Letter Sequence Meeting |
---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0507304612005-03-23023 March 2005 Meeting Duke Energy Corporation to Discuss February 14, 2005, Digital Rps/Esps (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0510404352005-04-0606 April 2005 Attachment 3, Meeting Summary of 4/6/05 with Duke Energy Corp, Request for Digital Reactor Protective System.. Project stage: Meeting ML0510401512005-04-21021 April 2005 Duke Energy Corp, Meeting Summary of 4/6/05, Installation of Digital Rps/Esps During Fall 2006 Oconee Unit 1 Refueling Outage Project stage: Meeting ML0510401762005-04-21021 April 2005 Attachment 2, Meeting Summary with Duke Energy Corp. Installation of Digital Rps/Esps During Fall 2006 Refueling Outage of Oconee Unit 1 (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0511100402005-04-21021 April 2005 Notice of Meeting with Duke Energy Corporation, Oconee, Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0512200392005-04-21021 April 2005 Notice of Cancellation of Meeting with Duke Energy Corp., Interchannel Connections for the Proposed Digital Reactor Protective System Project stage: Meeting ML0518800752005-07-0707 July 2005 Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519504042005-07-0707 July 2005 Cancelled - 7/19/05, Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519202632005-07-27027 July 2005 Ltr MC5895, Review Issues for Digital Upgrade of Rps/Esps Project stage: Acceptance Review ML0520700052005-07-28028 July 2005 Notice of Meeting with Duke Energy Corporation to Discuss the Oconee License Amendment Request for a Digital Reactor Protective System and Engineered Safeguards Protective System (Rps/Esps) Project stage: Meeting ML0524103192005-09-0101 September 2005 8/17/05 Meeting Summary to Discuss the License Amendment Request for a Digital Reactor Protective System & Engineered Safeguards Protective System Project stage: Meeting ML0524500962005-09-0606 September 2005 RAI, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0527801042005-10-0505 October 2005 Notice of Forthcoming Meeting with Duke Energy Corporation, to Provide a Design Overview of the Proposed Digital Reactor Protective System Engineered Safeguards Protective System Project stage: Request ML0530401582005-10-18018 October 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Enclosure, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0527700642005-10-20020 October 2005 9/26/05 Meeting Summary with Duke Energy Corp. on Oconee Units 1, 2 and 3, Re Rps/Esps Project stage: Meeting ML0530502742005-11-29029 November 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0535403592005-12-20020 December 2005 Trip Report for Staff Visit to Framatome Anp Offices in Alpharetta, Ga, November 14-18, 2005 to Review the Rps/Esps Digital Upgrade for Oconee Nuclear Station Project stage: Other ML0536302922006-01-0404 January 2006 Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0536302662006-01-10010 January 2006 Request for Additional Information, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0600604272006-01-11011 January 2006 Units 1, 2 and 3, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0601202972006-01-12012 January 2006 Cancelled Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0617905192006-07-24024 July 2006 Withdrawal of an Amendment Request Project stage: Withdrawal 2005-07-27
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24071A1692024-03-15015 March 2024 February 2024 Subsequent License Renewal Public Draft Environmental Impact Statement Meetings-Memo ML24071A1702024-03-15015 March 2024 February 2024 Oconee Draft EIS Public Meetings - Summary ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22200A0772022-08-0808 August 2022 SLRA - Summary of July 14, 2022 and July 28, 2022 Public Meetings ML22193A0182022-07-18018 July 2022 SLRA - Summary of June 30, 2022 Public Meeting ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML22130A0122022-05-0404 May 2022 SLRA - Summary of April 28, 2022 Public Meeting ML22075A2042022-04-0505 April 2022 SLRA - Summary of March 7, 2022 Public Meeting ML22084A6142022-04-0404 April 2022 SLRA - Summary of March 16, 2022 (Closed Public Meeting) ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22063A1162022-03-0808 March 2022 SLRA - Summary of Public Meeting Dated February 17, 2022 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21348A5452021-12-14014 December 2021 December 13, 2021, Clarification Call Summary Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21279A1542021-11-0808 November 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary Memo ML21279A1192021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary ML21195A2692021-07-14014 July 2021 Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Memo ML21195A2712021-07-14014 July 2021 Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Summary ML21102A0612021-04-27027 April 2021 April 14, 2021, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML20266G2192020-11-0303 November 2020 Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19331A5202019-12-12012 December 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Submitted License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19102A3352019-04-12012 April 2019 Public Meeting Summary - Oconee Nuclear Station Docket Nos. 50-269, 50-270, and 50-287 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18227B2122018-09-0505 September 2018 Summary of August 1, 2018, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Tornado Mitigation Licensing Basis ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML18082A1082018-03-29029 March 2018 Summary of February 28, 2018, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed LAR Regarding Tornado Mitigation Licensing Basis ML18082A0582018-03-23023 March 2018 Summary of Meeting with Oconee Nuclear Station to Discuss Annual Assessment of Oconee for the Period of January 01, 2017 - December 31, 2017 ML17179A3472017-07-18018 July 2017 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Thermal Margin for the Standby Shutdown Facility ML17103A0292017-04-13013 April 2017 Summary of Meeting to Provide Opportunities to Discuss Annual Assessment of Oconee Nuclear Station Units 1, 2 and 3 ML16166A4022016-06-27027 June 2016 Summary of November 18, 2015, and December 15, 2015, Meetings with Duke Energy Carolinas, LLC to Discuss a Proposed Relief Request in Accordance with 10 CFR 50.55a(z) for the Oconee Nuclear Station, Units 1, 2, and 3 ML16132A4352016-05-20020 May 2016 Summary of October 13, 2015, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed LAR to Support Keowee Dam Stator Replacement ML15161A4312015-06-19019 June 2015 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Ongoing Major Projects at Oconee Nuclear Station, Units 1, 2 and 3 ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0052014-12-31031 December 2014 Summary of December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response for Oconee Nuclear Station, Units 1, 2, and 3 ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14069A3492014-03-13013 March 2014 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Ongoing Major Projects at Oconee Nuclear Station, Units 1, 2, and 3 ML13336A5982013-12-0404 December 2013 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Proposed One-time TS Completion Time Change to Perform Khu Generator Field Pole Rewind Maintenance - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME9021, ME9022, and M ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13281A6972013-10-21021 October 2013 10/3/13 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss the Protected Service Water System Operation - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME7737, ME7738, ME7739, ME7746, ME7747, and ME7748) ML13281A5412013-10-21021 October 2013 9/24/2013 - Oconee Nuclear Station, Units 1, 2, and 3, Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Jocassee Dam Seismic Analysis ML13241A4482013-08-29029 August 2013 August 28, 2013 Summary of Public Meeting - Major Projects Status Meeting with Oconee ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13134A5232013-05-14014 May 2013 5/9/2013 Summary of Public Meeting with Duke Energy Corp., Oconee Nuclear Station to Provide Opportunities to Discuss the Annual Assessment for the Year 2012 ML13122A4362013-05-0606 May 2013 Summary of April 9, 2013, Meeting with Duke Energy Carolinas, LLC, to Discuss the Re-evaluation of External Flooding for Oconee Nuclear Station, Units 1, 2, and 3 2024-05-01
[Table view] |
Text
November 29, 2005 LICENSEE: DUKE ENERGY CORPORATION FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3
SUBJECT:
SUMMARY
OF OCTOBER 18, 2005, MEETING TO PROVIDE DESIGN OVERVIEW OF THE DIGITAL REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (TAC NOS. MC5895, MC5896, AND MC5897)
On October 18, 2005, the Nuclear Regulatory Commission (NRC) met with Duke Energy Corporation (the licensee). The licensee provided a design overview of the proposed digital Reactor Protective System (RPS) and Engineered Safeguards Actuation System (ESPS). A list of attendees is provided as Enclosure 1. Enclosure 2 is the slides presented during the meeting.
The licensee focused its presentation on the two issues on which the NRC has expressed concern: the use of interchannel connections and the combining of RPS and ESPS, The licensee requested that the NRC provide its position on these two issues by November 1, 2005.
