ML050400114

From kanterella
Jump to navigation Jump to search

Technical Specification Page, System Bypass Leakage Acceptance Criterion
ML050400114
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/07/2005
From:
NRC/NRR/DLPM
To:
Peters S, NRR/DLPM, 415-1842
References
TAC MC5833
Download: ML050400114 (1)


Text

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.11 Ventilation Filter Testina Program (VFTP) (continued)

ESF Ventilation System Penetration Flowrate Annulus Ventilation (Unit 1) <1% 9000 cfm Annulus Ventilation (Unit 2) < 0.05% 9000 cfm Control Room Area Ventilation < 0.05% 6000 cfm Aux. Bldg. Filtered Exhaust (Unit 1) <1% 30,000 cfm Aux. Bldg. Filtered Exhaust (Unit 2) < 0.05% 30,000 cfm Containment Purge (non-ESF) (2 fans) <1% 25,000 cfm Fuel Bldg. Ventilation (Unit 1) <1% 16,565 cfm Fuel Bldg. Ventilation (Unit 2) < 0.05% 16,565 cfm

b. Demonstrate for each of the ESF systems that an Inplace test of the charcoal adsorber shows the following penetration and system bypass when tested In accordance with Regulatory Guide 1.52, Revision 2, and ANSI N510-1980 at the flowrate specified below +/- 10%.

ESF Ventilation System Penetration Flowrate Annulus Ventilation (Unit 1) <1% 9000 cfm Annulus Ventilation (Unit 2) < 0.05% 9000 cfm Control Room Area Ventilation < 0.05% 6000 cfm Aux. Bldg. Filtered Exhaust (Unit 1) <1% 30,000 cfm Aux. Bldg. Filtered Exhaust (Unit 2)* < 0.05% 30,000 cfm I Containment Purge (non-ESF) (2 fans) <1% 25,000 cfm Fuel Bldg. Ventilation (Unit 1) <1% 16,565 cfm Fuel Bldg. Ventilation (Unit 2) < 0.05% 16,565 cfm

c. Demonstrate for each of the ESF systems that a laboratory test of a sample of the charcoal adsorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows the methyl Iodide penetration less than the value specified below when tested in accordance with ASTM D3803-1989 at a temperature of s 30°C and greater than or equal to the relative humidity specified below.

ESF Ventilation System Penetration RH Annulus Ventilation <4% 95%

Control Room Area Ventilation < 0.95% 95%

Aux. Bldg. Filtered Exhaust <4% 95%

Containment Purge (non-ESF) <6% 95%

Fuel Bldg. Ventilation <4% 95%

  • The Penetration bypass acceptance criteria for the charcoal adsorber for the 2B ABFVES train Is changed to 0.20%. This will remain In effect until the next Unit 2 refueling outage In the spring of 2006.

(continued)

Catawba Units 1 and 2 5.5-14 Amendment Nos. 213