August 3, 2005 Tennessee Valley Authority ATTN: Mr. K. W. Singer Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) RE. BROWNS FERRY UNIT 1 RECOVERY STATUS -

DOCKET NO. 50-259

Dear Mr. Singer:

This refers to the meeting conducted at our mutual request at the Nuclear Regulatory Commissions (NRC) Region II Office in Atlanta, Georgia, on July 20, 2005. The meeting purpose was to discuss the Browns Ferry Unit 1 Restart Project Status. Discussions during this management meeting were lead by both representatives of the TVA and the NRC and included the following topics: accomplished work activities to date, schedules for future milestones, responses to challenges, and understanding activities important to NRC oversight and inspections regarding Unit 1. Enclosure 1 contains a list of NRC, TVA, and other attendees. contains the presentation handouts used by your staff and the NRC to discuss the status of the Browns Ferry Unit 1 Restart Project. Enclosure 3 contains the NRC Browns Ferry Unit 1 Recovery Issues List which represents the NRCs current understanding of the issues requiring NRC review prior to restart of Unit. The meeting was informative and a beneficial exchange of information. Although it did not result in specific action items or decisions, both sides gained a better understanding of near term priorities.

These periodic meetings will continue throughout the recovery process.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

2 TVA Should you have any questions concerning this meeting, please contact me at (404) 562-4520.

Sincerely,

/RA/

Stephen J. Cahill, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-259 License No.: DPR-33

Enclosures:

1. List of Attendees
2. TVA Presentation Handout - Browns Ferry Nuclear Plant - Unit 1 Restart NRC Presentation Handout - NRC Oversight of the Browns Ferry Unit 1 Recovery
3. NRC Browns Ferry Unit 1 Recovery Issues List (July 20, 2005) cc w/encls: (See page 3)

3 TVA cc w/encls:

Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, General Manager Nuclear Engineering Tennessee Valley Authority Electronic Mail Distribution Brian O'Grady Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Robert J. Beecken, Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority Electronic Mail Distribution Bruce M. Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution William D. Crouch, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P. O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Jon R. Rupert, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35609 Robert G. Jones, Restart Manager Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35609 Distribution w/encls: (See page 4)

OFFICE DRP:RII DRS:RII SIGNATURE SJC for MSL NAME SShaeffer MLesser DATE 08/03/2005 08/02/2005 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO List of Attendees NRC/TVA Unit 1 Restart Management Meeting Nuclear Regulatory Commission Headquarters W. Kane, Deputy Executive Director for Reactor and Preparedness Programs W. Borchardt, Deputy Director, Office of Nuclear Reactor Regulation (NRR)

E. Hackett, Director, Project Directorate II (PDII), Office of Licensing and Project Management (DLPM), NRR M. Marshall, Section Chief, PDII, DLPM, NRR M. Chernoff, Browns Ferry Unit 1 Project Manager, PDII, DLPM, NRR E. Brown, Browns Ferry Units 2 and 3 Project Manager, PDII, DLPM, NRR R. Subaratnam, License Renewal Project Manager, NRR (per telecon)

Region II W. Travers, Regional Administrator, Region II (RII)

C. Casto, Director, Division of Reactor Projects (DRP), RII V. McCree, Director, Division of Reactor Safety (DRS), RII J. Shea, Deputy Director, DRP, RII H. Christensen, Deputy Director, DRS, RII S. Cahill, Chief, DRP, Branch 6, RII M. Lesser, Chief, Maintenance Branch, DRS, RII C. Julian, Team Lead for License Renewal Inspections, DRS, RII B. Bearden, Unit 1 Senior Resident Inspector, Browns Ferry, DRP, RII S. Shaeffer, Senior Project Engineer, DRP, RII, S. Vias, Senior Reactor Inspector, DRS, RII L. Lake, Reactor Inspector, DRS, RII B. Miller, Reactor Inspector, DRS, RII G. Cameron, Reactor Safety Coop.

Browns Ferry (TVA)

B. OGrady, Site Vice President J. Rupert, Unit 1 Vice President R. Jones, Unit 1 Plant Restart Manager J. Valente, Unit 1 Engineering Restart Manager T. McGrath, Senior Project Manager, Operational Readiness W. Crouch, Site Licensing & Industry Affairs Manager R. Baron, Unit 1 Nuclear Assurance Manager E. Hollins, Unit 1 Maintenance & Mods Manager J. McCarthy, Unit 1 Licensing E. Riley, TVA Nuclear Fuels G. Storey, TVA BWR Fuel Engineering Manager C. Beasley, TVA Communications and Government Relations Other B. Lawson, Reporter, The Huntsville Times NRC REGION II - BROWNS FERRY UNIT 1 RECOVERY ISSUES LIST Issue Status as of July 20, 2005 Last Quarterly update from Licensee: May 19, 2005 Next BF1 Restart Meeting: July 20, 2005 in Region II Summary TVA Special Programs - These are identified in the TVA Regulatory Framework Letter. TVA will provide Special Program issue closures via their quarterly issue update.

