MONTHYEARML22112A0062022-04-20020 April 2022 (Public Version) Oconee SLRA - Final RCI 3.5.2.2.2.6-L ML21323A1152021-11-23023 November 2021 Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Enclosure ML18060A0282018-02-28028 February 2018 Noncurrence Process - Alternative to Codes and Standards ML16055A1882016-01-15015 January 2016 FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 2 of 2 ML16055A1872016-01-15015 January 2016 FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 1 of 2 ML15224A7792015-08-0707 August 2015 FOIA/PA-2015-0393 - Resp 2 - Final, Part 1 of 1 ML15162A0842015-06-11011 June 2015 GTCC Disposals at the Barnwell Low-Level Radioactive Waste Facility from 1998 to Present ML14135A4082014-05-0707 May 2014 FOIA/PA-2013-0213 - Resp 3 - Final, Group Letter D. Part 1 of 1 ML14058A0822014-02-0404 February 2014 Questions and Answers Related to the Oconee External Flooding Issue ML14058A0522014-02-0404 February 2014 Use of FERC Inundation Calculation Parameters ML14058A0502014-02-0404 February 2014 Questions and Answers Related to Oconee Flood Barrier ML14058A0492014-02-0404 February 2014 Site Adequate Protection Backfit Documented Evaluation ML14058A0212014-02-0404 February 2014 Request for Opinion on the Safe Shutdown Facility Added to the License Basis for the Oconee Units in an SER ML14058A0202014-02-0404 February 2014 Nancy Ssf Flooding URI Number 1 ML14058A0192014-02-0404 February 2014 TIA, Answers to Questions in Relation to Licensing Basis for Flooding for the Safe Shutdown Facility at Oconee Station ML14058A0152014-02-0404 February 2014 Site Adequate Protection Backfit Documented Evaluation ML14049A2872013-08-28028 August 2013 Meeting Feedback Form Meeting No. 20140354 ML16070A2882013-04-24024 April 2013 Jocassee and Keowee Dams, Breach Parameter Review, Dated April 24, 2013 (Redacted) ML13240A0162013-03-0606 March 2013 Report, Enclosure Oconee Nuclear Station Flooding Hazard Reevaluation Report ML13052A7852013-02-26026 February 2013 Flood Licensing Basis Evaluation Open Items ML13056A1052013-02-0606 February 2013 Comparison of Approaches for Calculating a Jocassee Dam Failure Frequency ML13052A7802013-02-0606 February 2013 Options for Revising Oconee Flood CAL Due Dates ML13052A7812013-02-0606 February 2013 Timeline - Summary of Events ML13052A7832013-02-0606 February 2013 Draft NRC Information Notice on Dam Failure Frequency in Probabilistic Risk Assessments ML13052A7872013-02-0606 February 2013 Justification for Continued Operation of Oconee Nuclear Station ML13056A1002013-02-0606 February 2013 Resolution of Oconee Flooding Issue ML13052A7862013-02-0606 February 2013 Jocassee Dame Failure Frequency Components ML12121A6382012-04-30030 April 2012 Response to Nuclear Regulatory Commission Standard Steam Generator Questions for Oconee Unit 3 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12003A0632011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 2 of 6 ML12003A0672011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 4 of 6 ML12003A0682011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 5 of 6 ML12003A0692011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 6 of 6 ML1131406132011-11-0101 November 2011 Enclosure 3 - Regulatory Enforcement Conference - Resubmittal of Supplement ML11279A2532011-10-0606 October 2011 NRC Pre-submittal Meeting - Proposed Tornado Mitigation Flowchart Revision 6 Oconee Nuclear Station, Units 1, 2, and 3 ML11279A2522011-10-0606 October 2011 NRC Pre-submittal Meeting- Proposed Turbine Building HELB Mitigation Flow Chart Revision 5 Oconee Nuclear Station, Units 1, 2, and 3 ML1101907492011-01-18018 January 2011 Enclosure 3 - List of Attendees ML1035103792010-12-17017 December 2010 NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 1 ML1026404582010-09-13013 September 2010 Enclosure 2 - Redacted Version of Request for Additional Information Re the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) ML1035100122010-08-19019 August 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 0 (Updated) ML1023705812010-08-19019 August 2010 NFPA 805 Transition Pilot Plant FAQ 08-0054 ML1019301982010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for Oconee Nuclear Station ML14058A0612010-04-13013 April 2010 Draft Oconee Nuclear Site Adequate Protection Backfit Documented Evaluation ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML1019305442010-02-0808 February 2010 Ground Water Communication Supplemental Information Questions and Answers ML1100606662009-10-0909 October 2009 Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 2 of 14 ML0927103442009-09-25025 September 2009 Site Visit Observation on 09/25/2009 by Joel Munday for Oconee ML1100404352009-09-15015 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/15/2009 ML1100309332009-07-13013 July 2009 Congressional Staff Briefing: Monday July 13, 2009, 3:30 Pm, Room 2108 Rayburn Bldg; Topic: Follow-Up Questions Regarding Chairman'S June 17, 2009 Response Regarding a IP2 Buried Pipe Leak ML0909004332009-04-0606 April 2009 Enclosure 2 - Oconee Nuclear Station Regulatory Audit - Documents Reviewed 2022-04-20
[Table view] |
Text
FAQ 71.5 Plant: Oconee Submittal Date: 7/10/07 Licensee
Contact:
Judy Smith Tel/email: 864-885-4309 jesmikduke-energy.com NRC
Contact:
Dan Rich Tel/email: 864-885-3008 dwrlknrc.gov Performance Indicator: MS06 MSPI Emergency AC Power System Site-Specific FAQ (Appendix D)? Yes FAQ requested to become effective when approved.
