ML110460633
| ML110460633 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/11/2011 |
| From: | Walton R Operations Branch III |
| To: | |
| References | |
| RO-E00-JP012, Rev C | |
| Download: ML110460633 (133) | |
Text
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 22 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Failure of ICS to Automatically Initiate.
JPM NUMBER:
RO-E00-JP012 REV.
C RELATED PRA INFORMATION:
None TASK NUMBER(S) /
TASK TITLE(S):
E000010501 Respond to a Reactor Trip with Safety Injection K/A NUMBERS:
011EA1.04 - Ability to operate and monitor the following as they apply to Large Break LOCA: ESF actuation system in manual IMP 4.4 / 4.4 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Classroom Lab:
Time for Completion:
15 Minutes Time Critical:
No Alternate Path / Faulted:
YES TASK APPLICABILITY:
RO/SRO Additional signatures may be added as needed.
Developed by: Andy Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andy Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 22 JPM Number:
RO-E00-JP012 JPM
Title:
Failure of ICS to Automatically Initiate Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 22 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 22 INITIAL CONDITIONS:
The Reactor was initially operating at 100% Rated Thermal Power.
Steam Generator A is Faulted Inside of Containment.
The Reactor Tripped and SI initiated.
Feed Flow to A S/G is isolated.
The immediate actions of E-0 have been completed.
INITIATING CUES (IF APPLICABLE): You are the Reactor Operator and the Unit Supervisor directs you to perform E-0 Attachment A. Other actions are being performed by the crew.
EVALUATOR - Hand the performer Attachment A of E-0 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Direct the booth operator to go to run on the simulator. - Lets Begin.
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 22 JPM PERFORMANCE INFORMATION Required Materials:
Attachment A of E-0 Reactor Trip or Safety Injection General
References:
E-0, Reactor Trip or Safety Injection, Rev 41 Task Standards:
ICS equipment aligned and operating per E-O Attachment A Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.
[OTH 12765]
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: The examinee may pull forward the step to start the ICS pumps. This is acceptable. The examinee should inform the US of their actions.
Performance Step: 1 Critical: No E-0 Attachment A, A.1 Notify Plant Personnel Using Gaitronics
- a. Announce the following:
Attention in the Plant.
Attention in the plant.
Safety Injection has occurred.
Safety Injection has occurred.
Standard:
Use the Gaitronics to announce the following:
Attention in the Plant.
Attention in the plant.
Safety Injection has occurred.
Safety Injection has occurred.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 22 Performance Step: 2 Critical: No E-0 Attachment A, A.2 CHECK Feedwater Isolation
Ensure Main Feedwater Flow Control Valves - BOTH CLOSED FW-7A for SG A FW-7B for SG B Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical: No E-0 Attachment A, A.2 CHECK Feedwater Isolation
- b. ENSURE Main Feedwater Bypass Flow Control Valves - BOTH CLOSED FW-10A for SG A FW-10B for SG B Standard:
Ensure Main Feedwater Bypass Flow Control Valves - BOTH CLOSED FW-10A for SG A FW-10B for SG B Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical: No E-0 Attachment A, A.2 CHECK Feedwater Isolation
Ensure Feedwater Isolation Valves - BOTH CLOSED FW-12A for SG A FW-12B for SG B Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 22 Performance Step: 5 Critical: No E-0 Attachment A, A.2 CHECK Feedwater Isolation
Ensure Main Feedwater Pumps - BOTH OFF FW Pump A FW Pump B Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Critical: No E-0 Attachment A, A.3 CHECK SI Pumps - BOTH RUNNING SI Pump A SI Pump B Standard:
Check Both SI pumps running by verifying the following for Both SI Pumps:
Red Light ON Motor Amps Indicated Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical: No E-0 Attachment A, A.4 CHECK RHR Pumps - BOTH RUNNING RHR Pump A RHR Pump B Standard:
Check Both RHR pumps running by verifying the following for Both RHR Pumps:
Red Light ON RHR Flow Motor Amps Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 22 Performance Step: 8 Critical: No E-0 Attachment A, A.5 CHECK CC Pumps - BOTH RUNNING CC Pump A CC Pump B Standard:
Check Both CC pumps running by verifying the following for Both CC Pumps:
Red Light ON Pressure Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Critical: No E-0 Attachment A, A.6 CHECK Containment and Containment Ventilation Isolation:
- a. Check CI Active Status Panel Lights - ALL LIT Standard:
Check CI Active Status Panel Lights - ALL LIT Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 Critical: No E-0 Attachment A, A.6 CHECK Containment and Containment Vent Isolation:
- b. PLACE Control Switches for Letdown Orifice Isolation valves to CLOSE LD-4A LD-4B LD-4C Standard:
Place Control Switch for LD-4A to CLOSE Evaluator Note:
LD-4B & LD-4C control switches are already in CLOSE Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 22 Performance Step: 11 Critical: No E-0 Attachment A, A.7 CHECK if Main Steam Lines Can Remain Open:
- a. CHECK main steam isolation and bypass valves - ANY OPEN MS-1A for SG A MS-2A for SG A MS-1B for SG B MS-2B for SG B Standard:
Determine NO main steam isolation or bypass valves OPEN and GO TO Step A.8 per RNO A.7 Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 Critical: Yes E-0 Attachment A, A.8 (CAS) CHECK Containment Spray NOT Required:
- a. CHECK containment pressure - HAS REMAINED BELOW 23 PSIG Standard:
Determine that containment pressure exceeded 23 psig using pen trend recorders 42597 or 42598, or PPCS.
Evaluator Note:
If the performer does not proceed to the RNO to establish containment spray at this time then allow the individual to continue through Attachment A until they inform the Unit Supervisor that Attachment A is Complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 22 Performance Step: 13 Critical: No E-0 Attachment A, A.8 RNO ESTABLISH containment spray:
- 1. CHECK containment spray actuated:
- a. Annunciator CONTAINMENT SPRAY ACTUATED lit.
47021-F Standard:
Identify that Containment Spray Has NOT actuated.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 14 Critical: No E-0 Attachment A, A.8 RNO ESTABLISH containment spray:
- 2. IF containment spray has NOT actuated, THEN manually ACTUATE containment spray Standard:
Depress BOTH TRAINS of containment spray manual actuation Push Buttons at the same time.
Evaluator Note:
ICS pushbuttons will fail to actuate ICS Evaluator Cue:
If the performer informs the Unit supervisor of the component manipulation then acknowledge with three part communication Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 22 Performance Step: 15 Critical: Yes E-0 Attachment A, A.8 RNO ESTABLISH containment spray:
- 3. ENSURE all Containment Spray Pump Discharge valves open.
ICS-5A for Pump A ICS-6A for Pump A ICS-5B for Pump B ICS-6B for Pump B Standard: All actions in this step Critical Position Control Switch for ICS-5A to OPEN and VERIFY ICS-5A OPEN by RED Light LIT and GREEN Light OUT.
Position Control Switch for ICS-6A to OPEN and VERIFY ICS-6A OPEN by RED Light LIT and GREEN Light OUT.
Position Control Switch for ICS-5B to OPEN and VERIFY ICS-5B OPEN by RED Light LIT and GREEN Light OUT.
Position Control Switch for ICS-6B to OPEN and VERIFY ICS-6B OPEN by RED Light LIT and GREEN Light OUT.
Evaluator Cue:
If the performer informs the Unit supervisor of the component manipulation then acknowledge with three part communication Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 22 Performance Step: 16 Critical: Yes E-0 Attachment A, A.8 RNO ESTABLISH containment spray:
(C)
(C)
Verify SI Sequencer Complete based on time since SI initiation.
Inform US starting ICS pumps Position ICS Pump A control switch to start and ensure ICS Pump A RED Light LIT and GREEN Light OFF.
Ensure ICS Pump A Motor Amps indicate ICS Pump A is running Position ICS Pump B control switch to start and ensure ICS Pump B RED Light LIT and GREEN Light OFF.
Ensure ICS Pump B Motor Amps indicate ICS Pump B is running Evaluator Cue:
Acknowledge starting of ICS pumps Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 22 Performance Step: 17 Critical: Yes E-0 Attachment A, A.8 RNO ESTABLISH containment spray:
- 5. ENSURE both Caustic Additive To Containment Spray Valves OPEN.
CI-1001A CI-1001B Standard:
Position Control Switch for CI-1001A to OPEN and ensure CI-1001A OPEN by RED Light LIT and GREEN Light OUT.
Position Control Switch for CI-1001B to OPEN and ensure CI-1001B OPEN by RED Light LIT and GREEN Light OUT.
Evaluator Note:
If the performer does not establish containment spray at this time then allow the individual to continue through Attachment A until they inform the Unit Supervisor that Attachment A is Complete, otherwise completion of this step completes the JPM.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When the performer has aligned ICS per E-O Attachment then State This Completes the JPM Stop Time:
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 22 During the evaluation, the trainee:
Performed the task correctly and in accordance with procedure usage and adherence requirements.
Yes No Never put anyones safety at risk.
Yes No Never put equipment reliability at risk.
Yes No Never violated radiological work practices.
Yes No Demonstrated effective use of event-free human performance tools.
Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 22 SIMULATOR SET UP:
Reset the simulator to any Full power IC Go to RUN Run CAEP file RO-E00-JP012.
Insert Trigger 1.
Perform Immediate actions of E-0 Isolate AFW flow to A S/G Establish 210-250 gpm AFW flow Go to Freeze Snap the IC if desired - If snapping the IC for each reset the blind triggers need to be accepted each time.
Codes for malfunctions in CAEP File.
