual Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Ford Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for October 2007 through September 2008 (FY2008). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2008 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2008, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2008 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Ford Reactor FY2008 MIP.

We currently project the Region will conduct three inspections at the Ford Reactor during FY2008. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedure(s) used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors

T. Alexander In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Patrick Louden, Chief Decommissioning Branch Docket No. 050-00002 License No. R-28 cc: S.L. Ceccio, University of Michigan C.W. Becker, University of Michigan

T. Alexander In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Patrick Louden, Chief Decommissioning Branch Docket No. 050-00002 License No. R-28 cc: S.L. Ceccio, University of Michigan C.W. Becker, University of Michigan DOCUMENT NAME: G:\SEC\Work in progress\UofMI Ford Rx FY2008 MIP.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME WGSnell:mb PLLouden DATE 10/18/07 10/18/07 OFFICIAL RECORD COPY