ML063240210

From kanterella
Jump to navigation Jump to search
Final Outlines (Folder 3)
ML063240210
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/10/2006
From:
Exelon Generation Co
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
References
Download: ML063240210 (23)


Text

ES-401 BWR Examination Outline Form ES-401-1 Facility: Limerick Generating Station Printed: 10/30/2006 Date Of Exam: 10/23/2006 Note:

1. Ensure that at least two topics from every WA category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each WA category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by k1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate WA statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.

7.* The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system.

8. On the following pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

Note: This form deviates from theNUREG-1021 Form ES-401-1 by the addition o f t h e K and A column under the SROOnly Points. This allows sampling all Fuel Handling System KAs as required by ES-401.

1

BWR RO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 I Group 1 (RO I SRO) Form ES-401-1 EIAPE # I Name I Safety Function K1 K2 IR #

295001 Partial or Complete Loss of Forced X 3.5 1 Core Flow Circulation I 1 & 4 295003 Partial or Complete Loss of AC Pwr 3.5 16 295004 Partial or Complete Loss of DC Pwr 3.8

/6 295005 Main Turbine Generator Trip I 3 3.8

~~~

295006 SCRAM I 1 4.3*

295016 Control Room Abandonment 1 7 2.8 295016 Control Room Abandonment 1 7 X 4.4*

295018 Partial or Total Loss of CCW I 8 3.3 295019 Partial or Total Loss of Instrument 3.3 Air I 8 295021 Loss of Shutdown Cooling I 4 3.7 295023 Refueling Acc I 8 2.6 295024 High Drywell Pressure I 5 4.1 295025 High Reactor Pressure I 3 X 4.4*

295026 Suppression Pool High Water 3.9 1 Temp. I 5 295028 High Drywell Temperature I 5 X 3.6 295030 Low Suppression Pool Wtr Lvl 1 5 3.5 29503 1 Reactor Low Water Level I 2 X 4.6* 1 295037 SCRAM Condition Present and X 4.0 1 Reactor Power Above APRM Downscale or Unknown I 1 295037 SCRAM Condition Present and 4.2* 1 Reactor Power Above APRM Downscale or Unknown I 1 295038 High Off-Site Release Rate I 9 X 3.6 1 I I WACategory Totals: I 3 I 4 tTotal: 20 1

BWR RO Examination Outline Printed: 1013012006 Facility: Limerick Generating Station ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 (RO / SRO) Form ES-401-1 I

T I

295007 High Reactor Pressure 1 3 I 295010 High Drywell Pressure I 5 I I I x I 295015 Incomplete SCRAM I I I I 295020 Inadvertent Cont. Isolation / 5 & 7 Secondary Containment Area lxl 1 Radiation Levels 1 9 500000 High CTMT Hydrogen Conc. I 5 1 WACategory Totals: 1 1 1 7 1

BWR RO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station ES - 401 Plant Systems - Tier 2 I Group 1 (RO I SRO) Form ES-401-1 1 SysIEvol # I Name IK1 IK21K3 203000 RHWLPCI: Injection Mode 205000 Shutdown Cooling 206000 HPCI 209001 LPCS X 209001 LPCS I/

2 12000 RPS I212000RPs I I 215003 IRM I IxI I 2 15004 Source Range Monitor I l l I 2 15005 A P W L P R M IxI I I I I 2 17000 RCIC 2 17000 RCIC 2 18000 ADS 223002 PCIS/Nuclear Steam Sur& Shutoff 239002 SRVs 259002 Reactor Water Level K X Control X

I 261000 sGTs I l l I 262001 AC Electrical Distribution I I 1 I 262002 UPS (ACDC)

I Ix 1

2 BWR RO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station ES - 401 Plant Systems - Tier 2 / Group 2 (RO / SRO) Form ES-401-1 I SyslEvol # I Name IK1 lK2lK31 K4 230000 RHWLPCI: Torus/Pool Spray Mode 245000 Main Turbine GeneratodAux 256000 Reactor Condensate X 259001 Reactor Feedwater 290003 Control Room HVAC WACategory Totals:

///Ix 1 1 1 2 1

Generic Knowledge and Abilities Outline (Tier 3)

BWR RO Examination Outline Printed: 10/30/2006 Facilitv: Limerick Generating Station Form ES-401-3 Catepory -

KA# Topic -

IR -#

Conduct of Operations I

2.1.3 1 I

Knowledge of shift turnover practices. I I

3.0 I I

1 2.1.19 Ability to use plant computer to obtain and evaluate parametric information on system or comoonent status. 3*0 I 2.1.28 Knowledge of the purpose and function of major 3.2 1 system components and controls.

2.2.1 Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivitv.

2.2.1 1 Knowledge of the process for controlling temDorarv changes.

2.2.13 Knowledge of tagging and clearance procedures. 3 .6 Category Total: 3 Radiation Control 2.3.4 Knowledge of radiation exposure limits and 2.5 1 contamination control, including permissible levels in excess of those authorized.

I 7-

~ Ability to control radiation releases.

~ Category Total: I Emergency Plan 2.4.21 2.4.46 Knowledge of the parameters and logic used to assess the status of safety functions including:

1.Reactivity control 2.Core cooling and heat removal 3.Reactor coolant system integrity 4.Containment conditions 5.Radioactivity release control.

Ability to verify that the alarms are consistent with the olant conditions.

Category Total:

Generic Total:

I3.5 I 1 2

10 1

ES-401 BWR Examination Outline Form ES-401-1 Facilitv: Limerick Generating Station Printed: 10/30/2006 Date Of Exam: 10/23/2006 RO WA Category Points I SRO-Only Points Note:

1. Ensure that at least two topics from every WA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each WA category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +I from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate WA statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

5 . Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.

7.* The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system.

8. On the following pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the WA catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

Note: This form deviates from theNUREG-1021 Form ES-401-1 by the addition o f t h e K and A column under the SROOnly Points. This allows sampling all Fuel Handling System KAs as required by ES-401.

1

BWR SRO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 I Group 1 (RO I SRO) Form ES-401-1 EIAPE # I Name I Safety Function #

295001 Partial or Complete Loss of Forced 1 Core Flow Circulation I 1 & 4 295003 Partial or Complete Loss of AC Pwr 1

/6 295016 Control Room Abandonment / 7 29502 1 Loss of Shutdown Cooling / 4 295024 High Drywell Pressure / 5 29503 1 Reactor Low Water Level / 2 1 295037 SCRAM Condition Present and 1 Reactor Power Above APRM Downscale or Unknown / 1 KIA Category Totals: 7 1

BWR SRO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 (RO / SRO) Form ES-401-1 tions for operations and safety 1

BWR SRO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station Plant Systems - Tier 2 1 Group 1 (ROI SRO) Form ES-401-1 ES - 401 1

1 Generic Knowledge and Abilities Outline (Tier 3)

BWR SRO Examination Outline Printed: 10/30/2006 Facility: Limerick Generating Station Form ES-401-3 Category Topic IR -#

Conduct of Operations 2.1.4 I

Knowledge of shift staffing requirements. I I

3.4 I I

1 2.1.34 Ability to maintain primary and secondary plant 2.9 1 chemistry within allowable limits.

Equipment Control 2.2.6 Knowledge of the process for making changes in 3.3 1 procedures as described in the safety analysis report.

2.2.28 Knowledge of new and spent fuel movement 3.5 1 procedures.

Radiation Control 2.3.9 Knowledge of the process for performing a 3.4 1 containment purge.

Category Total: 1 Emergency Plan 2.4.1 Knowledge of EOP entry conditions and 4.6 1 immediate action steps.

2.4.6 Knowledge symptom based EOP mitigation 4.0 1 strategies.

Category Total: 2 Generic Total: 7 1

Limerick lLTO5-1 ES-401 Record of Rejected WAS Form ES-401-4 Tier I Randomly Reason for Rejection Group Selected WA RO EXAM 295016 2.2.25 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

295023 2.1.27 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

295031 EA2.01 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

295038 EKl.03 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator and WA corresponds to a task that is NIA for RO's.

600000 2.4.6 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator and generic WA refers to EOP mitigation strategy, while the category is an AOP.

295007 AAI .04 Redrawn with the approval of the lead examiner due to WA overlap with another WA already included on this portion of the exam.

295033 2.1.23 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

203000 K6.08 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator. Also a loss of ECS room cooling has no effect on LPCl because LGS is analyzed for loss of room cooling.

212000 A4.14 Redrawn with the approval of the lead examiner due to WA overlap with a JPM.

261000 K6.01 Redrawn with the approval of the lead examiner due this WA is a duplicate from 2005 ILT Exam (Q375215). Substituted another K6 in its place.

262002 K3.07 Redrawn with the approval of the lead examiner due to this WA is essentially the same as another already on the exam.(215002 K2.03 RBM, electrical power supplies to APRM channels). Substituted another K3 in its 234000 A3.02 Redrawn with the approval of the lead examiner due to A3 not applicable to SRO exam, deselected due to a known deficiency in the software.

2.1.28 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

ES-401, Page 27 of 33

