ML040790042

From kanterella
Jump to navigation Jump to search
Miscellaneous Correspondence for the Kewaunee Initial Examination - February 2004
ML040790042
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/02/2004
From: Lanksbury R
NRC/RGN-III/DRS/OLB
To: Coutu T
Nuclear Management Co
References
50-305/04-301
Download: ML040790042 (30)


Text

MISCELLANEOUS CORRESPONDENCE FOR THE KEWAUNEE INITIAL EXAMINATION FEB 2004

c -

r Xewaunee Nuclear Power Plant N490, State Highway 42 Kewaunee, WI 54216-9511 Committed to Nuclear Excellence 920-388-2560 NRC 01-101 September 27, 2001 Document Control Desk U. S. Nuclear Regulatory Commission Mail Stop P1-137 Washington, DC 20055-001 Ladi es/Gentlemen:

DOCKET 50-305 RESPONSE TO REGULATORY ISSLCE SUMM, R 2001-- 7 KEWAUNEE NUCLEAR POWER PLANT Regulatory Issue Summary (RIS) 2001-17, Preparation and Scheduling of Operator Licensing Examinations, was issued on August 22,2001. The RIS asked that within 30 days licensees voluntarily submit schedular information concerning generic fundamentals examinations through CY 2003 and initial operator license examinations through CY 2005.

Attached is a completed NRC Form 536 that provides the requested infoimation for Kewaunee Nuclear Power Plant.

Sincerely , ----

Thomas J. Webb Licensing Director Attachment FAF/tyf cc: Chief, Operator Licensing Branch, NRC Region I11

m c 01-101 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31 50-0131 EXPIRES: 07/31/2002 (8-2000) Estimated burden per response to comply with this voluntary informalion collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Tnis informalion collection is used to plan budgets OPERATOR LICENSING and resources for operator Ixaminations. Send comments regarding burden estimate to the Records Management Branch (T-6 6). U.S. Nuclear EXAMINATION DATA Regulatory Commission, VJashington. DC 20555-0001, or by internet e-mail lo bjsl @nrc.gov. and to the Cesk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-01 31), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond lo. the informalion collection.

NRC REGION 111 PROPOSED NUMBER CY 2 CY 3 CY 4 CY 5 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 PROPOSED NUMBER CY 2 CY 3 CY 4 CY 5 NUMBER OF REACTOR OPERATORS 8 8 0 3 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 7 5 0 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 9/2002 9/2003 N/A 6/2005 ALTERNATE DATE 10/2002 10/2003 N/A 7/2005 PROPOSED NUMBER CY 02 CY 03 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF CANDIDATES 0 12 0 0 0 0

February 20,2002 Mr. M. Reddemann Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

Dear Mr. Reddemann:

In response to your facility management letter dated September 27,2001,and as augmented by discussions with Chuck Sizemore of your staff on January IO, 2002,we have tentatively scheduled an initial licensing examination for your operator license applicants at the Kewaunee Nuclear Power Plant during the weeks of September 29 and October 6,2003. Validation of the examination will occur at the station during the week of August 25, 2003. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of August 4,2003 to begin our review of your submitted examination.

Your letter indicated you are training approximately 16 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.

Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.

Michael E. Bielby has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9762.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Dell R. McNeil of my staff at 630-829-9737.

M. Reddemann In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.lqov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely, David E. Hills, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: K. Hoops, Manager, Kewaunee Plant D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer W. Walker, Training Department ADAMS Distribution:

WDR DFT JGLI RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlIl PLBI JRKI DCT M. A. Bies, DRS DOCUMENT NAME: G:\DRS\KEWO2 02DRS.wpd OFFICE RIII:DRS c, RIII:DRS I 4 RI1I:DRS In/

NAME MABies: /?.z/rF DRMcNeil $.,- DEHills W DATE 02/v/02 02/LC{/O2 021td02

i

? 5-H UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 May 13, 2002 Mr. M. Warner Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

Dear Mr. Warner:

In response to a telephone conversation that I had with Mr. Chuck Sizemore, Training Supervisor, on May 6, 2002, we have tentatively rescheduled an initial licensing examination for your operator license applicants at the Kewaunee Nuclear Power Plant during the weeks of February 2, 2004, and February 9, 2004. Validation of the examination will occur at the station during the week of January 12, 2004. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter dated September 27, 2001, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of December 22, 2003, to begin our review of your submitted examination.

Your letter indicated you are training approximately 16 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.

Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for N R C review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.