27 Open - (30 listed, 3 combined into original 27 programs outlined in Framework Letter, dated 12/13/2002) 0 Closed TVA has indicated that 5 Special Programs are complete and ready for inspection and closure. These include MELB (6/04), Cable Tray Supports (2/05), Conduit Supports (2/05), Configuration Management (5/05), and Design Calc. Review (5/05). Initial inspections have been performed for most Special Programs.

Near term 2005 closure focus: MELB, Long Term Torus Integrity, Cable Ampacity, Cable Splices, Drywell Platforms, IGSCC, Long Term Torus Integrity, Q list, Thermal Overloads, and PSA.

Generic Communications Open Items - Includes all items from TVA Regulatory Framework correspondence and other NRC reviews to identify issues for Unit 1. These include NRC Generic Letters, Bulletins, MPA, TMI Items, TIs, etc.

54 Open 12 Closed (Items adequately resolved for restart in accordance with NRC Inspection Manual Chapter (MC) 2509.

Open Items (LERs, URIs, and IFIs) - Includes items identified as open for Unit 1 based on historical docket review. This was the primary inspection area for 2004 to date.

6 Open Listed below.

44 Closed Adequately resolved for restart per MC 2509 and closed in a report since BF1 Recovery inspections began in 2003.

Remaining Unit 1 LERs, URIs, and IFIs URI 87-26-03, RHR Pump Suction and Nozzle Load Allowables - J. Lenahan reviewing 8/11/05 for closure LER 88-32, Evaluate Cable Separation Criteria, DRS to schedule during Special Program Review 8/1/05 -Fillion/Staples LER 88-37, Inadequate Design Results for HVAC (Seismic Issue) - Vias assigned to inspect 8/05 LER 88-40, Inadequate Design Control for Backup Control Room - To be reviewed during Unit 1 Safe shutdown Inspection schedule for 10/17-27/05, Fillion.

IFI 93-04-01, Static O-Ring Switches, related Bulletin 86 discussed in 05-06, new design to be implemented - review mod/qualification.

SRI to review new Design Change Notice (DCN) to close. Bearden to re-inspect late 05.

URI 05-06-02, Effect of Location Deviations for Pipe Support, Chou to address 8/05 NOTES:

An extensive review of inspection reports (IR) back to 1985 was done for all open inspection items against Unit 1. Many of these were resolved but never formally closed on the Unit 1 docket. Most of these items have now been formally closed in a Unit 1 IR and recorded in NRCs RPS tracking program. Open allegations, OI investigations, and emerging/draft issues are not contained in this list. Open Licensing Actions with NRR are maintained on a separate list, but will be added to this list once the Restart Panel is convened..

Sources for all the above issues include: Historical RPS, SIMS, NUREG 1435 (Status of Safety Issues at Licensed Power Plants),

SECY 95-264 (final Unit 3 Restart Matrix)

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 1

Cable Ampacity 3.11.3 DRS-C.Smith, Staples 04-07 Open 9/27/06 Yes NUREG-1232 No Installation inspection planned 10/3/05.

2 Cable Installation/Cable Separations Issues 3.11.4,.5 DRS-Fillion, Staples 04-07 04-09 Open 9/27/06

Yes, tracked as 8 sub issues SER 4/08/92 SER 7/1/94 on bend radius No Related closure item LER 88-32.

Next inspection Aug 05 (to close separation portion. Ref. 1/28/93 closure letter.

U2 closed IR 90-25, U3 closed 95-25.

3 Cable Splices 3.13 DRS-Merriweather, Rodriguiz 04-08 Open 9/27/06 Yes SER 4/08/92 1/23/91 No Installation inspection planned 8/05.

4 Cable Tray Supports 2.2.2.7; SE 12/17/91 DRS-Vias, Carrion, Nazario 03-10 04-06 Closed 2/18/05 Yes SER 12/17/91 11/19/92 3/19/93 No U3 closed IR 90-22,95-14, 95-20, 95-52.

5 Component and Piece Part Qualification 3.3 DRS-Merriweather.

In combination with EQ (11)

Open 6/26/06 Yes 12/07/93 ltr determined could be closed via inspection No Inspection 8/22/05 and 9/19/05.

U3 closed 95-60.

6 Conduit Supports 2.2.2.3 DRS-Vias, Carrion, Nazario 04-06 Closed 2/18/05 Yes SER 10/24/89 3/20/92 11/19/92 3/19/93 No U3 -IR 95-15, 95-57. Inspection planned 12/05.

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 7

Configuration Mgmt/ Design Baseline 2.1 DRS-Mellen, SSDPC Team Closed 5/19/05 Yes NRC 11/21/91 approval letter on U1 docket No Inspection scheduled 8/29 and 9/12, 2005. Utilize SSDPC inspection procedure for review.

Discuss system selection with SRI.

Related to Item #10.

8 Containment Coatings 3.7 DRS-Lenahan, Maymi 04-07 04-08 05-06 Open 8/14/06 Yes NUREG 1232 covered U2.

No Torus closeout insp. 8/30/04 was deferred to and closed in 3/05.

Need to schedule drywell and component review. U3 IR 94-01, 94-09, 94-18, 94-27.

9 Control Rod Drive insert/withdrawal piping 2.2.3.2 DRS-Lenahan, Vargas 04-07 04-08.

Open 5/08/06 Yes NUREG 1232 covered U2.

No Scheduled 8/05.

U3 95-52.

10 Design calc review 2.1 DRS-Mellen, Unit 1 SSDPC type team inspection Closed 5/19/05 No, TVA tracking as

  1. 7, design baseline NRC 11/21/91 approval letter on U1 docket No Inspection scheduled 8/29 and 9/12, 2005. Utilize SSDPC inspection procedure for review.

Discuss system selection with SRI.

Rescheduled from April 06.

Related to Item #7.

U2/3 SSDPC performed in Jan 05.

11 Environmental Qualification 3.2 DRS-Merriweather, Mas-Penaranda 03-10 04-08 Open 7/31/06 Yes NUREG 1232 covered U2 No Inspection scheduled for 8/22/05 and 9/19/05 U3 closed in IR95-43, 95-56.

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 12 Fire Protection/10 CFR 50, Appendix R

3.1 DRS-Fillion,

Wiseman, Rodriguiz 04-09 Open 8/7/06 Yes SER 12/08/88 11/03/89 3/31/93 11/02/95 No SERs addressed overall approach, no Unit 1 specific exemptions required. First review 04-09, 4 additional DCNs scoped for review. An Appendix R safe shutdown insp. scheduled for 10/17-27/05. Next tri-insp 8/06 for U1,2,3. U3 closed IRs 94-27, 95-04, 95-07, 95-37.

Team to include determination if any impact from manual action or hot short generic resolutions.

13 Flexible Conduits 3.12 DRS-Fillion, Staples,Mas-Penaranda 04-07 04-09.

Open 7/31/06 Yes SER 3/19/93 SER 10/3/95 No 8/1/05 Fillion turnover to Staples.

Additional inspections TBD.

14 Fuses 3.11 DRS-Merriweather, Staples, Christnot assist in sampling verification 04-08 Open 9/20/06 Yes NUREG 1232 covered U2 SER.

4/14/89 No Program reviewed in 04-08. Next inspection 8/22/05 (installation).

U3 closed IRs 93-02, 93-08, 95-02, 95-45. Also review splices (#3).

15 HVAC Duct Supports 2.2.2.4 DRS-Vias, Carrion, Nazario Open 5/25/06 Yes NUREG 1232 covered U2 SER.

10/24/89 8/22/90 No Next 12/05/05. U3 93-201, 95-52.

Also address LER/88-37 during 12/05 inspection.

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 16 Instrument Sensing Lines 3.4 DRS-Lenahan in-house review of design DRP-SRI perform sample walkdown, focus on key instrumentation lines in high traffic areas.

Open 7/13/06 Yes SER 12/10/91 No Early 06 (after installation near completion). U3 closed IRs 94-24, 95-56.

Close by inhouse DRS review of Program and DRP final walkdown.

17 Instrument Tubing 2.2.3.4 DRS-Lenahan, Vargas.

DRP-SRI perform sample walkdown, focus on key lines in high traffic areas.

Open Combined with Small Bore Special Program Close by inhouse DRS review of Program and DRP walkdown.

Incorporate field inspection close to restart to look for damaged tubing. Program combined with small bore piping in original regulatory framework letter.

18 Intergranular Stress Corrosion Cracking (IGSCC) 3.6 DRS-Fuller, Vargas 03-09 03-10 04-06 04-07 04-09 Open Yes SER 12/21/89 U2 SER 12/03/93 U3 SER 4/25/05 NRR SE to be issued Program submitted for review 7/21/04. Scope of U1 different than U2 and 3. New precedent for U1.

Reviews have included recirc and RBCCW piping, Ref. GL 88-01, GL 94-03.

U3 closed IRs 92-31, 93-05.

Inspection planned 8/1/05, to include Mechanical Stress Improvement Process (MSIP).

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 19 Large Bore Piping Supports 2.2.3.1 DRS-Chou, Maymi, Rivera 03-09 Open Yes, TVA tracks as Bul 79-02 and 79-14, not as a special program NUREG 1232 No Inspection planned 11/28/05. A of 6/28/05 Installation approximately 7% complete.

20 Long Term Torus Integrity Program 2.2.4.3; SE 8/20/80 DRS-Chou, Lenahan, Maymi 03-09 03-10 04-11(Esc.

Enf) 04-07 04-09.

Open 7/5/06 Yes SER 5/06/85 2/10/92 No Inspection planned 7/18/05.

Complete in conjunction with large bore pipe.

Internal torus complete. Next inspection to review external supports. U3 closed in IRs 94-15,95-03, 95-52.

21 Lower Drywell Platforms and Miscellaneous Steel 2.2.2.5 DRS-Lenahan, Maymi 03-09 04-07 Open 4/20/06 Yes SER 12/7/93 No Inspections remain on lower platforms to close. Inspection planned 7/18/05.

22 Misc Steel Frames 2.2.2.6 SE 10/24/89 DRS-Lenahan, Carrion 03-09 Combined No Inspection of Drywell steel is complete

-TVA to NRC 12/13/02 letter combined Misc Steel Frames into Lower Drywell Platforms and Miscellaneous Steel.

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 23 Moderate Energy Line Break (MELB) 3.8 NRR/DRP/Shaeffer

Complete, closure package available.

Yes NUREG 1232 Yes NRR issue letter to close.

-TVA to NRC 6/25/04 letter completed TVA actions. NRR provide documentation to support closure.

U3 52 MELB analysis requested from TVA by Shaeffer 5/19/05. RII received closure package 6/4/05.

24 Platform Thermal Growth 2.4 DRS-Lenahan, Carrion, Maymi 03-09 Combined No Inspection date TBD. TVA to NRC 12/13/02 letter combined Platform Thermal Growth into Lower Drywell Platforms and Miscellaneous Steel.

25 Probabilistic Safety Assessment (PSA) 3.9 NRR DRS-Bernhard Complete 2/18/05 No No SER for any unit (PSA). NRC staff evaluation 9/28/94 for U2 (88-20) 5/20/98, 5/04/99 for U3 (88-20)

Yes Closure Ltr to Licensee from NRR.

Determine what NRR reviews required. TVA to NRC 12/13/02 letter closed PSA with BFN Multi-Unit PSA (April 14, 1995).

NRC request ltr 6/21/04.

SRA/NRR to review TVAs 8/17/04 Resp to GL 88-20. Issues caused re-calc to be done May 05 - will make more like U2/3 PSA results.

NRR response letter to close.

U3 closed IR 95-49.

26 Q List 3.15 DRP-Bearden Open Yes Inspection planned 1/06. Ref GL 83-28.

TVA SPECIAL PROGRAMS (Endorsed per 8/14/03 Reg Framework ltr from NRR/Marsh)

DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS (C-CLOSED)

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 27 Restart test program (RTP) 4.6 NRR/DRP Open Yes NUREG 1232 SER 8/30/94 No System turnover review to be performed for key systems.

Reviews to be performed by experienced inspectors familiar with BWR mitigating systems.

TVA plans Closure Ltr for 9/12/06.

NRR Ltr to TVA 6/15/05 requesting details of Restart Test Program (RTP).

U3 closed IRs 95-07, 08, 26, 51, 60.

28 Seismic Class II Over I/Spacial Systems Interactions and Water Spray 2.2.4.2 DRS-Vias, Nazario Open 7/21/05 Yes SER 11/19/92 No Perform in conjunction with HVAC and Electrical Conduit Support.

Next inspection 8/05, 12/05.

Include DCN 51192, as referenced in IR 04-06, Section E1.3. Close with GL 87-02.

29 Small Bore Piping/Supports 2.2.3.3 DRS-Lenahan, Maymi Alternate - Vias Open

Yes, combined with #17 Instrument Tubing SER 10/24/89 2/4/92 No Inspection TBD. Inspect in conjunction with Instrument Tubing. Final Instrument tubing inspection should be close to restart date to identify damaged tubing post installation.

U3 closed IRs 95-03, 95-57.

30 Thermal Overload 3.11 DRS-Merriweather, Staples 04-08 Open 9/20/06 Yes NUREG 1232 No Next inspection 9/19/05. U3 closed in IR 95-25.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 1

BU 79-02 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts SER 2/8/90 DRS-Chou Open Yes NUREG 1232 Associated with large bore piping reviews.

TVA action due Apr 06.

2 BU 79-12 Short Period Scrams At BWR Facilities DRS-E. Lea Open Yes Inspection planned 2/27/06. U3 item closed in IR 95-51, TVA action due Jun 06.

3 BU 79-14 Seismic Analysis for As-Built Safety Related Piping Systems DRS-Chou Open Yes SER 10/24/89 NUREG 1232 TVA action due Apr 06.

Associated with large bore piping reviews.

U3 closed IRs 94-15, 94-29, 95-03, 95-52.

4 BU 80-06 Engineered Safety Feature Reset Controls DRS-Mas-Penaranda -

EB1 Open Yes No SER Inspection scheduled 12/05. U3 item closed in IR 95-22, TVA action due May 05.

5 BU 84-02 Failure of GE Type HFA Relays in Use in Class 1E Safety Systems DRP 04-09C Closed 2/18/05 Yes No SER U3 item closed in IR 95-43, WOs for Buls 84-02 & 88-03 to be worked Oct 05.

6 BU 86-02 Static O Ring Differential Pressure Switches DRP 05-06C Closed 5/19/05 Yes No SER 94-31 U3 item closed in IR 94-31, see also IFI 93-04-01, TVA action due Apr 06.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 7

BU 88-03 Inadequate Latch Engagement in HFA Type Relays Manufactured by GE SER 8/2/90 NRR/DRP 04-09C Closed 2/18/05 Yes No TVA submittal required upon completion NRR determined issue is closed for Unit 2-3.,

WOs for Buls 84-02 &

88-03 to be worked until Oct 05.

8 BU 88-04 Potential Safety Related Pump Loss DRP/Bearden 04-09C Closed 2/18/05 Yes No SER Yes TI 2515/105 (orig. did not require BF to do insp.).

TVA response submitted 5/04, U1 item addressed in IR 95-31. TVA to NRC 5/7/04 letter completed TVA actions.

