ML051030213

From kanterella
Jump to navigation Jump to search
Draft - Section B Operating (Folder 2)
ML051030213
Person / Time
Site: Beaver Valley
Issue date: 12/27/2004
From: Hynes C
FirstEnergy Nuclear Operating Co
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
Download: ML051030213 (72)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0071-025-01-013 Task

Title:

Perform Manual MakeuD to the VCT JPM No.: 2005 NRC JPM S8 WA

Reference:

004A4.01 (3.8/3.9) 004A4.07 (3.913.7) 004A4.04 (3.2/3.6)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: X Actual Performance:

Class room Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

. The plant is at 100% power.

RCS boron concentration is 1550 ppm.

The inservice Boric Acid Tank concentration is 7450 ppm VCT level is 22%.

Task Standard: Makeup flow initiated at 75 gpm through the blender Required Materials: None General References : 20M-7.4.N, Blender Manual Makeup Operations, Rev. 4 Handouts: 20M-7.4.N, Blender Manual Makeup Operations, Rev. 4 Initiating Cue: The Unit Supervisor directs you to raise VCT level to 4096 at 75 gpm by performing a manual makeup in accordance with 20M-7.4.N, Blender Manual Makeup Operations. All Initial Conditions are met. The addition is to be batched, therefore the total volume change does not need to be calculated.

Time Critical Task: No Validation Time: 11 minutes BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 Simulator Setup: initialize IC-10.

PW = NJPM To set VCT level to 22%: Set AVCTLIQ = 6720.

Mark inservice BAST placard to 7450 ppm.

Reset Boric Acid and Total Flow Totalizers to ZERO.

BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 (Denote Critical Steps with a check mark)

Performance Step: 1 Obtain the reactor coolant system boron concentration from the (Step IV.A.l) last Chemists analysis.

Standard: No action required per JPM Initial Conditions.

CUE: If asked, inform Candidate that current RCS boron is 1550 ppm.

Comment :

ti Performance Step: 2 Place the Boric Acid Makeup Blender Control switch in the Stop (Step IV.A.2) position. (BB-A).

Standard: Candidate locates and places boric acid makeup blender control switch in Stop.

Standard: Candidate verifies makeup control green light is on.

Comment :

Performance Step: 3 If in Mode 4, 5 or 6, align PG water to the blender by unlocking (Step IV.A.3) and opening one of the following valves:

Standard: No action required. Plant is in Mode 1.

Comment :

BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 4 Performance Step: 4 Place the makeup Mode Selector switch in the Manual position (Step IV.A.4) (BB-A)

Standard: Candidate locates and places mode selector switch in Manual.

Comment :

Performance Step: 5 Set the Total Makeup From Blender Flow Totalizer, to the (Step IV.A.5) desired total volume in gallons of makeup water to be added.

(BB-A)

Standard: Candidate locates and adjusts total makeup from blender flow totalizer to desired value.

NOTE: Batch amounts are set at the operators discretion.

Total volume change is approximately 290 gallons (1% VCT level 16 gallons).

CUE: If necessary, inform the Candidate that the total volume may be set at their discretion.

Comment:

Performance Step: 6 Determine Boric Acid flow from the following calculation:

(Step IV.A.6.a)

Standard: Candidate calculates the required boric acid flow as:

1550ppm X 75gpm

= 15.6gpm 7450 Comment:

BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 4 Performance Step: 7 Set [2CHS*FCV113A] as follows:

(Step IV.A.6.b)

Standard: Candidate calculates the desired flow setpoint as:

15.6gpm

= 3.9 4gPm Standard: Candidate locates and sets 2CHS*FCV113A for the desired flow setpoint: approximately 390 units (? 2 units).

Cornment :

4 Performance Step: 8 Adjust [2CHS*HIC168], Blender Total Flow Auto Setpoint, to the (Step IV.A.7) blender total flow used in Step IV.A.6.

Standard: Candidate calculates the desired setpoint as:

75.Ogpm

= 4.68 16gpm Standard: Candidate locates and sets 2CHS*HIC168 for the value calculated: 468 units ( 2 2 units)

Comment :

4 Performance Step: 9 Adjust [2CHS-FCVl14A] pot setting to the same as (Step IV.A.8) [2CHS*HIC168].

Standard: Candidate locates and sets 2CHS-FCVl14A setpoint for 468 units (+ 2 units).

Comment :

BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 Performance Step: 10 Set Boric Acid Flow To Blender Flow Totalizer, to the total (Step IV.A.9) volume in gallons of boric acid to be added from the following equation:

Standard: Candidate adjusts boric acid flow to blender flow totalizer to the desired value.

28 8ga1, 15.6 gpm x = 59 75 Comment :

Performance Step: 11 Verify the inservice Boric Acid Transfer Pump is in Auto. (BB-A)

(Step IV.A.10)

Standard: Candidate locates and verifies inservice boric acid transfer pump in Auto.

Cornment :

.( Performance Step: 12 Open [2CHS*FCVl13B], Boric Acid Blender Disch To Chg (Step IV.A.11) Pumps. (BB-A)

Standard: Candidate locates and places 2CHS*FCV113B switch in Open Standard: Candidate verifies red open light is on and green closed light is off.

Comment:

BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 Performance Step: 13 Prior to the start of AND at least once every hour during a (Step IV.A.12) reduction in the RCS boron concentration: (Tech. Spec. 4.1 .1.3, 4.9.8.1.b) (N/A if raising or maintaining RCS boron concentration)

Standard: No action required. Step is N/A.

Comment:

4 Performance Step: 14 To initiate makeup, place the Boric Acid Makeup Control switch (Step IV.A.13 & 14) to the Start position. (BB-A)

Standard: Candidate locates and places boric acid makeup control switch in Start.

Standard: Candidate verifies red running light on for the boric acid transfer pump in auto.

Comment:

Performance Step: 15 Verify proper operation at recorder [2CHS-FR113]: (VB-A)

(Step IV.A.15) a. Boric Acid To Blender

b. Total WU Flow From Blender Standard: Candidate locates and verifies 2CHS-FRll3 indicates boric acid flow and total flow to blender of approximately 15.6 gpm and 75 gpm respectively.

Comment :

Terminating Cue: When the Candidate verifies flow to the blender, the evaluation for this JPM is complete.

BVPS-2 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0461-012-01-012 Task Title Locallv Startup a Containment Hvdroaen JPM No.: 2005 NRC JPM P1 Analvzer WA

Reference:

028 Al.01 (3.4/3.8) 028 A4.01 (4.0/4.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq:

Simulated Performance: X Actual Performance:

CIass room Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

.. The plant is in Mode 1.

A containment hydrogen concentration level for containment atmosphere has been requested, in support of an upcoming containment entry.

Task Standard: Containment hydrogen analyzer powered up and sample pump in operation.

Required Materials: None General

References:

20M-46.4.F, Containment Hydrogen Analyzer - Startup, Rev. 4 Handouts: 20M-46.4.FI Containment Hydrogen Analyzer - Startup, Rev. 4 Initiating Cue: The Unit Supervisor directs you to locally startup the Train B hydrogen analyzer using 20M-46.4.F, beginning at Step 3.

Time Critical Task: No Validation Time: 10 minutes BVPS-2 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Open [2HCS*PNL1OOB], Containment H2 Monitoring Control (Step IV.A.3.a) Panel.

Standard: Candidate locates and opens [2HCS*PNL1OOB] (DF SWGR)

Comment:

.( Performance Step: 2 Place the ON/OFF power switch to the ON position.

(Step IV.A.3.b)

Standard: Candidate locates the OFF/ON switch and positions to ON.

CUE: Panel lights are energized.

~.

Comment:

d Performance Step: 3 Place the Pump STOP/RUN/START switch in START. (Switch (Step IV.A.3.c) will return to RUN).

Standard: Candidate locates and places the Pump STOP/RUN/START switch to START and allows it to spring return to RUN.

CUE: The pump RED light is ON.

Comment:

BVPS-2 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 Performance Step: 4 Verify ON the following red lights:

(Step IV.A.3.d)

Standard: 0 Candidate locates and verifies red light SVl LIT 0 Candidate locates and verifies red light SV6 LIT CUE: Both red lights are lit.

Comment:

4 Performance Step: 5 At Control Panel, enter Pre-LOCA heat trace values:

(Step IV.A.4.a - h)

Standard: 0 Enter monitor mode: Press <6>

0 Enter access code: Press<82,ENTER>

0 Select change: Press <3>

0 Select calibration Array 6, Element 18: Press <1618,ENTER>

0 Set Pre-LOCA setpoint to 89.6: Press <896,NXT>

Select change: Press<3>

Select calibration Array 5, Element 18: Press <1 518,ENTEFb Set Pre-LOCA reset to 89.5: Press <895,NXT>

CUE: Acknowledge entries, as performed.

Comment:

BVPS-2 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 Performance Step: 6 If desired, start recorder [2HCS*HR100], Cnmt H2 Concentration (Step IV.A.5) by placing the power switch on the left side of the recorder to ON, (VB-A)

Standard: No action required.

CUE: It is not desired to start the recorder at this time.

NOTE: Recorder is located in the Control Room.

Comment:

Terminating Cue: When the Candidate correctly enters the Pre-LOCA heat trace values, the evaluation for this JPM is complete.

. STOP TIME:

BVPS-2 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0241-054-04-012

-- 0532-010-05-043 Task

Title:

Aliqn Service Water S u ~ p l vto AFW Pumos JPM No.: 2005 NRC JPM P2 WA

Reference:

061 K1.07 (3.6/3.8)

G2.1.30 (3.9/3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is an inadequate core cooling condition. EOP E-1, Loss Of Reactor Or Secondary Coolant is in effect. [2FWE*LI104Al] and

[2FWE*LI104A2], Tk 210 Pri Plt Demin Wtr Stg Level both indicate 20.

Task Standard: Service water aligned to the suction of the AFW Pumps in accordance with EOP Attachment A-1.8.

Required Materials: Keys (Simulated)

General

References:

20M-53A.1 .A-1.8, Makeup To PPDWST [2FWE*TK210], Issue 1C, Rev. 1 Handouts: 20M-53A.1.A-1.8, Makeup To PPDWST [2FWE*TK210], Issue 1C, Rev. 1 Initiating Cue: The Unit Supervisor directs you to supply all three auxiliary feedwater pumps from service water using EOP Attachment A-1.8 beginning at Step 8.

Time Critical Task: No Validation Time: 15 minutes BVPS-2 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 (Denote Critical Steps with a check mark)

START TIME:

Note: In accordance with EOP Attachment A-1.8, the AFW pumps may be aligned in any order. Use of keys for this JPM is simulated.

Performance Step: 1 In the Control Room, verify open or open [2SWS*MOVl03B],

(Step 8.a) Recirc Spray Hxs Serv Wtr Sup Hdr 6 Isol.

Standard: Candidate contacts the Control Room to verify 2SWS*MOV103B in the Open position.

CUE: Control Room reports that 2SWS*MOV1038 is Open.

Comment:

4 Performance Step: 2 With Key SW14, open [2FWE*90], Service Water Supply Valve (Step 8.b.l) to [2FWE*P22], (South SFGDS - 718').

Standard: Candidate locates, unlocks and opens 2FWE'90 CUE: 2FWE*90 is open.

Comment:

.( Performance Step: 3 With Key CRIT/17, close [2FWE*93], Primary DWST Supply (Step 8.b.2) Valve To [2FWE*P22], (South SFGDS - 718')

Standard: Candidate locates, unlocks and closes 2FWE*93.

CUE: 2FWE*93 is closed.

Comment:

BVPS-2 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 Performance Step: 4 Observe AFW pump discharge pressure to ensure proper pump (Step 8.b.3) operation.

Standard: Candidate locates and observes AFW pump discharge pressure CUE: Discharge pressure is normal.

Comment :

4 Performance Step: 5 With Key SW15, open [2FWE*91], Service Water Supply Valve (Step 8.c.l) to [2FWE*P23A], (South SFGDS - 718).

Standard: Candidate locates, unlocks and opens 2FWE*91.

CUE: 2FWE*91 is open.

Comment:

d Performance Step: 6 With Key CRIT/18, close [2FWE*94], Primary DWST Supply (Step 8.c.2) Valve To [2FWE*P23A], (South SFGDS - 718)

Standard: Candidate locates, unlocks and closes 2FWE*94 CUE: 2fWE*94 is closed.

Comment :

BVPS-2 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 Performance Step: 7 Observe AFW pump discharge pressure to ensure proper pump (Step 8.c.3) operation.

Standard: Candidate locates and observes AFW pump discharge pressure CUE: Discharge pressure is normal.

Comment:

4 Performance Step: 8 With Key SW16, open [2FWE*92], Service Water Supply Valve (Step 8.d.l) to [2FWE*P23B], (South SFGDS - 718').

Standard: Candidate locates, unlocks and opens 2FWE*92.

CUE: 2FWE*92 is open.

Comment:

4 Performance Step: 9 With Key CRIT/19, close [2FWE*95], Primary DWST Supply (Step 8.d.2) Valve To [2FWE*P23B], (South SFGDS - 71 8')

Standard: Candidate locates, unlocks and closes ZFWE'95.

CUE: 2FWE*95 is closed.

Comment :

BVPS-2 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 Performance Step: 10 Observe AFW pump discharge pressure to ensure proper pump (Step 8.d.3) operation.

Standard: Candidate locates and observes AFW pump discharge pressure CUE: Discharge pressure is normal.

Comment:

Terminating Cue: When the Candidate verifies pump discharge pressure, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM P2 NUREG 1021, Revision 9

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1

._ Facility: BVPS Unit 2 Task No: 0361-019-01 -013 Task

Title:

BV-2 Actions To Establish Station JPM No: 2005 NRC JPM P3 Blackout Cross-tie to Unit 1 WA

Reference:

055 EA1.06 (4.1/4.5) 055 EA2.03 (3.9/4.7) 055 2.1.30 (3.913.4)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testina:

Simulated Performance: X Actual Performance:

Class room: Simulator: Plant: X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A tornado strike has caused a partial loss of the switchyard. Unit 2 is without normal and emergency AC power. Unit 1 is prepared to

~

cross-tie power from a 4KV bus emergency source.

Task Standard: The station blackout cross-tie has been established in accordance with Attachment A-l.13DF.

Required Materials: Cubicle Pictures General

References:

20M-53A.1 .A-l.l3DF, Actions To Establish BV-1 Cross-tie To B u s 2DF During Station Blackout, Issue 1C, Rev. 1 Handouts: 20M-53A.1 .A-l.13DFfActions To Establish BV-1 Cross-tie To Bus 2DF During Station Blackout, Issue 1C, Rev. 1 Tools: Racking Tool and Gear (Simulated)

Key No. 9 (Simulated)

Initiating Cue: The Unit Supervisor directs you to perform EOP Attachment A-l.l3DF, Steps 7 through 9 to establish a station blackout cross-tie from Unit 1.

All preceding procedure steps have been completed.

Time Critical Task: NO Validation Time: 20 minutes BVPS-2 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-1 JOB PERFORMANCE MEASURE 2005 NRC P3 (Denote Critical Steps with a check mark)

START TIME:

Evaluator Note: Remind Candidate to simulate all actions and NOT to reach inside any switchgear or relay panel cabinets.

Evaluator Note: Relay Panels and Bus UV cubicles are NOT to be opened. Provide Candidates with a picture of cabinet internals at the appropriate steps.

u Performance Step 1: To defeat the 4KV emergency bus undervoltage trip, open 125 VDC (Step 7.a) control breaker Bus UV Cont in Cubicle 2F6 (2DF Bus).

Standard: Candidate locates and opens control breaker.

CUE: 125 VDC control breaker is open.

Comments:

u Performance Step 2: To defeat the 480V emergency bus undervoltage trip, open Knife (Step 7.b) Switch 2-5505 2P Bus UV Potential in Cubicle 2 (2P Bus)

Standard: Candidate locates and opens Knife Switch 2-5505.

CUE: Knife Switch 2-5505 is open.

NOTE: Refer to attached picture.

Comments:

BVPS-2 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 4 Performance Step 3: Open all Bus 2P 480V breakers, except bus feeder breaker (Step 8.a) (Cubicle 38, Transformer 2P)

Standard: Candidate locates and opens all Bus 2P breakers, except the bus feeder breaker using the left trip pushbutton.

CUE: All bus 2P breakers, except the feeder breaker are open.

NOTE: If Candidate attempts to trip breakers using the right Side trip pushbutton, CUE that the breaker did not trip Comments:

4 Performance Step 4: In Cubicle 10A, open 125VDC Bkr Control ACE 1OD to defeat (Step 8.b) automatic start of [2HVC*REF24BJ,CR ACU Refrig Unit.

Standard: Candidate locates and opens 125VDC breaker for ACB1 OD.

CUE: 125VDC breaker ACB 10D is open.

NOTE: Breaker is located in cubicle for ACE 1OA.

Comments :

d Performance Step 5: At 4KV Bus 2D, open [ACB-2D3], 480V Substation 2-2 Bus 2D And (Step 9.a) Tfmr 2-H4 480V Substation 2-4 Bus 2H Breaker.

Standard: Candidate locates and opens ACB-2D3, using control switch or trip lever.

CUE: ACB-2D3 breaker is open.

Comments :

BVPS-2 NRC JPM P3 NUREG-1021. Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 Performance Step 6: Open [ACB-2D6], A/C Chiller [2CDS-CHL23C].

(Step 9.b)

Standard: Candidate locates and opens ACB-2D6 using control switch.

CUE: Breaker ACB-2D6 is open.

Comments:

Evaluator Note: Prior to racking in breaker, Candidate may verbalize obtaining racking gear Candidate may open ACB-2D12 cubicle door to demonstrate actions to be taken, or provide the Candidate with a 4KV breaker diagram (attached).

d Performance Step 7: With Key 10, [2D12] SBO Bkr, remove padlock from [ACB-2D12],

(Step 9.c.l) Unit 1 To Bus 2D Cross-tie.

Standard: Candidate locates ACB-2D12, Unit 1 To Bus 2D Cross-tie.

Standard: Candidate obtains Key No. 10.

CUE: Simulate giving Key No. 10 to Candidate.

Standard: Candidate removes padlock from ACB-2Dl2 using Key 10.

CUE: Padlock is removed.

Comments:

BVPS-2 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3

.u' Performance Step 8: Verify DC Control Power - Off.

(Step 9.c.2)

Standard: Candidate locates and opens DC control power breaker.

CUE: Control power breaker is open.

Comments:

u' Performance Step 9: Verify charging springs are discharged by pulling the manual close (Step 9.c.3, 4 & 5) lever.

Standard: Candidate locates and then holds down the manual trip button.

Standard: Candidate locates and pulls the manual close lever.

Standard: Candidate releases the manual trip button.

CUE: Charging springs are discharged.

Comments:

Performance Step 10: Verify that the breaker mechanical indicator is in the OPEN position (Step 9.c.6)

Standard: Candidate locates and verifies the mechanical flag indicates open.

CUE: Mechanical flag is in the open position.

Comments :

\--

BVPS-2 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 d Performance Step 11: Rack the breaker to the CONNECT position.

(Step 9.c.7)

Standard: Candidate turns the lock release lever to the left, inserts racking tool and turns in the clockwise until reaching the connect position CUE: Breaker is in the connect position.

Comments:

4 Performance Step 12: Close DC control power breaker (Step 9.c.8)

Standard: Candidate locates and closes the DC control power breaker, CUE: DC control power breaker is closed and the closing springs are charged.

Comments:

4 Performance Step 13: Manually close [ACB-2Dl2], Unit 1 To Bus 2D Cross-tie using breaker (Step 9.c.9) control switch.

Standard: Candidate locates and closes ACB-2D12 using the control switch Standard: Candidate verifies red light is on.

CUE: Breaker is closed.

NOTE: Ensure the breaker door is shut and fastened.

Comments:

-- BVPS-2 NRC JPM P3 NUREG-1021 Revision 9

~

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 Terminating Cue: When the Candidate completes the actions to close breaker ACB-2D12, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM P3 NUREG-1021. Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet FaciIity: BVPS Unit 2 Task No.: 001 1-014-01-01 3 0535-006-04-013 Task

Title:

Raise Reactor Power To lo* AmDs JPM No.: 2005 NRC JPM S1 WA

Reference:

001 A2.11 (4.4/4.7) 001 M 1 . 0 5 (4.314.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A reactor startup is in progress in accordance with 20M-50.4.D, Reactor Startup From Mode 3 To Mode 2. The following conditions exist:

a All shutdown bank rods are fully withdrawn.

Control Bank D is at 90 steps.

. The estimated critical position is 101 steps on Control Bank D.

Task Standard: The reactor is tripped in response to inappropriate continuous control rod motion.

Required Materials: Estimated Critical Position & 1/M Plot General

References:

20M-50.4.Q Reactor Startup From Mode 3 To Mode 2, Rev. 43 20M-53C.4.2.1.3, RCCA Control Bank Inappropriate Continuous Movement, Rev. 6 Handouts: 20M-50.4.0, Reactor Startup From Mode 3 To Mode 2, Rev. 43 Estimated Critical Position & 1/M Plot Initiating Cue: The Unit Supervisor directs you to withdraw control rods to criticality in accordance with 20M-50.4.0, Reactor Startup From Mode 3 To Mode 2, beginning at Step IV.D.18.b.

Time Critical Task: NO Validation Time: 15 minutes BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet

~~~

PW = NJPM Select FAST speed on NR-45.

Ensure NR-45 selected to one IR channel.

Block Source Range Flux Doubling (6B-6).

Verify [Al2-3D] & [A12-3E] in alarm.

BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

I NOTE: Provide Candidate with copy of 1/M Plot and ECP. I NOTE: Inform the Candidate, that you will perform any independent verifications that are required by the procedure.

Performance Step: 1 When the Inverse Count Rate Ratio is less than 0.25, reduce rod withdrawal intervals to 25 step increments.

(Step 18.b)

Standard: Candidate initiates rod withdrawal at less than 25 step increments .

CUE: The ICRR is less than 0.25. Withdraw control rods to take the reactor critical.

Comment :

Performance Step: 2 When Annunciator A12-3B, "P6 PERMISSIVE" is ON (1 E-10 AMPS), Block the source range high flux trip by performing the (Step 19.a) following:

a. Record the SR Countrate.

N31 CPS N32 CPS Standard: Candidate locates and records SR counts for N31 and N32.

Comment:

BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION

-.- .( Performance Step: 3 Deenergize the N31 Source Range High Voltage and block the N31 SR High Flux trip by performing the following:

(Step 19.b.l)

1) Momentarily turn the switch, Source Range A Block, to the BLOCK position (BB-B).

Standard: Candidate locates and places SOURCE RANGE TRIP 8LOCW RESET TRAIN A control switch in Block.

Comment:

.I Performance Step: 4 Deenergize the N32 Source Range High Voltage and block the N32 SR High Flux trip by performing the following:

(Step 19.c.l)

1. Momentarily turn the switch, Source Range B Block, to the BLOCK position (BB-B).

Standard: Candidate locates and places SOURCE RANGE TRIP BLOCK/

--- RESET TRAIN B control switch in Block.

Comment:

Performance Step: 5 Check that both source range HV Manual ON/OFF switches are in the NORMAL position.

(Step 19.c.2)

Standard: Candidate locates and checks both source range HV MANUAL CONTROL switches in NORMAL.

Comment:

BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Verify that the detector voltmeter on both source range drawers indicates zero volts.

(Step 19.c.3)

Standard: Candidate locates and verifies Source Range DETECTOR VOLTS indicate zero.

Cornment:

Performance Step: 7 Select both IR range channels to indicate on recorder NR-45.

(Step 20)

Standard: Candidate locates and UPPER 1N45 and LOWER 2N45 to record IR channels N35 and N36.

Comment:

Performance Step: 8 When Tavg is less than 551O F AND the reactor is critical AND IF (Step 21 .a) Annunciator A4-3C, TAVG DEVIATION FROM T R E F comes ON (or becomes OOS), perform the following (TS 4.1 .I .5.b)

(Otherwise N/A):

Verify Tavg is greater than 541OF AND Record the results on Data Sheet 1.

Standard: Candidate locates and verifies 2RCS-TR408 indicates Tavg greater than 541F.

NOTE: Candidate may choose to refer to PVC display to obtain Tavg value.

Standard: Candidate records Tavg value on Data Sheet 1 Comment:

BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 9 Make an entry in the Shift Log stating Verify the lowest Tavg to (Step 21 .b) be greater than or equal to 541F at least once per 30 minutes while the Tavg deviation alarm (A4-3C,TAVG DEVIATION FROM TREF) is NOT reset. Use Data Sheet 1 .

Standard: Candidate initiates SOMS shift log entry.

CUE: Inform the Candidate that Unit Supervisor will make the shift log entry.

Comment:

4 Performance Step: 10 Continue incremented rod withdrawal until the reactor is critical, as indicated by a stable positive startup rate with no rod motion, (Step 22) on the intermediate range instrumentation once the prompt jump has receded.

Standard: Candidate continues withdrawing control rods to obtain a stable startup rate.

CUE: If asked, inform Candidate to withdraw rods at no more than 25 step increments to obtain a stable startup rate.

Comment:

BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION NOTE: The following step begins the alternate path portion of the JPM.

Performance Step: 11 Determine that rods are withdrawing with NO demand signal Standard: Candidate determines from CONTROL BANK D GROUP 1 and GROUP 2 ROD POSITION indication that rods are withdrawing with NO demand signal.

Comment :

Performance Step: 12 Trip the reactor in response to inappropriate continuous rod motion.

(AOP-2.1.3, Step 1 RNO)

Standard: Candidate trips the reactor in response to inappropriate continuous rod motion.

NOTE: Candidate may refer to AOP-2.1.3 and determine that a reactor trip is required based on Step 1 RNO.

Comment :

r Terminating Cue: When the Candidate trips the reactor, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0531-005-05-013 Task

Title:

Perform SI Termination IAW ES-1.1 JPM No.: 2005 NRC JPM S2 KIA

Reference:

E02 EA1.3 (3.W4.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The reactor was tripped and safety injection was actuated due to low L-RCS pressure.

The crew has entered ES-1.1, SI Termination.

Task Standard: High head safety injection is aligned to provide flow to the RCS Required Materials: None General

References:

20M-53A.1.ES-1. I , SI Termination, Issue 1C, Rev. 2 Handouts: 20M-53A.1. E S - l . l , SI Termination, Issue 1C, Rev. 2 Initiating Cue: The Unit Supervisor directs you to perform the steps to terminate safety injection in accordance with ES-1.1, SI Termination.

Time Critical Task: NO Validation Time: 18 minutes BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-192 PW = NJPM Insert the following to increase the RCS leak size when Candidate takes action to stop LHSl pumps:

. IMF RCS02A 2000 30 Trigger xaZi036s = 1 BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

ti Performance Step: 1 Reset SI Candidate locates and depresses SAFETY INJECTION SIGNAL TRAIN A/TRAIN B pushbuttons.

Standard: Candidate verifies A12-1 D resets.

Comment :

.r Performance Step: 2 Reset CIA and CIB (Step 2)

Standard: Candidate locates and depresses

-- - Comment:

Performance Step: 3 Stop all but ONE Charging Pump (Step 3)

Standard: Candidate locates and places 2CHS*P21A or 21 B control switch in Stop.

Standard: Candidate verifies white trip light on and red running light Comment:

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Check RCS Pressure - STABLE or RISING (Step 4)

Standard: Candidate locates RCS pressure indication and verifies stable or rising.

Comment:

Performance Step: 5 Close [2SIS*MOV867Al B, C, D] High Head SI Cold Leg lsol Vlvs (Step 5)

Standard: Candidate locates 2SIS*MOV867Al 6, C, D control switches and places in Close.

Standard: Candidate verifies green close light on and red open light off for each valve.

Comment:

Performance Step: 6 Open [ZCC-AOV118], Domestic Water To Station Air Compressor Valve.

(Step 6.a)

Standard: Candidate locates and opens 2CC-AOV118.

Standard: Candidate verifies red open light on and green closed light off Cornment :

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Close [2CCS-78, 83, 841, Station Air compressor Isolation Valves (Turb Bldg - 730).

(Step 6.b.l)

Standard: Candidate dispatches local operator to close valves.

CUE: 2CCS-78, 83,84 are closed.

Comment:

Performance Step: 8 Open [2CCS-229, 2301, Station Air Compressors Discharge Drain Valves (Turb Bldg - 730).

(Step 6.b.2)

Standard: Candidate dispatches local operator to open valve CUE: 2CCS-229 and 230 are open.

-- Comment :

Performance Step: 9 Check Station Air Compressors - ONE RUNNING.

(Step 7)

Standard: Candidate locates and verifies 2SAS-C21 A or C21B running.

Standard: Candidate verifies red running light on and white trip light off.

Comment:

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Cross-connect station instrument air with CNMT instrument air by opening the following valves:

(Step 8.a)

[2IAC-MOV131]

[21AC*MOV130]

Standard: Candidate locates and opens 2IAC-MOV131 and 2IAC*MOV130.

Standard: Candidate verifies red open light on and green closed light off for each valve.

Comment :

Performance Step: 11 Check CNMT instrument air header pressure - GREATER THAN 85 PSIG.

(Step 8.b)

Standard: Candidate locates and verifies 2IAC-PIl06A indicates greater than 85 psig.

-- Cornment :

Performance Step: 12 Establish Normal Charging Flow (Step 9.a) Close [2CHS*FCV122]

Standard: Candidate locates and closes 2CHSFCV122.

Standard: Candidate verifies green closed light on and red open light off.

Cornment :

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 13 Establish Normal Charging Flow (Step 9.b) Open [2CHS*MOV310]

Standard: Candidate locates and opens 2CHS*MOV310.

Standard: Candidate verifies red open light on and green closed light off Comment :

Performance Step: 14 Establish Normal Charging Flow (Step 9.c) Open [2CHS*MOV289]

Standard: Candidate locates and opens 2CHS*MOV289.

Standard: Candidate verifies red open light on and green closed light off.

Cornment :

Performance Step: 15 Establish Normal Charging Flow (Step 9.d) Adjust [2CHS*FCVl22] to maintain PRZR level.

Standard: Candidate locates 2CHS*FCVl22 controller and opens valve to re-establish charging flow.

Cornment :

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 16 Control Charging Flow to Maintain PRZR Level (Step 10)

Standard: Candidate observes PRZR level indication and adjusts charging flow, as necessary to maintain PRZR level greater than 17%.

Comment :

Performance Step: 17 Stop LHSl Pumps and place in AUTO (Step 11)

Standard: Candidate locates and places 2SIS*P21A and 21 B control switches in Stop, then Auto.

Standard: Candidate verifies white trip light on and red running light off for each pump.

Comment :

Performance Step: 18 Reset SI Recirc Mode (Step 12)

Standard: Candidate locates and depresses SI RECIRC MODE RESET TRAIN NTRAIN B pushbuttons.

Comment:

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 19 Verify SI Flow Not Required (Step 13.a) RCS subcooling based on Core exit TCs - GREATER THAN 41 "F [59"F ADVERSE CNMT]

Standard: Candidate locates PSMS display and verifies subcooling greater than 46°F.

Comment :

Performance Step: 20 Verify SI Flow Not Required (Step 13.b) PRZR level - GREATER THAN 17% [38% ADVERSE CNMT]

Standard: Candidate locates and verifies PRZR level indicates less than 17%.

Comment :

I NOTE: The followinq step beqins the alternate path portion of the JPM. I Performance Step: 21 Control charging flow to maintain PRZR level.

(Step 13.b RNO)

Standard: Candidate locates and adjusts FCV-1CH-122 to restore PRZR level.

Comment:

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-1 PERFORMANCE INFORMATION

.I Performance Step: 22 -

IF PRZR level can NOT be maintained, THEN manually start SI pumps and align valves as necessary. GO TO E-1, Loss Of (Step 13.b RNO)

Reactor Or Secondary Coolant, Step 1 .

Standard: Candidate manually starts SI pumps and aligns valves, as necessary.

NOTE: Candidate may choose to manually re-initiate SI based on SI Reinitiation Criteria on Foldout Page.

Comment:

Terminating Cue: When the Candidate starts the SI pumps manually or re-initiates SI, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 01 11-011-01-013 Task

Title:

Isolate SI Accumulators Durina a LOCA JPM No.: 2005 NRC JPM S3 KIA

Reference:

009 EA1.13 (4.414.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

L-Task Standard: SI Accumulators A and B are isolated. SI Accumulator C is vented.

Required Materials: Shorting Bars (3)

General

References:

20M-53A.1 .ES-1.2, Post LOCA Cooldown and Depressurization, Issue lC,Rev. 3 20M-11.4.G, Venting A Safety Injection Accumulator, Rev. 20 Handouts: 20M-53A.1 .ES-l.2,Post LOCA Cooldown and Depressurization, Issue l C , Rev.

20M-53A.1 .A-5.1, OF Plus Subcooling Based On Core Exit TCs initiating Cue: The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 25.

Time Critical Task: NO Validation Time: 12 Minutes BVPS-2 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-196 PW = NJPM VLV SISOGB BVPS-2 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-1.2: Post LOCA Cooldown and Depressurization.

INITIATING CUE: The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 25.

BVPS-2 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 RCS subcooling based on core exit TCs - GREATER THAN SUBCOOLING LISTED ON ATTACHMENT A-5.1 (Step 25.a)

Standard: Candidate locates PSMS display and verifies RCS subcooling based on core exit TCs is greater than subcooling listed on Attachment A-5.1.

CUE: Provide Candidate with a copy of Attachment A-1.5.

Comment:

Performance Step: 2 PRZR level - GREATER THAN 17OI0 [38% ADVERSE CNMT]

(Step 25.b)

Standard: Candidate locates and verifies PRZR level indication is greater than 17%.

Comment:

Performance Step: 3 Power to [2SIS*MOV865A, B, C] - AVAILABLE (Step 25.c)

Standard: Candidate locates and verifies power available to 2SIS*MOV865A, B and C.

Standard: Candidate verifies red open light on for each valve Comment:

BVPS-2 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 4 Insert shorting bars into jacks for [2SIS*MOV865A, 6, C]

(Step 25.d)

Standard: Candidate locates and inserts shorting bars into jacks for 2SIS*MOV865A9 B and C.

CUE: Provide Candidate with shorting bars.

Comment :

4 Performance Step: 5 Close [2SIS*MOV865A, B, C]

(Step 25.e)

Sta ndar d: Candidate locates 2SIS*MOV865A and B control switches and places in Close.

Standard: Candidate verifies green close light on and red open light off for each valve.

Comment :

4 Performance Step: 6 Close [2SIS*MOV865A, B, C].

(Step 25.e)

Standard: Candidate locates 2SISMOV865C control switch and places in Close.

Standard: Candidate verifies red open light remains on indicating valve NOT closed.

NOTE: Valve is overridden in the Open position.

Comment:

BVPS-2 NRC JPM S3 NUREG 1021. Revision 9

~ ~~ ~~ ~

Appendix C Page 5 of 8 Form ES-C-7 PERFORMANCE INFORMATION NOTE: The followina steD beains the alternate bath Dortion of the JPM.

Performance Step: 7 Vent any unisolated accumulator. Refer to 20M-11.4.G, "Venting A Safety Injection Accumulator".

(Step 25.e. RNO)

Standard: Candidate refers to 20M-11.4.G to vent 2SIS"TK21C CUE: Provide Candidate with a copy of 20M-11.4.G.

CUE: Direct Candidate to use Section B for direct venting to containment.

Comment :

Performance Step: 8 If containment is not under vacuum, close [2SlS*367 (369) (399)]

(Step III.B.l) Accumulator [2SIS*TK21A (B), (C)] Level Isolation to prevent educting liquid into the vent line during venting. (Cnmt 692, 710 by the accumulator) (otherwise N/A).

- Standard: Candidate dispatches local operator to close 2SIS*399.

CUE: Local operator reports 2SIS*399 is closed.

Comment:

Performance Step: 9 Check closed, [2GNS*AOVlOl-l (101 -2), SI ACC Nitrogen (Step 111.8.2) Makeup Outside (Inside) Cnmt lsol Vlv.

Standard: Candidate checks 2GNS*AOVlOl-1 (101 -2) indicate closed.

Standard: Candidate verifies green closed light on and red open light off.

Comment:

BVPS-2 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION

.( Performance Step: 10 Open [2GNSrSOV853A(D) (8538 (E)) (853C (F))] 21 A (B) (C) SI Accumulator Nitrogen Makeup Vlv.

(Step lll.B.3)

Standard: Candidate locates and opens 2GNSSOV853C (F).

Standard: Candidate verifies red open light on and green closed light off.

Comment:

Performance Step: 11 Open [2GNS*SOV854A (854B)I SI Accumulator Vent Vlv until the Accumulator is lowered to the desired value, then close (Step lll.B.4)

[2GNS8SOV854A (854B)l.

Standard: Candidate locates and opens 2GNS*SOV854A (854B) to lower accumulator pressure.

Standard: Candidate verifies 2SIS-PI929 & 931 indicate accumulator pressure is lowering.

Comment:

Terminating Cue: When the Candidate verifies that accumulator pressure is lowering, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 021 1-012-01-013 L 0531 -009-05-011 Task

Title:

Initiate Natural Circulation Cooldown JPM No.: 2005 NRC JPM S4 WA

Reference:

002 A4.02 (4.3145)

EO9 E A l . l (3.513.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq, Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: . The plant has been tripped manually due to a component cooling

.. water problem that required stopping all RCP's.

The plant is now in natural circulation.

. The crew has completed E-0, ES-0.1, and ES-0.2 up to Step 5.

The plant is stable with condenser steam dumps in automatic in the steam pressure mode.

Task Standard: RCS cooldown in progress using residual heat release valve Required Materials: None General

References:

20M-53A.1 .ES-0.2, Natural Circulation Cooldown, Issue 1C, Revision 2 20M-53A.1 .A-4.3 Issue 1C, Revision 2 Handouts: 20M-53A.1 .ES-0.2, Natural Circulation Cooldown, Issue 1C, Revision 2 20M-53A.1 .A-4.3, Initiating Cue: The Unit Supervisor directs you to initiate an RCS cooldown in accordance with ES-0.2, Natural Circulation Cooldown, beginning at Step 5.

Time Critical Task: NO Validation Time: 15 minutes BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-191 PW = NJPM TRGl XC21066H IMF CNH-PCS07A Display Rx Coolant System (Group 301) on PVC terminal and OP LIMITS on SPDS Terminal BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

NOTE: It may be necessary to reduce letdown, manually operate 2CHS*FCV-122 or use a PORV t o control pressure. Also, A R N starts are inhibited, so no actuation will occur if SG levels are low.

Performance Step: 1 Maintain cooldown rate in RCS cold legs - LESS THAN 25"F/HR (Step 5.a)

Standard: No action required.

Comment:

Performance Step: 2 Initiate a trend of RCS cold leg temperature and pressure (Step 5.a.l)

Standard: Candidate initiates a trend of RCS cold leg temperature and pressure.

CUE: Inform Candidate that SPDS has been setup to trend RCS temperature and pressure.

Comment:

Performance Step: 3 Initial every half hour (Step 5.a.2)

Standard: Candidate notes trending frequency requirement NOTE: Inform Candidate that another operator will be responsible for trending and initialing.

Com ment :

BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Maintain RCS temperature and pressure - WITHIN LIMITS OF ATTACHMENT A-4.3 IF AT LEAST TWO CRDM FANS (Step 5.a.3)

RUNNING -OR- WITHIN LIMITS OF ATTACHMENT A-4.2 IF LESS THAN TWO CRDM FANS RUNNING Standard: Candidate locates and verifies at least 2 CRDM fans running Standard: Candidate verifies red running light on and white trip light off for each CRDM fan.

Standard: Candidate refers to Attachment A-4.3 for tempe rature/pressure limits.

CUE: Provide Candidate with a copy of Attachment A-4.3.

Comment :

Performance Step: 5 Maintain S/G narrow range level - BETWEEN 30% and 50%

(Step 5.b)

Standard: No action required.

CUE: Inform Candidate that another operator will be responsible for controlling S/G levels.

Comment:

Performance Step: 6 Check MSlVs - AT LEAST ONE OPEN (Step 5.c.l)

Standard: Candidate locates and verifies at least one MSlV open.

Standard: Candidate verifies red open light on and green closed light off.

Cornment :

BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Check condenser available (Step 5.c.2)

Standard: Candidate locates and checks A1 2-4C, CONDENSER AVAILABLE (2-9) not in alarm.

Comment:

.I Performance Step: 8 Place condenser steam dump in MANUAL (Step 5.c.3)

Standard: Candidate locates and places 2MSS-PK464, MAIN STEAM MANIFOLD PRESS CONTROL in Manual.

Standard: Candidate verifies red light on.

Comment :

Performance Step: 9 Verify demand - ZERO (Step 5.c.4)

Standard: Candidate locates and verifies 2MSS-PK464 demand indicates zero.

Comment :

BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Place steam dumps in STM PRESS Mode.

(Step 5.c.5)

Standard: No action required per JPM Initial Conditions.

Com ment :

Performance Step: 11 Check Tavg - GREATER THAN 541QF (Step 5.c.6)

Standard: Candidate locates and checks status lights A-1 1, B-11, C-1 1, RCS LOOP A (B) (C) LO-LO TAVG INTERLOCK (Panel 18)

NOT on.

Comment :

I/ Performance Step: 12 Gradually raise steam dump rate.

(Step 5.c.7)

Standard: Candidate locates 2MSS-PK464 controller and depresses raise pushbutton to open steam dump valves.

Standard: Candidate determines that steam dump valves do NOT open NOTE: Candidate may attempt to open steam dump valves in AUTO. If so, valves will NOT open.

NOTE: Steam dump controller is overridden to prevent dump valves from opening.

CUE: As the Unit Supervisor, acknowledge steam dump failure and direct Candidate to use 2SVS*HCV104 to dump steam.

Comment :

BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION NOTE: The following step begins the alternate path portion of the JPM.

Performance Step: 13 Manually or locally dump steam using:

(Step 5.c RNO) SG Atm Stm Dump Valves - 0 R -

Residual Heat Release Valve Standard: Candidate locates 2SVS*HCVlO4, Residual Heat Release Valve and depresses raise pushbutton to open valve.

Standard: Candidate verifies valve open indication.

CUE: As the Unit Supervisor, direct the Candidate to use the RHR valve to continue the cooldown.

Comment:

Terminating Cue: When the Candidate initiates a cooldown using the RHR valve, the evaluation for this JPM is complete.

STOP TIME:

BVPS NRC JPM S4 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet FaciI it y : BVPS Unit 2 Task No.: 001 1-006-01-013 Task

Title:

Manuallv Actuate CIB JPM No.: 2005 NRC JPM 55 WA

Reference:

026 A2.03 (4.114.4) 026 A2.04 (3.9/4.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinqL Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A reactor trip and safety injection have occurred due to a large break LOCA.

The actions of E-0 are being performed.

Task Standard: Manually initiate CIB, start 2QSS-P-21A & 21 B, and stop the RCPs.

Required Materials: None General

References:

20M-53A.1.A-0.11, Verification Of Automatic Actions, Issue 1C, Revision 3 20M-53A.1 .A-0.5, Containment Isolation Phase B Checklist, Issue 1C, Rev. 1 Handouts: 20M-53A.1 .A.O-11, Verification Of Automatic Actions, Issue 1C, Revision 3 20M-53A.1.A-0.5,Containment Isolation Phase B Checklist, Issue 1C, Rev. 1 Initiating Cue: The Unit Supewisor directs you to perform Attachment A-0.11, Verification Of Automatic Actions, Step 7 to check CIB and Containment Spray status.

Time Critical Task: NO Validation Time: 10 minutes BVPS NRC JPM S5 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-184 PW = NJPM Enter IMF PPL07A = 6 Enter IMF PPLO7B = 6 Enter BST-PCS048 Inhibited Enter BST-PCS049 Inhibited Enter BST-PCS052 1nhi bit ed Enter BST-PCS055 Inhibited BVPS NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Check CIB and Containment Spray Status (Step 7) Containment pressure - HAS REMAINED LESS THAN 8 PSlG Standard: Candidate checks A1 -2H CONTAINMENT ISOLATION PHASE B in alarm.

Standard: Candidate locates 2LMS*PR950, Containment Pressure Recorder and determines that containment pressure has NOT remained less than 8 psig.

NOTE: Containment pressure is > 8 psig.

Comment:

NOTE: The followina steD beains the alternate Dath Dortion of the JPM.

Performance Step: 2 Verify CIB initiated:

(Step 7.a RNO) Check BLUE CIB marks - LIT Standard: Candidate checks components properly aligned and determines CIB components not positioned as required, and CIB NOT actuated.

Cornment :

BVPS NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 3 Verify CIB initiated:

(Step 7.a RNO) IF NOT, THEN manually initiate CIB (both switches for both trains). Check BLUE CIB marks - LIT Standard: Candidate locates and positions both switches to actuate Train A C I6.

Standard: Candidate locates and positions both switches to actuate Train B CIB.

NOTE: Candidate may actuate either train first followed by the opposite train.

Cornment :

Performance Step: 4 Verify CIB initiated:

(Step 7.a RNO) IF CIB NOT actuated, THEN manually align equipment. If necessary, refer to Attachment A-0.5, Containment Isolation Phase B Checklist.

NOTE: If requested, provide Candidate with a copy of Attachment A-0.5.

Standard: Candidate checks all indicating lights with BLUE CIB marks LIT NOTE: The following components with BLUE CIB marks do not actuate on CIB and will not be LIT:

2QSS-PZ4, Chemical Injection Pump 2QSS-SV-1OOA, Chem Injection Pump Discharge To CNMT Sump 2QSS-SV-1008, Chem Injection Pump Discharge To CNMT Sump BVPS NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION

.I Performance Step: 4 Verify CIB initiated:

(Step 7.a RNO cont.) -

IF CIB NOT actuated, THEN manually align equipment. If necessary, refer to Attachment A-0.5, Containment Isolation Phase 6 Checklist.

Standard: Candidate determines 2QSS*P21A & 21 B, Quench Spray Pumps not running.

Standard: Candidate locates and places 2QSS*P21A & 21 B control switches in Start.

Standard: Candidate verifies red running light on and white trip light off for each pump.

Standard: Candidate verifies 2QSS*PIlOl A & B indicate discharge pressure.

Standard: Candidate verifies 2QSSI121 A 8 B indicate motor amps Cornment :

.I Performance Step: 5 Verify CIB initiated:

(Step 7.RNO b) Stop all RCPs Standard: Candidate determines that all RCPs are running.

Standard: Candidate locates and places control switches for 2RCSP21 A, 21 B and 21 C in Stop.

Standard: Candidate verifies white trip light on and red running light off for each pump.

Comment :

Terminating Cue: When the Candidate stops the RCPs, the evaluation for this JPM is complete.

STOP TIME:

BVPS NRC JPM S5 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 2 Task No.: 0362-005-06-013 Task

Title:

Svnchronize and Load EDG 2-1 JPM No.: 2005 NRC JPM S6 KIA

Reference:

064 A4.06 (3.913.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is operating at 100% power. 20ST-36.1, Emergency Diesel Generator [2EGS*EG2-1] Monthly Test is in progress.

Task Standard: 2-1 diesel generator synchronized and running at minimum load.

Required Materials: None General

References:

20ST-36.1, Emergency Diesel Generator [2EGS*EG2-1] Monthly Test Rev. 44 Handouts: 20ST-36.1, Emergency Diesel Generator [ZEGS*EGZ-l] Monthly Test Rev. 44 Initiating Cue: The Unit Supervisor directs you to synchronize and load EDG 2-1 in accordance with 20ST-36.1, Emergency Diesel Generator [ZEGS"EG2-1]

Monthly Test, Steps 25 - 33. All of the preceding procedure steps have been completed.

Time Critical Task: NO Validation Time: 15 minutes BVPS-2 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: initialize IC-183 PW = NJPM Place Synchroscope Power Control Switch to ON (Located behind VB-C)

Ensure correct Synch Selector Switch I

handle for EDG is in its NSA position.

BVPS-2 NRC JPM S6 NUREG 1021. Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

4 Performance Step: 1 Position the 2-1 EMERG GEN SYNCHRONIZING SELECTOR switch to the BUS 2AE position (BB-C).

(Step 25)

Standard: Candidate locates and places 2-1 EMERG GEN SYNCHRONIZING SELECTOR in 2AE position.

Comment :

Performance Step: 2 Adjust EDG speed using the 2-1 EMERG GEN GOVERNOR switch (BB-C) UNTIL the EDG 2-1 Synchroscope needle is (Step 26) rotating slowly in the FAST direction (VB-C).

Standard: Candidate locates and adjusts 2-1 EMERG GEN GOVERNOR control switch.

-- Standard: Candidate verifies synchroscope needle is rotating slowly in the fast direction.

Comment:

4 Performance Step: 3 Ensure 2-1 EMERGENCY GENERATOR VOLTAGE REGULATOR control switch is in AUTO the position (BB-C)

(Step 27)

Standard: Candidate locates and verifies 2-1 EMERGENCY GENERATOR VOLTAGE REGULATOR control switch in AUTO.

Comment :

BVPS-2 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Record voltage reading from 2-1 EMERG GEN Voltmeter (BB-C)

(Step 27.a)

Standard: Candidate locates and records 2-1 EMERG GEN voltage.

Comment:

Performance Step: 5 Record voltage reading from 41 60V BUS 2AE Voltmeter (VB-C)

(Step 27.b)

Standard: Candidate locates and records 41 60V BUS 2AE voltage.

Comment:

Performance Step: 6 If aligned to the SSST, Place Bus 2A Load Tap Changer in MANUAL. (Otherwise N/A).

(Step 28)

Standard: No action required per JPM Initial Conditions Comment:

BVPS-2 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION

- 4 Performance Step: 7 Using the 2-1 EMERG GEN VOLTAGE ADJUST switch, match EDG voltage with the voltage on Bus 2AE, & 1 volt.

(Step 29)

Standard: Candidate locates and adjusts 2-1 EMERG GEN VOLTAGE ADJUST switch to match voltages.

Standard: Candidate verifies incoming and running voltages indicate approximately 120 - 122 volts.

Cornment :

4 Performance Step: 8 Place the 2-1 EMERG GEN MTR OPERATED GND DISCONNECT switch in the CLOSE position. Before releasing the (Step 30) switch, verify that the green light goes out AND the red light is lit (VB-C).

Standard: Candidate locates and closes 2-1 EMERG GEN MTR OPERATED GND DISCONNECT switch.

Standard: Candidate verifies red close light on and green open light off Cornment :

Performance Step: 9 When both synchronizing lights are completely dark AND the synchroscope needle is at the 12 oclock position, place 2-1 (Step 31 .a)

Emergency Generator Output Breaker ACB 2E10 control switch in the CLOSE position.

Standard: Candidate locates and places 2-1 Emergency Generator Output Breaker ACB 2E10 control switch in Close at 12 oclock position.

Comment:

BVPS-2 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 When the red light above the switch turns ON, release the switch (BB-C).

(Step 31 .b)

Standard: Candidate locates and releases 2-1 Emergency Generator Output Breaker ACB 2E10 control switch when red light is on.

Standard: Candidate verifies red close light on and green open light off Comment:

.I Performance Step: 11 Increase the load to on EDG 2-1 to approximately 450 Kw as follows:

(Step 32)

Load the EDG to approximately 450 Kw by moving the 2-1 EMERG GEN GOVERNOR control switch intermittently to RAISE.

Standard: Candidate locates 2-1 EMERG GEN GOVERNOR control switch and places in the Raise position.

Comment:

.( Performance Step: 12 Increase the load to on EDG 2-1 to approximately 450 Kw as follows:

(Step 32)

Observe increasing indications on the EDG 2-1 Wattmeter (VB-C) and Ammeter (BB-C) while increasing load.

Standard: Candidate verifies 2-1 EMERGENCY GENERATOR WATTS indicates increasing Kw.

Standard: Candidate verifies 2-1 EMERGENCY GEN 4KV BUS 2AE AMPS indicates increasing load.

Comment:

BVPS-2 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION

\.

Performance Step: 13 Place the 2-1 EMERG GEN SYNCHRONIZING SELECTOR switch in the OFF position.

(Step 33)

Standard: Candidate locates and places 2-1 EMERG GEN SYNCHRONIZING SELECTOR in Off.

Comment:

Terminating Cue: When the Candidate turns the synchroscope selector switch off, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet L-Facility: BVPS Unit 2 Task No.: 0021 -004-01-013 Task

Title:

Remove Power Ranae Instrument From JPM No.: 2005 NRC JPM S7 Service WA

Reference:

015 A3.03 (3.9/3.9) 015 A4.03 (3.813.9)

Examinee: NRC Examiner:

Facility Evaluator Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is operating at power All systems are normal with the exception of one Power Range Nuclear Instrument which has failed.

The required actions to stabilize the plant have been taken. Reactor, turbine power and TAVG are stable. TAVG is within one degree of TEF.

Control Rods are in Manual.

Task Standard: The failed nuclear channel is bypassed in accordance with AOP-1.2.1C Required Materials: None General

References:

20M-53C.4.2.2.1C, Power Range Channel Malfunction, Issue 1A, Rev. 6 Handouts: 20M-53C.4.2.2.1C, Power Range Channel Malfunction, Issue 1A, Rev. 6 Initiating Cue: The Unit Supervisor directs you to bypass the failed power range channel using AOP-2.2.1C and report when completed.

Time Critical Task: NO Validation Time: 10 Minutes BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-I Worksheet Simulator Setup: Initialize IC-182 PW = NJPM IMF NIS03A 0 c

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Check If Malfunction Of One Power Range Channel (N-41, N-42, N-43, N-44) Has Occurred.

(Step 1)

Standard: Candidate locates and determines that 2NMP-N141B and/or NIS Rack N41, drawer A indicates channel has failed.

Standard: Candidate verifies that no other power range channel has failed.

NOTE: Power Range channels read as follows:

N-41: 0%

N-42: 48%

N-43: 48%

N-44: 40%

Comment:

Performance Step: 2 E Power Range Channel 4 (N-44) fails, THEN perform the following:

(Step 1. b . l )

Place Control Rod Group Selector switch in MAN.

Standard: No action required.

NOTE: Candidate may choose to verify that Control Rod Group Selector switch is in Manual.

Comment :

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 3 E Power Range Channel 4 (N-44) fails, THEN perform the following:

(Step 1 .b.2)

Place [2FWS*FCV479,489,499], 21A (B) (C) SG Feedwater Bypass Control Vlvs in MANUAL.

Standard: No action required.

NOTE: Candidate may choose to verify that 2FWS*FCV479,489,499 are in Manual.

Comment :

4 Performance Step: 4 At NIS Rack N50, Detector Current Comparator, turn Rod Stop Bypass Switch to BYPASS on the failed channel.

(Step 1.c)

Standard: Candidate locates and places rod stop bypass switch in Bypass PR N-41 position.

Comment:

Performance Step: 5 Verify appropriate Status Light, Overpwr Rod Stop Bypass (Status Light Panel 308, A-14, B-14, C-14, D-14) - LIT FOR (Step 1.c.l)

FAILED CHANNEL Standard: Candidate locates and verifies A-14 status light on.

Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Check reactor power - GREATER THAN 50%

(Step 1.d)

Standard: Candidate locates and verifies reactor power indicates less than 50%.

Comment :

.I Performance Step: 7 At NIS Rack N37/N46, Comparator and Rate, turn Comparator Channel Defeat Switch to failed channel.

(Step 1 . g )

Standard: Candidate locates and places comparator channel defeat switch in N41 position.

Comment:

Performance Step: 8 Ensure vertical board recorders are selected to monitor only operable detectors.

(Step 1.g>

Standard: Candidate locates and places NIS RECORDER SELECTOR UPPER 1N45 or LOWER 2N45 in N42, N43, or N44 position NOTE: Normally, only 1 recorder is set to monitor power range indication.

Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 9 Report task complete to the Unit Supervisor.

Standard: Candidate reports Power Range Channel N-41 is bypassed NOTE: As Unit Supervisor, acknowledge report that channel is bypassed.

Corn ment :

Terminating Cue: When the Candidate selects an operable recorder to the detector, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9