Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23249A2626 September 2023Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021)
ML20121A1333 March 2020Biological Opinion 2019 Annual Incidental Take Report
LR-N18-0057, Pressure and Temperature Limits Report, Revision 18 June 2018Pressure and Temperature Limits Report, Revision 1Pressure and Temperature Limits Report
LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary9 November 2017License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-ProprietaryAnticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report28 April 2017Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits ReportPressure and Temperature Limits Report
LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)31 March 2017Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)
ML17188A26731 March 2017Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)
ML17188A26531 December 2016Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi
LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve31 December 2016Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi
ML16256A64231 August 2016NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.Safe Shutdown Earthquake
Operating Basis Earthquake
Cyber Security
LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.31 August 2016NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.Safe Shutdown Earthquake
Operating Basis Earthquake
Cyber Security
ML16256A64430 September 2015NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.
LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)30 September 2015NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)
LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.30 September 2015NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.
ML15030A29522 September 2014Table 04, Groundwater Measurements and Elevations - First Quarter 2014
ML15030A29422 September 2014Table 03, Effluent Data Tritium Activity
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML13365A25311 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Containment Hardened Vent
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML14028A0746 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Hope Creek Generating Station, TAC No. MF0867Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
LR-N14-0024, Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic29 January 2014Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: SeismicSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G30 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
ML13052A67730 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
ML13052A67830 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
ML13052A67930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 530 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-7528 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-14928 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
ML13052A68028 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J
ML13052A68128 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75
ML13052A68228 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N
LR-N11-0289, Site-Specific Cost Estimates15 September 2011Site-Specific Cost EstimatesFuel cladding
Fire Watch
Scaffolding
ML10279010630 September 2010NEDO-33506, Rev 0, Hope Creek, Final Feedwater Temperture Reduction and Feedwater Heaters Out-of-Service.Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Safe Shutdown Earthquake
Feedwater Controller Failure
MELLLA
LR-N10-0239, 0000-0119-1728, Revision 0, Hope Creek Cycle 17 Stability Results for GE14i Support, Attachment 130 June 20100000-0119-1728, Revision 0, Hope Creek Cycle 17 Stability Results for GE14i Support, Attachment 1
ML10298062230 April 2010Email from Cahill, Christopher to Burritt, Arthur; Cline, Leonard, FW: AFW Missile Barrier.Tornado Missile
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
ML10139031815 November 2009Calculation 80096650, Revision 0, Leakage Reduction Program Calculation, Attachment 6 to LR-N10-0163Fuel cladding
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 131 October 2008Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1Finite Element Analysis
Liquid penetrant
LR-N08-0224, Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 031 October 2008Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0Finite Element Analysis
ML08310082831 October 2008Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0Finite Element Analysis
LR-N08-0199, Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1.31 August 2008Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1.Finite Element Analysis
ML08254032931 August 2008Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1.Finite Element Analysis
LR-N08-0199, Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions.31 August 2008Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions.Finite Element Analysis
Liquid penetrant
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
LR-N08-0123, C.D.I. Technical Note No. 07-29NP, Revision 2, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Hope Creek Unit 1.31 May 2008C.D.I. Technical Note No. 07-29NP, Revision 2, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Hope Creek Unit 1.Finite Element Analysis
ML08136049230 April 2008Attachment 2, C.D.I. Technical Note No. 07-29NP, Revision 1, Limit Curve Analysis with ACM Rev. 4 at Hope Creek Unit 1.Finite Element Analysis
Flow Induced Vibration
ML08042054431 January 2008CDI Report No. 07-17NP Revision 3 Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Mode.Finite Element Analysis
Liquid penetrant
LR-N08-0033, CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model.31 January 2008CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model.Finite Element Analysis
Liquid penetrant
Flow Induced Vibration
ML07264041131 August 2007CDI Report 07-17NP, Stress Assessment of Hope Creek, Unit 1 Steam Dryer Based on Revision 4 Loads Model Revision 2.Finite Element Analysis
Liquid penetrant