INPUT
SUMMARY
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 16 of 22 Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS 47034-O SER1670 Source Range High Flux At Shutdown Alarm Blocked 00:00:00 00:00:00 Preload Block Block MS02A Main Steam Line Rupture Inside Containment (1A) 00:00:00 00:00:00 1
0 20 1
SER0172 47021-F Containment Spray Actuated 00:00:00 00:00:00 N/A Block Block Preload CS03A Failure to Auto Start, ICS Pump 1A 00:00:00 00:00:00 N/A False True Preload CS03B Failure to Auto Start, ICS Pump 1B 00:00:00 00:00:00 N/A False True Preload FW16B Failure to Auto Start, AFW Pump 1B 00:00:00 00:00:00 N/A False True Preload
- Denotes Malfunctions that preload with ALL IC loads REMOTE FUNCTIONS IA101 AIR COMPRESSOR 1C LOCAL CONTROL AUTO/OFF/ON 00:00:00 00:00:00 N/A Auto Off Preload OVERRIDES MCC DI-46351-Close ICS-5A 00:00:00 00:00:00 N/A Off On Preload MCC DO-46351-R ISC-5A 00:00:00 00:00:00 N/A Off Off Preload MCC DO-46351-G ISC-5A 00:00:00 00:00:00 N/A Off On Preload MCC DI-46352-Close ICS-6A 00:00:00 00:00:00 N/A Off On Preload MCC-DO-46352-R ICS-6A 00:00:00 00:00:00 N/A Off Off Preload MCC DO-46352-G ICS-6A 00:00:00 00:00:00 N/A Off On Preload MCC DI-46353-Close ICS-5B 00:00:00 00:00:00 N/A Off On Preload MCC DO-46353-R ICS-5B 00:00:00 00:00:00 N/A Off Off Preload
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 17 of 22 INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MCC DO-46353-G ICS-5B 00:00:00 00:00:00 N/A Off On Preload MCC-DI-46354-Close ICS-6B 00:00:00 00:00:00 N/A Off On Preload MCC-DO-46354-R ICS-6B 00:00:00 00:00:00 N/A Off Off Preload MCC-DO-46354-G ICS-6B 00:00:00 00:00:00 N/A Off On Preload MCC DI-467471-01-Initiate Cntmt Spray Train A Start 00:00:00 00:00:00 N/A Off Off Preload MCC DI-467474-01-Initiate Cntmt Spray Train B Start 00:00:00 00:00:00 N/A Off Off Preload MCC DO-46401-G CI-1001A 00:00:00 00:00:00 N/A Off On Preload MCC DO-46401-R CI-1001A 00:00:00 00:00:00 N/A Off Off Preload MCC-DI-46401-Close CI-1001A 00:00:00 00:00:00 N/A Norm Norm Preload MCC DO-46402-G CI-1001B 00:00:00 00:00:00 N/A Off On Preload MCC DO-46402-R CI-1001B 00:00:00 00:00:00 N/A Off Off Preload MCC DI-46402-Close CI-1001B 00:00:00 00:00:00 N/A Norm Norm Preload
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 18 of 22 BLIND TRIGGERS (GUN SYMBOL)
Event# 12 Event Action: hwzcst6401(2)==1.0 Command: DOR DI-46402-Close Trigger activates on CI-1001A switch operation providing indication of valve opening Event# 13 Event Action: hwzcst6401(2)==1.0 Command: DOR DO-46402-R Trigger activates on CI-1001A switch operation providing indication of valve opening Event# 14 Event Action: hwzcst6401(2)==1.0 Command: DOR DO-46402-G Trigger activates on CI-1001A switch operation providing indication of valve opening Event# 15 Event Action: hwzcst6401(1)==1.0 Command: DOR DI-46401-Close Trigger activates on CI-1001B switch operation providing indication of valve opening Event# 16 Event Action: hwzcst6401(1)==1.0 Command: DOR DO-46401-R Trigger activates on CI-1001B switch operation providing indication of valve opening Event# 17 Event Action: hwzcst6401(1)==1.0 Command: DOR DO-46401-G Trigger activates on CI-1001B switch operation providing indication of valve opening Event# 18 Event Action: hwzcst5254(2)==1.0 Command: DOR DO-46354-G Trigger activates on ICS-6B switch operation providing indication of valve opening Event# 19 Event Action: hwzcst5254(2)==1.0 Command: DOR DO-46354-R Trigger activates on ICS-6B switch operation providing indication of valve opening Event# 20 Event Action: hwzcst5254(2)==1.0 Command: DOR DI-46354-Close Trigger activates on ICS-6B switch operation providing indication of valve opening Event# 21 Event Action: hwzcst5254(1)==1.0 Command: DOR DO-46352-G Trigger activates on ICS-6A switch operation providing indication of valve opening
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 19 of 22 Event# 22 Event Action: hwzcst5254(1)==1.0 Command: DOR DO-46352-R Trigger activates on ICS-6A switch operation providing indication of valve opening Event# 23 Event Action: hwzcst5254(1)==1.0 Command: DOR DI-46352-Close Trigger activates on ICS-6A switch operation providing indication of valve opening Event# 24 Event Action: hwzcst5153(2)==1.0 Command: DOR DO-46353-G Trigger activates on ICS-5B switch operation providing indication of valve opening Event# 25 Event Action: hwzcst5153(2)==1.0 Command: DOR DO-46353-R Trigger activates on ICS-5B switch operation providing indication of valve opening Event# 26 Event Action: hwzcst5153(2)==1.0 Command: DOR DI-46353-Close Trigger activates on ICS-5B switch operation providing indication of valve opening Event# 27 Event Action: hwzcst5153(1)==1.0 Command: DOR DO-46351-G Trigger activates on ICS-5A switch operation providing indication of valve opening Event# 28 Event Action: hwzcst5153(1)==1.0 Command: DOR DO-46351-R Trigger activates on ICS-5A switch operation providing indication of valve opening Event# 29 Event Action: hwzcst5153(1)==1.0 Command: DOR DI-46351-Close Trigger activates on ICS-5A switch operation providing indication of valve opening
RO-E00-JP012, REV C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 20 of 22 TURNOVER SHEET INITIAL CONDITIONS:
The Reactor was initially operating at 100% Rated Thermal Power.
Steam Generator A is Faulted Inside of Containment.
The Reactor Tripped and SI initiated.
Feed Flow has been isolated to A S/G.
The immediate actions of E-0 have been completed.
INITIATING CUES (IF APPLICABLE): You are the Reactor Operator and the Unit Supervisor directs you to perform E-0 Attachment A. Other Actions are being performed by the crew.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 21 of 22 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written.
The individual(s) performing the validation shall sign and date this form.
Chris Brandt 01/19/2011 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-E00-JP012 Rev C, Failure of ICS to Automatically Initiate Retention: Life of plant insurance policy + 10 years KPS-SystemJPMA-L-RO/SRO-S-01212011-103 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 22 of 22 Historical Record:
Rev A New.
Rev B - Used in LOR Rev C Converted to Job Aid Format.
Added directions if using a snap to accept blind triggers Typo Corrected for Step 16 Made Step Critical to Identify ICS required.
Removed Cue steps for this JPM is not time critical and the steps of this JPM are to be performed. -
NRC Comment
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 24 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Perform Control Rod Exercise JPM NUMBER:
RO-049-JP01D REV.
A RELATED PRA INFORMATION:
N/A TASK NUMBER(S) /
TASK TITLE(S):
0490010201 / Perform Control Rod Exercise K/A NUMBERS:
001A4.03 RO/SRO Imp 4.2 / 4.1 2.1.13 RO/SRO Imp 4.3 / 4.4 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Lab:
Time for Completion:
20 Minutes Time Critical:
No Alternate Path / Faulted:
No TASK APPLICABILITY:
RO / SRO Additional signatures may be added as needed.
Developed by: Stephen Johnson /s 09/17/2010 Instructor Date Validated by: Andrew Fahrenkrug /s 10/30/2010 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 11/08/2010 Training Supervisor Date Approved by: Mark Goolsbey /s 11/10/2010 Facility Representative Date
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 24 JPM Number:
RO-049-JP01D JPM
Title:
Perform Control Rod Exercise Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 24 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
The Unit is operating at 100% power.
SP-49-075, Control Rod Exercise, is being performed to meet Technical Specification surveillance requirements.
Plant Initial Conditions have been verified and are currently being met.
Limiting Conditions for Operation are being tracked.
I&C is stationed at the Rod Control Cabinets (Logic Cabinet) to observe operation.
Control Bank D is at the ARO position, 229 steps withdrawn.
A second operator is available in the Control Room to provide peer checking.
INITIATING CUES (IF APPLICABLE):
The Unit Supervisor directs you to perform SP-49-075, section 6.6 for Shutdown Bank A.
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 24 JPM PERFORMANCE INFORMATION Required Materials:
Marked up copy of SP-49-075 (to section 6.6)
General
References:
SP-49-075, Control Rod Exercise, Rev. 33 OP-AP-300, Reactivity Management, Rev. 10 Task Standards:
Shutdown Bank A control rods inserted at least 10 steps and returned to the 229 step position IAW SP-49-075.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.
[OTH 12765]
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical Yes SP-49-075, Step 6.6.1 RECORD initial Individual Rod Position indication and Group Step Position.
Standard:
Value of 222 to 231 recorded in INITIAL column of Individual Rod Position Indication blocks of the table for each rod in SBA-1 and SBA-2.
AND Value of 229 recorded in INITIAL column of Group Step Position blocks of the table for each Bank & Group SBA-1 and SBA-2.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 24 Performance Step: 2 Critical Yes SP-49-075, Step 6.6.2 POSITION Control Rod Bank Selector to SBA.
Standard:
PLACE Control Bank Selector switch to SBA position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical No SP-49-075, Step 6.6.2.a.
VERIFY Rod Speed indicator at 66 steps per minute.
Standard:
Using Rod Speed meter SI-401 41210, VERIFY 66 steps per minute. Meter located on Mechanical Consol B.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 24 Performance Step: 4 Critical Yes SP-49-075, Step 6.6.3 (CAS) IF Shutdown Bank A is withdrawn past the position recorded in Step 6.6.1 at any time, THEN PERFORM ATTACHMENT B.
Standard:
If Shutdown Bank A, Group 1 or Group 2 is withdrawn beyond 229 steps as indicated on their associated Group Step Counter, the perform Attachment B of the procedure.
Evaluator Note:
(CAS) indicates this is a Continuous Action Step and applies anytime during performance of this section of the procedure.
This is a conditional Critical Step which must be performed only if Shutdown Bank A rods are WITHDRAWN past step 229.
These steps are at the end of this JPM.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 24 Performance Step: 5 Critical No SP-49-075, Step 6.6.4 CYCLE Shutdown Bank A per ATTACHMENT A as follows to displace any loose crud prior to larger rod movements:
- a. INSERT Shutdown Bank A one step.
Standard:
- 1. POSITION Rod Motion IN-HOLD-OUT switch to IN until rod position reads 228 steps on Shutdown Bank A Group 1 Step Position AND Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
Attachment A provides general instructions for making the manual control rod position change. The STANDARD above summarizes these action specific items being performed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 24 Performance Step: 6 Critical No SP-49-075, Step 6.6.4 CYCLE Shutdown Bank A per ATTACHMENT A as follows to displace any loose crud prior to larger rod movements:
- b. WITHDRAW Shutdown Bank A one step.
