Letter Sequence Request |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0504702752005-02-14014 February 2005 Duke Energy Corporation Submittal of Revision 6 to Physical Security Plan for Oconee Nuclear Station, Units 1, 2, and 3, McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2 Project stage: Request ML0507304612005-03-23023 March 2005 Meeting Duke Energy Corporation to Discuss February 14, 2005, Digital Rps/Esps (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0510404352005-04-0606 April 2005 Attachment 3, Meeting Summary of 4/6/05 with Duke Energy Corp, Request for Digital Reactor Protective System Project stage: Meeting ML0510401512005-04-21021 April 2005 Duke Energy Corp, Meeting Summary of 4/6/05, Installation of Digital Rps/Esps During Fall 2006 Oconee Unit 1 Refueling Outage Project stage: Meeting ML0510401762005-04-21021 April 2005 Attachment 2, Meeting Summary with Duke Energy Corp. Installation of Digital Rps/Esps During Fall 2006 Refueling Outage of Oconee Unit 1 (Tac No. MC5895, MC5896, MC5897) Project stage: Meeting ML0511100402005-04-21021 April 2005 Notice of Meeting with Duke Energy Corporation, Oconee, Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0512200392005-04-21021 April 2005 Notice of Cancellation of Meeting with Duke Energy Corp., Interchannel Connections for the Proposed Digital Reactor Protective System Project stage: Meeting ML0518800752005-07-0707 July 2005 Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519504042005-07-0707 July 2005 Cancelled - 7/19/05, Duke Energy Corp, Oconee Mtg Reactor Protective System and Engineered Safeguards Protective System Project stage: Other ML0519202632005-07-27027 July 2005 Ltr MC5895, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0520700052005-07-28028 July 2005 Notice of Meeting with Duke Energy Corporation to Discuss the Oconee License Amendment Request for a Digital Reactor Protective System and Engineered Safeguards Protective System (Rps/Esps) Project stage: Meeting ML0524103192005-09-0101 September 2005 8/17/05 Meeting Summary to Discuss the License Amendment Request for a Digital Reactor Protective System & Engineered Safeguards Protective System Project stage: Meeting ML0524500962005-09-0606 September 2005 RAI, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0527801042005-10-0505 October 2005 Notice of Forthcoming Meeting with Duke Energy Corporation, to Provide a Design Overview of the Proposed Digital Reactor Protective System Engineered Safeguards Protective System Project stage: Request ML0530401582005-10-18018 October 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Enclosure, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0527700642005-10-20020 October 2005 9/26/05 Meeting Summary with Duke Energy Corp. on Oconee Units 1, 2 and 3, Re Rps/Esps Project stage: Meeting ML0530502742005-11-29029 November 2005 Duke Energy Corp, Oconee, Units 1, 2 and 3, Meeting Summary, Design Overview of Digital Reactor Protective System Project stage: Meeting ML0535403592005-12-20020 December 2005 Trip Report for Staff Visit to Framatome Anp Offices in Alpharetta, Ga, November 14-18, 2005 to Review the Rps/Esps Digital Upgrade for Oconee Nuclear Station Project stage: Other ML0536302922006-01-0404 January 2006 Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0536302662006-01-10010 January 2006 Request for Additional Information, Reactor Protective System/Engineered Safeguards Protection System Digital Upgrade Project stage: RAI ML0600604272006-01-11011 January 2006 Units 1, 2 and 3, Review Issues for Digital Upgrade of Rps/Esps Project stage: Other ML0601202972006-01-12012 January 2006 Cancelled Notice of Meeting with Oconee, Units 1, 2 and 3, to Discuss Relief Requests for Certain Aspects of the Proposed Digital Reactor Protective System/Engineered Safeguards Protective System Project stage: Meeting ML0617903622006-06-22022 June 2006 Withdrawal of License Amendment Request Associated with Rps/Esps Digital Upgrade (TSC 2004-09) Project stage: Withdrawal ML0617905192006-07-24024 July 2006 Withdrawal of an Amendment Request Project stage: Withdrawal 2005-07-27
[Table View] |
Text
October 5, 2005 MEMORANDUM TO: Evangelos C. Marinos, Section Chief, Section 1 Project Directorate II Division of Licensing Project Management, NRR FROM:
Leonard N. Olshan, Project Manager, Section 1
/RA/
Project Directorate II Division of Licensing Project Management, NRR
SUBJECT:
FORTHCOMING MEETING WITH DUKE ENERGY CORPORATION DATE & TIME:
Tuesday, October 18, 2005 3:00 p.m. - 4:30 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-8B4 Rockville, Maryland PURPOSE:
To provide a design overview of the proposed digital Reactor Protective System and Engineered Safeguards Protective System CATEGORY1:
- This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Proprietary information will be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002 MEETING CONTACTS:
Leonard N. Olshan, NRR Sean E. Peters, NRR 301-415-1419 301-415-1842 lno@nrc.gov sep@nrc.gov
Evangelos C. Marinos PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation.
NRC DUKE ENERGY B. Sheron R. Jones B. Boger L. Nicholson G. Holahan D. Baxter E. Hackett M. Glover E. Marinos P. Gillespie J. Calvo B. Geddes (Framatome)
A. Howe L. Olshan Docket Nos: 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/encl: See next page
ML052780104 NRC-001 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME LOlshan BClayton for CHawes EHackett for EMarinos DATE 10/5/05 10/5/05 10/5/05
MEETING TO PROVIDE DESIGN OVERVIEW OF PROPOSED DIGITAL RPS/ESPS AGENDA OCTOBER 18, 2005 3:00 p.m. - 3:10 p.m.
Opening remarks 3:10 p.m. - 4:10 p.m.
Design overview of digital RPS/ESPS (Proprietary) 4:10 p.m. - 4:20 p.m.
Summary (Proprietary) 4:20 p.m. - 4:30 p.m.
Closing remarks
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Duke Energy Corporation 526 South Church Street P. O. Box 1006 Mail Code = EC07H Charlotte, North Carolina 28201-1006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672