Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23249A263 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019 | |
ML23249A264 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020 | |
ML23249A265 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021 | |
ML23249A266 | 6 September 2023 | Attachment 2: Salem Pavan Input File | |
ML23249A267 | 6 September 2023 | Attachment 3: Salem Pavan Output File | |
ML23249A268 | 6 September 2023 | Attachment 4: Hope Creek Pavan Input File | |
LR-N23-0050, Attachment 5: Hope Creek Pavan Output File | 6 September 2023 | Attachment 5: Hope Creek Pavan Output File | |
LR-N16-0112, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal | 29 December 2016 | Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal | High winds Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi |
ML16320A484 | 15 November 2016 | Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System (Meeting Handout) | Cyber Security MELLLA |
ML16231A110 | 16 August 2016 | Updated Issues List for 08/16/2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System Meeting Handout | Cyber Security MELLLA |
ML16116A235 | 15 March 2016 | Meeting Summary for Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission, Hope Creek Generating Station - Power Range Neutron Monitoring System Digital Upgrade LAR HCGS Numac Upgrade - Open Item DOC-0006-2118 Ri | Cyber Security |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16102A277 | 11 March 2016 | Submittal of Annual Incidental Take Report | |
ML15238B655 | 10 September 2015 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML15243A502 | 10 September 2015 | Interim Letter Tables 1 and 2 | |
ML15030A295 | 22 September 2014 | Table 04, Groundwater Measurements and Elevations - First Quarter 2014 | |
ML15030A294 | 22 September 2014 | Table 03, Effluent Data Tritium Activity | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
ML13052A682 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
ML12284A427 | 4 October 2012 | PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4 | |
ML11181A187 | 29 June 2011 | Attendance Sheet for 06/29/2011 Public Meeting to Discuss Observations and Lessons Learned of the Pilot Application of the Nuclear Energy Institute'S | |
ML080560539 | 4 March 2008 | Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events | |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML071500202 | 29 May 2007 | U.S. Census Bureau Minority Data for Hope Creek Generating Station EPU | |
ML062020175 | 17 July 2006 | NRC Inspection Findings | Stroke time Temporary Modification |
ML060660064 | 7 February 2006 | SCWE Followup Practices - Development Timeline | |
LR-N06-0046, PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report | 31 January 2006 | PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report | Coatings Biofouling |
ML050980173 | 5 April 2005 | PSEG Nuclear LLC Hope Creek Station B-Reactor Recirculation Decontamination Connection Leak Cause Determination Report Notification No. 20230319, Event Date: March 27. 2005 | Finite Element Analysis Liquid penetrant Through-Wall Leak |
ML050980199 | 2 April 2005 | Decontamination Port, Reactor Recirc Vibration Data Analysis | |
ML050980131 | 1 April 2005 | Decontamination Port, Natural Frequency of Loop B Port | |
ML050980112 | 1 April 2005 | Decontamination Port, Harmonic Stress Analysis of Loop B Port | |
ML052140334 | 9 March 2005 | RIC 2005 Presentation - B3 - Michael Brothers - Objective Measures of Safety Culture | |
ML050120261 | 12 January 2005 | December Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML050060022 | 30 December 2004 | 'B' Recirculation Pump Stuffing Box Measurements Summary | |
ML050060256 | 30 December 2004 | 'B' Reactor Recirculation Pump Vibration Troubleshooting Summary | |
ML050050111 | 12 December 2004 | H-1-FD-CEE-1879, Hope Creek HPCI Exhaust Piping Supports Analysis Reported Damage in RF12. | |
ML050060384 | 7 September 2004 | C-0031 Piping Code Compliance, 9/7/2004 | |
ML052490461 | 10 August 2004 | Open Branch 3 Allegation Status Summary | |
ML062210333 | 3 March 2004 | Regulatory Activity Schedule | |
ML050060041 | 26 December 1995 | H-1-BB-MEE-1050 Hope Creek Recirculation System Large Bore Pipe Cracking Resolution, 12/26/1995 |