Standard:
- 1. POSITION Rod Motion IN-HOLD-OUT switch to OUT until rod position reads 229 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
If the performer has withdrawn Shutdown Bank A above 229 steps, Attachment B should be performed at this time. Attachment B is contained in Performance Steps 16-18.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 24 Performance Step: 7 Critical No SP-49-075, Step 6.6.4 CYCLE Shutdown Bank A per ATTACHMENT A as follows to displace any loose crud prior to larger rod movements:
- c. INSERT Shutdown Bank A one step.
Standard:
- 1. POSITION Rod Motion IN-HOLD-OUT switch to IN until rod position reads 228 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 24 Performance Step: 8 Critical No SP-49-075, Step 6.6.4 CYCLE Shutdown Bank A per ATTACHMENT A as follows to displace any loose crud prior to larger rod movements:
- d. WITHDRAW Shutdown Bank A one step.
Standard:
- 1. POSITION Rod Motion IN-HOLD-OUT switch to OUT until rod position reads 229 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
If the performer has withdrawn Shutdown Bank A above 229 steps, Attachment B should be performed at this time. Attachment B is contained in Performance Steps 16-18.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 24 Performance Step: 9 Critical No SP-49-075, Step 6.6.4 CYCLE Shutdown Bank A per ATTACHMENT A as follows to displace any loose crud prior to larger rod movements:
- e. INSERT Shutdown Bank A one step.
Standard:
- 1. POSITION Rod Motion IN-HOLD-OUT switch to IN until rod position reads 228 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 24 Performance Step: 10 Critical No SP-49-075, Step 6.6.4 CYCLE Shutdown Bank A per ATTACHMENT A as follows to displace any loose crud prior to larger rod movements:
- f. WITHDRAW Shutdown Bank A one step.
Standard:
- 1. POSITION Rod Motion IN-HOLD-OUT switch to OUT until rod position reads 229 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
If the performer has withdrawn Shutdown Bank A above 229 steps, Attachment B should be performed at this time. Attachment B is contained in Performance Steps 16-18.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 24 Performance Step: 11 Critical Yes SP-49-075, Step 6.6.5 INSERT Shutdown Bank A Rods 10 to 16 steps and VERIFY the following:
- a. All rods being tested stepping simultaneously
- b. Rod Control Rods In light, ON
- c. Shutdown Bank A Group 1 and 2 Step Position indicators, STEPPING in the correct sequence.
- d. TLA-1 ROD SUPERVISION ALARM (47033-11), ON Standard: (C) 1. POSITION Rod Motion IN-HOLD-OUT switch to IN until rod position reads between 219 steps and 213 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
All rods being tested stepping simultaneously Rod Control Rods In light, ON Shutdown Bank A Group 1 and 2 Step Position indicators, STEPPING in the correct sequence.
TLA-1 ROD SUPERVISION ALARM (47033-11), ON
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
The portions of this standard that are critical actions are marked with a (C)
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 24 Performance Step: 12 Critical Yes SP-49-075, Step 6.6.6 WHEN Shutdown Bank A is at test position, THEN RECORD the following:
- a. Shutdown Bank A Individual Rod Position Indication
- b. Shutdown Bank A Group 1 and 2 Step Position Standard:
Value of current rod RPI position recorded in TEST column of Individual Rod Position Indication blocks of the table for each rod in SBA-1 and SBA-2.
AND Value of current rod demand position recorded in TEST column of Group Step Position blocks of the table for each Bank & Group SBA-1 and SBA-2.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 24 Performance Step: 13 Critical Yes SP-49-075, Step 6.6.7 WITHDRAW Shutdown Bank A to initial position recorded in Step 6.6.1 and VERIFY the following:
- a. All rods being tested stepping simultaneously
- b. Shutdown Bank A Group 1 and 2 Step Position indicators, STEPPING in the correct sequence.
- c. Rod Control Rods Out light, ON
- d. TLA-1 ROD SUPERVISION ALARM (47033-11), OFF Standard: (C) 1. POSITION Rod Motion IN-HOLD-OUT switch to OUT until rod position reads 229 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 2. While rods are in motion, VERIFY the following:
All rods being tested stepping simultaneously Shutdown Bank A Group 1 and 2 Step Position indicators, STEPPING in the correct sequence.
Rod Control Rods Out light, ON TLA-1 ROD SUPERVISION ALARM (47033-11), OFF
- 3. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position
- 4. MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
The portions of this standard that are critical actions are marked with a (C).
If the performer has withdrawn Shutdown Bank A above 229 steps, Attachment B should be performed at this time. Attachment B is contained in Performance Steps 16-18.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 16 of 24 Performance Step: 14 Critical Yes SP-49-075, Step 6.6.8 WHEN Shutdown Bank A has been withdrawn to initial position recorded in Step 6.6.1, THEN RECORD the following:
- a. Shutdown Bank A Individual Rod Position Indication
- b. Shutdown Bank A Group 1 and 2 Step Position Standard:
Value of 222 to 231 recorded in FINAL column of Individual Rod Position Indication blocks of the table for each rod in SBA-1 and SBA-2.
AND Value of 229 recorded in FINAL column of Group Step Position blocks of the table for each Bank & Group SBA-1 and SBA-2.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 Critical No SP-49-075, Step 6.6.9 Independent Verification:
Shutdown Bank A at INITIAL POSITION Standard:
Value of 222 to 231 recorded in FINAL column of Individual Rod Position Indication blocks of the table for each rod in SBA-1 and SBA-2.
AND Value of 229 recorded in FINAL column of Group Step Position blocks of the table for each Bank & Group SBA-1 and SBA-2.
Evaluator Note:
Independent Verification is required by the procedure for this step. IF the performer has not exceeded 229 steps withdrawn during the manipulations, proceed to JPM termination.
Evaluator Cue:
Independent Verification Provided Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 17 of 24 Performance Step: 16 Critical Yes SP-49-075, ATTACHMENT B B.1 IF Shutdown Bank A OR Shutdown Bank B is withdrawn past the ARO position, THEN PERFORM the following:
- 1. INFORM the Unit Supervisor.
Standard:
Unit Supervisor informed of Control Bank position exceeding 229.
Evaluator Note:
These are the conditional actions from Attachment B which are required if Shutdown Bank A is withdrawn above 229 steps.
Evaluator Cue:
AS Unit Supervisor acknowledge report and direct performer to continue with Attachment B.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 18 of 24 Performance Step: 17 Critical Yes SP-49-075, ATTACHMENT B B.1 IF Shutdown Bank A OR Shutdown Bank B is withdrawn past the ARO position, THEN PERFORM the following:
- 2. WHEN directed, THEN RETURN the affected bank to the ARO position.
Standard: (C) POSITION Rod Motion IN-HOLD-OUT switch to IN until rod position reads 229 steps on Shutdown Bank A Group 1 Step Position and Shutdown Bank A Group 2 Step Position. RELEASE IN-HOLD-OUT switch to HOLD position.
- 1. While rods are in motion, VERIFY the following:
Appropriate Rod Control Rods In/Out light, ON Affected Control Bank(s) Individual Rod Position Indication, maintaining alignment Control Bank Group Step counter(s), RISING or LOWERING as appropriate
- 2. WHEN Rod Motion IN-HOLD-OUT switch is released, THEN VERIFY the following:
Rod motion, STOPPED Appropriate Rod Control Rods In/Out light, OFF Control Rods, at desired position MONITOR Reactor Power, Average Coolant Temperature, and Axial Power Offset for expected effects of reactivity change.
Evaluator Note:
These are the conditional actions from Attachment B which are required if Shutdown Bank A is withdrawn above 229 steps.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 19 of 24 Performance Step: 18 Critical Yes SP-49-075, ATTACHMENT B B.1 IF Shutdown Bank A OR Shutdown Bank B is withdrawn past the ARO position, THEN PERFORM the following:
UPDATE PPCS rod bank position as follows:
- 1. SELECT PPCS functions.
- 2. SELECT Operator Entry.
- 3. SELECT Rod Bank Position Update.
- 4. VERIFY the affected shutdown bank computer point ID indicates ARO position.
C3005G for Shutdown Bank A C3006G for Shutdown Bank B Standard:
- 1. SELECT PPCS functions.
- 2. SELECT Operator Entry.
- 3. SELECT Rod Bank Position Update.
- 4. VERIFY the affected shutdown bank computer point ID indicates 229.
C3005G for Shutdown Bank A C3006G for Shutdown Bank B Evaluator Note:
These are the conditional actions from Attachment B which are required if Shutdown Bank A is withdrawn above 229 steps.
THIS is the last step of Attachment B, return to appropriate Performance Step where Attachment B was entered.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When rods have been returned to their original position and position verification addressed: This completes this JPM.
Stop Time:
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 20 of 24 During the evaluation, the trainee:
Performed the task correctly and in accordance with procedure usage and adherence requirements.
Yes No Never put anyones safety at risk.
Yes No Never put equipment reliability at risk.
Yes No Never violated radiological work practices.
Yes No Demonstrated effective use of event-free human performance tools.
Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.
SP-49-075 Marked Up.pdf
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 21 of 24 SIMULATOR SETUP:
Simulator Setup Instructions:
Reset the Simulator to any 100% power IC Ensure Shutdown Bank Step Positions read 229.
Insert Remote RD115 Master Cycler Reset to 4 Count to a valve of RST TO 4.
Insert Remote RD115 Master Cycler Reset to 4 Count to a valve of NORM.
Delete Remote RD115 Master Cycler Reset to 4 Count.
Provide a copy of SP-49-075 marked up through and including step 6.5.5.
RO-049-JP01D, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 22 of 24 TURNOVER SHEET INITIAL CONDITIONS:
The Unit is operating at 100% power.
SP-49-075, Control Rod Exercise, is being performed to meet Technical Specification surveillance requirements.
Plant Initial Conditions have been verified and are currently being met.
Limiting Conditions for Operation are being tracked.
I&C is stationed at the Rod Control Cabinets (Logic Cabinet) to observe operation.
Control Bank D is at the ARO position, 229 steps withdrawn.
A second operator is available in the Control Room to provide peer checking.
INITIATING CUES (IF APPLICABLE):
The Unit Supervisor directs you to perform SP-49-075, section 6.6 for Shutdown Bank A.
