Other: ML043230163, ML043500645, ML043510279, ML043650296, ML050050111, ML050050112, ML050050116, ML050050470, ML050060022, ML050060025, ML050060041, ML050060054, ML050060074, ML050060110, ML050060114, ML050060252, ML050060256, ML050060384, ML050060387, ML050120303, ML050140232, ML050140236, ML050140245, ML050140247, ML050140253, ML050140298
|
MONTHYEARML0500600411995-12-26026 December 1995 H-1-BB-MEE-1050 Hope Creek Recirculation System Large Bore Pipe Cracking Resolution, 12/26/1995 Project stage: Other ML0501402362002-07-12012 July 2002 Reactor Coolant Pump Shaft Cracking, July 12, 2002 Project stage: Other ML0500600252003-04-15015 April 2003 CR 70029861 Hope Creek 'B' Recirculation Pump Excessive Seal Leakage Condition Report, 03/01/2003 Project stage: Other ML0501402982003-05-0707 May 2003 Drawing 1 of 2, M-43-1 P&Id, Reactor Recirculation System Project stage: Other ML0501402532004-04-29029 April 2004 HC-04Q-301 Hope Creek Extended Power Uprate Piping Vibration Monitoring, 4/29/2004 Project stage: Other ML0500603842004-09-0707 September 2004 C-0031 Piping Code Compliance, 9/7/2004 Project stage: Other ML0500600542004-10-19019 October 2004 Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004 Project stage: Other ML0501402472004-10-26026 October 2004 Flowserve RAL-7483 Rev 0 Design Modification Report Assy 93-14347, 10/26/2004 Project stage: Other ML0501402452004-10-26026 October 2004 Flowserve RAL-7482 Rev 0 Design Modification Report Assy 93-15122, 10/26/2004 Project stage: Other ML0500603872004-10-29029 October 2004 H1BC-1-BC-V183 (CR 20208920) Handwheel Operator Spins Freely, 11/08/2004 Project stage: Other ML0500501122004-10-30030 October 2004 HC.OP-SO.BB-0002(Q) Rev 50A Reactor Recirculation System Operating Procedures, 10/30/2004 Project stage: Other ML0500501162004-10-30030 October 2004 HC-OP-AR.ZZ-0008(Q), Rev 25A, Overhead Annunciator Window Box C1, Operations Alarm Response Procedure, 10/30/2004 Project stage: Other ML0500600742004-11-0303 November 2004 Structural Integrity Associates, Inc. HC-06-301 Hope Creek Recirculation System Vibration Testing (Vtd 326747) 11/03/2004 Project stage: Other ML0432301632004-11-18018 November 2004 Expected Task Interface Agreement to Review 'B' Recirculation Pump High Vibration Report Project stage: Other ML0500601102004-12-10010 December 2004 Design Change Package 80062466 Revision 2 Extended Power Uprate Piping Vibration Monitoring Installation Package, 12/10/2004 Project stage: Other ML0500501112004-12-12012 December 2004 H-1-FD-CEE-1879, Hope Creek HPCI Exhaust Piping Supports Analysis Reported Damage in RF12. Project stage: Other ML0501402322004-12-12012 December 2004 H-1-BB-MEE-1878, Rev 0, Hope Creek 'B' Recirculation Pump Vibration Analysis, 12/12/2004 Project stage: Other ML0434801642004-12-13013 December 2004 Questions Regarding 'B' Recirculation Pump High Vibrations and High Pressure Coolant Injection System Exhaust Damage Project stage: Request ML0500504702004-12-16016 December 2004 H-1-BB-MEE-1878, Hope Creek 'B' Recirculation Pump Vibration Analysis, Revision 1 Project stage: Other ML0435006452004-12-16016 December 2004 Pseg'S Preliminary Responses to NRC Staff Questions Regarding 'B' Recirculation Pump Vibration Project stage: Other ML0435102792004-12-16016 December 2004 PSEG Preliminary Responses to NRC Staff Questions Project stage: Other ML0502100682004-12-17017 December 2004 Hope Creek Generating Station - Summary of Meeting with PSEG to Discuss B Recirculation Pump High Vibrations (TAC MC5111), Attendance Sheet Project stage: Meeting ML0500601142004-12-23023 December 2004 Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004 Project stage: Other ML0436502962004-12-30030 December 2004 Public Availability and Docketing of Documents Project stage: Other ML0500600222004-12-30030 December 2004 'B' Recirculation Pump Stuffing Box Measurements Summary Project stage: Other ML0500602522004-12-30030 December 2004 Summary of Hope Creek Vibration Issues and Planned Actions Project stage: Other ML0500602562004-12-30030 December 2004 'B' Reactor Recirculation Pump Vibration Troubleshooting Summary Project stage: Other ML0501202552005-01-12012 January 2005 Response to Task Interface Agreement - TIA 2004-006, Request for Evaluation of Sargent and Lundy Report on Hope Creek 'B' Reactor Recirculation Pump and PSEG Nuclear LLC Evaluation of High Pressure Coolant Injection System Exhaust Snubbers Project stage: Acceptance Review ML0501203032005-01-12012 January 2005 Flowserve Response to NRC Questions Station 'B' Recirculation Pump Project stage: Other ML0500301602005-01-19019 January 2005 Hope Creek Generating Station - Summary of Meeting with PSEG to Discuss B Recirculation Pump High Vibrations Project stage: Meeting 2004-12-10