9 BU 88-07 Power Oscillation in Boiling Water Reactors DRS-OLHP-Lea Complete-package available for closure, delivered to Lea 3/05 Yes SER 5/31/94 Inspection planned 2/27/06. TI 2515/099, TVA action due May 05

-NRC to TVA 5/31/1994 letter, TVA considers complete with issuance of TS 300 10 BU 88-10 Nonconforming Molded-Case Circuit Breakers DRP-S. Walker Open Yes No SER.

NRC to TVA letter 3/10/92 Inspection planned 12/5/05 and 1/9/06.

Reference NRC to TVA letter 3/10/92 closed Bulletin for U1-verify no changes, to parts or installed components.

Lic mods 12/05.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 11 BU 90-01 Loss of Fill Oil in Rosemount Transmitters DRS-EB1, Moore/Peabody Planned 11/05 Open R. Moore has partial package 3/05.

Requested more info 7/12 from TVA.

Yes SER 4/04/95 NRR closeout letter / SE 2/7/05 Inspection planned 11/05. TI 2515/122 -

reference only. MC change notice 95-08 deleted TI for BF1. TVA ltr 6/7/04. May also review during License Renewal inspection planned 9/19/05.

12 BU 93-02 Debris Plugging of Emergency Core Cooling Suction Strainers DRP-Patterson Inspection complete.

To be closed 05-07 pending SER.

Complete 5/19/05 Closure Pkg.

Ready Yes 6/28/93 ltr 7/19/94 ltr SER pending per NRR No original SER for U2/3. TVA response 5/6/04. Included final drywell inspection walkdown.

U3 closed IR 95-60.

13 BU 93-03 Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs SER 4/20/94 DRP-Patterson Open Yes SER 4/20/94 TVA closure ltr See BUL 92-04. Use TI 2515/128 reference.

Verify installation to close. U3 closed IRs 95-31 and 95-56,93-201.

14 BU 95-02 Unexpected Clogging of a RHR Pump Strainer While Operating in Suppression Pool Cooling Mode DRP-Patterson Inspection complete.

To be closed 05-07 pending SER Complete 5/19/05 Closure Pkg.

Ready Yes SER 3/14/96 BU 93-02 SER pending per NRR TVA action due Oct 04.

Was to be addressed for Unit 3 around startup.

Ref needed.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 15 BU 96-03 Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling Water Reactors DRP-Patterson Inspection complete.

To be closed 05-07 pending SER Complete 5/19/05 Closure Pkg.

Ready Yes No SER BU 93-02 SER pending per NRR 11/15/99 NRC letter completed review for U 2,3.

16 GL 82-33 Instrumentation to Follow the Course of an Accident -

R.G. 1.97 SER 2/8/90 DRS-Mellen, Peabody Inspection completed 7/05. To be closed in IR 05-07.

Open Yes SER 2/8/90 5/10/91 5/3/94 11/19/04 update letter for neutron monitoring U3 closed IRs 90-32,93-201, 95-39. TVA closure due Jan 06.

Ref.TI 2515/87. NRR reviewing an amendment involving a proposed upgrade to the neutron monitoring system.

17 GL-83-08 Modification of Vacuum Breakers on Mark 1 Containments DRP-Bearden 05-06C Closed 5/19/05 Yes TVA submittal required upon completion Ref. TI 2515/096, TVA action due Mar 06.

88-19. NRC letter 11/25/86 for all three units.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 18 GL 83-28 Salem ATWS

-Item 1.2 Trip Review

-Item 4.5.2 Periodic On-Line Testing

-Item 4.5.3 Intervals for On-Line Testing DRP-Patterson Open Yes Multiple SERs 8/17/90 9/2/86 10/27/86 3/23/88 6/1/89 5/1/89 9/2/86 6/12/85 6/17/85 TI 2515/064 & TI 2500/020 A-9, TVA action due Mar 06. Note 2500/20 is a TI requiring inspection.

Item 1.2 Trip review remains open.

19 GL 87-02 Verification of Seismic Adequacy of Mechanical and Electrical Equipment In Operating Reactors DRS-Vias Open Yes SER 3/21/2000 Yes, NRR SE required TVA action due Mar 06.

Related to USI A-46.

Status in 04-06, E1.3.

Program submittal 10/7/2004. No U2,3 ref Insp. planned 8/05.

20 GL 88-01 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping SER 12/3/93 DRS-Fuller Open Yes Yes, NRR SE required IR 95-44, TVA action due Apr 05. See Special program.

Insp. planned 8/05.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 21 GL 88-11 Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations SER 6/29/89 NRR/Shaeffer, NRR to review TS 293 to determine U1 impact, any RAI.

Complete Yes 6/29/89 No NRR determined issue closed.

NRC to TVA 1/8/93 letter regarding PT curve change, TVA considers complete with issuance of TS 293. NRR to confirm.

22 GL 88-14 Instrument Air Supply System Problems Affecting Safety Related Equipment SER 5/9/89 DRP-Patterson Open Yes 5/9/89 ltr No IRs 95-38, 95-56, TVA action due Mar 06.

23 GL 88-20 Sup4 Individual Plant Examination of External Events for Severe Accident Vulnerabilities DRS-Bernhard Open Yes No Yes See Special Program -

PSA. Initial IPE was U2, then multi-plant was U2/3. TVA letter 1/14/05 indicating complete.

SRI to Evaluate U1 operational risk addition.

24 GL 89-06 Safety Parameter Display System SER 2/5/92 DRS-Lea Open Yes April 06 Yes No See TMI item 1D.2 25 GL 89-08 Erosion/Corrosio n-Induced Pipe Wall Thinning DRP-Bearden Open Yes May 06 8/21/89 ltr Unit 3 closed IR 95-41.

Insp. Planned 1/06.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 26 GL 89-10 Safety-Related Motor-Operated Valve Testing and Surveillance NRR/

DRP-Shaeffer Several GL89-10 mods reviewed in 04-09, not closed Open Yes May 06 No SER Closeout via inspection TI 2515/109 Propose NRR Onsite review/Scarborough.

27 GL 89-13 Service Water System Problems Affecting Safety Related Equipment DRS-Maymi Open Yes SER 4/23/90 TVA submittal -

notification of action completion TI 2515/118, and TI 2515/159 as ref. TVA action due Mar 06. U3 -

95-23. Insp. Planned 5/15/06. Adequate resources to complete in combination with heat sink?

28 GL 89-16 Installation of a Hardened Wetwell Vent SER 8/16/91 DRP-Shaeffer 05-06C Open per 2/18/05 restart Ltr Yes SER 8/16/91 No TI 2515/121, TVA action due Mar 06. U3 95-38, 95-56.

29 GL 92-01 Reactor Vessel Structural Integrity NRR DRP/Shaeffer Complete-Package available Yes No SER NRR to issue closure ltr.

-TVA to NRC 5/23/94 letter, TVA will inform NRC of the applicability of NEDO 32205 within 90 days of the final surveillance capsules analysis report. 7/07/99 letter closed for U 2,3.

Inspection planned 9/05.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 30 GL 92-04 Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs SER 3/25/93 DRP-Patterson Complete Yes SER 3/25/93 No IR 93-16, see IEB 93-03,

-Long term actions were addressed as part of the resolution of Bulletin 93-

03. TI 2515/119 ref. U2 93-16. NRC 3/25/93 letter found acceptable for all three units - verify.

31 GL 94-02 Long-Term Solutions and Upgrade of Interim Operating Recommendation s for Thermal-Hydraulic Instabilities in BWRs DRS-E. Lea Open Yes No SER Yes U3 - IR 94-11, 95-62.

Ref TI 2515/119. Need SER to enable TVA to submit TS change on GE topical.

32 GL 94-03 Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs DRS-Fuller Open Yes SER 1/13/95 No U3 - IRs 94-16, 95-44 TVA action due Aug 05 See SP #18.

33 GL 95-07 Pressure Locking and Thermal Binding of Safety-Related and Power-Operated Gate Valves DRP-Patterson Open Yes SER 6/23/99 HQ

Response

No TVA action due May 06 Lic. Response 5/11/04, 7/29/04. NRC HQ Ltr/SE 1/28/05 closed.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 34 GL 96-01 Testing of Safety-Related Logic Circuits DRS EB1-C.

Smith (S.

Walker)

Open Yes No SER No Inspection planned 12/5/05 and 1/9/06. TVA action due Oct 05.

6/28/99 completion letter for Units 2,3. IR 98-03, 98-05, 98-07, 98-09.

35 GL 96-05 Periodic Verification of Design Basis Capability of Motor Operated Valves DRP-Moore Complete -

Package requested Yes No SER No, closeout via inspection TVA considers complete since the industry program has been completed. Insp.

planned 11/05.

36 GL 96-06 Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions DRS-Vias Open 4/06 Yes No SER HQ

Response

No NRC ltr 2/15/00 closed for all three units, however stated U1 would be revisited. TVA submitted response 5/12/04. NRR letter 2/7/05 said TVA provided acceptable resolution.

37 GL 97-04 Assurance of Sufficient Net Positive Suction for Emergency Core Cooling and Containment Heat Removal Pumps DRP-Patterson Inspection complete.

To be closed 05-07 pending SER Complete-Package available Yes BU 93-02 SER pending per NRR No 6/11/98 Ltr closed for U 2,3. TVA response for U1 5/6/04-TVA considers complete based on Unit 1 EPU application, dtd 6/28/04.

GENERIC COMMUNICATIONS: Bulletins {BU} and Generic Letters {GL}

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREV U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 38 GL 98-01 Readiness of Computer Systems at Nuclear Power Plants DRP-Shaeffer 05-06C Complete-Package available Yes No SER No

- NRC to TVA 10/18/99 letter completed.

39 GL 98-04 Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss of Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Containment DRS-Lenahan Complete-Package available Yes No

-TVA to NRC 5/11/04 letter provided response NRC 11/24/99 Ltr closed for all TVA sites - verify Close with Special Program for Coatings.

THREE MILE ISLAND ACTION ITEMS ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREVU2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 40 I.D.1 Control Room Design Review DRS-Lea Open 3/28/06 Yes SER 10/29/91 Available for inspection 12/05.

41 I.D.2 Safety Parameter Display Console DRS-Lea Open 7/24/06 Yes SER 2/05/92 Available for inspection 12/05.

42 II.B.3 Post-Accident Sampling System DRS-Loo Open 6/28/06 Yes SER 5/27/87 Insp. Planned 1/06.

43 II.E.4.

2.1-4 Containment Isolation Dependability -

Implement Diverse Isolation, containment purge valves DRP-Bearden Open Yes SER 1/6/95 10/3/95 6/24/04 ltr Insp. planned 10/05.

44 II.F.1.2

.C Accident -

Monitoring -

Containment High Range Radiation DRS-Loo Open 5/9/06 Yes SER 1/8/82 Insp. Planned 1/06.

45 II.F.1.2

.D Accident -

Monitoring -

Containment Pressure DRP-Bearden 05-06C Complete-Package available Yes SER 6/16/83

-NRC to TVA 11/8/90 letter closed issue.

46 II.F.1.2

.E Accident -

Monitoring -

Containment Water Level DRP-Bearden 05-06C Complete-Package available Yes SER 6/16/83

-NRC to TVA 12/12/83 letter, TS Amendment 92 closed issue.

THREE MILE ISLAND ACTION ITEMS ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS (Planned)

TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY PREVU2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 47 II.F.2.4 (Generic Letter 84-23) -

Instrumentation for Detection of Inadequate Core Cooling DRP-Patterson Inspection complete.

To be closed 05-07 Open 7/13/05 Closure Pkg.

Ready Yes No SER 48 II.K.3.

13 HPCI/RCIC Initiation Levels DRP-Bearden

Open, 7/17/06 NRC has package Yes SER 9/19/83 TVA will notify upon completion 49 II.K.3.

18 ADS Actuation Modifications DRP-Bearden

Open, 5/21/06 NRC has package Yes SER 5/29/90 50 II.K.3.

27 Common reference level for BWR DRP-Bearden Open No SER 9/19/83 Not on TVA letter, added during Scott's review, see IRs 91-03, 91-10, U3 item closed in IR 95-16, NRR ltr dtd 12/30/82 agreed w/integration into I.D.1 and considered item closed for U1,2,3, TVA action due Oct 05.

51 II.K.3.

28 Qualification of ADS Accumulators DRP-Bearden

Open, 7/5/06 NRC has package Yes SER 5/29/90

MULTI-PLANT ACTIONS (MPA)

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 52 MPA-B011 Flood of equipment important to safety DRP-Carrion No TI 2515/088 Flooding information available in association with MELB reviews.

53 MPA-B041 Fire protection -

Final TS (including SER Sup)

DRS-Fillion No TI 2515/062, ref. Rpts 89-13, 90-06, 90-11 Review during App. R 10/05.

54 MPA-C002 BWR recirc pump trip (ATWS)

DRP-Patterson No TI 2515/095, ref. Rpts 89-35, 95-60.

55 TI 2500/20 Inspection to determine compliance with ATWS Rule 10 CFR 50.62 DRP-Patterson Open Yes SEE GL 83-28. TVA action due Mar 06.

56 TI 2515/111 EDSFI Followup Unit 1 Followup for previously performed electrical distribution inspection DRP-Rudisail No To complete early 06, Review selected EDG/Bus loading calcs similar to U3 closure in 95-60. Request calcs in advance.

57 TI 2515/154 Spent fuel Material Control and Accountability DRP/Bearden 04-08C No

MULTI-PLANT ACTIONS (MPA)

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 58 TI 2515/156 Offsite Power System Readiness DRP/Bearden 04-08C No USI A-44 Station Blackout.

59 TI 2515/157 Mark I and II Containment Operations DRP/Bearden 04-08C No Not applicable to BF1 per Steve Stein.

60 USI A-7 Mark 1 Long-Term Program, NuReg-0661, Supp 1 NRR No TI 2515/85 Torus Integrity SP.

61 USI A-9 ATWS DRP-Patterson No TI 2500/020,SEE GL 83-28, USI A-75.

62 USI A-24 Qualification of Class 1E Safety-Related Equipment DRS-Merriweather No Ref. TI 2515/76.

Review with EQ Special Program 63 USI A-26 Reactor Vessel Pressure Transient Protection NRR No TI 2500/019, Determine if DRP inspection required PT curves/see GL 88-11.

64 USI A-44 Station Blackout DRS-EB1 May 06 No TVA to implement DC power mods. Previously closed for U3 95-16, 95-34, 95-60.

MULTI-PLANT ACTIONS (MPA)

ISSUE DESCRIPTION RESOLVED ON U2-3 (NUREG 1232 VOL. 3 SECTION /

PREV. SER)

NRC INSP LEAD/

ALTERNATE INSP REPORTS

[C-CLOSED]

TVA CLOSURE STATUS TRACKED IN TVA RESTART ISSUES LETTER NRR UNIT 1 COVERED BY U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS 65 USI A-46 Verification of Seismic Adequacy of Mechanical and Electrical Equipment In Operating Reactors DRS-Vias No Discussed in IR 04-06, E1.3 Ref. GL 87-02.