Mr. Charles Phillips has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9739.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Dell R. McNeil of my staff at 630-829-9737.

M. Warner In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://www.nrc.qov/NRC/ADAMS/index.html(the Public Electronic Reading Room).

Sincere1y ,

David E. Hills, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: T. Coutu, Manager, Kewaunee Plant D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer W. Walker, Training Department ADAMS Distribution:

WDR DFT JGLl DCT RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlll PLBl JRKI M. A. Bies (concurrence copy)

OFFICE RIII:DRS & RIII:DRS 1.1 RIII:DRS Iv/d NAME MABies:sd &- DRMcNeil DEHills "2-DATE 0517/02 ' 05/oq/02 05//q02

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 February 7, 2003 Mr. T. Coutu Site Vice President Kewaunee Nuclear Power Plant N490 Hwy 42 Kewaunee, WI 54216

Dear Mr. Coutu:

In a telephone conversation on January 27, 2003, between Mr. S. Johnson, Kewaunee Initial License Training Exam Lead, and Mr. C. Zoia, NRC Examiner, preliminary arrangements were made for the administration of initial licensing examinations at the Kewaunee Nuclear Generating Plant during the weeks of February 2, 2004, and February 9, 2004. The Chief Examiner for this examination is C. Phillips. Also, the NRC will make an examination validation visit to your facility during the week of January 12, 2004.

The NRC will prepare the examinations based on the guidelines in NUREG-I 021, Operator Licensing Examination Standards for Power Reactors. As discussed in the telephone call, it is your staffs option whether these examinations are prepared per NUREG 1021, Revision 8, Supplement 1, or NUREG 1021, Revision 9 (Draft). Please indicate your choice, in writing, as soon as possible, but no later than March 15, 2003. Your staff will be given an opportunity to review the written examination on January 7-8, 2004, at the Region 111 office. Your staff will be given the opportunity to review the written examination and operating test material at Kewaunee Nuclear Generating Plant during the validation week.

In order to meet this schedule, your staff must furnish the reference materials identified in NUREG 1021, ES-201, Attachment 2, no later than March 15, 2003. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it is necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

T. Coutu In accordance with 10 CFR Part 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readinn-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc w/encl: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer Kevin Davison, Training Manager ADAMS Distribution:

WDR DFT JGLI RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlll PLBI JRKI Mary Ann Bies (Concurrence Copy)

DOCUMENT NAME: G:DRS\KEW020/103DRSI .wpd To receive a copy of this document, indicate In the box: "C" = Copy without attachmentlenclosure " E =Copy with attachmentlenclosure "N" = No copy IOFFICE I RIII IC I Rlll Id1 NAME CZoia:sd RLanksburyW&

I DATE 0216'03 02/ 7 0 3

T. Coutu Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Papenwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30,2003.

The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. S. Johnson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Phillips at 630-829-9739, or me at 630-829-9631.

Operated by Nuclear Management Company, LLC NRC-03-024 March 11, 2003 Regional Administrator, Region I l l U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532 - 4351 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE NO. DPR-43 INITIAL OPERATOR LICENSING EXAMINATION NUREG 1021 OPTION

Reference:

Letter from Roger D. Lanksbury (NRC) to Thomas Coutu (NMC) dated February 7, 2003 In response to your letter dated February 7, 2003, about our initial licensing examination we request that the examination be prepared per NUREG 1021, Revision 8, Supplement 1.

Please contact Mr. Wyatt Godes at 920/388-8779 if you have any further questions.

Thomas Coutu Site Vice-president, Kewaunee Plant WAG cc Roger D. Lanksbury, Chief, Operations Branch Wyatt Godes , KNPP N490 Highway 42 Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

C>N Committed to Nuclear Excellence Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-029 10 CFR 55.40 March 13, 2003 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 80 1 W arrenviIle Road Lisle, IL 60532 - 4351 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE NO. DPR-43 REFERENCE MATERIALS FOR KEWAUNEE NUCLEAR POWER PLANT INITIAL LICENSING EXAMINATION WEEKS OF FEBRUARY 2 AND FEBRUARY 9,2004 In accordance with the guidelines NUREG 1021, Operating License Examination Standard for Power Reactors, Revision 8, Supplement 1, ES-201, Attachment 2, we are sending to Mr. C.