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24068A0742024-03-13013 March 2024 Summary of February 27, 2024, Pre Submittal Public Meeting with Pseg Nuclear Llc to Discuss Future Amendment Regarding Improved Technical Specification Conversion ML24068A0862024-03-13013 March 2024 February 27, 2024, Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Future Amendment Regarding 24 Month Fuel Cycle and Surveillance Interval Extension ML23300A0382023-11-0101 November 2023 Summary of Hope Creek Oct 24, 2023, Pre Submittal Public Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Improved TS Conversion 24 Month Fuel Cycle & Surveillance Interval Extension & Safety Relief Valve Lift Setpoint C ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23146A1012023-05-31031 May 2023 Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Sites Exclusion Area Boundary ML22325A3052022-11-22022 November 2022 Summary of November 17, 2022, Pre Submittal Public Meeting with PSEG Nuclear LLC to Discuss Threshold Determination on Transferring Ownership of Portions of the Site ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21092A1502021-04-15015 April 2021 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss License Amendment Regarding Ultimate Heat Sink Technical Specification Changes ML21064A0962021-03-0909 March 2021 Summary of 3/4/2021 Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Adoption of ASME Section XI Code Cases N-878, N-879, and N-880 at Hope Creek Generating Station and Salem Nuclear Generating Station ML20308A3692020-11-19019 November 2020 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Replacement of Source and Intermediate Range Neutron Monitors with Numac Wide Range Neutron Monitoring System ML19317E6762019-11-26026 November 2019 Summary of November 12, 2019, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment to Adopt 10 CFR 50.69 ML19109A1282019-04-16016 April 2019 and Hope Creek Generating Station: Summary of Public Webinar Meeting on April 10, 2019 ML19045A4702019-02-15015 February 2019 Summary of Closed Teleconference Meeting with PSEG Nuclear LLC and General Electric-Hitachi Nuclear Energy to Discuss a General Electric Part 21 Issue ML18156A4242018-06-0505 June 2018 Annual Assessment Meeting, 5/30/18 Meeting Summary ML18044A9942018-02-26026 February 2018 Summary of Meeting with PSEG Nuclear LLC Regarding Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Extending the Allowed Outage Time for the Inverters ML18036A6142018-02-21021 February 2018 Generation Station-Summary of January 24, 2018, Meeting with PSEG Nuclear LLC on Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Diesel Generator Extended Allowed Outage Time ML17201A1012017-08-0404 August 2017 Summary of Meeting with PSEG Nuclear LLC to Discuss Potential License Amendment Request Technical Specification Task Force Traveler-542 for Hope Creek Generating Station ML17164A1742017-06-20020 June 2017 Summary of May 31, 2017, Meeting with PSEG Nuclear LLC to Discuss a Potential Measurement Uncertainty Recapture Power Uprate for Hope Creek Generating Station ML17102A7772017-04-10010 April 2017 Summary of Annual Assessment Meeting with PSEG ML16362A2022017-01-24024 January 2017 Summary of Meeting with PSEG Nuclear LLC Regarding Potential Measurement Uncertainty Recapture Power Uprate ML17023A1452017-01-23023 January 2017 Summary of Teleconference with PSEG Regarding Hope Creek HPCI ML16347A3932017-01-0505 January 2017 Summary of Teleconference with PSEG Nuclear LLC Regarding Planned License Amendment Request Regarding Change to the Salem Nuclear