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 23 of 24 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Andrew Fahrenkrug 10/30/2010 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-049-JP01D, Perform Control Rod Exercise, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPMB-L-RO/SRO-S-11052010-066 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 24 of 24 Historical Record:
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 11 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Pressurizer Pressure Control Malfunction JPM NUMBER:
RO-E00-JP011 REV.
C RELATED PRA INFORMATION:
None TASK NUMBER(S) /
TASK TITLE(S):
E000010501 - Respond to a Reactor Trip Condition with Safety Injection K/A NUMBERS:
007EA1.03 RO/SRO Imp 4.2 / 4.1 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
NO Alternate Path / Faulted:
YES TASK APPLICABILITY:
RO/SRO Additional signatures may be added as needed.
Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 11 JPM Number:
RO-E00-JP011 Rev C JPM
Title:
Pressurizer Pressure Control Malfunction Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-E00-JP011, Pressurizer Pressure Control Malfunction, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 11 JPM BRIEFING/TURNOVER If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
Note to Instructor:
- 1. Human Performance attributes should be visible. The student may use obvious STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged.
The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
This should be explained to the student at this time.
Read to Examinee:
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials..
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
You are the Reactor Operator.
The reactor is tripped.
SI is actuated.
E-0, Reactor Trip or Safety Injection, is being performed with steps complete through step 10.
INITIATING CUES (IF APPLICABLE):
You are directed by the US to perform steps 11 and 12 of E-0.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets begin
RO-E00-JP011, Pressurizer Pressure Control Malfunction, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 11 JPM PERFORMANCE INFORMATION Required Materials:
E-O, steps 11 - 12.
General
References:
E-O, Reactor Trip or Safety Injection, Rev. 42 47012-K, RXCP B BREAKER OPEN, Rev. 0 Task Standards:
Steps 11 and 12 completed, RXCP B stopped and CVC-15 closed.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical No E-0, Step 11 Check PRZR PORVs both CLOSED.
PR-2A PR-2B Standard:
Determine PR-2A/CV-31110 PRZR PORV AND PR-2B/CV-31109 PRZR PORV closed.
Evaluator Note:
Check PR-2A/CV-31110 PRZR PORV green light ON, red light OFF.
Check PR-2B/CV-31109 PRZR PORV green light ON, red light OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP011, Pressurizer Pressure Control Malfunction, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 11 Performance Step: 2 Critical No E-0, Step 12.a CHECK normal PRZR spray valves BOTH CLOSED PS-1A PS-1B Standard:
Determine PS-1A closed AND PS-1B open.
Evaluator Note:
Check PS-1A auto demands read 0% output (fully CLOSED) and associated green light ON, red light OFF.
Check PS-1B auto demands read 100% output (fully OPEN) and associated red light ON, green light OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical No E-0 Step 12. RNO IF PRZR pressure less than 2260 psig, THEN STOP spray flow:
Standard:
DETERMINE PRZR pressure channels PI-429, 430, 431 and/or 449A read less than 2260 psig.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP011, Pressurizer Pressure Control Malfunction, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 11 Performance Step: 4 Critical No Step 12.a.1 RNO IF PRZR pressure less than 2260 psig, THEN STOP spray flow:
Manually CLOSE valve(s).
Standard:
- 1. POSITION PS-1B/ CV-31111 - 4330402/HC-431H, PRZR Spray Control Loop B, AUTO-BAL-MAN switch to MAN.
- 2. ROTATE manual control until PS-1B to attempt to drive demand reading 0% output (fully CLOSED).
DETERMINE PS-1B NOT closed by OBSERVING red light remains ON and green light remains OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Critical Yes Step 12.a.2 RNO IF PRZR pressure less than 2260 psig, THEN STOP spray flow:
If valve(s) will NOT close, THEN STOP RXCP(s) supplying failed spray valve(s) and place in PULLOUT.
RXCP A for PS-1A RXCP B for PS-1B Standard:
RXCP Pump B stopped with its control switch in PULLOUT.
Evaluator Note:
When RXCP control switch taken to STOP, the operator should verify 1)
RXCP Pump B red light OFF, 2) RXCP Motor B Current meter 41334 indicates 0 amps, OR 3) annunciator 47012-K, RXCP B BREAKER OPEN (SER PT 790), is alarmed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-E00-JP011, Pressurizer Pressure Control Malfunction, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 11 Performance Step: 6 Critical No Step 12.a.3 RNO IF PRZR pressure less than 2260 psig, THEN STOP spray flow:
IF pressure continues to decrease, THEN STOP the other RXCP and PLACE in PULLOUT.
Standard:
Check Pressurizer pressure stabilizes or rises on pressure channels PI-429, 430, 431 and/or 449A.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical No Step 12.b CHECK Auxiliary Spray Valve, CLOSED CVC-15 Standard:
Determine CVC-15 is closed.
Evaluator Note:
VERIFY CVC-15/CV-31230 PRZR Auxiliary Spray Valve green light ON, red light OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When E-0 steps 11 and 12 are complete: This completes this JPM.
Stop Time:
During the evaluation, the trainee:
Evaluation Performed the task correctly and in accordance with procedure usage and adherence requirements.
PASS FAIL Never put anyones safety at risk.
PASS FAIL Never put equipment reliability at risk.
PASS FAIL Never violated radiological work practices.
PASS FAIL Demonstrated effective use of event-free human performance tools.
PASS FAIL
RO-E00-JP011, Pressurizer Pressure Control, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 11 SIMULATOR SETUP:
Simulator Setup Instructions:
- 1. Reset the Simulator to any at-power IC INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS REMOTE FUNCTIONS OVERRIDES AI-43304-02-R2 PS-1B BAL ADJ 00:00:00 00:00:00 1
0 0
1 DI-43304-02-AUTO PS-1B 00:00:00 00:00:00 1
ON OFF 1
DI-43304-02-MAN-BAL PS-1B 00:00:00 00:00:00 1
OFF ON 1
TRIGGERS
- 2. Go to RUN
- 3. Enter Malfunction on TRIGGER 1 to fail open PRZR Spray Valve PS-1B.
- 4. Trip the reactor.
- 5. Verify SI automatically actuates. Open the second spray valve PS-1A in manual if required.
- 6. Throttle AFW-2A and AFW-2B to maintain total 210 gpm flow and greater than 1000 psig discharge pressure in both AFW headers.
- 7. Place T/D AFW Pump to PULLOUT (MS-102)
- 8. Verify PRZR Spray Valve PS-1A closed and in AUTO.
- 9. Place the Simulator in FREEZE
- 11. When directed by the JPM Evaluator, place the SIMULATOR in RUN.
RO-E00-JP011 Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 11 TURNOVER SHEET INITIAL CONDITIONS:
You are the Reactor Operator.
The reactor is tripped.
SI is actuated.
E-0, Reactor Trip or Safety Injection, is being performed with steps complete through step 10.
INITIATING CUES (IF APPLICABLE):
You are directed by the US to perform steps 11 and 12 of E-0.
Inform Evaluator when you are ready to begin.
RO-E00-JP011, Pressurizer Pressure Control, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 11 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Scott Stenner 01/19/2011 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-E00-JP011, Pressurizer Pressure Control, Rev. C Retention: Life of plant insurance policy + 10 years KPS-SystemJPMC-L-RO/SRO-S-01212011-104 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 11 Historical Record:
Rev A Changed JPM ID from RO-E01-JP01B to RO-E00-JP011 both to reflect actual task ID and to reflect Alternate Path JPM.
Updated to latest procedure direction.
Added direction in Simulator Setup to open second spray Valve if necessary to get SI actuation, and restore to AUTO.
No major changes to actions so SME review not required.
Rev B:
Update JPM to match rev 41 of E-0 Rev C Update for rev 42 of E-0 Removed JPM Not time critical from Cue
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 12 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Rapid Power Reduction to Approximately 570 MWe JPM NUMBER:
RO-054-JP061 REV.
G RELATED PRA INFORMATION:
None TASK NUMBER(S) /
TASK TITLE(S):
0540060101 / Change Turbine and Generator Load K/A NUMBERS:
045 2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation. RO 3.9 / SRO 4.0 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
x EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
x Other:
Lab:
Time for Completion:
15 Minutes Time Critical:
NO Alternate Path / Faulted:
YES TASK APPLICABILITY:
RO/SRO Additional signatures may be added as needed.
Developed by: Andy Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 12 JPM Number:
RO-054-JP06 Rev G JPM
Title:
Rapid Power Reduction to Approximately 570 MWe Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 12 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Off-board annunciators will be addressed by an individual assigned to that task.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. You are the BOP Operator
- 2. The turbine is selected to TURBINE MANUAL due to cycling noted on the turbine control valves when in OPER AUTO.
- 3. The Unit Supervisor has directed a load backdown to LESS THAN OR EQUALTO 570 MWe at 1% per minute.
- 4. Actions of OP-KW-AOP-GEN-002, Rapid Power Reduction, are in progress.
- 5. AOP-GEN-002 Steps 1 through 6 have been completed.
- 6. A normal boration using AOP-GEN-002 Attachment F has been completed and Tave is being monitored by the RO.
- 7. Initial Tave was 571.7ºF.
INITIATING CUES:
You have been directed to complete the load reduction to LESS THAN OR EQUALTO 570 MWe beginning at Step 7 of AOP-GEN-002.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets Begin
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 12 JPM PERFORMANCE INFORMATION Required Materials:
AOP-GEN-002 marked up through step 6 (including Attachments A and F).
General
References:
OP-KW-AOP-GEN-002, Rapid Power Reduction, Rev 8 Task Standards:
Reduce turbine load to at or below 570 MWe using the CV DOWN pushbutton in accordance with OP-KW-AOP-GEN-002, Rapid Power Reduction.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical: No AOP-GEN-002, Step 7.a (CAS) PERFORM Turbine Load Reduction:
CHECK load reduction desired.
Standard:
Determine turbine load reduction is desired.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 12 Performance Step: 2 Critical: No AOP-GEN-002, Step 7.b (CAS) PERFORM Turbine Load Reduction:
CHECK Turbine MODE - OPER AUTO.
Standard:
Determine turbine control is in TURBINE MANUAL.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical: Yes AOP-GEN-002, Step 7.b (RNO)
REDUCE load by alternate means:
Intermittently PRESS CV DOWN pushbutton at rate determined in Step 3 of Gen-002 (1%/min) until at desired load while CONTINUING with this procedure.
GO TO Step 8.
