Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0720702572007-06-29029 June 2007 Technical Specification Change Request No. 337 - Reactor Building Emergency Sump Ph Control System Buffer Change Project stage: Other ML0726102912007-09-20020 September 2007 Electronic Transmission, Draft Request for Additional Information Regarding Reactor Building Sump Ph Control System Buffer Change Project stage: Draft RAI ML0726705392007-09-25025 September 2007 Electronic Transmission, Draft Request for Additional Information Regarding Reactor Building Sump Ph Control System Buffer Change Project stage: Draft RAI ML0726705492007-10-0404 October 2007 Request for Additional Information Regarding Proposed Ph Control System Buffer Change Project stage: RAI ML0729806992007-10-19019 October 2007 Response to Request for Additional Information - Technical Specification Change Request No. 337: Reactor Building Emergency Sump Ph Control System Buffer Change Project stage: Response to RAI ML0730601372007-11-0505 November 2007 Electronic Transmission, Draft Request for Additional Information Regarding Reactor Building Sump Ph Control System Buffer Change Project stage: Draft RAI ML0733104162007-11-27027 November 2007 Request for Additional Information Regarding Proposed Reactor Building Emergency Sump System Buffer Change Project stage: RAI ML0733803942007-11-29029 November 2007 Response to Request for Additional Information - Technical Specification Change Request No. 337: Reactor Building Emergency Sump Ph Control System Buffer Change Project stage: Response to RAI 2007-11-29
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML24215A3602024-08-20020 August 2024 Summary of July 30, 2024 Meeting Between the NRC and TMI2Solutions Staff ML23102A0382023-04-10010 April 2023 Occupational Radiation Exposure Annual Report ML22073A2442022-03-16016 March 2022 TMI NMSS Memo for ISFSI PSP Review Completion, Staff Review of the Three Mile Island Independent Spent Fuel Storage Installation Physical Security Plan (Rev.0) and License Amendment Request (Cac/Epid No: 000078/05000289/L-2021-SPR-0004) ML22074A0922022-03-15015 March 2022 TMI: 1 ISFSI Only PSP Rev. 0 Notice of Safeguards Memo ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML21218A0082021-08-10010 August 2021 NSIR Review of the Three Mile Island Physical Security Plan Revision 24 for the Verification of ASM 20-103 Incorporation ML21166A1182021-06-15015 June 2021 Technical Assistance Request - Review of Physical Security Plan for the Three Mile Island Unit 1 Power Station Independent Spent Fuel Storage Installation ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19044A3842019-02-0606 February 2019 Notification of the Facility Director Change for the Nuclear Regulatory Commission Regulated Independent Spent Fuel Storage Installations (CLNl90659) ML18093B1022018-04-0303 April 2018 Notice of Public Meeting with Exelon Generation Company, LLC, to Discuss the NRCs Assessment of Safety Performance at Three Mile Island Nuclear Station, Unit 1 for 2017, as Described in the Annual Assessment Letter Dated February 28, 2018 ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16252A2732016-08-26026 August 2016 Notification of the Facility Director Change Update for the NRC Independent Spent Fuel Storage Installations (EM-NRC-16-020) ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15175A3002015-08-0606 August 2015 Final Response to Task Interface Agreement 2015-01, Assessment of Three Mile Island Nuclear Station'S Use of a Non-Seismic Qualified Cleanup Path for the Borated Water Storage Tank ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML14133A0592014-07-0101 July 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, Federal Energy Regulatory Commission, Exelon Generation Co, LLC, and PPL Susquehanna, LLC, to Discuss Dam Failure Analysis.. ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14106A3742014-03-31031 March 2014 Notification of Facility Director Change for the Nuclear Regulatory Commission Regulated Fort St Vrain, Three Mile Island and Idaho Spent Fuel Facility Independent Spent Fuel Storage Installations (EM-FMDP-14-018) ML13269A1792013-09-25025 September 2013 Draft Request for Additional Information ML13262A1632013-09-23023 September 2013 Meeting Report - Three Mile Island, Unit 2, Post-Shutdown Decommissioning Activities Report Public Meeting ML13253A2252013-09-10010 September 2013 Draft Request for Additional Information ML13249A2072013-09-0505 September 2013 Draft Request for Additional Information ML13221A4462013-08-12012 August 2013 Meeting Notice: to Discuss the Three Mile Island, Unit 2, Post-Shutdown Decommissioning Activities Report Submittal and Obtain Public Comments ML13190A1992013-08-0606 August 2013 FRN - Memo to Cindy Bladey Transmitting Federal Register Notice on Receipt of Three Mile Island - Unit 2 Post-Shutdown Decommissioning Activities Report ML13193A1452013-07-12012 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values (TAC Nos. MF0425 & MF0426) ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13177A3902013-06-26026 June 2013 Electronic