MONTHYEARML0416103102004-07-0606 July 2004 PSEG Nuclear, LLC, Withholding from Public Disclosure, NEDC-33066P, Hope Creek Generating Station Aprm/Rbm/Technical Specifications/Maximum Extended Load Line Limit Analysis (Arts/Mellla), Revision 1 Project stage: Other ML0423701062004-08-24024 August 2004 Request for Additional Information Implementation of Alternate Source Term Project stage: RAI LR-N04-0417, LCR S03-05, Implementation of Alternate Source Term Request for Additional Information (TAC Nos. MC3094 & MC3095)2004-09-23023 September 2004 LCR S03-05, Implementation of Alternate Source Term Request for Additional Information (TAC Nos. MC3094 & MC3095) Project stage: Request ML0429406752004-10-29029 October 2004 Delay in Submission of Fuel Dependent Analyses (Tac No. Mc 3390) Project stage: Other ML0431303612004-11-16016 November 2004 Request for Additional Information Amendment to Implement Alternative Source Term Project stage: RAI ML0504901532005-03-0808 March 2005 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0510803412005-05-0505 May 2005 RAI, Amendment to Implement Alternative Source Term Project stage: RAI ML0522105012005-07-25025 July 2005 E-Mail Miller, NRR, to Duke, PSEG, Hope Creek Arts/Mellla Draft RAIs Project stage: Draft Other ML0523004982005-08-18018 August 2005 RAI - Request for Change to Technical Specifications, Implementation of Arts/Mellla Operating Domain Project stage: RAI LR-N05-0448, Response to Request for Additional Information Re Request for Change to Technical Specifications Arts/Mellla Implementation2005-09-23023 September 2005 Response to Request for Additional Information Re Request for Change to Technical Specifications Arts/Mellla Implementation Project stage: Response to RAI ML0530000292005-10-31031 October 2005 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance LR-N05-0520, Response to Request for Additional Information Request for Change to Technical Specifications Arts/Mellla Implementation2005-11-16016 November 2005 Response to Request for Additional Information Request for Change to Technical Specifications Arts/Mellla Implementation Project stage: Response to RAI JAFP-06-0015, Application for Technical Specification Amendment to Support Implementation of Arts/Meod2006-01-26026 January 2006 Application for Technical Specification Amendment to Support Implementation of Arts/Meod Project stage: Request ML0605301292006-02-17017 February 2006 Issuance of Amendments Alternate Source Term - Technical Specification Pages Project stage: Approval ML0600403222006-02-17017 February 2006 Issuance of License Amendments 271 and 252 Alternate Source Term Project stage: Approval ML0606205002006-03-0303 March 2006 SE Related to Amendment No. 163 - Non-Proprietary Project stage: Other ML0606204702006-03-0303 March 2006 Re-Issuance of Safety Evaluation for Amendment 163 Implementation of Arts/Mellla Project stage: Approval ML0610700392006-05-0202 May 2006 Corrections to Safety Evaluation for Amendment No. 271 and No. 252, Respectively, Alternate Source Term Project stage: Approval 2005-03-08
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22038A1552022-02-0404 February 2022 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22021A7012022-01-21021 January 2022 NRR E-mail Capture - Acceptance Review - Hope Creek -Relief Request HC-I4R-220 Regarding Partial Penetration Nozzle Repairs (L-2022-LLR-0003) ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21334A1182021-11-30030 November 2021 NRR E-mail Capture - Acceptance Review - Hope Creek -Revise SRs for Electric Power Monitor Channels for RPS and Power Range Neutron Monitoring System ML21154A0102021-05-28028 May 2021 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML20293A1832020-10-19019 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A7062020-10-15015 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Low Pressure Safety Limit to Address GE Part-21 Safety Communication SC05-03 ML20246G5952020-09-0202 September 2020 Acceptance Review - Hope Creek - Adopt TSTF-427, Allowance for Non TS Barrier Degradation ML20191A0202020-07-0202 July 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise ECCS TS with Respect to HPCI System Inoperability ML20153A3782020-06-0101 June 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Actions for Suppression Pool Cooling ML20006E2802020-01-0606 January 2020 NRR E-mail