2011 Kewaunee Power Station, Initial License Examination ES-301-5 Forms
ML110460256
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/2011
From: Walton R
Operations Branch III
To:
References
Download: ML110460256 (2)


Text

KPS-ES-301-5-CREWABC-A-L-11022010-058 ES-301 Transient and Event Checklist Form ES-301-5 Facility: Kewaunee Power Station Date of Exam: 2/7-14/2010 Operating Test Number: Crews A, B, & C A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

RO SRO-I SRO-U RX 1

1 1

1 0

NOR 1

1 1

1 1

I/C 3,6 3,5,6 5

4 4

2 MAJ 5

4 2

2 2

1 TS 0

0 2

2 RO SRO-I SRO-U RX 1

1 2

1 1

0 NOR 1

1 1

1 1

I/C 2,4 2,3,5,6 6

4 4

2 MAJ 5

4 2

2 2

1 TS 2,3 2

0 2

2 RO SRO-I SRO-U RX 1

1 1

1 0

NOR 1

1 2

1 1

1 I/C 2,3,4,6 2

5 4

4 2

MAJ 5

4 2

2 2

1 TS 2,4 2

0 2

2 RO SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 4

4 2

MAJ 2

2 1

TS 0

2 2

Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301, Page 26 of 27

KPS-ES-301-5-A-L-CREWD-D-11022010-057 ES-301 Transient and Event Checklist Form ES-301-5 Facility: Kewaunee Power Station Date of Exam: 2/7-14/2010 Operating Test Number: Crew D A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

RO SRO-I SRO-U RX 1

1 1

1 0

NOR 1

1 2

1 1

1 I/C 3,6 3,5,6 5

4 4

2 MAJ 5

4 3

3 2

2 1

TS 0

0 2

2 RO SRO-I SRO-U RX 1

1 1

3 1

1 0

NOR 1

1 2

1 1

1 I/C 2,4 2,3,5,6 2,4,5 9

4 4

2 MAJ 5

4 3

3 2

2 1

TS 2,3 1

3 0

2 2

RO SRO-I SRO-U RX 1

1 2

1 1

0 NOR 1

1 2

1 1

1 I/C 2,3,4,6 2

2,5 7

4 4

2 MAJ 5

4 3

3 2

2 1

TS 2,4 2

0 2

2 RO SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 4

4 2

MAJ 2

2 1

TS 0

2 2

Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301, Page 26 of 27