Transmission, Draft Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13136A2032013-05-20020 May 2013 Meeting Notice with Exelon Generation Company, LLC, to Discuss Once Through Steam Generator Tube-to-Tube Wear at Three Mile Island, Unit 1 ML13066A1262013-03-0707 March 2013 Electronic Transmission, Draft Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13050A6362013-02-20020 February 2013 Draft RAI Memo ML13044A6652013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval ML13044A3122013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12310A2022012-11-0606 November 2012 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12306A4542012-11-0101 November 2012 Electronic Transmission, Draft Request for Additional Information Regarding 2011 Steam Generator Tube Inspection Report ML1208701692012-03-28028 March 2012 Electronic Transmission, Draft Request for Additional Information Regarding Fourth Interval Inservice Testing Relief Request PR-05 ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1134801002011-12-19019 December 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1133605762011-12-0505 December 2011 Electronic Transmission, Draft Request for Additional Information Regarding Proposed License Amendment Revising Technical Specifications to Incorporate Administrative Changes ML1119900962011-07-20020 July 2011 Electronic Transmission, Draft Request for Additional Information Regarding Third Inservice Inspection Interval Relief Requests RR-11-01 and RR11-02 ML1113802512011-06-0303 June 2011 Memo to Cindy Bladey Federal Register Notice Providing Notice of Issuance of Director'S Decision Under 10 CFR 2.206 ML1111804942011-04-28028 April 2011 Electronic Transmission, Draft Request for Additional Information Regarding Fourth Interval Inservice Inspection Relief Request I4R-04 ML1107305692011-03-14014 March 2011 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request RR-10-01, Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection Interval ML1106200272011-03-0303 March 2011 Electronic Transmission, Draft Request for Additional Information Proposed Technical Specification Changes Regarding Number of Required Operable Main Steam Safety Valves ML1105509182011-02-25025 February 2011 Notice of Meeting with Exelon Generation Company, LLC, to Discuss Three Mile Island, Unit 1, Main Steam Safety Valve License Amendment Request ML1105403472011-02-23023 February 2011 Electronic Transmission, Draft Request for Additional Information, Proposed Technical Specification Changes Regarding Relocation of Equipment Load List from Technical Specifications to a Licensee Controlled Document ML1103416642011-02-0404 February 2011 Electronic Transmission, Draft Request for Additional Information, Proposed Technical Specification Changes Regarding Number of Required Operable Main Steam Safety Valves ML1103402022011-02-0303 February 2011 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request RR-10-02, Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds 2024-08-20
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24011A2352024-01-11011 January 2024 Eco Request for Additional Information for 2023 License Amendment Request 1-11-24 ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23187A0332023-06-29029 June 2023 TMI Unit 2, PSDAR Rev. 5 RAIs ML23082A3432023-03-31031 March 2023 Enclosure - RAI - Three Mile Island, Unit 2 - Acceptance Review and Request for Additional Information for the Historic and Cultural Resources License Amendment Request - EPID: 2023-LLA-0026 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22210A0882022-07-29029 July 2022 Enclosure - Three Mile Island, Unit No. 2 - Request for Additional Information for Requested Licensing Action Regarding Decommissioning Technical Specifications ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22038A9362022-02-0707 February 2022 TMI2 Accident Analyses Questions ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML20164A0902020-06-10010 June 2020 Request for Additional Information Related to TMI-1 License Amendment Request to Delete Permanently Defueled Technical Specification 3/4.1.4 (L-2019-LLA-0250) ML19319B2082019-11-15015 November 2019 NRR E-mail Capture - Request for Additional Information Related to TMI-1 Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E (L-2019-LLA-0216) ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18220A7832018-08-0707 August 2018 NRR E-mail Capture - Request for Additional Information Related to TMI Fall 2017 Steam Generator Tube Inspection Report ML18212A2712018-07-31031 July 2018 NRR E-mail Capture - Request for Additional Information Related to Amendment Regarding Decommissioning ERO Staffing Changes ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16356A4802016-12-21021 December 2016 NRR E-mail Capture - RAIs on TMI License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16337A0072016-12-0101 December 2016 NRR E-mail Capture - Draft RAIs Three Mile Island Nuclear Station, Units 1 and 2, License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16287A4042016-10-11011 October 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15020A7372015-03-0808 March 2015 Request for Additional Information