Attachment 3, Meeting Summary of 4/6/05 with Duke Energy Corp, Request for Digital Reactor Protective System
ML051040435
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/06/2005
From: Olshan L
NRC/NRR/DLPM/LPD2
To:
Duke Energy Corp
Olshan L N, NRR/DLPM, 415-1419
Shared Package
ML051040162 List:
References
TAC MC5895, TAC MC5896, TAC MC5897
Download: ML051040435 (18)


Text

,nergy Tsa RPS/ESPS Licensing Amendment Request Oconee Nuclear Station April 6, 2005

7Duke Agenda

  • . Opening Remarks
  • Project Status RPS/ESPS Modification
  • . Diverse LPI actuation

.:* Discrepancy between TXS TR and SER

  • 0 Risk-informed D3
  • .* NRC Questions
  • .: Closing Remarks 2

7Duke ft EergyF n

=

Opening Remarks

~,;

P"-

    • Introductions

+ Purpose of Meeting & Expected Outcome

> Meeting Purpose

  • NRC questions X Communicate details of proposed LAR

> Expected Outcome

  • Address preliminary questions from NRC
  • Good mutual understanding of proposed LAR and RPS/ES modification 3

Project Status

  • Project Activities Completed

> 30% Owners Review of FANP

  • Initial Scope Document
  • Engineering Turnover
  • Technical Issues Checklist (Multi-Discipline Interface Identifier)
  • Project Change Order Reconciliation
  • Design Document Red Marks

> Procedure Writers Training

  • 3 Week Intensive training on TXS for procedure revisions 4

Project Status

  • Upcoming Major Project Activities

> Beznau NPP Benchmark Trip - Mid July 2005

> FANP-NGL Hardware FAT in Germany - November 2005

> FANP-NGL TXS Equipment @ ONS - December 2005

> FANP-Alpharetta TXS FAT @ ONS - January thru March 2006

> FANP Lynchburg RCPPM & NI FAT @ ONS - January thru March 2006

> ONS SAT - April 2006 through September 2006 5

~i SAAre 149559p erc a-.

ProjectStatus

    • Upcoming Project Activities (Continued)

> Procedure Verification & Validation - August thru September 2006

> Implementation - October thru November 2006

> Post Implementation Testing - Late November 2006

> Unit 1 Return to Service - Early December 2006 V: Numerous Internal Project Deliverables Through April 2006 6

L nerr rRPS/ESPS Mod.

  • .* Modification Description

> Replacement of Analog Bailey RPS/ES with Digital FANP TXS

> Replacement of some analog/solid state input signal components (RCPPM, NI modules)

  • . Modification Scope Review

> R x R - 9 RPS Cabinets, 7 ES Cabinets

> Delete ES Bailey RZ Module interface panels

> Add ES Component Status Panels

> Add ES Channel Trip/Reset Pushbutton Station

> Add, Relocate some ES actuated component operator control interfaces

> Additional Redundancy for RCPPM

> NI Recorder replacement (Units I & 2)

7Duke r~~er, Vy1 RPS/ES Mod. (cont)

> Reliability Analysis for FANP TXS - April 05

> FMEA for FANP TXS underway

> Final FMEA for modification - December 05

    • Instrument changes

> No field sensor replacements planned as part of RPS/ES modification

> Revision to instrumentation loop accuracy calculations underway 8

7Duke

-n.

RPS/ES Mod. (con t.)

  • Mechanical changes

> Verification of acceptable heat loading from new TXS, RCPPM to Control Room and Cable Room underway

> Verification of acceptable heat rise in new TXS cabinetry included in FAT and post-implementation testing

> Verification of SBO Analyses 9

RPS/ES Mod. (cont)

    • Electrical changes

> System cabling requirements evaluation

> Power systems loading analysis

> Human Factors evaluation underway for Control Room changes

> Modification documentation changes underway V:

Civil changes New cabinet seismic mounting design underway Cable tray and conduit installation evaluation underway Review of seismic qualification of non-TXS equipment 10

1 Dukre RPSIES Mod. (con t)

  • Design criteria

> Electrical separation

> Cable and wiring Separation

> Use of fiber optics for Inter-Channel connections

  • Functional criteria

> Equipment Specification Revision 1 approved - March 2005

> Functional Requirements Specification approved - March 2005

> Software Requirements Specification approval - August 2005 11

,ergy RPS/ES Mod. (cont.)

+* PRA

> PRA Input information development underway

.* UFSAR Summary

> UFSAR Changes in Draft (Red Marked) Stage

    • Design Basis Documentation

> DBD Changes in Draft (Red Marked) Stage 12

4 HEDuke ra7uirre Diverse LPI Actuation 1

  • + Provided diverse LPI actuation design requirements in November 17, 2004 meeting
  • NRC concurred with design requirements
  • Duke approval of FANP proposed design strategy - March 2005
  • . Duke to provide additional details by June 2005 13

4 l ^Duke 1301h~

i uerg Discrepancy between TXS TR and SER 7, t II _...

u

., I...

  • + In one location, TXS Topical Report could be read as indicating that invariable data is stored in the EEPROM and is subject to cyclical redundancy checks (CRCs)
    • TXS SER essentially repeats this
  • + No invariable (Non Changeable Parameter) data is stored in the EEPROMs
  • CRCs are performed on EEPROMs only on use (anytime the data is moved from the EEPROM to RAM or RAM to EEPROM) 14

D Duke

~er9 Risk-informed D3

  • Duke performed deterministic D3 assessment per BTP HICB-19 guidelines

°:

New EPRI guideline provides risk-informed method of performing parts of or all of D3 assessment

  • Duke plans to use EPRI extended deterministic approach to demonstrate adequate defense against digital common cause failures and concurrent LBLOCA based on small change in risk
  • Duke plans to submit by July 2005 and request approval within a year
  • Upon approval, Duke would discontinue design/installation of diverse LPI actuation 15

Y Duke NRC Questions V> Informal NRC questions received March 30, 2005

  • . Plan to provide initial response electronically
  • .* Follow-up with docketed response
  • 4:

Discussion of NRC Questions 16

goDuke AL aerq,

_aDi

-t t

. y.I Closing Remarks 4+ Closing Remarks 17

^ Duke r

7u, ire L

_e_,

V A Technical Specification Change

......"i If-

¢4Combine current and proposed TS requirements by using qualifiers and notes

  • >Eliminate 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Channel Checks

-4Extend Channel Functional Test Intervals to 18 months 18