Standard:
Load decrease using CV DOWN pushbutton until load is equal to or less than 570 MWe with the following constraints:
Load reduction is performed so as not to exceed rate of 1%/min Periodic pressing of the CV DOWN pushbutton is used.
Evaluator Note:
The CV DOWN pushbutton is located in the TURBINE CV MANUAL CONTROL section of the turbine control panel.
The operator may remain at this step (7) until load reduction is completed.
The procedure is NOT normally performed by a single individual and the Unit Supervisor would follow to ensure all appropriate steps performed.
The rate of 1%/minute is equivalent to 6 MWe/minute.
Evaluator Cue:
As Unit Supervisor, Maintain approximately 1% per minute load rate.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
CV
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 12 Performance Step: 4 Critical: Yes AOP-GEN-002, Step 8 (CAS) MAINTAIN MVAR out loading during power reduction between 0-150 MVAR.
Standard:
MVAR loading maintained/restored to between 0 MVAR and 150 MVAR during/after load reduction by adjusting GENERATOR #1 VOLTAGE ADJUSTER.
Evaluator Note:
MVAR loading will rise to greater than 150 MVARs during the load reduction. To satisfy this critical step the performer needs to identify MVAR loading exceeds 150 MVARs (during or after performing the load reduction) AND then take action to lower MVARs.
Though exceeding the MVAR loading specified in the procedure (GEN-002) may not exceed the capacity curve specified in NOP-TB-001, it will result in generator heating and represents an inability to follow procedures, maintain parameters within normal limits.
Evaluator Note:
The operator may remain at this step (8) until load reduction is completed.
The procedure is NOT normally performed by a single individual and the Unit Supervisor would follow to ensure all appropriate steps performed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 12 Performance Step:5 Critical No AOP-GEN-002, Step 9 (CAS) CONTROL boration flow and power reduction rate as necessary to maintain plant requirements:
I Rod Insertion Limits Tave/Tref deviation Standard:
Monitors load rate to maintain Tave within 4ºF of Tref.
Evaluator Note:
The RO is responsible for monitoring I and RIL. With rods in AUTO, the stated limit for temperature difference will Not be exceeded if load is reduced in as described in Performance Step 3.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When Operator reports turbine load adjustment complete: THIS JPM IS COMPLETE.
Stop Time:
During the evaluation, the trainee:
Evaluation Performed the task correctly and in accordance with procedure usage and adherence requirements.
PASS FAIL Never put anyones safety at risk.
PASS FAIL Never put equipment reliability at risk.
PASS FAIL Never violated radiological work practices.
PASS FAIL Demonstrated effective use of event-free human performance tools.
PASS FAIL
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 12 SIMULATOR SET UP:
The JPM Evaluator will need a copy of OP-KW-AOP-GEN-002, marked as performed Steps 1 through 6, including marked up Attachments A, and F.
Simulator Information:
Setup:
Any 100% power Steady State condition INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS TC05 Turbine Control System Cycling 00:00:00 00:00:00 1
1 REMOTE FUNCTIONS OVERRIDES TRIGGERS
- 1. Reset to IC and place Simulator in RUN.
- 2. If snapped IC is used, verify initial conditions and place the Simulator in Freeze.
- 3. Place Turbine control in TURBINE MANUAL.
- 4. Enter TRIGGER 1 to activate malfunction for turbine control cycling in OPER AUTO.
- 5. Balance Heater Drain Pump speeds (amps).
- 6. If a standard IC is used, ensure the following actions of OP-KW-AOP-GEN-002 are performed:
- a. Ensure Control Rod Bank Selector is in AUTO. (Step 4)
- b. Determine the required boration using the Standard Reactivity Plan. (Step 5)
- c. Initiate boration using Attachment F. (Step 5)
- d. Place all PRZR heaters ON. (Step 6)
- 7. Acknowledge and reset all annunciators and alarms, as appropriate.
- 9. When Tave has lowered by approximately 1.0ºF (0.8ºF to 1.0ºF), place the Simulator in FREEZE.
- 11. When directed by the JPM Evaluator, place the SIMULATOR in RUN.
RO-054-JP061, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 12 TURNOVER SHEET INITIAL CONDITIONS:
- 1. You are the BOP Operator.
- 2. The turbine is selected to TURBINE MANUAL due to cycling noted on the turbine control valves when in OPER AUTO.
- 3. The Unit Supervisor has directed a load backdown to LESS THAN OR EQUALTO 570 MWe at 1% per minute.
- 4. Actions of OP-KW-AOP-GEN-002, Rapid Power Reduction, are in progress.
- 5. AOP-GEN-002, Steps 1 through 6 are completed.
- 6. A normal boration using AOP-GEN-002 Attachment F has been completed and Tave is being monitored by the RO.
- 7. Initial Tave was 571.7ºF.
INITIATING CUES:
You have been directed to complete the load reduction to LESS THAN OR EQUALTO 570 MWe beginning at Step 7 of AOP-GEN-002.
Inform Evaluator when you are ready to begin.
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 12 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Mike Nichols 01/19/2011 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 12 Historical Record:
Rev. B:
Changed Initial Conditions and Initiating Cue to have Step 10 - Turbine on VPL, removed since changes in plant practices now have returned normal steady-state operations to operating on VPL.
This action is not germane to performance of task.
Deleted Performance Step 1 as result of having AOP-GEN-002 Step 10 already performed.
Performance Step 6 - Changed STANDARD to remove specific rate control from standard. Added specific actions to meet intent that the load decrease be controlled:
o Load reduction is performed in discrete steps of at least 4 steps. This ensures that a controllable rate less than 5%/minute is maintained as specified by procedure.
o Periodic pressing of the CV DOWN pushbutton is used. Ensures the load reduction is performed over a period of time relative to the rate of power decrease.
Performance Step 12 - Changed to show proper procedural flowpath with status light NOT lit.
Operator will not perform AOP-GEN-002, Step 15.c, but will go to RNO for Step 15.b and proceed to Step 15.d.
Performance Step 14 (old revision) - Deleted performance step for AOP-GEN-002, step 15.c.
Operator will not perform AOP-GEN-002, Step 15.c, since he/she will go to RNO for Step 15.b and proceed to Step 15.d.
Performance Step 22 - A NOTE was added to explain that this explicit step, AOP-GEN-002, Step 45 Check Turbine Load LESS THAN OR EQUAL TO DESIRED FINAL VALUE, does not have to be performed by the Operator. The intent is to ascertain that the task has been met with turbine load at or less than 560 MWe. This may be done at any step in the procedure. The STANDARD is tied to this step since this is the logical procedural step that represents completion of the task. Also performance of this particular step cannot be CRITICAL since the action is CHECK which cannot be successfully measured.
Rev. C Shortened number of steps of procedure covered based on feedback from validation. Action to reduce load is directed in, and can be completed in, Step 12 of AOP-GEN-002. Deleted Performance steps 9 through 22.
Restored Performance Step 1 to have the operator check if turbine is on VPL. This is the first action appropriate for the BOP operator in performing tasks and should key the operator into MANUAL operation.
Rev. D Incorporate NRC comments from ILT examination validation:
- 1. Transposed position of INITIAL CONDITION 2 and 3 to eliminate confusion that the load reduction is due to the cycling of turbine control valves.
- 2. Added information to Evaluator Note for Performance Step 7 that 1%/min rate is equivalent to 6 MWe/min.
- 3. Combined information from Performance Step 9 into Performance Step 8 (last step).
Rev. E Revised to incorporate procedure changes to Gen-002 to start at step 7.
Rev. F Revised to incorporate procedure changes to Gen-002.
RO-054-JP061, Rapid Power Reduction to Approximately 570 MWe, Rev. G Retention: Life of plant insurance policy + 10 years KPS-SystemJPMD-L-RO/SRO-S-01212011-105 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 12 Rev G Removed from initial cue This JPM is not time Critical Step 3 updated the standard to say reduce load not exceed rate of 1%/min Step 3 updated to add rate to standard to aid in administration.
Added to setup step to adjust MVAR loading to between 143 and 149 MVARs to make adjusting MVAR loading a critical step. As load goes down MVAR will rise and exceed 150 MVARs requiring the operator to adjust MVARS.
Updated Step 8 to make critical for requirement to have to lower MVARS to less than 150 MVARs
Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 12 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Respond to Containment Fan Coil Unit Emergency Discharge Damper Open JPM NUMBER:
RO-018-JP011 REV.
A RELATED PRA INFORMATION:
N/A TASK NUMBER(S) /
TASK TITLE(S):
0180010401 / Respond to Containment Fan Coil Unit Emergency Discharge Damper(s) OPEN K/A NUMBERS:
022A4.03 - Ability to manually operate and/or monitor in the control room: Dampers in the CCS IMP 3.2 / 3.2 022 2.4.50 - Ability to verify system alarm setpoints and operate controls identified in the alarm response manual IMP 3.3 / 3.3 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
No Alternate Path / Faulted:
Yes TASK APPLICABILITY:
RO/SRO Additional signatures may be added as needed.
Developed by: Stephen Johnson /s 6/22/2010 Instructor Date Validated by: Andrew Fahrenkrug /s 09/03/2010 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 11/08/2010 Training Supervisor Date Approved by: Mark Goolsbey /s 11/10/2010 Facility Representative Date
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 12 JPM Number:
RO-018-JP011 JPM
Title:
Respond to Containment Fan Coil Unit Emergency Discharge Damper Open Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 12 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
You are the Operator At The Controls (RO)
Annunciator 47052-C, CNTMT EMERG DISCH DMPRS ABNORMAL, has just alarmed.
INITIATING CUES (IF APPLICABLE):
The Unit Supervisor directs you to perform the actions of the Alarm Response Procedure, OP-KW-ARP-47052-C.
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 12 JPM PERFORMANCE INFORMATION Required Materials:
ARP-47052-C General
References:
OP-KW-ARP-47052-C, CNTMT EMERG DISCH DMPRS ABNORMAL, Rev. 0 Task Standards:
All Containment Fan Coil Units running and RXCP motor temperatures displayed on PPCS.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.
[OTH 12765]
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical No ARP-47052-C, Step 1.
CHECK Safety Injection NOT Initiated Standard:
Determine Safety Injection NOT actuated by checking either of the following:
Status Light window 44905-1201, SI SIGNAL ACTUATED, NOT LIT.
Annunciator windows 47021-A, SI TRAIN A ACTUATED, and 47021-B, SI TRAIN B ACTUATED, NOT LIT.