Regarding Related to December 22, 2014, Report Submitted Pursuant to 10 CFR 50.46 ML14307A1172014-11-14014 November 2014 Request for Additional Information Regarding Relief Request RR-14-01 Concerning Alternative Root Mean Square Depth Sizing Requirements ML14240A4122014-09-0404 September 2014 Request for Additional Information Regarding License Amendment Request to Eliminate Certain Technical Specification Reporting Requirements (Tac MF0628) ML14134A3222014-05-22022 May 2014 Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report ML14134A1722014-05-14014 May 2014 Draft RAIs in Support of NRC Staff Review of TMI Cycle 20 COLR ML14052A2592014-02-27027 February 2014 Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specification Reporting Requirements ML14030A5832014-01-29029 January 2014 Draft Request for Additional Information Proposed Revision to Technical Specifications Reporting Requirements Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1 ML13266A2852013-10-21021 October 2013 Request for Additional Information on Three Mile Island Nuclear Station Unit 2 - post-shutdown Decommissioning Activities Report ML13276A6492013-10-0303 October 2013 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML13269A1792013-09-25025 September 2013 Draft Request for Additional Information ML13253A2252013-09-10010 September 2013 Draft Request for Additional Information ML13249A2072013-09-0505 September 2013 Draft Request for Additional Information ML13193A1752013-07-22022 July 2013 Request for Additional Information Regarding Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13193A1452013-07-12012 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values (TAC Nos. MF0425 & MF0426) ML13176A4702013-06-26026 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13177A3902013-06-26026 June 2013 Electronic Transmission, Draft Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13066A2442013-03-19019 March 2013 Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13066A1262013-03-0707 March 2013 Electronic Transmission, Draft Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13044A3212013-03-0505 March 2013 Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13045A6432013-02-25025 February 2013 Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval ML13051A3852013-02-25025 February 2013 Request for Additional Information Regarding End-of-Interval Relief Request RR-12-01, Pressure Nozzle-to-Head Weld Exams ML13050A6362013-02-20020 February 2013 Draft RAI Memo ML13044A3122013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13044A6652013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval 2024-08-15
[Table view] |
Text
September 20, 2007 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Peter Bamford, Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING REACTOR BUILDING SUMP PH CONTROL SYSTEM BUFFER CHANGE (TAC NO. MD5963)
The attached draft request for additional information (RAI) was sent by electronic transmission on September 18, 2007, to Mr. David Distel, at AmerGen Energy Company, LLC (AmerGen). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call with AmerGen in order to clarify certain items in the licensee=s submittal. The draft RAI is related to AmerGen=s submittal dated June 29, 2007, regarding a proposed change to the reactor building sump pH buffering agent from sodium hydroxide to trisodium phosphate. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Additionally, review of the draft RAI would allow AmerGen to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Docket Nos. 50-289
Enclosure:
As stated
September 20, 2007 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Peter Bamford, Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING REACTOR BUILDING SUMP PH CONTROL SYSTEM BUFFER CHANGE (TAC NO. MD5963)
The attached draft request for additional information (RAI) was sent by electronic transmission on September 18, 2007, to Mr. David Distel, at AmerGen Energy Company, LLC (AmerGen). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call with AmerGen in order to clarify certain items in the licensee=s submittal. The draft RAI is related to AmerGen=s submittal dated June 29, 2007, regarding a proposed change to the reactor building sump pH buffering agent from sodium hydroxide to trisodium phosphate. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Additionally, review of the draft RAI would allow AmerGen to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Docket Nos. 50-289
Enclosure:
As stated DISTRIBUTION:
Public RidsNrrPMPBamford LPL1-2 R/F MYoder, NRR KParczewski, NRR Accession No.: ML072610291 *via memorandum OFFICE LPL1-2/PM CSGB/BC NAME PBamford AHiser*
DATE 9/20/2007 09/17/2007 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING REACTOR BUILDING SUMP PH CONTROL SYSTEM BUFFER CHANGE THREE MILE ISLAND UNIT 1 DOCKET NOS. 50-289 By letter dated June 29, 2007, (Agencywide Documents Access and Management System Accession No. ML072070257), AmerGen Energy Company, LLC, the licensee, submitted a license amendment request pertaining to the replacement of the containment sump buffer at Three Mile Island (TMI), Unit 1.
