PLA-6146, Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement

From kanterella
(Redirected from ML070040376)
Jump to navigation Jump to search

Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement
ML070040376
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/26/2006
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6146
Download: ML070040376 (4)


Text

Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney @pplweb.com DEC 2 6 2006 Proprietary Information Enclosed ppJ U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 CONSTANT PRESSURE POWER UPRATE -

SUPPLEMENT Docket Nos. 50-387 PLA-6146 and 50-388

References:

1) PPL Letter PLA -6076, B. T. McKinney (PPL) to USNRC, "ProposedLicense Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate," dated October 11, 2006.
2) NRC Letter to B. T. McKinney, "Susquehanna Steam Electric Station, Units 1 and 2 - Extended Power Uprate (EPU) Acceptance Review TAC NOS MD 3309 and MD 3310), " dated November 21, 2006.
3) PPL Letter PLA -6138, B. T. McKinney (PPL) to USNRC, "ProposedLicense Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 OperatingLicense No. NPF-22 Constant Pressure Power Uprate - Supplement, " dated December 4, 2006.
4) PPL Letter PLA -6128, B. T. McKinney (PPL) to USNRC "Supplement to Proposed License Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 OperatingLicense No. NPF-22: Constant PressurePower Uprate," dated October 25, 2006.

Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).

Document Control Desk PLA-6146 In Reference 2, NRC identified areas of the Reference 1 application that required additional information in order for NRC to complete their acceptance review.

Reference 3 provided the additional information NRC requested. In a teleconference held December 14, 2006, the NRC staff indicated that a final stress analysis report for the new SSES dryers would be needed for NRC to complete the acceptance review. provides a proprietary version of the dryer stress analysis report for the new SSES dryers. Enclosure 2 provides a non-proprietary version of this stress analysis report.

There are no new regulatory commitments associated with the additional information provided herein. Reference 4, however, identified four (4) Regulatory Commitments applicable to the Reference 1 license amendment request. The first two (2) were met by the PPL responses provided in Reference 3. Regulatory Commitments 3 and 4 are met by the supplemental information provided herein. Specifically, the ASME load combination tables based on 120% OLTP conditions (Commitment 3) are provided in Section 8 of . The description of the steam dryer power ascension test plan (Commitment 4) is provided in Enclosure 4. (proprietary version) summarily describes how each of the PPL Reference 4 commitments have been satisfied. Enclosure 5 provides a non-proprietary version. With the supplemental information provided herein, PPL considers all the commitments made in Reference 4 to be met.

PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to this supplemental information.

We have determined that there are no changes required to either of these documents.

The supplemental information contained herein is considered by General Electric Company to be proprietary. General Electric Company requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4. An Affidavit supporting this request is provided in Enclosure 3.

Reference I requested NRC to approve the proposed changes by October 15, 2007. As noted in Reference 3, PPL will be replacing the existing steam dryers prior to implementing the uprate. Implementation of the first step of the uprate (approximate 7%

increase) is planned to be completed upon startup (entry into Mode 2) from the Spring 2008 Unit 1 refueling outage and subsequently on Unit 2 once all required modifications have been installed. As a result, NRC approval of this application is requested by January 30, 2008.

Dec. 26 2006 02:O0PM P4 FAX NO. :5708686562 FROM :McKinney P.05 DEC-26-2006 TUE 11:44 AM CONCUR FAX NO. 818687558795 Document Control Desk PLA-6146 If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:____ _____

B. T. McKinney Enclosure 1: Proprietary Version of General Electric Company Nuclear Energy Report

  1. GE-NE-O000-0061-0595-P-RO, "~Susquehanna Replacement Steamn Dryer Fatigue Analysis" Enclosure 2: Non-Proprietary Version of General Electric Company Nuclear Energy Repott # GE-NE-O0OO-061-0595.NP-RO, "Susquehanna Replacement Steam Dryer Fatigue Analysis" Enclosure 3: General Electric Company Affidavit Enclosure 4: Description of PPL Conunitment Closure (Proprietary Version)

Enclosure 5:- Deacription of PPL Commitment Closure (Non Proprietary Version)

Copy: NRC Region I Mr. A. J. Blawnys NRC Sr. Resident Imspactor Mr. R. V. Guzman, NRC Project Manager Mr. R. R. Janati, DEP/HRP

ENCLOSURE 2 GE-SSES-AEP-3 14

.5 NE-GE-OOOO-0061-059X-NP-RO - Non-Proprietary Non-Proprietary Notice This is a non-proprietary version of the Enclosure 1 of GE-SSES-AEP-314, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here ((I I].