The licensee and the NRC agreed to have another meeting in the near future if the NRC needs more information to reach its position on these two issues.
Please direct any inquiries to me at 301-415-1419, or LNO@nrc.gov.
/RA/
Leonard N. Olshan, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosures:
- 1. List of Attendees
- 2. Licensee Handout (ML053040158) cc w/encls: See next page
November 29, 2005 LICENSEE: DUKE ENERGY CORPORATION FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3
SUBJECT:
SUMMARY
OF OCTOBER 18, 2005, MEETING TO PROVIDE DESIGN OVERVIEW OF THE DIGITAL REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (TAC NOS. MC5895, 5896, AND M5897)
On October 18, 2005, the Nuclear Regulatory Commission (NRC) met with Duke Energy Corporation (the licensee). The licensee provided a design overview of the proposed digital Reactor Protective System (RPS) and Engineered Safeguards Actuation System (ESPS). A list of attendees is provided as Enclosure 1. Enclosure 2 is the slides presented during the meeting.
The licensee focused its presentation on the two issues on which the NRC has expressed concern: the use of interchannel connections and the combining of RPS and ESPS, The licensee requested that the NRC provide its position on these two issues by November 1, 2005.
The licensee and the NRC agreed to have another meeting in the near future if the NRC needs more information to reach its position on these two issues.
Please direct any inquiries to me at 301-415-1419, or LNO@nrc.gov.
/RA/
Leonard N. Olshan, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosures:
- 1. List of Attendees
- 2. Licensee Handout ML053040158 cc w/encls: See next page Distribution: See next page Package: ML053050006 Meeting Handouts: ML053040158 Meeting Summary: ML053050274 Meeting Notice: ML052780104 NRC-001 OFFICE NRR/LPLC/PM NRR/LPLC/LA NRR/LPLC/BC NAME LOlshan CHawes EMarinos DATE 11/17/05 11/17/05 11/29/05 OFFICIAL RECORD COPY
SUBJECT:
SUMMARY
OF OCTOBER 18, 2005, MEETING TO PROVIDE DESIGN OVERVIEW OF THE DIGITAL REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (TAC NOS. MC5895, MC5896, AND MC5897)
Dated: _November 29, 2005____
Distribution:
PUBLIC LPC R/F RidsNrrPMLOlshan (Hard Copy)
RidsNrrLAMOBrien (Hard Copy)
RidsNrrAdpt (BSheron/BBoger)
RidsNrrDorl (CHaney/EHackett)
RidsNrrDorlLplc (EMarinos)
RidsRgn2MailCenter RidsAcrsAcnwMailCenter RidsOgcRp BWetzel MWaterman PLoeser JCalvo AHowe YHsii CDoutt COgle VMcCree PRebstock MChiramal RJasinski HLi
LIST OF ATTENDEES MEETING TO PROVIDE DESIGN OVERVIEW OF OCONEE DIGITAL RPS/ESPS OCTOBER 18, 2005 NRC DUKE B. Sheron R. Jones B. Boger M. Miller E. Hackett L. Nicholson J. Calvo P. Gillespie E. Marinos D. Baxter T. Marsh J. Fuller L. Olshan R. Gill (by phone)
P. Rebstock B. Shingleton (by phone)
M. Chiramal B. Thomas (by phone)
H. Li G. Davenport (by phone)
M. Waterman P. Loeser A. Howe Y. Hsii FRAMATOME C. Doutt C. Ogle (by phone) B. Geddes V. McCree (by phone) S. Kelley M. Dunn C. Hendrix Enclosure 1
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.
Duke Energy Corporation Manager - Nuclear Regulatory 526 South Church Street Issues and Industry Affairs P. O. Box 1006 Duke Energy Corporation Mail Code = EC07H 526 S. Church St.
Charlotte, North Carolina 28201-1006 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.
Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.
Suite 705 Mr. Ronald A. Jones Rosslyn, VA 22209 Vice President, Oconee Site Duke Energy Corporation Mr. B. G. Davenport 7800 Rochester Highway Regulatory Compliance Manager Seneca, SC 29672 Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602