Letter Sequence Request |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0504702752005-02-14014 February 2005 Duke Energy Corporation Submittal of Revision 6 to Physical Security Plan for Oconee Nuclear Station, Units 1, 2, and 3, McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2 Project stage: Request ML0507304612005-03-23023 March 2005 Meeting Duke Energy Corporation to Discuss February 14, 2005, Digital Rps/Esps (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0510404352005-04-0606 April 2005 Attachment 3, Meeting Summary of 4/6/05 with Duke Energy Corp, Request for Digital Reactor Protective System Project stage: Meeting ML0510401512005-04-21021 April 2005 Duke Energy Corp, Meeting Summary of 4/6/05, Installation of Digital Rps/Esps During Fall 2006 Oconee Unit 1 Refueling Outage Project stage: Meeting ML0510401762005-04-21021 April 2005 Attachment 2, Meeting Summary with Duke Energy Corp. Installation of Digital Rps/Esps During Fall 2006 Refueling Outage of Oconee Unit 1 (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0511100402005-04-21021 April 2005 Notice of Meeting with Duke Energy Corporation, Oconee, Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0512200392005-04-21021 April 2005 Notice of Cancellation of Meeting with Duke Energy Corp., Interchannel Connections for the Proposed Digital Reactor Protective System Project stage: Meeting ML0518800752005-07-0707 July 2005 Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519504042005-07-0707 July 2005 Cancelled - 7/19/05, Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519202632005-07-27027 July 2005 Ltr MC5895, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0520700052005-07-28028 July 2005 Notice of Meeting with Duke Energy Corporation to Discuss the Oconee License Amendment Request for a Digital Reactor Protective System and Engineered Safeguards Protective System (Rps/Esps) Project stage: Meeting ML0524103192005-09-0101 September 2005 8/17/05 Meeting Summary to Discuss the License Amendment Request for a Digital Reactor Protective System & Engineered Safeguards Protective System Project stage: Meeting ML0524500962005-09-0606 September 2005 RAI, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0527801042005-10-0505 October 2005 Notice of Forthcoming Meeting with Duke Energy Corporation, to Provide a Design Overview of the Proposed Digital Reactor Protective System Engineered Safeguards Protective System Project stage: Request ML0530401582005-10-18018 October 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Enclosure, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0527700642005-10-20020 October 2005 9/26/05 Meeting Summary with Duke Energy Corp. on Oconee Units 1, 2 and 3, Re Rps/Esps Project stage: Meeting ML0530502742005-11-29029 November 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0535403592005-12-20020 December 2005 Trip Report for Staff Visit to Framatome Anp Offices in Alpharetta, Ga, November 14-18, 2005 to Review the Rps/Esps Digital Upgrade for Oconee Nuclear Station Project stage: Other ML0536302922006-01-0404 January 2006 Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0536302662006-01-10010 January 2006 Request for Additional Information, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0600604272006-01-11011 January 2006 Units 1, 2 and 3, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0601202972006-01-12012 January 2006 Cancelled Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0617903622006-06-22022 June 2006 Withdrawal of License Amendment Request Associated with Rps/Esps Digital Upgrade (TSC 2004-09) Project stage: Withdrawal ML0617905192006-07-24024 July 2006 Withdrawal of an Amendment Request Project stage: Withdrawal 2005-07-27
[Table View] |
Duke Energy Corporation Submittal of Revision 6 to Physical Security Plan for Oconee Nuclear Station, Units 1, 2, and 3, McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2| ML050470275 |
| Person / Time |
|---|
| Site: |
Oconee, Mcguire, Catawba, McGuire  |
|---|
| Issue date: |
02/14/2005 |
|---|
| From: |
Rosalyn Jones Duke Energy Corp, Duke Power Co |
|---|
| To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
|---|
| References |
|---|
| Download: ML050470275 (4) |
|
Text
fift M -e SAFEGUARDS INFORMATION DUKE POWER FOR Powe r.7800 Rochester Hwy.
A Duke Energy Company Seneca, SC 29672 February 14, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-369,50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413,50-414 Duke Energy Corporation Physical Security Plan Submittal of Revision 6 Pursuant to 10 CFR § 50.4(b)(4), enclosed are four copies of Revision 6 to the Duke Energy Corporation Catawba, McGuire and Oconee Physical Security Plan. The effective date of Revision 6 is March 1, 2005. Tlhe changes reflected in Revision 6 are submitted pursuant to 10 CFR § 50.54(p)(2).
A Synopsis of Changes is included to facilitate review. Details regarding implementation of each change are documented and available for inspection. These changes do not decrease the safeguards effectiveness of the Physical Security Plan.
The attached information contains Safeguards Information and is subject to the restrictions described in 10 CFR §73.21.
If you have any questions regarding this submittal, please contact Terry W. King, Oconee Nuclear Station Security Manager, at (864) 885-3019.
Since ely R.
Jones Vice President Oconee Nuclear Station Attachments SAFEGUARDS INFORMATION V
NOTE: TIE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATON" AND MUSTBE www.duke-energy.com
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission February 14, 2005 Page 2 STATE of SOUTH CAROLINA The above-subscribed individual appeared before me and made oath that he is duly authorized to execute this response on behalf of the Oconee Nuclear Station, the statements contained within this response are true to the best of his knowledge and belief, and that copies of the response were sent to the addressee and listed individuals.
Before me, Vfi/&;
v 7
, Žoe, 6
Notary Public My Commission Expires:
G
.- / 2Žo i 3 SAFEGUARDS INFORMATION NOTE: T1E ATACHMENT TO THIS LETER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission February 14, 2005 Page 3 xc:(w Attachment)
Mr. W.D. Travers, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 xc:(w/o Attachment)
M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station.
E. F. Guthrie NRC Senior Resident Inspector Catawba Nuclear Station SAFEGUARDS INFORMATION NOTE: TIHE ATTACHMENT TO TIIIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission February 14,2005 Page 4 bxc:(w Attachment)
T. W. King - ONOISC D. G. Black-MGO1SC W. T. Byers - CNO1SC bxc:(w/o Attachment)
L. E. Nicholson -ONO1VP J. A. Kammer - MGO1VP P. A. Mc Intyre - CNOISA B. G. Davenport - ON03RC C. J. Thomas - MGO1RC L. A. Keller-CNO1RC R. L. Gill-ECOSP T. Shafeek - PBO5 L. F. Vaughn - PBE5 K L. Crane - MGO1RC K E. Nicholson - CNOIRC NCMPA-1 SREC PMPA NCEMC ONS Master File - ON03DM (File OS 801.01)
MNS Master File - MGO1DM CNS Master File - CNO1DM ELL SAFEGUARDS INFORMATION NOTE: TIE ATACHIMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE