Letter Sequence Withdrawal |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0504702752005-02-14014 February 2005 Duke Energy Corporation Submittal of Revision 6 to Physical Security Plan for Oconee Nuclear Station, Units 1, 2, and 3, McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2 Project stage: Request ML0507304612005-03-23023 March 2005 Meeting Duke Energy Corporation to Discuss February 14, 2005, Digital Rps/Esps (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0510404352005-04-0606 April 2005 Attachment 3, Meeting Summary of 4/6/05 with Duke Energy Corp, Request for Digital Reactor Protective System Project stage: Meeting ML0510401512005-04-21021 April 2005 Duke Energy Corp, Meeting Summary of 4/6/05, Installation of Digital Rps/Esps During Fall 2006 Oconee Unit 1 Refueling Outage Project stage: Meeting ML0510401762005-04-21021 April 2005 Attachment 2, Meeting Summary with Duke Energy Corp. Installation of Digital Rps/Esps During Fall 2006 Refueling Outage of Oconee Unit 1 (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0511100402005-04-21021 April 2005 Notice of Meeting with Duke Energy Corporation, Oconee, Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0512200392005-04-21021 April 2005 Notice of Cancellation of Meeting with Duke Energy Corp., Interchannel Connections for the Proposed Digital Reactor Protective System Project stage: Meeting ML0518800752005-07-0707 July 2005 Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519504042005-07-0707 July 2005 Cancelled - 7/19/05, Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519202632005-07-27027 July 2005 Ltr MC5895, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0520700052005-07-28028 July 2005 Notice of Meeting with Duke Energy Corporation to Discuss the Oconee License Amendment Request for a Digital Reactor Protective System and Engineered Safeguards Protective System (Rps/Esps) Project stage: Meeting ML0524103192005-09-0101 September 2005 8/17/05 Meeting Summary to Discuss the License Amendment Request for a Digital Reactor Protective System & Engineered Safeguards Protective System Project stage: Meeting ML0524500962005-09-0606 September 2005 RAI, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0527801042005-10-0505 October 2005 Notice of Forthcoming Meeting with Duke Energy Corporation, to Provide a Design Overview of the Proposed Digital Reactor Protective System Engineered Safeguards Protective System Project stage: Request ML0530401582005-10-18018 October 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Enclosure, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0527700642005-10-20020 October 2005 9/26/05 Meeting Summary with Duke Energy Corp. on Oconee Units 1, 2 and 3, Re Rps/Esps Project stage: Meeting ML0530502742005-11-29029 November 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0535403592005-12-20020 December 2005 Trip Report for Staff Visit to Framatome Anp Offices in Alpharetta, Ga, November 14-18, 2005 to Review the Rps/Esps Digital Upgrade for Oconee Nuclear Station Project stage: Other ML0536302922006-01-0404 January 2006 Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0536302662006-01-10010 January 2006 Request for Additional Information, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0600604272006-01-11011 January 2006 Units 1, 2 and 3, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0601202972006-01-12012 January 2006 Cancelled Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0617903622006-06-22022 June 2006 Withdrawal of License Amendment Request Associated with Rps/Esps Digital Upgrade (TSC 2004-09) Project stage: Withdrawal ML0617905192006-07-24024 July 2006 Withdrawal of an Amendment Request Project stage: Withdrawal 2005-07-27
[Table View] |
Text
BRUCE H HAMILTON Vice President tWEnergyD Oconee Nuclear Station Duke Energy Corporation ON01 VP / 7800 Rochester Highway June 22, 2006 Seneca, SC 29672 864 885 3487 864 885 4208 fax bhhamilton@duke-energy. corn U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk
Subject:
Duke Power Company LLC dlb/a Duke Energy Carolinas, LLC (Duke)
Oconee Nuclear Station Docket Numbers 50-269, 270, and 287 Withdrawal of License Amendment Request (LAR) associated with RPS/ESPS Digital Upgrade (TSC 2004-09)
By letter dated February 14, 2005, Duke requested the Nuclear Regulatory Commission (NRC) approve a Reactor Protective System (RPS)fEngineered Safeguards Protective System (ESPS) digital modification and associated Technical Specification (TS) changes. Duke has submitted numerous supplements and has conducted numerous meetings with the NRC related to this LAR over the past year.
As a result of recent discussions between Duke and the NRC, as well as other considerations, Duke has decided to withdraw the LAR and re-submit a revised LAR at a later date.
If there are any questions regarding this submittal, please contact Boyd Shingleton at (864) 885-4716.
Very truly yours, B. H. Hamilton, Vice President Oconee Nuclear Site www.duke-energy.cormk*
0
U. S. Nuclear Regulatory Commission June 22, 2006 Page 2 cc: Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-14 H25 Washington, D. C. 20555 Dr. W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. D. W. Rich Senior Resident Inspector Oconee Nuclear Station Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201
U. S. Nuclear Regulatory Commission June 22, 2006 Page 3 bcc:
Robert W. Cornett Barry R Loftis Barbara M. Thomas B. Graham Davenport T. P. Gillespie Lisa F. Vaughn Paul M. Stovall David B. Coyle Robert L. Gill - NRI&IA Charles J. Thomas - MNS Randall D. Hart - CNS Michael E. Bailey Robert E. Hall James T. Fuller Bruce J. Geddes NSRB, EC05N ELL, ECO50 File - T.S. Working BWOG Tech Spec Committee (5)
ONS Document Management Reene' V. Gambrell