Limerick ILT05-I ES-401 Record of Reiected WAS Form ES-401-4

I.IvyLyyI SRO EXAM Redrawn with the approval of the lead examiner due to WA overlap with questions on the RO portion of the exam.

295031 2.1.6 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

Redrawn with the amroval of the lead examiner due the lack of concepts that would meet the k/A and still distinguish between a competent and non-competent operator.

1/2 295007 2.2.25 Redrawn with the approval of the lead examiner due to WA overlap with questions on the RO portion of the exam.

2/1 21 8000 A2.05 Redrawn with the approval of the lead examiner due to WA overlap with questions on the RO portion of the exam.

2/1 223002 A2.05 Redrawn with the approval of the lead examiner due to WA overlap with questions on the Rbportion of the exam.

2/1 295002 A2.02 Redrawn with the amroval of the lead examiner due the lack of conceDts that would meet the k/A and still distinguish between a competent and non-competent operator.

Redrawn with the approval of the lead examiner due to WA overlap with questions on the RO portion of the exam.

Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

2.4.32 Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

Redrawn with the approval of the lead examiner due the lack of concepts that would meet the WA and still distinguish between a competent and non-competent operator.

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Limerick Date of Examination: 10/23/06 Examination Level: RO SRO 0 Operating Test Number: ILT05-1 I Administrative Topic (See Note)

Type Code*

Describe activity to be performed Determination of Adequate Shift Staffing Review Main Turbine Bypass Valve Exercising ST Radiation Control N. R Calculate Stay Time Emergency Plan Fire Alarm in Invertor Room (CE 254')

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (53 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)

(P)revious 2 exams (( 1; randomly selected)

ES 301,Page 22 of 27

ES-301 Ad min ist rative Toeics 0 utIine Form ES-301-1 Facility: Limerick Date of Examination: 10/23/06 Examination Level: RO 0 SRO [XI Operating Test Number: ILT05-1 Administrative Topic Type Describe activity to be performed (See Note) Code*

Conduct of Operations N. R Determination of Adequate Shift Staffing Conduct of Operations Administrative Actions on a Thermal Limit Violation Equipment Control Review Main Turbine Bypass Valve Exercising S.T.

I Radiation Control N, R Calculate Stay Time I Emergency Plan D. S ERP Classification and Reporting (LOCA)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (53 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (21)

(P)revious 2 exams (5 1; randomly selected)

ES 301,Page 22 of 27

ES-301 Control Roomhn-Plant Systems Outline Form ES-301-2 Facility: Limerick Date of Examination: 10/23/06 Exam Level: RO [XI SRO-I SRO-U 0 Operating Test Number: ILT05-1 Control Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type 'Ode*

Function

a. Reactor RecirciStart MG Set - High Vibration A, L, P, S 1
b. Shutdown "1C" Reactor Feed Pump From Standby Condition A, N, S 2
c. Manually Initiate a Control Room Ventilation Radiation Isolation 1 p,s I 9
d. Manually Initiate Core Spray ("D" Core Spray Pump fails to start) A, N, S 4
e. Restore RECW, DWCW, PClG D, s 5
f. DG Fast Start From Control Room (Jacket Water High Temp) A, N, S 6
g. Scram Reset A, D, S 7
h. Placing Alternate RECW Pump in Service A, N, S 8 in-Plant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Start "OB" ESW Pump From D12 SG (SE-6)
j. Place Alternate CRD Flow Control Valve In Service
k. MSlV -129" Bypass (T-221) I D , E , R I 4

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions: in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I I SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank -< 9 / ( 8 /(4 (E)mergency or abnormal in-plant ->I/ 21 />I (L)ow-Power / Shutdown ->I/ 21 />I (N)ew or (M)odified from bank including -> 2 / 2 2 /,I (P)revious 2 exams -3 3 / 5 2 (randomly selected)

(WCA -> I / 21 / ? I (S)imulator ES-301, Page 23 of 27

ES-301 Control Roomlln-PlantSystems Outline Form ES-301-2

-acility: Limerick Date of Examination: 10123/06 Exam Level: RO 0 SRO-I SRO-U 0 Operating Test Number: ILT05-1 Zontrol Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System I JPM Title Type 'Ode*

Function

3. Reactor Recirc/Start MG Set - High Vibration A, L, P, S 1
3. Shutdown "1C" Reactor Feed Pump From Standby Condition 2
c. Manually Initiate a Control Room Ventilation Radiation Isolation P, s 9
d. Manually Initiate Core Spray ("D" Core Spray Pump fails to start) A, N, S 4
e. DG Fast Start From Control Room (Jacket Water High Temp) A, N, S 6
f. Scram Reset A, D, S 7
g. Placing Alternate RECW Pump in Service A, N, S 8 h.

In-Plant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Start"0B" ESW Pump From D12 SG (SE-6) D, E, R 8
j. Place Alternate CRD Flow Control Valve In Service D, L, R 1
k. MSlV -129" Bypass (T-221) I D , E , R / 4

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions: all 5 SRO-U systems must serve different safety functions: in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-l I SRO-U (A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including (P)revious 2 exams (S)imulator ES-301, Page 23 of 27

ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 Facility: Limerick Date of Examination: 10/23/06 Exam Level: RO 0 SRO-I 0 SRO-U Operating Test Number: ILT05-1

a. Reactor RecircIStart MG Set - High Vibration u

~~

II I I

b. DG Fast Start From Control Room (Jacket Water High Temp) A, N, S . 6 1

(ESF)

c. Restore RECW, DWCW, PClG D, S 5 d.

e.

f.

9.

h.

1 Implant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

' i. Start "OB" ESW Pump From D l 2 SG (SE-6) D, E, R 8

j. MSlV -129" Bypass (T-221) D,E, R 4 k.

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO I SRO-I I SRO-U (A)lternate path 4-6 I 4-6 / 2-3 (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power I Shutdown (N)ew or (M)odified from bank including l(A)

(P)revious 2 exams (R)CA (S)imulator ES-301, Page 23 of 27

Appendix D Scenario Outline Form ES-D-1 Facility: Limerick Scenario No.: 1 Op-Test No.: ILT05-1 Examiners: Operators:

Initial Conditions: 100% power. RCIC is out of service for bearing replacement. Regulatory actions log entry has been made. Estimated time of repair is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Turnover: Maintain 100% power. Continue repairs on RCIC.

The crew is to perform ST-6-047-200-1, SDV Valve Exercise Test.

J-7F Event Event Type* Event Description N (ALL) Perform ST-6-047-200-1, SDV Valve Exercise Test I (PRO/CRS) Inadvertent isolation of PClG (TS) 4 I MFW245C MED263D C (ROKRS)

R (PRO)

C (ALL)

RFP B high vibration, power reduction, remove B RFP from service.

D14 bus overcurrenffloss of D14 bus (TS), loss of BCRD pump and B drywell chiller.

6 I MRR441 C (ALL) SRV L fails open mechanically Coolant leakage / B Feedwater line rupture inside Primary Containment MHP448B C (PRO/CRS) HPCl speed/flow controller fails low in AUTO with subsequent HPCl turbine trip

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor APPENDIX D, Page 38 of 39

Appendix D Scenario Outline Form ES-D-1 Facility: Limerick Scenario No.: 2 Op-Test No.: ILT05-1 Examiners: 0perato rs:

Initial Conditions: 95% power recovering from a planned down power to perform a minor rod pattern adjustment.

Turnover: 95% power. The minor rod pattern adjustment is complete. Raise power to 100%

using GP-5, Appendix 2, and OP-AB-300-1003 without RE presence in the MCR.

Event Malf. Event Type* Event Description N/A R (PRO) Raise power to 100% with recirc.

I (RO/CRS) A RPV Pressure Transmitter (RPS) fails high (TS).

RCW219 C (PRO/CRS) RECW valve to RWCU non-regen heat exchanger MCU002B closes. RWCU outboard isolation valve does not automatically isolate on high demin. inlet temp.

5 I MRR435B MRR435A C (PRO/ CRS)

R (RO)

M (ALL)

IB Recirc Pump trips (TS)

Insert control rods to exit Restricted Region 1 A Recirc Pump trips / ATWS - B RPS fails to MRP029D trip, both RRCS channels fail to initiate ARI MRP407C C (RO/CRS) SLC pipe rupture in drywell MEH108 C (PRO/CRS) Main turbine bypass valves fail closed MEHl04B EHC load set runs back to minimum

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor APPENDIX D, Page 38 of 39

Appendix D Scenario Outline Form ES-D-I Facility: Limerick Scenario No.: 3 Op-Test No.: ILT05-1 Examiners: Operators:

Event Malf. Event Type* Event No. No. Description 1 N/A N (PRO) Start the I C condensate pump for PMT 2 N/A R (RO) Continue to withdraw control rods 3 MSR214F I (RO/CRS) IRM channel F fails upscale (TS) 4 E51-S37-PB C (CRS) RClC inadvertent start and RPV injection (TS) 5 VlCl14A C (RO/CRS) 1 A CRD Pump high vibration 6 MRR441 M (ALL) Small coolant leak followed by a large steam leak MMS067 in the drywell 7 MRP029C C (RO/CRS) A RPS failure to scram 8 MRH171A C (PRO/CRS) A RHR pump trips on start signal MRH574A HV51-1F024B fails due to thermal overload 9 MRH171B C (ALL) B RHR pump trips when attempting to spray the drywell / must spray drywell with RHRSW.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor APPENDIX D, Page 38 of 39