Capture - Acceptance Review - Hope Creek: LAR Regarding Proposed Adoption of 10 CFR 50.69, Risk- Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) ML19267A1622019-09-24024 September 2019 NRR E-mail Capture - Hope Creek - Acceptance Review: Alternative for Exam of ASME Section XI, Exam Category B-G-1, Item Number B6.40, Threads in Flange (L-2019-LLR-0090) ML19226A3932019-08-14014 August 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Delete License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19198A0992019-07-17017 July 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Changes to Emergency Plan Staffing ML19186A3842019-07-0505 July 2019 NRR E-mail Capture - Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-563, Revise Instrumentation Testing Definition ML19123A2172019-05-0303 May 2019 NRR E-mail Capture - Re Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-564, Safety Limit MCPR ML19081A1532019-03-22022 March 2019 NRR E-mail Capture - Acceptance Review: Hope Creek - Revise TS to Adopt TSTF-546 (L-2019-LLA-0032) ML19046A2382019-02-15015 February 2019 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010) ML18323A0252018-11-16016 November 2018 NRR E-mail Capture - Acceptance Review: Hope Creek - Remote Shutdown System I & C Amendment (L-2018-LLA-0295) ML18288A2512018-10-15015 October 2018 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124) ML18271A0342018-09-13013 September 2018 Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and Email ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18206A7302018-07-27027 July 2018 (50-272, 50-311, 50-354), Transmittal Email 26.717 Updates ML18201A1112018-07-20020 July 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18128A3862018-05-0808 May 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek Revise Inverter AOT TS Actions (L-2018-LLA-0101) ML18122A2392018-05-0202 May 2018 NRR E-mail Capture - Acceptance Review Results: Revise Emergency Diesel Generator Technical Specifications Action to Remove Salem Unit 3 Gas Turbine Generator (L-2018-LLA-0079) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17340B2682017-12-0606 December 2017 NRR E-mail Capture - Notification to State of New Jersey of Impending License Amendment Issuance for Hope Creek (MF9501; EPID L-2017-LLA-0183) ML17338A2742017-12-0404 December 2017 NRR E-mail Capture - State of New Jersey: Notification of Impending Amendment Issuance for Hope Creek - Relocate Pressure-Temperature Limits Curves to the Pressure-Temperature Limits Report ML17338A2752017-12-0404 December 2017 NRR E-mail Capture - Acceptance Review - Hope Creek License Amendment Request to Revise the Safety Limit Minimum Critical Power Ratio ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17324A0522017-11-0909 November 2017 NRR E-mail Capture - Draft Request for Additional Information - Hope Creek Mur Chemical, Corrosion, and Steam Generator 2023-09-29
[Table view] |
Text
From: Glenn Miller To: Paul.Duke@pseg.com Date: 7/25/05 2:49PM
Subject:
Hope Creek ARTS/MELLLA draft RAIs
- Paul, Attached are the draft RAIs based on the fuel dependent evaluation of the ARTS/MELLLA submittal. After you have had a chance to look at them lets set up a conference call and discuss. At the end of the call we can discuss a time frame for response to the formal RAI.
Ed Miller 301-415-2481 CC: Muhammad Razzaque; Stewart Bailey
Mail Envelope Properties (42E5344B.B92 : 9 : 35080)
Subject:
Hope Creek ARTS/MELLLA draft RAIs Creation Date: 7/25/05 2:49PM From: Glenn Miller Created By: GXM@nrc.gov Recipients Action Date & Time nrc.gov OWGWPO01.HQGWDO01 Delivered 07/25/05 2:49 PM SNB CC (Stewart Bailey) Opened 07/25/05 2:52 PM nrc.gov TWGWPO01.HQGWDO01 Delivered 07/25/05 2:49 PM MMR1 CC (Muhammad Razzaque) Opened 07/25/05 3:45 PM pseg.com Transferred 07/25/05 2:50 PM Paul.Duke (Paul.Duke@pseg.com)
Post Office Delivered Route OWGWPO01.HQGWDO01 07/25/05 2:49 PM nrc.gov TWGWPO01.HQGWDO01 07/25/05 2:49 PM nrc.gov pseg.com Files Size Date & Time MESSAGE 779 07/25/05 02:49PM rai mc3390_round 2_draft.wpd 15238 07/25/05 02:48PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT REQUEST TO UTILIZE ARTS/MELLLA OPERATING DOMAIN HOPE CREEK GENERATING STATION DOCKET NO. 50-354 By letter dated June 7, 2004, PSEG Nuclear, LLC (PSEG) submitted license amendment request LCR H04-01 for the Hope Creek Generating Station (Hope Creek), seeking U.S.
