ML110460256
| ML110460256 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/11/2011 |
| From: | Walton R Operations Branch III |
| To: | |
| References | |
| Download: ML110460256 (2) | |
Text
KPS-ES-301-5-CREWABC-A-L-11022010-058 ES-301 Transient and Event Checklist Form ES-301-5 Facility: Kewaunee Power Station Date of Exam: 2/7-14/2010 Operating Test Number: Crews A, B, & C A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 3,6 3,5,6 5
4 4
2 MAJ 5
4 2
2 2
1 TS 0
0 2
2 RO SRO-I SRO-U RX 1
1 2
1 1
0 NOR 1
1 1
1 1
I/C 2,4 2,3,5,6 6
4 4
2 MAJ 5
4 2
2 2
1 TS 2,3 2
0 2
2 RO SRO-I SRO-U RX 1
1 1
1 0
NOR 1
1 2
1 1
1 I/C 2,3,4,6 2
5 4
4 2
MAJ 5
4 2
2 2
1 TS 2,4 2
0 2
2 RO SRO-I SRO-U RX 1
1 0
NOR 1
1 1
I/C 4
4 2
MAJ 2
2 1
TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27
KPS-ES-301-5-A-L-CREWD-D-11022010-057 ES-301 Transient and Event Checklist Form ES-301-5 Facility: Kewaunee Power Station Date of Exam: 2/7-14/2010 Operating Test Number: Crew D A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 1
1 1
1 0
NOR 1
1 2
1 1
1 I/C 3,6 3,5,6 5
4 4
2 MAJ 5
4 3
3 2
2 1
TS 0
0 2
2 RO SRO-I SRO-U RX 1
1 1
3 1
1 0
NOR 1
1 2
1 1
1 I/C 2,4 2,3,5,6 2,4,5 9
4 4
2 MAJ 5
4 3
3 2
2 1
TS 2,3 1
3 0
2 2
RO SRO-I SRO-U RX 1
1 2
1 1
0 NOR 1
1 2
1 1
1 I/C 2,3,4,6 2
2,5 7
4 4
2 MAJ 5
4 3
3 2
2 1
TS 2,4 2
0 2
2 RO SRO-I SRO-U RX 1
1 0
NOR 1
1 1
I/C 4
4 2
MAJ 2
2 1
TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27