Generating Station-Hope Creek Generating Station Emergency Action Levels (MF8875, MF8876, and MF8877) ML16201A0292016-08-15015 August 2016 Summary of June 21, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of the Hope Creek Generating Station Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16217A4552016-08-15015 August 2016 Summary of July 19, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System ML16141A2402016-06-16016 June 2016 Summary of April 19, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Stations'S Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16113A3962016-04-29029 April 2016 Summary of Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16096A2222016-04-0505 April 2016 March 30, 2016, Summary of Annual Assessment Meeting with PSEG - Salem Nuclear Generating Station & Hope Creek Generating Station ML16064A0052016-03-22022 March 2016 Summary of Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16116A2352016-03-15015 March 2016 Meeting Summary for Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission, Hope Creek Generating Station - Power Range Neutron Monitoring System Digital Upgrade LAR HCGS Numac Upgrade - Open Item DOC-0006-2118 Ri ML15104A1492015-04-14014 April 2015 Hope, Summary of Annual Assessment Meeting with PSEG ML15043A2392015-03-24024 March 2015 January 29, 2015, Summary of Pre-licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor (Prnm) ML14224A1332014-08-26026 August 2014 Summary of August 12, 2014, Pre-Licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor ML14100A0242014-04-10010 April 2014 Salem and Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13364A2422014-02-0404 February 2014 9/11/2013 - Summary of Pre-Licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor ML13099A3242013-04-0909 April 2013 Salem & Hope Creek - Summary of Annual Assessment Meeting with PSEG ML12144A3312012-05-23023 May 2012 Summary of Meeting at the PSEG to Discuss the Nrc'S Assessment of Pseg'S Safety Performance at Salem & Hope Creek for 2011 ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11181A1772011-06-30030 June 2011 June 29, 2011 Summary of Public Meeting to Discuss Observations and Lessons Learned During the Hope Creek Nuclear Generating Station Application of the Nuclear Energy Institute'S Nuclear Safety Culture Assessment Process ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML11138A3212011-06-0808 June 2011 May 9, 2011, Summary of Telephone Conference Call Held Between NRC and PSEG Nuclear, LLC, Concerning Status of Hope Creek Drywell Air Gap Drains ML11137A0762011-06-0202 June 2011 Summary of Telephone Conference Call Held on May 11, 2011, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning the Hope Creek License Condition for the Drywell ML1114002132011-05-20020 May 2011 Summary of Annual Assessment Meeting for Salem and Hope Creek ML11105A0372011-05-0404 May 2011 Summary of Telephone Conference Call Held on March 25, 2011, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Findings on the Hope Creek Generating Station Gas Turbine ML1100700302011-03-25025 March 2011 Summary of Telephone Conference Call Held on August 30, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Hope Creek Generating Station License Renewal Application ML1034909292011-02-0909 February 2011 Summary of Telephone Conference Call Held on November 18, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Findings on the Hope Creek Generating Station Recent Outage ML1100501592011-02-0909 February 2011 September 15, 2010 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Hope Creek Generating Station License Renewal Application ML1031907452010-11-19019 November 2010 Summary of Telephone Conference Call Held on 10/21/10 Btw the USNRC and PSEG Nuclear, LLC, Concerning Hope Creek Generating Station, License Renewal Application, Environmentally Assisted Fatigue Analysis ML1025903832010-11-0202 November 2010 September 09, 2010, Summary of Telephone Conference Call Held Between NRC & PSEG Concerning a LRA Supplement Pertaining to the Hope Creek Generating Station, License Renewal Application 2024-06-03
[Table view] |
Text
January 19, 2005 LICENSEE: PSEG NUCLEAR, LLC.