Zoia the identified reference materials for use in preparing our examinations. This material includes only those items that can be made electronically available in a format currently accessible by the NRC, as identified in Attachment I. The remaining items, those in Attachment II that are not identified in Attachment I, will be maintained at the Kewaunee Plant until picked up by Mr. C. Zoia on his familiarization trip planned for March 27, 2003. This arrangement was agreed upon in a telephone conversation on March 6, 2003, between Mr. C. Zoia and Mr. S Johnson, Kewaunee Initial Training Exam Lead.

You may direct any questions or comments regarding this material to Mr. Stephen Johnson at (920) 388-8723 or Mr. Wyatt Godes at (920) 388-8779.

Thomas Coutu Site Vice-president, Kewaunee Plant SPJ cc U.S. NRC Resident Inspector w/o enc.

K. Davidson, NMC - Point Beach w/o enc.

W. Godes, NMC - KNPP w/o enc.

S. Johnson, NMC - KNPP w/o enc.

Roger Lanksbury, Chief, Operations Branch w/o enc.

Charles Zoia wlenc.

Attachment N490 Highway 42 Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

ATTACHMENT 1 NUCLEAR MANAGEMENT COMPANY, LLC KEWAUNEE NUCLEAR PLANT DOCKET 50-305 March 13,2003 Letter from Thomas Coutu (NMC)

To Regionat Administrator List of Electronic References Provided To The NRC For Examination Development

Docket 50-305 NRC-03-029 March 13,2003 , Page 1 ATTACHMENT I List of Electronic References Provided To The NRC For Examination Development

1. Fundamentals Lesson Plans (0-FND-LP-) [including Student Handouts]
2. Advanced Systems Lesson Plans [including Student Handouts]
3. Emergency Plan Training Lesson Plans [including Student Handouts]
4. Administrative Procedures Lesson Plans [including Student Handouts]
5. Normal Operations Lesson Plans and Simulator Exercises
6. Mandatory Abnormal Operations (AOP) Lesson Plans and Simulator Exercises
7. Accident & Transient Analysis (ATA) Lesson Plans and Simulator Exercises
8. Emergency Operating Procedure (EOP) Lesson Plans and Simulator Exercises
9. Abnormal / Emergency Operations (NE) Simulator Exercises
10. Initial Question Bank
11. JPM Bank
12. KNPP Technical Specifications (Information copy)
13. KNPP System Descriptions (Information copy)

ATTACHMENT 2 NUCLEAR MANAGEMENT COMPANY, LLC KEWAUNEE NUCLEAR PLANT DOCKET 50-305 March 13,2003 Letter from Thomas Coutu (NMC)

To Regional Administrator List of References To Be Provided To The NRC For Examination Development

Docket 50-305 NRC-03-029 March 13, 2003 , Page 1 ATTACHMENT II List of References To Be Provided To The NRC For Examination Development

1. Indexes of all (pertinent) procedures:
a. GNPs
b. NADs
c. Operating Procedures
d. ODls
e. Night Orders
f. IPEOPs
g. Alarm Response (Control Room & Local)
h. EPlPs
i. SPs (By System Numbers)
j. FPPs
k. RCCs I. RES
m. RFs
n. RXTs
2. All the following Procedures / Reference Books
a. Alarm Response Books (Control Room & Local)
b. EPlPs
c. Fire Plan
d. GNPs
e. IPEOPs
f. IPEOP Background Documents
g. MCCBook
h. Night Order Book
i. NADs
j. ODCM/REMM
k. Operating Procedure Books I. Operations Department Instructions (ODls)
m. Operator Aid - Tank Book
n. Plant Setpoint Control Document (Form NAD 4.6-1)
0. Reactor Data Manual
p. System Descriptions
q. Technical Specifications
r. USARBooks
s. Big Print Book (Operations Drawings)

Docket 50-305 NRC-03-029 March 13, 2003 , Page 2

3. Partial Procedure Books
a. SPs
i.48-002 ii.48-006 iii.48-008 iv.36-018 V.14-026, 14-026A, 14-026B vi.54-063 vii.54-064 viii.49-075 ix.56-078 X.36-082 xi.54-086 xii. 02-138B xiii.87-148 xiv.87-149 XV.87-151 xvi.87-214 xvii.45-230 xviii. 42-291A, 42-291-B xix. 42-312A, 42-312B XX. 25-326A, 25-326B
b. Refueling Procedures (RF)
i. 01.00 ii. 02.07 iii. 02.08 iv. 03.01
v. 03.02 vi. 04.09
c. HP Procedures
i. 01.004 ii. 01.005 iii. 01.008 iv. 01.019
v. 01.021 vi. 04.001 vii. 05.002

Docket 50-305 NRC-03-029 March 13, 2003 , Page 3

4. Training materials
a. Fundamentals Lesson Plans (0-FND-LP-) [including Student Handouts]
i. 2.1.6 ii. 2.2.1 iii. 2.2.2 iv. 2.2.3
v. 2.2.4 vi. 2.2.5 vii. 2.2.6 viii. 2.2.7 ix. 2.3.8
x. 2.3.9 xi. 2.4.7
b. All Advanced Systems Lesson Plans [including Student Handouts]
i. R02-02-LPs ii. R02-03-LPs iii. R02-04-LPs iv. R02-05-LPs
c. Emergency Plan Training Lesson Plans [including Student Handouts]
i. EPI-01-LP010 ii. 1-3-2 (to be updated to EPI-01-LPO11)
d. All Administrative Procedures Lesson Plans [including Student Handouts] -

R04-01-LPs

e. All Normal Operations Lesson Plans and Simulator Exercises
i. 0-NOP-LP D1 - D10 [including Student Handouts]

ii. 0-NOP-SEP D1 - D10

f. All mandatory Abnormal Operations (AOP) Lesson Plans and Simulator Exercises
i. 0-AOP-LP D 1 - D 13 [including Student Handouts]

ii. 0-AOP-SEP D 1 - D 12 OR R04-03-SE-DO1 - D12

g. Accident & Transient Analysis (ATA) Lesson Plans and Simulator Exercises
i. 0-ATA-LP 1 - 9 [including Student Handouts]

ii. 0-ATA-SEP 2, 3, 5 , 6, 8

Docket 50-305 NRC-03-029 March 13,2003 Attachment 2, Page 4

h. All Emergency Operating Procedure (EOP) Lesson Plans and Simulator Exercises
i. R04-04-LP001 - LP029, LP032, LP034 - LP043 [including Student Handouts]

ii. 0-EOP-SEP D 1 - D14

i. All Abnormal / Emergency Operations (NE) Simulator Exercises NE-SEPDI-D14
j. Question Bank(s)
k. JPMBank
5. Simulator materials
a. OpenSim Instructor Station Manual
b. Simulator Guidelines Book (SIMGLs)
c. Detailed lists:
i. Initial Conditions ii. Malfunctions iii. System Overrides iv. Remote Functions
d. List of Controllers, Meters, Switches, Lights and Annunciators with override capability.
e. List of known modeling conditions that could affect the exam.
f. List of performance test discrepancies not yet corrected (Open SWOs and their expected completion dates).
g. List of Simulator and Control Room differences.
6. Other
a. PRA / IPE information (failure modes)

.(

Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-056 10 CFR 55.40 May 14,2003 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532 - 4351 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE NO. DPR-43 REFERENCE MATERIALS FOR KEWAUNEE NUCLEAR POWER PLANT INITIAL LICENSING EXAMINATION WEEKS OF FEBRUARY 2 AND FEBRUARY 9,2004 As requested by Mr. C. Zoia, we are sending you the identified reference materials for use in preparing our examination. This material includes those documents specifically requested by Mr. Zoia, and other updated training and operating documents. These items, electronically formatted on the enclosed disc and the enclosed hard-copy materials, are identified in Attachment I .

You may direct any questions or comments regarding this material to Mr. Stephen Johnson at (920) 388-8723 or Mr. Wyatt Godes at (920) 388-8779.

Thomas Coutu Site Vice-president, Kewaunee Plant SPJ cc U.S. NRC Resident Inspector K. Davidson, NMC - KNPP W. Godes, NMC - KNPP T. Hunt, NMC - KNPP S. Johnson, NMC - KNPP Roger Lanksbury, Chief, Operations Branch w/o enc.

Charles Zoia w/enc.

Enclosure N490 Highway 42 Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

ATTACHMENT 1 NUCLEAR MANAGEMENT COMPANY, LLC KEWAUNEE NUCLEAR PLANT DOCKET 50-305 May 14,2003 Letter from Thomas Coutu (NMC)

To Regional Administrator Requested Reference Materials

. F c.

Docket 50-305 NRC-03-056 May 14,2003 Attachment 1, Page 1

1. Lesson Plans (electronic-CD enclosed)
a. R02-0 1-02 1
b. R02-01-023 C. R02-01-030
d. R02-01-031
e. R02-01-037
f. R02-0 1-045
g. R02-0 1-053
h. R02-01-361
i. R02-01-362
j. R02-01-36A
k. R02-01-366
2. Requested Surveillance Procedures (enclosed)
a. 05B-253
b. 056-283A C. 05B-2836
d. 05B-284
e. 05B-333
f. 05B-334A
g. 05B-3348
h.23-096
i. 25-263A
j. 25-263B
k. 31-168A I. 31-1686
m. 33-098A
n. 33-0986
0.33-110
p.33-144
q.33-191
r. 34-099A S. 34-0996
t. 42-047A U. 42-0476 V. 55-167-4
3. Updated Normal Operations Lesson Plans and Simulator Exercises (electronic)
a. R04-02-LPD01 - D17
b. R04-02-SEPD01 - D19
4. Updated Abnormal Operations (AOP) Lesson Plans and Simulator Exercises (electronic)
a. R04-03-LPD01 - D13 [except D05, 0101
b. R04-03-SED01 - D13 [except D05, DIO]
5. Miscellaneous document updates

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS60532-4351 July 16,2003 Mr. Thomas Coutu Site Vice President Kewaunee Nuclear Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS

Dear Mr. Coutu,

In a telephone conversation on June 17,2003,between Mr. D. McNeil of my staff and Mr.

D. Fitzwater, Kewaunee Operations Supervisor - LOR, it was confirmed that an initial license examination was scheduled to occur during the weeks of February 2, 2004, and February 9, 2004. On-site validation of the examination will occur at the station approximately 3 weeks before the examination administration. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We confirmed with Mr. Fitzwater that Region Ill examiners will develop the examination. We understand that you are training nine candidates for the examination. Please inform us if the number of candidates declines below seven as this will impact the examination schedule.

Finally, Mr. Fitzwater confirmed that the week of July 12,2004,scheduled for the biennial requalification program inspection (IP 711 1 1.I 1 B), was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. D.McNeil of my staff at 630-829-9737.

T. Coutu In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer K. Davison, Training Department

T. Coutu In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer K. Davison, Training Department DOCUMENT NAME: G:\DRS\KEW07 -03DRS OL.wpd 1

OFFICE RII1:DRS IC RII1:DRS It-l RIII:DRS Id 1 NAME MABies:sd AfUL-DMcNeil b RDLanksbury @I+

DATE 37 lh'/03 7 1 Pf103 '7 l i d /03 OFFICIAL RECORD COPY

T. Coutu ADAMS Distribution:

WDR DFT JGLI RidsNrrDipmIipb GEG HBC J FL C. Ariano (hard copy)

DRPlll DRSlll PLBI JRKI D. C. Trimble, NRR:DIPM:IOLB M. A. Bies, DRS

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 October 16, 2003 Mr. Thomas Coutu Site Vice President Kewaunee Nuclear Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-951 1

Dear Mr. Coutu:

In a telephone conversation on October 15, 2003, between Mr. S. Johnson, Kewaunee Initial License Training Exam Lead, and Mr. C. Phillips, NRC Chief Examiner, arrangements were made for the administration of licensing examinations at the Kewaunee Nuclear Power Plant the weeks of February 2 and February 9, 2004. In addition, the NRC will make an examination validation visit to your facility the week of January 12, 2004.

The NRC will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of NUREG-I 021, "Operator Licensing Examination Standards for Power Reactors." Your staff will be given the opportunity to review the examinations in the Region Ill office on January 7 and 8, 2004, and during the Validation Week of January 12, 2004.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OM6 approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

T. Coutu 2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006.

The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. S. Johnson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Phillips at 630-829-9739 or me at 630-829-9631.

In accordance with I O CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD:/lwww.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief v Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer

T. Coutu This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl @NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. S. Johnson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Phillips at 630-829-9739 or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qovlreadina-rm/adams.html(the Public Electronic Reading Room).

Sincerely, IRA by Michael Bielby Acting for/

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer W. Hunt, Training Department DOCUMENT NAME: G:DRS\Kew 101003 DRS.wpd ifb 0 7 J p d J L / r To receive a copy of this document, indicate in the box: " C = Copywithout attachmentieqclosure " E = Copy wfth attachmentienclosure " N = No copy OFFICE IRlll IG IRlll I I Iff I I I NAME DATE CPhillips:sd 1OAWO3 RLanksbury 10/lb/03 #6'/

OFFlClAL RECORD COPY fM I

T. Coutu ADAMS Distribution:

WDR DFT JGLI DCT RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlll PLBI JRKI M. A. Bies (correspondence copy)