University of Michigan Ford Nuclear Reactor Master Inspection Plan - FY2007
ML063110125
Person / Time
Site: University of Michigan
Issue date: 11/07/2006
From: Jamnes Cameron
NRC/RGN-III/DNMS/DB
To: Ceccio S
University of Michigan
References
Download: ML063110125 (2)


Text

November 7, 2006 Mr. Steven L. Ceccio, Director Phoenix Memorial Laboratory 2301 Bonisteel Boulevard University of Michigan Ann Arbor, MI 48109

SUBJECT:

UNIVERSITY OF MICHIGAN FORD NUCLEAR REACTOR MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2007

Dear Mr. Ceccio:

In accordance with NRC Manual Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Ford Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for October 2006 through September 2007 (FY2007). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2007 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2007, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2007 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Ford Reactor FY2007 MIP.

We currently project the Region will conduct two to three inspections at the Ford Reactor during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedure(s) used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors Based on resources allocated to the Region III Decommissioning staff, the Region expects to expend approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> on the routine inspection activities related to the Ford Reactor during FY2007. This includes time spent on inspection preparation, documentation, onsite inspection activities, and travel.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

S. Ceccio We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Decommissioning Branch Docket No. 050-00002 License No. R-28 DISTRIBUTION:

Docket File C. Craig, NMSS K. Banovac, NMSS RIII PRR CAC (e-mail)

DOCUMENT NAME:C:\FileNet\ML063110125.wpd XPublicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME WGSnell:mb JLCameron DATE 11/06/06 11/07/06 OFFICIAL RECORD COPY