MONTHYEARGO2-24-101, Independent Spent Fuel Storage Installation - Decommissioning Cost Estimate and Decommissioning Funding Plan -2024 Update2024-12-11011 December 2024 Independent Spent Fuel Storage Installation - Decommissioning Cost Estimate and Decommissioning Funding Plan -2024 Update GO2-24-123, Summary of Changes and Analysis for Revision 21 of Plant Procedures Manual 13.2.2, Determining Protective Action Recommendations2024-11-25025 November 2024 Summary of Changes and Analysis for Revision 21 of Plant Procedures Manual 13.2.2, Determining Protective Action Recommendations GO2-24-124, Docket No. 50-397 Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2)2024-11-21021 November 2024 Docket No. 50-397 Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) GO2-24-102, Relief Requests for the Fifth Inservice Inspection Interval2024-11-18018 November 2024 Relief Requests for the Fifth Inservice Inspection Interval IR 05000397/20240032024-11-12012 November 2024 Integrated Inspection Report 05000397/2024003 ML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24234A0292024-11-0505 November 2024 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Emergency Plan (EPID L-2024-LLA-0011) - Letter GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-100, Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing2024-11-0404 November 2024 Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 IR 05000397/20244032024-10-0101 October 2024 Cybersecurity Inspection Report 05000397/2024403 Public GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 2024-09-24
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARGO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-18-146, Response to Inspection Report 05000397/20180032018-11-29029 November 2018 Response to Inspection Report 05000397/2018003 GO2-17-173, Revised Response to a Notice of Violation; EA-17-0282017-10-11011 October 2017 Revised Response to a Notice of Violation; EA-17-028 GO2-17-141, Reply to a Notice of Violation; EA-17-0282017-08-0303 August 2017 Reply to a Notice of Violation; EA-17-028 GO2-17-100, Response to Inspection Report 05000397/20160092017-05-0909 May 2017 Response to Inspection Report 05000397/2016009 GO2-15-179, Response to Inspection Report 05000397/20150032015-12-22022 December 2015 Response to Inspection Report 05000397/2015003 GO2-11-137, Supplemental Information Provided to Report 0500397/20100072011-08-11011 August 2011 Supplemental Information Provided to Report 0500397/2010007 GO2-08-107, Reply to Notice of Violation; EA-08-1832008-07-16016 July 2008 Reply to Notice of Violation; EA-08-183 GO2-08-099, Reply to a Notice of Violation, EA-04-1452008-07-0202 July 2008 Reply to a Notice of Violation, EA-04-145 GO2-05-142, Response to Inspection Report 05000397-05-0072005-08-15015 August 2005 Response to Inspection Report 05000397-05-007 GO2-05-065, Review of NRC Violation 50-397/04-05-022005-04-0404 April 2005 Review of NRC Violation 50-397/04-05-02 ML0411803842004-04-16016 April 2004 Reply to Non-Cited Violation from IR 05000397/03-007 GO2-02-134, Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of Violation2002-08-21021 August 2002 Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of Violation GO2-02-016, Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008)2002-02-28028 February 2002 Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008) IR 05000397/20010082002-02-20020 February 2002 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC Inspection Report 50-397/01-008) 2024-07-30
[Table view] |
Text
ENERGY NORTH WEST PO. Box 968
- Richland, Washington 99352-0968 April 16, 2004 G02-04-072 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
COLUMBIA GENERATING STATION DOCKET NUMBER 50-397 REPLY TO NON-CITED VIOLATION: 50-397/03-07-01
Reference:
Letter dated January 30, 2004, from WB Jones (NRC) to JV Parrish (Energy Northwest), "Columbia Generating Station - NRC Integrated Inspection Report 05000397/2003007"
Dear Sir or Madam:
In the referenced inspection report, the Nuclear Regulatory Commission (NRC) provided Energy Northwest with the results of NRC inspection activities at Columbia Generating Station (CGS) .from October :5, 2003, through December;-31,,2003. Included in this inspection report was a Green finding with :-n 'associated non-cited: violation.:(NCV) regarding the. conduct of local~leak rate testing (LLRT). for the main;steam isolation valves (MSIVs) (NCV 50-397/03.