Nuclear Regulatory Commission approval of proposed changes to the Hope Creek Technical Specifications (TSs). Specifically, the proposed change would allow an expanded operating domain resulting from implementation of Average Power Range Monitor/Rod Block Monitor/Technical Specifications/Maximum Extended Load Line Limit Analysis (ARTS/MELLLA). Additionally, the proposed change would revise the methods used to evaluate annulus pressurization and jet loads resulting from the postulated Recirculation Suction Line Break. By letter dated February 18, 2005, PSEG submitted fuel dependent evaluations in support of the license change request. The Nuclear Regulatory Commission staff has been reviewing your submittal and has determined that the following draft additional information is required to complete our review:
- 1. It was stated in the submittal for fuel-dependent analysis (NEDC-33066P, Rev. 2) that in general, the limiting anticipated operational occurrences (AOOs) Minimum Critical Power Ratio (MCPR) calculation and the reactor vessel overpressure protection analysis are fuel dependent. These analyses are based on, or are applicable to, the Reference Loading Pattern (RLP) for Cycle 13. Hope Creek is currently operating with approximately 600 irradiated (for one to two previous cycles) non-GE14 fuel assemblies (SVEA-96+) in the core and has loaded 164 fresh GE14 fuel in the Cycle 13 core. For the fuel-dependent evaluations of the limiting AOOs, the licensees analyses indicate that the original licensed MCPR (OLMCPR) for operation in the MELLLA region remains bounded by the generic power and flow dependent limits. The analyses results also indicate that performance in the MELLLA region is within allowable design limits for over-pressure protection, loss-of-coolant accidents (LOCAs), and Anticipated Transient Without Scram (ATWS) licensing criteria.
Describe, in detail, how different fuel designs (for the case of the current loading and for planned future loadings) can be combined to perform a mixed-core analysis, and still be able to obtain a bounding fuel-dependent analyses that demonstrates, at MELLLA conditions, that the core and fuel performance will satisfy all safety and regulatory requirements. As a part of this discussion, the response should include:
- a. A discussion of the neutronic and thermal-hydraulic compatibility of the different vendors fuel loaded into the core.
- b. A discussion on which fuel-type (SVEA-96+ or GE14) is more limiting from the standpoint of AOOs, over-pressure protection, LOCA, ATWS, and the thermal-hydraulic stability, including what makes it the limiting fuel-type.
- 2. In order to develop the plant- and cycle-specific DIVOM curve for Cycle 13, did you consider the state points for operation within the MELLLA domain of the power-flow map, and does the MELLLA operation make th slope of the DIVOM curve more conservative compared to operation outside the MELLLA domain?
- 3. It is the NRC staffs understanding that the vendors methodologies were approved only to apply to their respective fuel designs. Demonstrate that the DIVOM curve is
bounding when the core is loaded with different fuel designs, supplied by different fuel vendors.
- 4. In Table 4-1 of NEDC-33066P, Rev. 2, the OLMCPR values from the Rod Withdrawal Error (RWE) event were shown for various power/flow combination, except for 100% of CLTP and 76% rated core flow. This is a state point on the modified power/flow map for MELLLA, however, it falls outside the current operating domain. The NRC staff believes that this state point has the potential to be limiting for the OLMCPR. Provide an evaluation of the OLMCPR at this point or a justification for why it is not considered limiting.
- 5. It has been stated in the submittal that because the Hope Creek RWE does not credit the rod block monitor (RBM), the Technical Specification (TS) Limiting Condition for Operation (LCO) 3.1.4.3 for the RBM is not required to be in the TSs and could be removed. It was further stated that the removal of this LCO (and associated Surveillance Requirements) is not being requested at this time, and that maintaining the RBM system in the TSs is conservative. Please clarify the following:
- a. If the RBM is not credited for a RWE, which plant safety feature is credited in order to prevent violation of fuel thermal limits during RWE?
- b. Will the RBM setpoints be maintained in the TS or in the core operating limits report (COLR)?
- 6. Describe you training program for the operators in preparation for implementing the ARTS/MELLLA operation at Hope Creek.