FACILITY: HOPE CREEK GENERATING STATION
SUBJECT:
SUMMARY
OF DECEMBER 17, 2004, MEETING WITH PSEG TO DISCUSS B RECIRCULATION PUMP HIGH VIBRATIONS (TAC NO. MC5111)
On December 17, 2004, at 10:00 a.m., the Nuclear Regulatory Commission (NRC) staff conducted a Category 1 technical meeting with PSEG Nuclear, LLC (PSEG or the licensee), at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss the licensees preliminary responses to questions developed during the NRC staffs review of actions taken to address high vibrations identified on the Hope Creek Generating Station (Hope Creek) B recirculation pump. Members of the public were also given the opportunity to observe the meeting, and to ask questions of the NRC staff, via a telephone conference bridge.
As previously stated, the NRC staff raised a number of questions as a result of its review of the B recirculation pump vibration issue. These questions were first communicated to PSEG verbally by members of the NRC Region I staff, and have subsequently been made available to the public via the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession Number ML043480164. Prior to the meeting, PSEG provided preliminary responses to the questions to the NRC staff. PSEGs preliminary responses to the questions are available in ADAMS under Accession Number ML043510279. The NRC staff notes that, because the questions were first transmitted verbally to the licensee, the questions reiterated in the licensees preliminary response may not necessarily match the NRC questions verbatim.
The meeting was opened by Robert J. Fretz, Project Manager, Division of Licensing Project Management, who discussed the purpose of the meeting and outlined the logistical aspects such as public participation. All participants and observers were given an opportunity to identify themselves and the organization they represented. A list of those in attendance at NRC Headquarters is enclosed.
Michael Gallagher, Vice President of Engineering, PSEG, opened the technical discussion with a brief overview of the history of the B recirculation pump, the analysis provided to the NRC, industry experience with recirculation pump shafts, and the licensees vibration monitoring program.
Following the licensees introductory remarks, Raymond Lorson, Chief of the Materials and Structural Engineering Branch, NRC Region I, led the discussion on the licensees preliminary responses to each of the questions posed by the NRC staff. Members of the NRC staff provided feedback to PSEG on those answers that needed additional supporting information, and identified those questions that had been adequately addressed.
The meeting included a lunch break, and prior to the break, members of the public were provided an opportunity to raise questions to the NRC staff. During this time, two questions were raised by members of the public observing the meeting via telephone conference. The
two questions involved the availability of copies of PSEGs preliminary responses to those not in attendance at NRC Headquarters. An electronic copy of this document was subsequently made available to the public on the NRC public website, and instructions on its location were given at the resumption of the meeting following the lunch break.
After the lunch break, the remaining questions were discussed, and a list of outstanding action items was developed. The following is a list of the items to be provided to the NRC by PSEG:
! Objective information that shows the auxiliary impeller rubbing is no longer a concern
! A pump drawing that shows all clearances including the auxiliary impeller
! The updated vibration monitoring plan
! Additional restrictions for startup of recirculation pumps
! A description of the operators response to a high vibration alarm
! The design change package for the drywell monitoring
! Supporting information for the ability of monitored parameters to predict an incipient shaft failure
! Relocation information for the axial probes and completion time
! Status of the Sargent & Lundy recommendations
! A list of past maintenance items on the residual heat removal system and the recirculation system due to fatigue or vibration
! Provide the engineering evaluation for the B recirculation pump
! A description of the power source for the recirculation pump isolation valves
! A justification of why relocation of the vibration probes would have no impact on the vibration level measurements
! Material strength information for the pump shaft
! Provide background data on the high-pressure coolant injection (HPCI) exhaust
! Bechtel piping design specifications for the HPCI exhaust line Prior to adjournment of the meeting, members of the public were given another opportunity to ask questions of the NRC staff. Dr. Jill Lipoti, Director of the New Jersey Department of Environmental Protection, Bureau of Nuclear Engineering, commented on the difficulty in comparing the licensees preliminary responses to the list of questions verbally communicated to PSEG. Dr. Lipoti was concerned that the licensee may have not adequately addressed the NRC staffs questions. Also, Dr. Lipoti requested information about additional public meetings
on this subject, as well as the planned upcoming public meeting prior to the restart of Hope Creek from its extended refueling outage. The NRC staff noted that, because of the uncertainty surrounding the timeline for receiving the additional information from PSEG, the NRC staff was not able to commit to a specific time for future public meetings with the licensee at this time.