66 USI A-75 MPA-B085, Required Actions on Generic Implications of Salem ATWS Events, Section 1.2, Post Trip Review DRP-Patterson No See USI A-9 Closed U3 in 95-60 GL 83-28.

OTHER MISC ISSUES ISSUE DESCRIPTION NRC INSP LEAD/

ALTERNATE CLOSURE IR NRR UNIT 1 COVERED BY U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS A

New simulator qualification/

Fidelity and Operator staffing Review licensees new simulator to support 3 unit operations. Review Licensed Operator staffing plans.

DRS-OLHPB - J.

Mooreman No. TVA will submit ltr when testing complete.

New simulator construction complete. Pre-op testing began June 05. RII OLB discussed HQs OLB in May 05. No requirement to inspect; however, propose assess performance during Requal. insp. Review any outstanding fidelity issues.

Staffing - As of 7/05, BF has 43 ROs, 48 SROs. Two exams scheduled prior to restart adding 15 RO and 8 SRO (3 are RO upgrades). Initial review indicates this would be adequate for 3 unit operation.

B Lay up inspections DRP-Bearden CLOSED -

Final layup inspection done in 2004, IR 04-06 No open concerns or further actions required.

OTHER MISC ISSUES ISSUE DESCRIPTION NRC INSP LEAD/

ALTERNATE CLOSURE IR NRR UNIT 1 COVERED BY U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS C

In-vessel inspections, core spray UT Full RPV internals and weld inspection done June -

August, 2005 for 10 year ISI DRS - Lesser (Fuller, Crowley, Blake)

N/A N/A Inspection scheduled for 8/1/05 for vessel internals. Subsequent inspection to be scheduled for vessel verticle weld (Late Aug/Sept. 05). Additional focus item - In May 2005, licensee det.

need to seal weld RHR HX after Unit 2 issues. Look at U2/3 review of mod and ISI implications?

DRS inspectors will look at significant portions while DRP/RIs will cover remainder.

D OSTI/ORAT DRP - Bearden/

Shaeffer. Restart Panel to determine best fit and scope.

Recommend reduced scope ORAT.

OPEN, coordinate time with licensee. Could be performed prior to or during restart.

E Common Accident Signal DRP-Bearden No. Lic amendment submitted 3/05.Amendment approved 4/1/04.

No TVA commitment. During U2 restart, condition discovered which could have prevented automatic initiation of RHR and reported via LER 259/88-12. LER was closed for U2 in 89-35 and closed for U3 in 95-58. Mods I/P U1-DCN51016, U2-DCN 51018 (complete), U3 - DCN 51017 OPEN.

F Extended Power Uprate NRR Project Manager New SE OPEN

OTHER MISC ISSUES ISSUE DESCRIPTION NRC INSP LEAD/

ALTERNATE CLOSURE IR NRR UNIT 1 COVERED BY U2-3 SER or HQ LETTER?

NRR NEW SE or TVA SUBMITTAL REQ?

COMMENTS G

Enhanced Restart Monitoring Restart Panel to determine duration. Proposed 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage.

DRP Coordinate.

Focus on BWR Residents and OL examiners for key observations.

Include simulator walkdown for each watchstand.

H License Renewal Application NRR Project Manager New SE OPEN I

Update Maintenance Rule Upon restart, U1 needs to comply with explicit scoping requirements of 50.65(b)

NRR Project Manager/Region II inspection No No SE. Letter from TVA to confirm Unit 1 in compliance with 50.65(b).

Unit 1 currently has a temporary exemption from the Maintenance Rule which expires upon restart per NRC 8/9/99 letter. This area to be inspected for Reactor Oversight Process (ROP) transition and confirmation of Unit 1 Maintenance Rule scoping.

Next inspection schedule for Jan 2007 to include all three units.

J License Amendment 234 Review Improved Standard Technical Specifications NRR Project Manager Yes NRC to confirm License condition ITS. TVA to review TS changes made by License Amendment 234 and any other subsequent TS changes prior to entering Mode that TS applies.

K Turbine Building (TB)

Dynamic Seismic Analysis Confirm seismic demand accelerations for TB NRR Project Manager NRR to review.

License condition. NRC to confirm conclusions in TVA letter dated 9/17/04 for turbine building seismic loading.

E:\\Filenet\\ML052160163.wpd

LIST OF ACRONYMS USED C

Closed CA Corrective Action CFR Code of Federal Regulations EDG Emergency Diesel Generator EOC Extent of Condition Review EOP Emergency Operating Procedure FSAR Final Safety Analysis Report GL NRC Generic Letter IFI NRC Inspector Followup Item IFS Inspector Followup System ILRT Integrated Leak Rate Test (of the Reactor Building)

IR NRC Inspection Report LER Licensee Event Report MPA NRC Multi-Plant Action NRR Office of Nuclear Reactor Regulation OIL Open Item List OP Operating Procedure PM NRR Project Manager PER Problem EvaluationReport QA Quality Assurance RB Reactor Building RG Regulatory Guide RI Resident Inspector SER Safety Evaluation Report SFP Spent Fuel Pool SIMS Safety Issues Management System TIA NRC Task Interface Agreement (between NRC offices)