Evaluator Note:
The performer may also check one or more of the following:
Status Light window 44905-1201, AUTOMATIC SI DISABLED, NOT LIT.
Reactor NOT tripped.
Any other SI related Annunciators NOT lit: 47052-Q, 47051-A, 47061-I, 47061-J, 47041-D, 47023-D.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 12 Performance Step: 2 Critical No ARP-47052-C, Step 2.
DEPRESS Both SI Manual Reset Pushbuttons
- 4647202
- 4647502 Standard:
Depress SAFETY INJECTION TRAIN A RESET pushbutton.
Depress SAFETY INJECTION TRAIN B RESET pushbutton.
Evaluator Note:
This action has no effect since the SI signal is NOT active.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical Yes ARP-47052-C, Step 3.
CLOSE Containment Fan Coil Unit IF any Containment Fan Coil Unit Emergency Discharge Dampers:
RBV-150A RBV-150B RBV-150C RBV-150D Standard:
(C)
- 1. Identify RBV-150B/CD-34131 CNTMT FAN COIL UNIT B EMERGENCY DISCH DMPR open.
Take control switch for RBV-150B/CD-34131 to the CLOSE position and report the damper closes.
- 2. Identify RBV-150D/CD-34133 CNTMT FAN COIL UNIT D EMERGENCY DISCH DMPR open.
Take control switch for RBV-150D/CD-34133 to the CLOSE position and report RBV-150D position does NOT change.
Evaluator Note:
The critical action is to CLOSE RBV-150B since this is the only one of the two affected dampers that will close. With RBV-150D remaining open, the performer will proceed with actions from the RESPONSE NOT OBTAINED (RNO) column.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 12 Performance Step: 4 Critical Yes ARP-47052-C, Step 3. (RNO)
IF any Containment Fan Coil Unit Emergency Discharge Damper(s) will NOT close, THEN PERFORM following:
- a. START all Containment Fan Coil Units.
CFCU 1A CFCU 1B CFCU 1C CFCU 1D Standard:
(C)
Verify CFCUs 1A, 1B and 1D are running.
Start CFCU 1C by taking its control switch to START and releasing. Verify red light LIT and green light OFF.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Critical No ARP-47052-C, Step 3. (RNO)
IF any Containment Fan Coil Unit Emergency Discharge Damper(s) will NOT close, THEN PERFORM following:
- b. IF RBV-150A open, THEN VERIFY RBV-100A-B CLOSED.
Standard:
Determine RBV-150A is NOT open and NO action required.
Evaluator Note:
RBV-100A-B/MD-32348 position indication (green / red) is located in CFCU section at upper right on MVA.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 12 Performance Step: 6 Critical No ARP-47052-C, Step 3. (RNO)
IF any Containment Fan Coil Unit Emergency Discharge Damper(s) will NOT close, THEN PERFORM following:
- c. IF RBV-150D open, THEN VERIFY RBV-100C-D CLOSED.
Standard:
Determine RBV-150D is OPEN.
Check RBV-100C-D/MD-32348 CLOSE with green light LIT and red light OFF.
Evaluator Note:
This step is NOT critical since the damper will be shut with RBV-150D OPEN.
RBV-100C-D/MD-32349, CNTMT FCU C & D DISCH TO RFLG FLOOR, position indication (green / red) is located in CFCU section at upper right on MVA.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical No ARP-47052-C, Step 3. (RNO)
IF any Containment Fan Coil Unit Emergency Discharge Damper(s) will NOT close, THEN PERFORM following:
- d. MONITOR RXCP motor stator temperatures.
Standard:
On PPCS go to one of the following screens to monitor RXCP motor stator temperatures:
Operations Protected Area 1, Group 15, Reactor Coolant Pumps Graphical Displays, Reactor Coolant Pumps PPCS Points/Trends T0417A, RCPA MOTOR STATOR TEMP and T0437A, RCPB MOTOR STATOR TEMP Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When performer has reported that RXCP motor stator temperatures are being monitored, This completes this JPM.
Stop Time:
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 12 During the evaluation, the trainee:
Performed the task correctly and in accordance with procedure usage and adherence requirements.
Yes No Never put anyones safety at risk.
Yes No Never put equipment reliability at risk.
Yes No Never violated radiological work practices.
Yes No Demonstrated effective use of event-free human performance tools.
Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 12 SIMULATOR SETUP Any At-Power IC INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS REMOTE FUNCTIONS OVERRIDES DI-40016-CLOSE RBV-150D 1
OFF OFF 1
DI-40016-OPEN RBV-150D 1
OFF ON 1
TRIGGERS
- 1. Reset to IC and place Simulator in RUN.
- 2. If snapped IC is used, verify initial conditions and place the Simulator in Freeze.
- 3. TAKE CFCU 1C control switch to STOP and release. ENSURE CFCU 1C stopped.
- 4. TAKE control switch for RBV-150B to OPEN and ENSURE RBV-150B is open.
- 5. ENTER and activate OVERRIDES (TRIGGER 1) to cause RBV-150D to OPEN and fail open, and ENSURE RBV-150D is open.
- 6. Place control switch for RBV-150B to AUTO.
- 7. ENSURE RBV-100C-D indicates closed.
- 8. PLACE the Simulator in FREEZE.
- 10. When directed by the JPM Evaluator, place the SIMULATOR in RUN.
RO-018-JP011, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 12 TURNOVER SHEET INITIAL CONDITIONS:
You are the Operator At The Controls (RO).
Annunciator 47052-C, CNTMT EMERG DISCH DMPRS ABNORMAL, has just alarmed.
INITIATING CUES (IF APPLICABLE):
The Unit Supervisor directs you to perform the actions of the Alarm Response Procedure, OP-KW-ARP-47052-C.
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 12 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Andrew Fahrenkrug 09/03/2010 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-018-JP011, Respond to Containment Fan Coil Unit Emergency Discharge Damper Open, Rev. A Retention: Life of plant insurance policy + 10 years KPS-SystemJPME-L-RO/SRO-S-11052010-069 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 12 Historical Record:
Rev. A - New JPM
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 15 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Transfer 4160 V AC Bus 1 From RAT To MAT JPM NUMBER:
RO-039-JP02A REV.
B RELATED PRA INFORMATION:
4160 V Electrical Distribution is ranked 5th for CDF = 3.6E-05/yr Control Rod Drive is ranked 7th for LERF = 1.6E-065/yr TASK NUMBER(S) /
TASK TITLE(S):
0390020101 / Operate the 4160V AC Supply and Distribution System during Steady State Conditions K/A NUMBERS:
062A4.07 - Ability to manually operate and/or monitor in the control room:
Synchronizing and paralleling of different ac supplies IMP 3.1 / 3.1 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
No Alternate Path / Faulted:
No TASK APPLICABILITY:
RO / SRO Additional signatures may be added as needed.
Developed by: Andy Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andy Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 15 JPM Number:
RO-039-JP02A Rev B JPM
Title:
Transfer 4160 V AC Bus 1 From RAT To MAT Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 15 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Bus 1 has been aligned to the RAT to allow troubleshooting of the Main Auxiliary Transformer Supply Beaker, BKR 1-104.
Maintenance has completed all work and the breaker is now available for operation.
OP-KW-NOP-EHV-001, 4160V AC Supply And Distribution System Operation, will be used to restore Bus 1 to its normal at-power alignment.
All Prerequisites and Precautions and Limitation for OP-KW-NOP-EHV-001 have been met.
BKR 1-104 has been racked in and the AO is standing by at Bus 1.
INITIATING CUES (IF APPLICABLE):
The Unit Supervisor directs aligning Bus 1 to the Main Auxiliary Transformer (MAT) using OP-KW-NOP-EHV-001, section 5.2 Transfer Bus 1 From RAT To MAT.
Do you have questions?
Answer any questions.
Lets Begin.
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 15 JPM PERFORMANCE INFORMATION Required Materials:
Marked up copy of NOP-EHV-001.
General
References:
OP-KW-NOP-EHV-001, 4160V AC Supply And Distribution System Operation, Rev. 4 AD-AA-102, Procedure Use and Adherence, Rev. 2 Task Standards:
Bus 1 energized from the MAT with BKR1-104 closed and BKR 1-101 open.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.
[OTH 12765]
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical No NOP-EHV-001, Step 5.2.1 CHECK power available from MAT.
Standard:
Check any of the following:
White light from MAT Y windings LIT on ECA Panel.
Main Aux XFMR Winding X power and current meters indicating above 0 KW and 0 KAMPS, respectively.
PPCS MAT voltage, current and power indications.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 15 Performance Step: 2 Critical No NOP-EHV-001, Step 5.2.2 Locally CHECK Bkr 1-104, MAT To Bus 1 RACKED IN.
Standard:
Determine BKR 1-104 is racked in as given by Initial Conditions OR Contact AO to check BRK 1-104 is racked in.
Evaluator Cue:
As AO (if contacted): Breaker 1-104 is racked in.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical No NOP-EHV-001, Step 5.2.3 IF Bkr 1-104 is NOT racked in, THEN REQUEST Electrical Maintenance RACK IN Bkr 1-104, MAT to Bus 1.
Standard:
Determine BKR 1-104 is racked in and mark the step N/A Evaluator Note:
AD-AA-102, Procedure Use and Adherence, step 3.10.2 identifies that for conditional steps (IF - THEN), IF the conditions does NOT exist, THEN MARK the conditional step N/A. The operator may request concurrence from cognizant supervision, but this is not required.
Evaluator Cue:
Unit Supervisor (if contacted): I authorize N/A for Step 5.2.3.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 15 Performance Step: 4 Critical No NOP-EHV-001, Step 5.2.4 ANNOUNCE the following via Gaitronics:
"Attention all personnel, shifting Bus 1 power supplies. Stand clear of Bus 1. Attention all personnel, shifting Bus 1 power supplies. Stand clear of Bus 1."
Standard:
Announcement made using gaitronics.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Critical Yes NOP-EHV-001, Step 5.2.5 POSITION Bkr 1-104 Sync Switch to ON Standard:
Synch Switch controller retrieved from BKR G-1 SYNCH SWITCH.
Bkr 1-104 Sync Switch is placed to ON.
Evaluator Note:
Concurrent Verification is required by the procedure for this step.
Evaluator Cue:
Concurrent Verification is provided.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 15 Performance Step: 6 Critical No NOP-EHV-001, Step 5.2.6 CHECK Incoming and Running voltmeter indications within 8 volts.