The Nuclear Regulatory Commission (NRC) Staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
- 1. In section 7.1, page 15 of Attachment 2 the licensee listed eight chemicals which will exist in the sump water after a loss of coolant accident (LOCA). In its analysis the licensee assumed that each of them will dissociate or speciate into positive or negative ionic species. By balancing the resulting positive and negative charges, to obtain neutrality of the solution, the licensee could determine the amount of trisodium phosphate (TSP) required for obtaining a given value of pH. Provide a list of the ionic species.
- 2. Describe the procedure for determining speciation of boron and TSP.
- 3. Explain the numerical data on page 16 of Attachment 2.
- 4. Explain the statement in section 2.6 on page 5 of Attachment 2 that boron content will not be exceeded provided the power rate does not increase (2568 MWt) and the cycle duration (2 years) does not increase.
- 5. In section 6, on page 13 of Attachment 2, it is stated that water and boric acid in the sump is determined from a mass balance with two bounding conditions for water and boric acid.
What are they and how were they determined?
- 6. According to Regulatory Guide 1.183, if the sump pH is controlled at the minimum values of 7, the molecular iodine is prevented from formation and release to the containment.
However, during the engineered safety feature (ESF) recirculation phase, a higher pH is assumed to support iodine flashing fractions at 5% for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 2% for the following 29 days. In the submittal the licensee specified the required pH 7.3. Discuss:
(1) the methodology for determining this pH value and (2) was the sump water pH buffered at this pH?
Enclosure
- 7. Proposed insert C to technical specification (TS) page 4-2b describes the need to perform periodic solubility tests on the TSP to ensure adequate dissolution time. However, Insert D to the proposed TS surveillance requirements, TS page 4-10c, does not include solubility as one of the verifications performed on the TSP. Describe this apparent discrepancy between the TS bases and the TS surveillance requirement.
- 8. When verifying the TSP buffering capability, solubility, and total mass, how is the sample obtained? How does the sampling account for the potential that the TSP on the interior of the basket may exhibit different properties (hydration, density, etc.) than samples taken from the basket periphery? Discuss the potential impact that variations in material properties within each basket may have on surveillance tests to determine buffer capability, solubility, and total mass of TSP available.
- 9. Proposed insert C to TS page 4-2b describes the need to periodically determine the mass of TSP because leaking valves and components may dissolve some of the TSP from the baskets. If a leaking valve or component were to result in a portion of the TSP being dissolved, how would the dissolved TSP be accounted for when adding additional TSP to the basket. If there is no mechanism for removing the dissolved TSP then addition of more TSP may result in a total mass that exceeds the TS limits. Discuss how the loss of TSP through operational dissolution is accounted for when determining the total mass of TSP.
- 10. TMI is proposing to switch to TSP as a buffering chemical. Testing indicates that TSP in the presence of dissolved calcium can result in rapid precipitation of calcium phosphate, which can create significant head loss across a sump strainer covered with a debris bed.
Provide a list of all potential sources and amounts of calcium within the TMI containment and provide the calculated dissolved calcium concentration in a post-LOCA pool. Provide the relative chemical precipitate loading predicted by the WCAP 16530-NP model for TMI with TSP and at the maximum projected pH value (8) for the pool.