ML050140298
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
TAC:MC5111, (Open) | |
Initiation Questions
Results
Other: ML043230163, ML043500645, ML043510279, ML043650296, ML050050111, ML050050112, ML050050116, ML050050470, ML050060022, ML050060025, ML050060041, ML050060054, ML050060074, ML050060110, ML050060114, ML050060252, ML050060256, ML050060384, ML050060387, ML050120303, ML050140232, ML050140236, ML050140245, ML050140247, ML050140253, ML050140298 | |
MONTHYEARML0500600411995-12-26026 December 1995
[Table View]H-1-BB-MEE-1050 Hope Creek Recirculation System Large Bore Pipe Cracking Resolution, 12/26/1995 Project stage: Other ML0501402362002-07-12012 July 2002 Reactor Coolant Pump Shaft Cracking, July 12, 2002 Project stage: Other ML0500600252003-04-15015 April 2003 CR 70029861 Hope Creek 'B' Recirculation Pump Excessive Seal Leakage Condition Report, 03/01/2003 Project stage: Other ML0501402982003-05-0707 May 2003 Drawing 1 of 2, M-43-1 P&Id, Reactor Recirculation System Project stage: Other ML0501402532004-04-29029 April 2004 HC-04Q-301 Hope Creek Extended Power Uprate Piping Vibration Monitoring, 4/29/2004 Project stage: Other ML0500603842004-09-0707 September 2004 C-0031 Piping Code Compliance, 9/7/2004 Project stage: Other ML0500600542004-10-19019 October 2004 Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004 Project stage: Other ML0501402472004-10-26026 October 2004 Flowserve RAL-7483 Rev 0 Design Modification Report Assy 93-14347, 10/26/2004 Project stage: Other ML0501402452004-10-26026 October 2004 Flowserve RAL-7482 Rev 0 Design Modification Report Assy 93-15122, 10/26/2004 Project stage: Other ML0500603872004-10-29029 October 2004 H1BC-1-BC-V183 (CR 20208920) Handwheel Operator Spins Freely, 11/08/2004 Project stage: Other ML0500501122004-10-30030 October 2004 HC.OP-SO.BB-0002(Q) Rev 50A Reactor Recirculation System Operating Procedures, 10/30/2004 Project stage: Other ML0500501162004-10-30030 October 2004 HC-OP-AR.ZZ-0008(Q), Rev 25A, Overhead Annunciator Window Box C1, Operations Alarm Response Procedure, 10/30/2004 Project stage: Other ML0500600742004-11-0303 November 2004 Structural Integrity Associates, Inc. HC-06-301 Hope Creek Recirculation System Vibration Testing (Vtd 326747) 11/03/2004 Project stage: Other ML0432301632004-11-18018 November 2004 Expected Task Interface Agreement to Review 'B' Recirculation Pump High Vibration Report Project stage: Other ML0500601102004-12-10010 December 2004 Design Change Package 80062466 Revision 2 Extended Power Uprate Piping Vibration Monitoring Installation Package, 12/10/2004 Project stage: Other ML0500501112004-12-12012 December 2004 H-1-FD-CEE-1879, Hope Creek HPCI Exhaust Piping Supports Analysis Reported Damage in RF12. Project stage: Other ML0501402322004-12-12012 December 2004 H-1-BB-MEE-1878, Rev 0, Hope Creek 'B' Recirculation Pump Vibration Analysis, 12/12/2004 Project stage: Other ML0434801642004-12-13013 December 2004 Questions Regarding 'B' Recirculation Pump High Vibrations and High Pressure Coolant Injection System Exhaust Damage Project stage: Request ML0500504702004-12-16016 December 2004 H-1-BB-MEE-1878, Hope Creek 'B' Recirculation Pump Vibration Analysis, Revision 1 Project stage: Other ML0435006452004-12-16016 December 2004 Pseg'S Preliminary Responses to NRC Staff Questions Regarding 'B' Recirculation Pump Vibration Project stage: Other ML0435102792004-12-16016 December 2004 PSEG Preliminary Responses to NRC Staff Questions Project stage: Other ML0502100682004-12-17017 December 2004 Hope Creek Generating Station - Summary of Meeting with PSEG to Discuss B Recirculation Pump High Vibrations (TAC MC5111), Attendance Sheet Project stage: Meeting ML0500601142004-12-23023 December 2004 Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004 Project stage: Other ML0436502962004-12-30030 December 2004 Public Availability and Docketing of Documents Project stage: Other ML0500600222004-12-30030 December 2004 'B' Recirculation Pump Stuffing Box Measurements Summary Project stage: Other ML0500602522004-12-30030 December 2004 Summary of Hope Creek Vibration Issues and Planned Actions Project stage: Other ML0500602562004-12-30030 December 2004 'B' Reactor Recirculation Pump Vibration Troubleshooting Summary Project stage: Other ML0501202552005-01-12012 January 2005 Response to Task Interface Agreement - TIA 2004-006, Request for Evaluation of Sargent and Lundy Report on Hope Creek 'B' Reactor Recirculation Pump and PSEG Nuclear LLC Evaluation of High Pressure Coolant Injection System Exhaust Snubbers Project stage: Acceptance Review ML0501203032005-01-12012 January 2005 Flowserve Response to NRC Questions Station 'B' Recirculation Pump Project stage: Other ML0500301602005-01-19019 January 2005 Hope Creek Generating Station - Summary of Meeting with PSEG to Discuss B Recirculation Pump High Vibrations Project stage: Meeting 2004-12-10 |
ML050140298 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 05/07/2003 |
From: | Public Service Enterprise Group |
To: | Office of Nuclear Reactor Regulation |
References | |
TAC MC5111 M-43-1, Rev 27 | |
Download: ML050140298 (1) | |
Similar Documents at Hope Creek | |
---|---|
Category:Drawing
MONTHYEARLR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023
[Table view]and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings2017-07-0707 July 2017 Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings ML16256A6402016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment LR-N16-0113, Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment2016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment LR-N15-0190, Intermediate Implementation Milestone Change for NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2015-12-14014 December 2015 Intermediate Implementation Milestone Change for NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. LR-N10-0355, Hope Creek, Bases Figure B 3/4 3-1, Reactor Vessel Water Level.2010-10-14014 October 2010 Hope Creek, Bases Figure B 3/4 3-1, Reactor Vessel Water Level. ML1100601892010-10-14014 October 2010 Hope Creek, Bases Figure B 3/4 3-1, Reactor Vessel Water Level. LR-N07-0069, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate ML0500600222004-12-30030 December 2004 'B' Recirculation Pump Stuffing Box Measurements Summary ML0421801322004-05-25025 May 2004 Drawing, Groundwater Tritium Results. ML0421801212004-04-26026 April 2004 Drawing, Monitoring Well Network. ML0421801162004-04-26026 April 2004 Drawing, Station Layout. ML0421801262004-04-0606 April 2004 Drawing, Groundwater Elevation Countours Shallow Water-Bearing Unit (March 19, 2004). ML0405005742003-09-26026 September 2003 Drawing No. 10, Groundwater Contour Map Shallow Water Table Aquifer June 26, 2003. ML0501402982003-05-0707 May 2003 Drawing 1 of 2, M-43-1 P&Id, Reactor Recirculation System 2023-01-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML050140298&oldid=2597384"