- a. IF Incoming and Running voltmeter indications are NOT within 8 volts, THEN ADJUST Main Generator MVARS out per ATTACHMENT A until within 8 volts.
Standard:
Check Incoming and Running voltmeter indications within 8 volts.
Evaluator Note:
It is not expected that adjustment would be required under the given conditions. The INCOMING and RUNING VOLTMETERS are the large analog meters on the upper part of the EVA panel.
Evaluator Cue:
Unit Supervisor (if contacted): I authorize N/A for Step 5.2.6.a.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical No NOP-EHV-001, Step 5.2.7 CHECK synchroscope indicator within 3.33 minutes (20º) of 12:00.
Standard:
Check synchroscope needle within 3.33 minutes of 12:00 (Straight up).
Evaluator Note:
The Synchroscope Indicator is the large analog meter on the upper part of the EVA panel, above and between the INCOMING and RUNING VOLTMETERS. It is expected to indicate to 12:00 under the given conditions.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 15 Performance Step: 8 Critical Yes (SEQ - 1)
NOP-EHV-001, Step 5.2.8 CRITICAL STEP: WHEN sources are in sync, THEN CLOSE Bkr 1-104, MAT To Bus 1.
Standard:
BKR 1-104 control switch taken to CLOSE and released with red light LIT and green light OFF.
Evaluator Note:
Concurrent Verification is required by the procedure for this step.
Evaluator Cue:
Concurrent Verification is provided.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Critical No (SEQ - 2)
NOP-EHV-001, Step 5.2.9 CHECK the following:
Bkr 1-104 red light is ON.
Indication of load shift between incoming and running sources.
Standard:
Check any of the following:
Reserve Aux Transformer Winding B power and current meters.
Main Aux XFMR Winding X power and current meters.
PPCS RAT and MAT voltage, current and power indications.
AND Determines that indications lower for RAT and rise for MAT.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 15 Performance Step: 10 Critical Yes (SEQ - 3)
NOP-EHV-001, Step 5.2.10 CRITICAL STEP: POSITION Bkr 1-101, RAT To Bus 1, control switch to TRIP.
Standard:
BKR 1-101 control switch taken to TRIP and released with red light OFF and green light LIT.
Evaluator Note:
Concurrent Verification is required by the procedure for this step.
Evaluator Cue:
Concurrent Verification is provided.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 11 Critical No (SEQ - 4)
NOP-EHV-001, Step 5.2.11 CHECK the following:
Bkr 1-101 green light is ON.
Indication of load shift between incoming and running sources.
Standard:
Check any of the following:
Reserve Aux Transformer Winding B power and current meters.
Main Aux XFMR Winding X power and current meters.
PPCS RAT and MAT voltage, current and power indications.
AND Determines that indications lower for RAT and rise for MAT.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 15 Performance Step: 12 Critical No NOP-EHV-001, Step 5.2.12 IF required to prevent breaker operation, THEN POSITION Bkr 1-101, RAT To Bus 1 control switch to PULLOUT.
Standard:
Determine BKR 1-101 is to remain in Normal-After -Trip position and mark the step N/A Evaluator Cue:
As Unit Supervisor: The breaker will be aligned for normal operation. If required, I authorize N/A for Step 5.2.12.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 Critical No NOP-EHV-001, Step 5.2.13 POSITION Bkr 1-104 Sync Switch to OFF.
Standard:
PLACE Bkr 1-104 Sync Switch to OFF.
Evaluator Note:
Concurrent Verification is required by the procedure for this step.
Evaluator Cue:
Concurrent Verification is provided.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When action has been taken to address BKR 1-104 Synch Switch position, This completes this JPM.
Stop Time:
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 15 During the evaluation, the trainee:
Performed the task correctly and in accordance with procedure usage and adherence requirements.
Yes No Never put anyones safety at risk.
Yes No Never put equipment reliability at risk.
Yes No Never violated radiological work practices.
Yes No Demonstrated effective use of event-free human performance tools.
Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.
MARKED UO COPY OF NOP-EHV-001.pdf
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 15 SIMULATOR SETUP Any At-Power IC > 20%
INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS REMOTE FUNCTIONS OVERRIDES TRIGGERS
- 1. Reset to IC and place Simulator in RUN.
- 2. If snapped IC is used, verify initial conditions and place the Simulator in Freeze.
- 3. Transfer Bus 1 to the RAT.
- a. POSITION Bkr 1-101 Sync Switch to ON.
- b. WHEN sources are in sync, THEN CLOSE Bkr 1-101, RAT To Bus 1.
- c. POSITION Bkr 1-104, MAT To Bus 1, control switch to TRIP.
- d. POSITION Bkr 1-101 Sync Switch to OFF.
- e. PLACE Sync Switch Control in BKR G-1 SYNCH SWITCH.
- 4. PLACE the Simulator in FREEZE
- 6. When directed by the JPM Evaluator, place the SIMULATOR in RUN.
RO-039-JP02A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 15 TURNOVER SHEET INITIAL CONDITIONS:
Bus 1 has been aligned to the RAT to allow troubleshooting of the Main Auxiliary Transformer Supply Beaker, BKR 1-104.
Maintenance has completed all work and the breaker is now available for operation.
OP-KW-NOP-EHV-001, 4160V AC Supply And Distribution System Operation, will be used to restore Bus 1 to its normal at-power alignment.
All Prerequisites and Precautions and Limitation for OP-KW-NOP-EHV-001 have been met.
BKR 1-104 has been racked in and the AO is standing by at Bus 1.
INITIATING CUES (IF APPLICABLE):
The Unit Supervisor directs aligning Bus 1 to the Main Auxiliary Transformer (MAT) using OP-KW-NOP-EHV-001, section 5.2 Transfer Bus 1 From RAT To MAT.
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 15 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Scott Stenner 01/19/2011 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-039-JP02A, Transfer 4160 V AC Bus 1 From RAT To MAT, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMF-L-RO/SRO-S-01242011-106 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 15 Historical Record:
Rev A - New JPM Rev B Changed MAT in the initial conditions to Main Auxiliary Transformer
Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 19 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Respond to a Shutdown Loss of Coolant Accident JPM NUMBER:
RO-034-JP04A REV.
B RELATED PRA INFORMATION:
None TASK NUMBER(S) /
TASK TITLE(S):
0340040401 / Respond to Abnormal RHR System Operation given decreasing RCS Level or Pressure K/A NUMBERS:
025AA1.02 Ability to operate and/or monitor the following as they apply to the Loss of Residual Heat Removal System: RCS inventory IMP 3.8 / 3.9 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
No Alternate Path / Faulted:
No TASK APPLICABILITY:
RO / SRO Additional signatures may be added as needed.
Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 01/24/2011 Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 19 JPM Number:
RO-034-JP04A Rev B JPM
Title:
Respond to a Shutdown Loss of Coolant Accident Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 19 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
You are the Reactor Operator The plant is in MODE 4 with a cooldown to MODE 5 in progress.
RHR Train A is aligned for Shutdown Cooling.
RHR Train B is aligned for Split Train Operation in Injection Mode.
Indications of an increase in RCS leakage were noted.
The Unit Supervisor has entered AOP-RHR-002, Shutdown Loss Of Coolant Accident, in response to the reported conditions.
All other alarms and actions other than those associated with the actions of AOP-RHR-002 will be addressed by the crew.
INITIATING CUES (IF APPLICABLE):
Perform the actions of AOP-RHR-002, in response to the existing conditions.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets begin
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 19 JPM PERFORMANCE INFORMATION Required Materials:
AOP-RHR-002 General
References:
GOP-202,Shutdown From RHR To MODE 5, Rev. 10 N-SI-33-CL, Safety Injection System Prestartup Checklist, Rev. 41, Attachment B NOP-RHR-001, Residual Heat Removal System Operation, Rev. 9 AOP-RHR-002, Shutdown Loss Of Coolant Accident, Rev. 5 Task Standards:
CVCS letdown isolated for RCS and makeup flow to RCS established from an SI Pump through at least one Cold Leg injection path.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.
[OTH 12765]
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical No AOP-RHR-002, Step 1 (CAS) CHECK If RHR Pumps Should Be Stopped:
- a. CHECK RHR pumps - ANY RUNNING IN DECAY HEAT REMOVAL MODE Standard:
Check RHR Pump A running and aligned for RCS cooldown (Decay Heat Removal).
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 19 Performance Step: 2 Critical No AOP-RHR-002, Step 1 (CAS) CHECK If RHR Pumps Should Be Stopped:
- b. CHECK the following:
- 1. Pressurizer Level - LESS THAN 3% [15%]
Standard:
Check Pressurizer level on LI-426, 427, 428 and/or recorder 42302 Check RCS subcooling on ICCMS display or PPCS.
Determine Pressurizer level is LESS THAN 3%
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical Yes AOP-RHR-002, Step 1 (CAS) CHECK If RHR Pumps Should Be Stopped:
- c. STOP RHR pumps and PLACE in PULLOUT.
Standard:
RHR Pump A stopped with its control switch in PULLOUT.
Evaluator Note:
The procedure does NOT specifically address placing only the running RHR Pump in PULLOUT. The performer may also place RHR Pump B in PULLOUT. This action is NOT required for the CRITICAL action performed by this step.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 19 Performance Step: 4 Critical No AOP-RHR-002, Step 2 ISOLATE RCS Letdown:
- a. VERIFY all letdown isolation valves - CLOSED
- LD-2
- LD-3
- LD-4A
- LD-4B
- LD-4C
- LD-6 Standard:
Check the valves CLOSED AND Take any OPEN valve control switch to CLOSE and check green light only LIT.
Evaluator Note:
The only expected OPEN valve is LD-6.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Critical No AOP-RHR-002, Step 2 ISOLATE RCS Letdown:
- b. VERIFY excess letdown isolation valve - CLOSED
- LD-300 Standard:
Check LD-300 closed with green light LIT.
Evaluator Note:
LD-300 is normally closed Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 19 Performance Step: 6 Critical No AOP-RHR-002, Step 2 ISOLATE RCS Letdown:
- LD-60 Standard:
Check LD-60 closed with green light LIT.
Evaluator Note:
LD-60 is normally closed after RHR is aligned with letdown via the Spectacle Flange.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical Yes AOP-RHR-002, Step 2 ISOLATE RCS Letdown:
- d. Locally VERIFY RHR/CVC isolation valves - CLOSED
- RHR-210
- RHR-211 Standard:
Contacts Auxiliary Operator (AO) and directs the AO locally close RHR-210 and RHR-211.
Acknowledges RHR-210 and RHR-211 are closed.
Evaluator Note:
The BOOTH OPERATOR will enter REMOTE FUNCTIONS RH120A and RH120B to close RHR-210 and RHR-211.
Evaluator Cue:
When contacted as AO, acknowledge request with repeat back.
After being directed to close valves: RHR-210 and RHR-211 (or valves directed to operate) are now closed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 19 Performance Step: 8 Critical No AOP-RHR-002, Step 2 ISOLATE RCS Letdown:
- e. CLOSE any known drain paths Standard:
Determine no other drain path exists.
Evaluator Cue:
If questioned as Unit Supervisor on systems alignment: No other RCS drain path is in service.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Critical No AOP-RHR-002, Step 3 CHECK If Charging Flow Is Adequate:
- a. CHECK Pressurizer Level:
- 1. GREATER THAN 3% [15%]
AND
- 2. STABLE OR INCREASING Standard:
Check Pressurizer level on LI-426, 427, 428 and/or recorder 42302 Determine Pressurizer level is LESS THAN 3%
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 19 Performance Step: 10 Critical No AOP-RHR-002, Step 3 CHECK If Charging Flow Is Adequate:
(RNO) a. PERFORM the following:
- a. INCREASE charging flow as necessary to maintain Pressurizer level.
Standard:
Using the manual potentiometer for Charging Pumps A and B, increase charging Pumps speed to maximum (100% each).
Evaluator Note:
This is NOT critical since the leak rate is greater than the capacity of TWO Charging Pumps (~ 120 gpm total).
Evaluator Cue:
If action reported and leakage greater than charging flow rate reported, then acknowledge report and direct to continue with the procedure.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 11 Critical No AOP-RHR-002, Step 3 CHECK If Charging Flow Is Adequate:
(RNO) b. IF Pressurizer level can NOT be maintained, THEN GO TO Step 5.
Standard:
Determine and report Pressurizer level cannot be brought on-scale or maintained with Charging flow at maximum.
Evaluator Cue:
If action reported and leakage greater than charging flow rate reported, then acknowledge report and direct to continue actions, if necessary.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 19 Performance Step: 12 Critical NO AOP-RHR-002, Step 5 START One SI Pump:
- a. SELECT one SI pump to start
- SI pump A
- SI pump B Standard:
SI Pump A or B selected to be started.
Evaluator Cue:
As Unit Supervisor, Use SI Pump A for operation.
Evaluator Note:
IF/WHEN performer asks for pump to use the EVALUATOR will provide the CUE above.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 19 Performance Step: 13 Critical No AOP-RHR-002, Step 5 START One SI Pump:
- b. ALIGN selected SI pump To RWST:
For the SI Pump A (B), check the required valves OPEN:
SI-4A (SI-4B)
SI-5A (SI-5B)
SI-208 SI-209 Evaluator Note:
It is expected each of the valves will be open in these conditions as normal alignment. The following indications may be used for position determination:
SI-4A: control switch green light indication SI-5A: control switch green light indication SI-208 and SI-209: control switch green light indication The alternate use of SI Train B equipment is given here as acceptable in the event the EVALUATOR does not have adequate time to direct SI Pump A prior to action be taken by the Performer.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 19 Performance Step: 14 Critical YES AOP-RHR-002, Step 5 START One SI Pump:
- c. START selected SI pump
- SI Pump A
- SI Pump B Standard:
Pump red light LIT Checks Pump amps normal on Checks Pump Discharge Pressure Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 Critical Yes AOP-RHR-002, Step 6 ESTABLISH SI flow:
- a. VERIFY Safety Injection To Cold Legs OPEN
- SI-9A
- b. VERIFY Safety Injection To Loop A(B) Cold Leg OPEN
- SI-11A
- SI-11B
- c. CHECK SI pump - FLOW INDICATED
- FI-925 Standard:
Control switch taken to OPEN and released for the following valves with the red light LIT:
SI-9A SI-11A SI-11B CHECK flow of approximately 630 gpm indicated on FI-925 Evaluator Note:
A flow path for SI to the RCS Loop Cold Leg is established by:
SI-9A open and SI-11A open for Cold Leg A SI-9A open and SI-11B open for Cold Leg B The procedure directs opening both flow paths; however, to establish adequate flow from an SI Pump only one of the paths is required.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 19 Terminating Cues:
When the Establish SI Flow step has been addressed, This completes this JPM.
Stop Time:
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 19 During the evaluation, the trainee:
Performed the task correctly and in accordance with procedure usage and adherence requirements.
Yes No Never put anyones safety at risk.
Yes No Never put equipment reliability at risk.
Yes No Never violated radiological work practices.
Yes No Demonstrated effective use of event-free human performance tools.
Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 19 Simulator Setup IC with RHR in service, RCS temperature 300ºF to 330ºF and RCS WR Pressure 320 psig to 350 psig.
INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS RC08 10 80 80 REMOTE FUNCTIONS SI115 SI-11A Breaker ON/OFF 1
ON ON 1
SI116 SI-11B Breaker ON/OFF 1
ON ON 1
SI119 SI-9A Breaker ON/OFF 1
ON ON 1
RH120A RHR-210 RHR/CVC Inlet Isolation 2
1 1
2 RH120B RHR-211 RHR/CVC Outlet Isolation 2
1 1
2 OVERRIDES TRIGGERS
- 1. Reset to IC and place Simulator in RUN.
- 2. If snapped IC is used, verify initial conditions and place the Simulator in Freeze.
- 4. Ensure Control Room switch alignment in accordance with N-SI-33-CL Appendix B with the following exceptions:
SI-302B is OPEN as aligned by NOP-RHR-001 Attachment A SI-300B is OPEN as aligned by NOP-RHR-001 Attachment A
- 5. Ensure both SI Pumps in PULLOUT. (N-SI-33-CL Appendix B)
- 6. Ensure Power Source alignment status in accordance with N-SI-33-CL Appendix B. This is accomplished by activating TRIGGER 1 to actuate the REMOTE FUNCTIONs (RFs). These RFs may be deleted after actuation. (SI-20A/B may also need to be powered if OPEN in initial IC. RFs SI117 and SI118 are used for this purpose).
- 7. Use Remote Function RM101 to align R-21 to Cntmt
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 16 of 19
- 8. Ensure RHR is aligned in accordance with NOP-RHR-001, with major items:
- a. Operation of this valve may affect RCS or RHR inventory tags on SI-351A/B, RHR-400A/B & RHR-299A/B
- b. Attachment A alignment complete. Exceptions to the positions listed may include the following if action has been taken to place RHR in service or if RHR is in service:
- i. RHR-1A/B open ii. RHR-2A/B open iii. RHR-8A throttled for cooling iv. RHR-101 throttled to maintain total RHR flow
- v. RHR-11 open
- d. RHR Pump A running
- e. LD-11 open
- f. RHR-210 and RHR-211 open with LD-60 closed
- g. LD-10 established in AUTO with approximately 80 gpm letdown flow
- 9. Pressurizer level established at ~ 40-50% with Charging Pumps in MAN
- 10. VCT level >25% with charging and letdown matched
- 11. Actuate RCS leak/LOCA using TRIGGER 10
- 12. When Pressurizer level indicates LESS THAN 3%, PLACE the Simulator in FREEZE
- 14. When directed by the JPM Evaluator, place the SIMULATOR in RUN.
Actions during JPM Performance
- 1. Performance Step 7 - Close RHR-201 and RHR-211. When direction is provided, use REMOTE FUNCTION RH120A and RH120B set to 0 to close the valves.
RO-034-JP04A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 17 of 19 TURNOVER SHEET INITIAL CONDITIONS:
You are the Reactor Operator The plant is in MODE 4 with a cooldown to MODE 5 in progress.
RHR Train A is aligned for Shutdown Cooling.
RHR Train B is aligned for Split Train Operation in Injection Mode.
Indications of an increase in RCS leakage were noted.
The Unit Supervisor has entered AOP-RHR-002, Shutdown Loss Of Coolant Accident, in response to the reported conditions.
All other alarms and actions other than those associated with the actions of AOP-RHR-002 will be addressed by the crew.
INITIATING CUES (IF APPLICABLE):
Perform the actions of AOP-RHR-002, in response to the existing conditions.
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 18 of 19 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Scott Stenner 01/19/2011 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-034-JP04A, Respond to a Shutdown Loss of Coolant Accident, Rev. B Retention: Life of plant insurance policy + 10 years KPS-SystemJPMG-L-RO/SRO-S-01242011-107 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 19 of 19 Historical Record:
Rev. A - New Rev B Added to the initial condition All other alarms and actions other than those associated with the actions of AOP-RHR-002 will be addressed by the crew.
Step 12 clarified the cue to aid in administration Step 12 updated the standard to allow for starting either SI pump A or B
Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 18 JOB PERFORMANCE MEASURE (JPM)
SITE:
Kewaunee Power Station JPM TITLE:
Operate the Process Radiation Monitors (R-11 Startup)
JPM NUMBER:
RO-045-JP01A REV.
C RELATED PRA INFORMATION:
None TASK NUMBER(S) /
TASK TITLE(S):
0450010101 / Perform a Pre-Startup Checklist of the Radiation Monitoring System K/A NUMBERS:
073A4.01 Ability to manually operate and/or monitor in the control room: Radiation monitoring system control panel APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
X Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
No Alternate Path / Faulted:
No TASK APPLICABILITY:
RO/SRO Additional signatures may be added as needed.
Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)
Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 18 JPM Number:
RO-045-JP01A Rev C JPM
Title:
Operate the Process Radiation Monitors (R-11 Startup)
Examinee:
Evaluator:
Job
Title:
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 18 JPM BRIEFING/TURNOVER Read to Examinee:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
- 1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
- 2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
You are the Reactor Operator.
R-11, CNTMT Air Particulate Monitor, has been shutdown for repairs and is now ready to be restarted for a PMT. I&C has requested the restart and only requires the monitor energized and aligned per the Prestartup checklist.
All Precautions and Limitations, and Prerequisites are met for:
N-RM-45, Radiation Monitoring System N-RM-45-CL, Radiation Monitoring System Prestartup Checklist INITIATING CUES (IF APPLICABLE):
The Control Room Supervisor directs you to start R-11/12, