ML110460648

From kanterella
Jump to navigation Jump to search
2011 Kewaunee Power Station Initial License Examination Administered In-Plant JPMs
ML110460648
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/2011
From: Walton R
Operations Branch III
To:
References
AO-036-JP09A, Rev. C
Download: ML110460648 (39)


Text

Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 12 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Locally Isolate Dilution Flow Paths JPM NUMBER:

AO-036-JP09A REV.

C RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

0360090404 - Respond to inadvertent Boron Dilution while at hot or cold shutdown K/A NUMBERS:

004 2.1.30 - CVCS: Ability to locate and operate components, including local controls IMP 4.4 / 4.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

X Perform:

EVALUATION LOCATION:

In-Plant:

X Control Room:

Simulator:

Other:

Classroom Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path / Faulted:

No TASK APPLICABILITY:

RO/SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/21/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/21/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hasting /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 12 JPM Number:

AO-036-JP09A JPM

Title:

Locally Isolate Dilution Flow Paths Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 12 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Evaluator Note: This JPM can begin from any location in the plant.

Evaluator Note: The valves operated during this JPM are as follows MU-1025 - Makeup water to Blender in the RCA next to SI pump A MU-1024 - Makeup Water to Mixing Tank Isol in the RCA East Wall by SI Pump A CVC-423 Mixing Tank to Charging Pump Suction Line Isol RCA East Wall SI Pump A MU-1031A/B RMW to 1A/B Boric Acid Transfer Pump Manifold above BATP-A/B

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 12 INITIAL CONDITIONS:

You are an extra operator on shift.

The plant is in Hot Shutdown.

The crew is responding to inadvertent boron dilution.

OP-KW-AOP-RC-006, Inadvertent Boron Dilution is in progress.

A boration of the RCS has been initiated per OP-KW-NOP-CVC-001.

The Steps in this JPM SHALL BE SIMULATED INITIATING CUES (IF APPLICABLE): The Unit supervisor directs you to LOCALLY verify dilution flow path isolation valves closed per Step 2.b of OP-KW-AOP-RC-006, Inadvertent Boron Dilution.

EVALUATOR CUE-When the performer has demonstrated how to locate the procedure then hand the performer a copy of the procedure..

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions.

Lets Begin

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 12 JPM PERFORMANCE INFORMATION Required Materials:

OP-KW-AOP-RC-006, Inadvertent Boron Dilution General

References:

OP-KW-AOP-RC-006, Inadvertent Boron Dilution Rev 0 Task Standards:

All dilution path valves verified closed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below. [OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: No Refer to AOP-RC-006 Step 2.b Standard:

Refer to AOP-RC-006 step2.b.

Evaluator Cue:

When the performer demonstrates how to locate the procedure then hand them a copy of AOP-RC-006.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 12 Performance Step: 2 Critical: No AOP-RC-006, Step 2.b:

ISOLATE Dilution Paths:

Locally VERIFY the following dilution flow path isolation valves CLOSED:

MU-1025, Makeup Water to Blender Standard:

VERIFY MU-1025 CLOSED by checking valve hand wheel is rotated fully clockwise and valve stem is down.

Evaluator Note:

The valve is located at the CVCS blender north side, just south of the SI Pump A motor.

Evaluator Cue:

The stem is fully down and the hand wheel is tight when rotated clockwise.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: Yes AOP-RC-006, Step 2.b:

ISOLATE Dilution Paths:

Locally VERIFY the following dilution flow path isolation valves CLOSED:

MU-1024, Makeup Water to Mixing Tank Isol Standard:

CLOSE MU-1024 by rotating the valve hand wheel fully clockwise.

Evaluator Note:

The valve is located at the inlet of the Chem Mixing Tank just south of the SI Pump A motor and along the EAST wall. Normal position is CLOSED, this valve is out of position for this JPM.

Evaluator Cue:

Valve stem is out (up).

As clockwise hand wheel operation is indicated, the hand wheel rotates until NO further motion occurs. The stem is fully down.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 12 Performance Step: 4 Critical: Yes AOP-RC-006, Step 2.b:

ISOLATE Dilution Paths:

Locally VERIFY the following dilution flow path isolation valves CLOSED:

CVC-423, Mixing Tank to Charging Pump Suct Line Isol Standard:

CLOSE CVC-423 by rotating the valve hand wheel fully clockwise.

Evaluator Note:

The valve is located at the inlet of the Chem Mixing Tank just south of the SI Pump A motor and along the EAST wall. Normal position is CLOSED, this valve is out of position for this JPM.

Evaluator Cue:

Valve stem is out (up).

As clockwise hand wheel operation is indicated, the hand wheel rotates until NO further motion occurs. The stem is fully down.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: No AOP-RC-006, Step 2.b:

ISOLATE Dilution Paths:

Locally VERIFY the following dilution flow path isolation valves CLOSED:

MU-1031A, RMW to 1A Boric Acid Transfer Pump Standard:

VERIFY MU-1031A CLOSED by checking valve hand wheel is rotated fully clockwise.

Evaluator Note:

The valve is located in the manifold above BATP A.

Evaluator Cue:

As clockwise handwheel operation is indicated, the handwheel is tight when rotated clockwise.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 12 Performance Step: 6 Critical: No AOP-RC-006, Step 2.b:

ISOLATE Dilution Paths:

Locally VERIFY the following dilution flow path isolation valves CLOSED MU-1031B, RMW to 1B Boric Acid Transfer Pump Standard:

VERIFY MU-1031B CLOSED by checking valve hand wheel is rotated fully clockwise.

Evaluator Note:

The valve is located in the manifold above BATP B.

Evaluator Cue:

As clockwise handwheel operation is indicated, the handwheel is tight when rotated clockwise.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: No AOP-RC-006, Step 2.b:

Report Step 2.b of OP-KW-AOP-RC-006 complete to the control room.

Standard:

Report Step 2.b of OP-KW-AOP-RC-006 complete to the control room.

Evaluator Cue:

Acknowledge completion of step 2.b of OP-KW-AOP-RC-006.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Completion of Step 2.b of OP-KW-AOP-RC-006 Stop Time:

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 12 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

AO-036-JP09A Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 12 TURNOVER SHEET INITIAL CONDITIONS:

You are an extra operator on shift.

The plant is in Hot Shutdown.

The crew is responding to inadvertent boron dilution.

OP-KW-AOP-RC-006, Inadvertent Boron Dilution is in progress.

A boration of the RCS has been initiated per OP-KW-NOP-CVC-001.

The Steps in this JPM SHALL BE SIMULATED INITIATING CUES (IF APPLICABLE): The Unit supervisor directs you to LOCALLY verify dilution flow path isolation valves closed per Step 2.b of OP-KW-AOP-RC-006, Inadvertent Boron Dilution.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Chris Brandt 01/21/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

AO-036-JP09A Locally Isolate Dilution Flow Paths, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMI-L-RO/SRO-S-01242011-109 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 12 Historical Record:

Rev. A:

Updated Task number. Replaces JPM AO-FRS-JP01B.

Updated Task Number.

Changed procedure to reflect task number.

Rev B Update to Job Aid 03-007 form.

Rev C Added note that JPM can begin from anywhere in the plant.

Added cue for obtaining the procedure at the beginning of the JPM Added evaluator note to beginning to describe all the valves to be operated Removed JPM not time critical from the initial conditions

Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 13

`

JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Remove Pressurizer PORV Fuses JPM NUMBER:

RO-E07-JP01H REV.

C RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

E070010501 Respond to a Fire in a Dedicated Zone K/A NUMBERS:

2.4.25 Knowledge of Fire Protection Procedures IMP 3.3 / 3.7 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

X Perform:

EVALUATION LOCATION:

In-Plant:

X Control Room:

Simulator:

Other:

Classroom Lab:

Time for Completion:

6 Minutes Time Critical:

Yes Alternate Path / Faulted:

No TASK APPLICABILITY:

RO/SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/20/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/20/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hasting /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 13 JPM Number:

RO-E07-JP01H JPM

Title:

Remove Pressurizer PORV Fuses Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 13 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

      • IMPORTANT***

CONTACT THE SHIFT MANAGER PRIOR TO STARTING THE JPM AND GET PERMISSION TO ENTER THE RELAY ROOM AND OPEN RELAY RACK DOORS 171, 174 AND 176. THERE ARE ONLY FUSES IN THESE PANELS AND YOU WILL NOT BREAK THE PLANE DURING PERFORMANCE OF THE JPM.

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 13 INITIAL CONDITIONS:

There is a fire in a Dedicated Zone.

The crew is performing OP-KW-AOP-FP-003, Fire In Dedicated Fire Zone.

The following items have been distributed to control Operator B per AOP-FP-003 Emergency keyring from CAS Two Way Radio Appendix R bag The crew entered OP-KW-AOP-FP-003 one minute ago.

The SRO/US has provided you with a field copy of AOP-FP-003 The Steps in this JPM SHALL BE SIMULATED unless directed otherwise.

THIS TASK IS TIME CRITICAL.

INITIATING CUES (IF APPLICABLE): You are Control Operator B and have been dispatched to Perform Attachment B of OP-KW-AOP-FP-003.

EVALUATOR - Hand the performer OP-KW-AOP-FP-003.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions.

Lets Begin

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 13 JPM PERFORMANCE INFORMATION Required Materials:

OP-KW-AOP-FP-003, Fire in Dedicated Fire Zone Fuses pullers, located in the Relay Room by the RR Doors. The operator should get these during the performance of the JPM.

General

References:

OP-KW-AOP-FP-003, Fire in Dedicated Fire Zone, Rev. 6 Task Standards:

Fuses removed per Attachment B Step B1 of OP-KW-AOP-FP-003.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below. [OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 13 Performance Step: 1 Critical: Yes Time Critical Step 1 and 3 Must be completed within 6 minutes AOP-FP-003, Attachment B, Step B1.a.

REMOVE the following Fuses:

In RR-171, REMOVE PRZR PORV B normal control fuses

  • Ckt 13 for PR-2B Standard:

(C)

1. Locate RR-171.
2. Identify fuses for Ckt 13 for PR-2B.
3. Remove fuses for Ckt 13 for PR-2B in RR-171.

Evaluator Cue:

WHEN the performer locates RR-171 and indicates that they would open the door for RR-171, THEN INFORM the performer to OPEN the relay rack door AND NOT to break the electrical plane.

WHEN the performer locates the fuses and indicates removal, THEN state The fuses are removed.

AFTER the performer has removed the FUSES, IF they look at the outside of the RR door then indicate that the associated Red indicating light for the circuit is NOT LIT.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 13 Performance Step: 2 Critical: Yes AOP-FP-003, Attachment B, Step B1.b.

REMOVE the following Fuses:

In RR-174, REMOVE SI Pump Makeup To Accumulator Fuses

  • Ckt 27 for SI-101A/B Standard:

(C)

1. Locate RR-174.
2. Identify fuses for Ckt 27 for SI-101A/B.
3. Remove fuses for Ckt 27 for SI-101A/B in RR-174.

Evaluator Cue:

WHEN the performer locates RR-174 and indicates that they would open the door for RR-174, THEN INFORM the performer to OPEN the relay rack door AND NOT to break the electrical plane.

WHEN the performer locates the fuses and indicates removal, THEN state The fuses are removed.

AFTER the performer has removed the FUSES, IF they look at the outside of the RR door then indicate that the associated Red indicating light for the circuit is NOT LIT.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 13 Performance Step: 3 Critical: Yes Time Critical Step 1 and 3 Must be completed within 6 minutes AOP-FP-003, Attachment B, Step B1.c.

REMOVE the following Fuses:

In RR-176, REMOVE PRZR PORV A Fuses

  • Ckt 12 for PR-2A Standard:

(C)

1. Locate RR-176.
2. Identify fuses for Ckt 12 for PR-2A.
3. Remove fuses for Ckt 12 for PR-2A in RR-176.

Evaluator Cue:

WHEN the performer locates RR-176 and indicates that they would open the door for RR-176, THEN INFORM the performer to OPEN the relay rack door AND NOT to break the electrical plane.

WHEN the performer locates the fuses and indicates removal, THEN state The fuses are removed.

AFTER the performer has removed the FUSES, IF they look at the outside of the RR door then indicate that the associated Red indicating light for the circuit is NOT LIT.

Evaluator Note:

Rubber electrical safety gloves are not required for performance of fuse removal with the fuse pullers. The performer may still indicate that they would wear electrical safety class 0 gloves Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 13 Performance Step: 4 Critical: Yes AOP-FP-003, Attachment B, Step B1.d.

REMOVE the following Fuses:

In RR-176, REMOVE RX/PRZR Head Vent to Containment Fuses

  • Ckt 39 for RC-49 Standard:

(C)

1. Locate RR-176.
2. Identify fuses for Ckt 39 for RC-49.
3. Remove fuses for Ckt 39 for RC-49 in RR-176.

Evaluator Cue:

WHEN the performer locates RR-176 and indicates that they would open the door for RR-176, THEN DO NOT let the performer open the door for RR-176.

WHEN the performer locates the fuses and indicates removal, THEN state The fuses are removed.

AFTER the performer has removed the FUSES, IF they look at the outside of the RR door then indicate that the associated Red indicating light for the circuit is NOT LIT.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the performer has removed all the Fuses in step B1 of Attachment B in OP-KW-AOP-FP-003.

Stop Time:

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 13 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

RO-E07-JP01H Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 13 TURNOVER SHEET INITIAL CONDITIONS:

There is a fire in a Dedicated Zone.

The crew is performing OP-KW-AOP-FP-003, Fire In Dedicated Fire Zone.

The crew entered and completed OP-KW-AOP-FP-003 up to and including Step 4.

The crew entered OP-KW-AOP-FP-003 one minute ago.

The SRO/US has provided you with a field copy of AOP-FP-003 The Steps in this JPM SHALL BE SIMULATED unless directed otherwise.

THIS TASK IS TIME CRITICAL.

INITIATING CUES (IF APPLICABLE): You are Control Operator B and have been dispatched to Perform Attachment B of OP-KW-AOP-FP-003.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Chris Brandt 01/20/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

RO-E07-JP01H Remove Pressurizer PORV Fuses, Rev C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMJ-L-RO/SRO-S-01242011-110 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 13 Historical Record:

Rev A New.

Rev B Updated to Job Aid Form 03-007 Rev C Updated initial conditions to state items in step 4 of AOP-FP-003 have been distributed rather than the step has been completed Updated the initial conditions to add The SRO/US has provided you with a field copy of AOP-FP-003 Added evaluator note to step 2 that electrical safety gloves class 0 are not required for the performance of removing fuses.

Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 14 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Emergency Shutdown of Diesel Generator B JPM NUMBER:

AO-010-JP021 REV.

C RELATED PRA INFORMATION:

System ranked 1st in importance to at-power CDF = 3.6E-5/yr System ranked 4th in importance to at-power LERF = 1.6E-6/yr TASK NUMBER(S) /

TASK TITLE(S):

0100020504 / Perform a Diesel Generator Emergency Shutdown K/A NUMBERS:

064K1.03 Knowledge of the physical connections and/or cause-effect relationships between the ED/G System and the following systems: Diesel fuel oil supply system. IMP 3.6 / 4.0 2.1.30 Ability to locate and operate components, including local controls. IMP 4.4 / 4.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

X Perform:

EVALUATION LOCATION:

In-Plant:

X Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path / Faulted:

Yes TASK APPLICABILITY:

AO / RO / SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/20/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/20/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 14 JPM Number:

AO-010-JP021 JPM

Title:

Emergency Shutdown of Diesel Generator B Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 14 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

You are an Extra Operator on shift.

The Plant is in MODE 3 [CTS - HOT SHUTDOWN].

Surveillance OP-KW-OSP-DGE-001B, Diesel Generator B Monthly Availability Test, was in progress.

When the operator attempted to shutdown Diesel Generator B, it did NOT respond to the Control Room control Diesel Engine B being taken to STOP and then to PULLOUT.

KW-OP-AOP-DGM-002B, Abnormal Diesel Generator B Operation, was entered.

An Emergency Shutdown of DG B per AOP-DGM-002B is in progress, Step 29 is complete.

THE STEPS IN THIS JPM SHOULD BE: SIMULATED INITIATING CUES (IF APPLICABLE):

The US has directed you to continue the Emergency Shutdown of DG B per AOP-DGM-002B starting at step 30.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets Begin

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 14 JPM PERFORMANCE INFORMATION Required Materials:

AOP-DGM-002B with Step 1 placekeeping (circle/slash) and Perform Emergency Shutdown block in table circled; Step 29 placekeeping (29.a and 29.b circle/slash);

step 30 number circled.

General

References:

OP-KW-OSP-DGE-001B, Diesel Generator B Monthly Availability Test, Rev. 12 OP-KW-AOP-DGM-002B, Abnormal Diesel Generator B Operation, Rev. 4 Task Standards:

Diesel Generator B stopped by local action.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.

[OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

NOTE: Normally double hearing protection is required in the DG Rooms during operation of the DG.

The operator should identify the need for the double hearing protection.

CUE: For performance of this JPM hearing protection is NOT required since the DG is NOT actually running. This use of this PPE is only suspended only in this case to allow for better communications during the performance of this JPM.

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 14 Performance Step: 1 Critical: No AOP-DGM-002B, Step 30:

Check Diesel Generator Speed - LESS THAN 980 RPM.

Standard:

Determine Diesel Generator B speed is less than 980 RPM.

Evaluator Note:

The Operator may either check the engine speed locally or may contact the control room for the engine rpm value.

DG 1B tachometer is located at bottom right side of panel On Diesel Engine Control Panel D-1B.

Evaluator Cue:

Locally if DG 1B Tachometer checked, indicate the value is 880 RPM.

If contacted as control room operator: DG B speed is about 880 RPM.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: No AOP-DGM-002B, Step 31:

CHECK Diesel Generator B SHUTDOWN Standard:

Determine DG B is NOT shutdown.

Evaluator Cue:

Provide response that indicates DG B is still running: sound, mechanical movement of components, running indicators.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 14 Performance Step: 3 Critical: No AOP-DGM-002B, Step 31.a RNO:

Locally PERFORM the following in sequence until Diesel Generator B is SHUTDOWN:

At Engine Control Panel, POSITION 1B Diesel Engine Control Switch to STOP.

Standard:

1B Diesel Selector Switch is taken to STOP.

Determine DG B is NOT shutdown.

Evaluator Note:

On Diesel Engine Control Panel D-1B. Switch spring returns to RUN (MANUAL) position when released..

Evaluator Cue:

After operation of switch to STOP: No change in sound or condition of DG.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 14 Performance Step: 4 Critical: Yes AOP-DGM-002B, Step 31.b RNO:

Locally PERFORM the following in sequence until Diesel Generator B is SHUTDOWN:

In Diesel Day Tank Room, CLOSE Fuel Oil Tank 1B1 and 1B2 to Diesel Gen B valves FO-100B1 FO-100B2 Standard:

Both valves CLOSED:

FO-100B1 FO-100B2 Evaluator Note:

Valve is normally open. It will not turn in counter-clockwise direction.

Evaluator Cue:

For each valve operated:

  • The hand-wheel turns (clockwise direction) until no further movement occurs.

20 seconds after last valve is closed: Begin to hear sputtering from the engine.

30 seconds after last valve is closed: Room becomes quiet as engine quits.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 14 Performance Step: 5 Critical: No AOP-DGM-002B, Step 31.c RNO:

Locally PERFORM the following in sequence until Diesel Generator B is SHUTDOWN:

POSITION non-porous material (plastic) over DG B air filters to restrict combustion air.

Standard:

Look for plastic material to place over DG B air filter.

[If Fuel Oil valves NOT closed in Performance Step 4, then this step becomes CRITICAL:]

Sufficient material placed over DG B air filter inlet to block all air intake.

Evaluator Note:

It is expected that this step and Steps 31.d & 31.e RNO actions will NOT be completed since the DG will stop 30 seconds after the fuel oil is isolated.

These actions will be provided in the event the operator fails to close the fuel oil valves.

Evaluator Cue:

If required, when it is indicated that material is placed over turbo fresh air filters inlet:

After 10 seconds: Begin to hear sputtering from engine.

After 20 seconds: Room becomes quiet as engine quits.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 14 Performance Step: 6 Critical: No AOP-DGM-002B, Step 31.d RNO:

Locally PERFORM the following in sequence until Diesel Generator B is SHUTDOWN:

Evacuate Personnel from 1B Diesel Room.

Standard:

Leaves 1B Diesel Room.

Evaluator Note:

It is expected that this step and Step 31.e RNO actions will NOT be completed since the DG will stop 30 seconds after the fuel oil is isolated.

These actions will be provided in the event the operator fails to close the fuel oil valves and block air intake.

This is for safety reasons prior to flooding room the CO2.

Evaluator Cue:

You are the only person currently in the room.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 14 Performance Step: 7 Critical: No AOP-DGM-002B, Step 31.e RNO:

Locally PERFORM the following in sequence until Diesel Generator B is SHUTDOWN:

Locally ACTUATE CO2 to Diesel Generator Room B:

1. OPEN red Cardox To Operate pushbutton cover.
2. PRESS pushbutton and VERIFY neon light goes out.

Standard:

[If Fuel Oil valves NOT closed in Performance Step 4 and DG B air intake NOT blocked in Performance Step 5, then this step becomes CRITICAL:]

CO2 actuated to Diesel Room B.

Evaluator Note:

It is expected that this step RNO actions will NOT be completed since the DG will stop 30 seconds after the fuel oil is isolated. These actions will be provided in the event the operator fails to close the fuel oil valves and block air intake.

Evaluator Cue:

When cover lift indicated: pushbutton is exposed.

When pushbutton pressed: Neon light extinguishes. A whooshing sound is heard from the CO2 piping.

After 10 seconds: Noise in Diesel B room decreases as engine quits.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: No AOP-DGM-002B, Step 31.f RNO:

CHECK Diesel Generator B SHUTDOWN Observe control board meters for shutdown indication.

Standard:

Contact Control Room to confirm Diesel Generator B shutdown indications.

Evaluator Cue:

As Control Operator: Acknowledge report related to DG B shutdown and confirm indications show DG B shutdown.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When control room notified of DG B status: This JPM is complete.

Stop Time:

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 14 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

MARKED UP COPY AOP-DGM-002B REV 4

AO-010-JP021, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 14 TURNOVER SHEET INITIAL CONDITIONS:

You are an Extra Operator on shift.

Surveillance OP-KW-OSP-DGE-001B, Diesel Generator B Monthly Availability Test, was in progress.

The Plant is in MODE 3 [CTS - HOT SHUTDOWN].

When the operator attempted to shutdown Diesel Generator B, it did NOT respond to the Control Room control Diesel Engine B being taken to STOP and then to PULLOUT.

KW-OP-AOP-DGM-002B, Abnormal Diesel Generator B Operation, was entered.

An Emergency Shutdown of DG B per AOP-DGM-002B is in progress, Step 29 is complete.

THE STEPS IN THIS JPM SHOULD BE: SIMULATED INITIATING CUES (IF APPLICABLE):

The US has directed you to continue the Emergency Shutdown of DG B per AOP-DGM-002B starting at step 30.

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 14 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Chris Brandt 01/20/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

AO-010-JP021, Emergency Shutdown of Diesel Generator B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMK-L-RO/SRO-S-01242011-111 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 14 Historical Record:

Rev. A:

Original Rev. B:

Updated to JPM Template Job Aid 03-007 Changed revision number for AOP-DGM-002B Minor layout changes and typo corrections Rev C PRA information updated on cover sheet Corrected Typo on Step 4 evaluator cue