Question Section
" Is it acceptable to use the segment approach as described in NEI 99-02, Revision 5, Appendix F, page F-3, line 40, for the Oconee Emergency AC Power System to change from 2 trains to 4 segments?
- Is it acceptable to use plant specific Maintenance Rule data from 2002-2004 to calculate the Unplanned Unavailability Baseline for the Oconee Emergency AC Power System? Oconee is requesting to use the same approach as the cooling water systems, as described in NEI 99-02, Appendix F, page F- 10, line 13.
NEI 99-02 Guidance needing interpretation (include page and line citation):
NEI 99-02, Revision 5, Appendix F, page F-3, line 12 states "For emergency AC power systems the number of trains is the number of class 1E emergency (diesel, gas turbine, or hydroelectric) generators at the station that are installed to power shutdown loads in the event of a loss of off-site power."
NEI 99-02, Revision 5, Appendix F, page F-10, line 5 - 11 states, "If a front line system is divided into segments rather than trains, the following approach is followed for determining the generic unplanned unavailability:
- 1. Determine the number of trains used for SSU unavailability reporting that was in use prior to MSPI
- 2. Multiply the appropriate value from Table 1 by the number of trains determined in (1).
- 3. Take the result and distribute it among the MSPI segments, such that the sum is equal to (2) for the whole MSPI system."
Table 1 of Appendix F details the Unplanned Unavailability Baseline data based on ROP Industry wide data. To accurately reflect unplanned unavailability of the Oconee Page 1 of 3
FAQ 71.5 Emergency AC Power System, the plant specific data should be used to determine a baseline.
Event or circumstances requiring guidance interpretation:
In the original MSPI Basis Document, the Oconee Emergency AC Power System was identified as two independent, separate trains. This was a simplified, conservative categorization that was chosen to meet the guidance per Appendix F, Page F-3, line 12 for Emergency AC Power Systems.
The Oconee Emergency AC Power System is unique in the fact that it is a hydroelectric system, significantly different in design from other plants which use diesel generators as their Emergency AC Power. Keowee Hydro Station consists of two hydroelectric units which connect to all three Oconee Units. These hydro units are connected to each Oconee unit through an overhead power path, as well as, through an underground power path. The Keowee units are interchangeable and can supply either path, which differs from a normal diesel generator train lineup. This unique arrangement of Keowee (i.e.
two independent power paths with two interchangeable power sources) requires the use of a segment approach (as opposed to the two-train approach) to accurately reflect the risk profile of our Emergency Power System. Currently the base PRA model for the Oconee Emergency Power system accounts for the different segments; therefore, no changes need to be made to the base PRA model to incorporate this change.
Redefining the Emergency AC Power System into four segments, i.e. each Keowee unit is a segment and each power path a segment, using the same approach as described for Cooling Water Systems, will more accurately reflect the risk profile of the Oconee Emergency AC Power System.
The N (Normal) breakers are no longer going to be included as monitored components.
Also, the FV/UA max will no longer be the FV associated with the N breakers. These changes are due to the fact that the N breaker itself, as well as a failure of the N breaker, is outside the scope of the NEI guidance for Emergency AC power systems.
Licensee and NRC resident/region agree on the facts and circumstances This FAQ was given to Dan Rich, Senior Resident Inspector (SRI), for review. The feedback that was provided to the licensee was that he and the Region do not object to the segmented method; however, he stated that this new reporting method does not accurately reflect the risk profile for the Emergency AC Power System with respect to the dual-unit outages allowed by Oconee's Technical Specifications.
Potentially relevant existing FAQ numbers N/A Page 2 of 3
FAQ 71.5 Response Section Appendix D since this is an Oconee unique issue.
Proposed Resolution of FAQ In order to remove the unnecessary conservatism in our MSPI model and more accurately depict the Oconee design, Duke proposes to use the four segment approach for the Emergency AC Power System. Each Keowee unit is a segment, and each power path is a segment. The segment approach is described in NEI 99-02, Appendix F, page F-3, line 40, for Cooling Water Systems. Oconee is requesting to use the same approach with its Emergency AC Power System.
Duke also proposes to update Table 1 in NEI 99-02, Appendix F-9, to reflect that the unplanned unavailability baseline data associated with Oconee Emergency AC system is
'itant-specific Maintenance Rule data for 2002-2004, as seen with Cooling Water Systems described in NEI 99-02, Appendix F, page F-10, line 13.
Page 3 of 3