07-01): The purpose of this letter ris ,to request. that.this NCV. be withdrawn and provide a summary of the actions that Energy Northwest is pursuing concerning this issue. On February 23,.2004, an extension to the normal 30-day response time was.requested, by Mr. Douglas Coleman (Energy Northwest) and granted by Mr. Williarn Jones (NRC, Region IV). The time to respond was extended.from February 29, 2004, to mid-April 2004..
.Non-cited-violation-50-397/03-07-01-was-issued-based on the -NRC determination that -Energy Northwest had performed inadequate MSIV LLRTs since initial plant startup. The NCV states that the NRC considered the test.methodology to be inadequate because, "Energy Northwest utilized nonsafety related instrument air to help close and seat the valves during testing." The NCV also stated that the non-safety related instrument air that recharges the safety related accumulators* provides "substantially more . seating -pressure than -the safety. related air accumulators.'. The NRC also concluded in the inspection report that an immediate or existing safety :concern does. not exist. This conclusion :is .based: on an Energy. Northwest analysis verifying that,.if the testingihad.been performed under conditions suggested by the NRC, the MSIVs would still -have passed~the.leakage rate testing. . . . .
~.- v::- ::;.~ . -..- A: : .. :;
~~.:: . ..: .. -- ....
. go
REPLY TO NON-CITED VIOLATION: 50-397/03-07-01 Page 2 Energy Northwest understands the NRC concerns as stated in the NCV. However, we believe that applicable NRC regulations (10 CFR 50 Appendix JJ.jII.C.1) and industry codes that discuss closing valves for local leak rate testing (ANSIIANS 56.8 - 1994, which is endorsed in NRC Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program") are subject to interpretation with respect to the required qualification (safety related or non-safety related) of the motive source used to close the valve. For example, 10 CFR 50 Appendix J, III.C. 1, states that each valve to be tested shall be closed by normal operation and without any preliminary exercising or adjustments. ANSI/ANS 56.8 - 1994, Section 3.3.3, states that closure of primary containment isolation valves for Type C testing shall be accomplished by normal or equivalent means and without adjustment. Energy Northwest considers closure of the MSIVs with the non-safety related air sources to be the "normal means" of closing the MSIVs at CGS.
Based on the above, Energy Northwest does not believe that issuance of NCV 50-397/03-07-01 was warranted and respectfully requests that this non-cited violation be withdrawn by NRC.
Energy Northwest believes that testing of MSIVs with a non-safety related air source providing seating pressure is a common practice within the industry and therefore this issue is generic in nature. Energy Northwest is coordinating with the BWR Owners Group (BWROG) to determine if the issue raised by the NRC in NCV 50-397/03-07-01 should be addressed on a generic basis and to determine if there should be a future BWROG role in pursuing resolution of this issue. To initiate these efforts, the BWROG has established an MSIV Testing Ad Hoc Committee, with the first meeting scheduled for May 19 and 20, 2004. If the BWROG MSIV Testing Ad Hoc Committee determines that BWROG should assume a role in this area, then additional actions and activities will be developed.
As noted in the referenced inspection report, this issue has been documented in our corrective action program and is not currently considered to be an immediate or existing safety concern.
Based on the results of testing and analysis produced during our previous refueling outage, we agree that performing MSIV LLRTs with use of safety related air only is a conservative method for ensuring that the MSIVs are capable of performing their intended design function.
Energy Northwest is currently planning to conduct MSIV LLRT testing with only safety-relatedaiFrsou-rc&sprovidiing -seatingpressure-tote valves durigo-u-r-neot-re~fuling-outage.-----
Should you have any questions concerning this letter or require additional information, please contact Ms. CL Perino at (509)-377-2075.
Respectfully, RLWebring (Mail Dro PE04)
Vice President, Nuclear Generation cc: BS Mallett - NRC - RIV RN Sherman - BPA/1399 FJ Congel - Director, Office of Enforcement WA Macon - NRC - NRR NRC Sr. Resident Inspector - 988C TC Poindexter - Winston & Strawn K. Putman - Chairman, BWROG