Finally, Dr. Kymn Harvin provided a number of comments in reference to PSEGs response to the high vibrations on the B recirculation pump, and urged the NRC staff to require the licensee to replace the B recirculation pump shaft prior to the restart of Hope Creek.
Subsequently, no more questions were identified and the meeting was adjourned.
Please direct any inquires concerning this meeting to Mr. Daniel Collins, Senior Project Manager, Hope Creek. Mr. Collins may be reached at (301) 415-1427, or dxc1@nrc.gov.
/RA/
Robert J. Fretz, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosure:
Attendance sheets Docket No. 50-354 cc w/encl: See next page
NRC staffs questions. Also, Dr. Lipoti requested information about additional public meetings on this subject, as well as the planned upcoming public meeting prior to the restart of Hope Creek from its extended refueling outage. The NRC staff noted that, because of the uncertainty surrounding the timeline for receiving the additional information from PSEG, the NRC staff was not able to commit to a specific time for future public meetings with the licensee at this time.
Finally, Dr. Kymn Harvin provided a number of comments in reference to PSEGs response to the high vibrations on the B recirculation pump, and urged the NRC staff to require the licensee to replace the B recirculation pump shaft prior to the restart of Hope Creek.
Subsequently, no more questions were identified and the meeting was adjourned.
Please direct any inquires concerning this meeting to Mr. Daniel Collins, Senior Project Manager, Hope Creek. Mr. Collins may be reached at (301) 415-1427, or dxc1@nrc.gov.
/RA/
Robert J. Fretz, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosure:
Attendance sheets Docket No. 50-354 cc w/encl: See next page DISTRIBUTION:
PUBLIC EImbro TKim, EDO PDI-2 Reading KManoly CMiller, EDO JDyer DTerao OGC BSheron JFair ACRS RBorchardt WPoertner ABlough, RGN-I TMarsh CHolden ECobey, RGN-I JLyons DRoberts GMatakas, RGN-I DCollins RFretz RLorson, RGN-I CRaynor GMiller Package Accession No.: ML Meeting Summary Accession No.: ML050030160 Attendance Sheets Accession No.: ML OFFICE PDI-2/PE PDI-2/PM PDI-2/PM PDI-2/LA PDI-2/SC NAME GMiller DCollins RFretz CRaynor DRoberts DATE OFFICIAL RECORD COPY
Hope Creek Generating Station cc:
Mr. John T. Carlin Ms. R. A. Kankus Vice President - Nuclear Assessment Joint Owner Affairs PSEG Nuclear - N10 Exelon Generation Company, LLC P.O. Box 236 Nuclear Group Headquarters KSA1-E Hancocks Bridge, NJ 08038 200 Exelon Way Kennett Square, PA 19348 Mr. Patrick S. Walsh Vice President - Eng/Tech Support Lower Alloways Creek Township PSEG Nuclear - N28 c/o Mary O. Henderson, Clerk P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Michael Brothers Dr. Jill Lipoti, Asst. Director Vice President - Site Operations Radiation Protection Programs PSEG Nuclear - N10 NJ Department of Environmental P.O. Box 236 Protection and Energy Hancocks Bridge, NJ 08038 CN 415 Trenton, NJ 08625-0415 Mr. James A. Hutton Plant Manager Brian Beam PSEG Nuclear - X15 Board of Public Utilities P.O. Box 236 2 Gateway Center, Tenth Floor Hancocks Bridge, NJ 08038 Newark, NJ 07102 Ms. Christina L. Perino Regional Administrator, Region I Director - Licensing & Nuclear Safety U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 475 Allendale Road P.O. Box 236 King of Prussia, PA 19406 Hancocks Bridge, NJ 08038 Senior Resident Inspector Jeffrie J. Keenan, Esquire Hope Creek Generating Station PSEG Nuclear - N21 U.S. Nuclear Regulatory Commission P.O. Box 236 Drawer 0509 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038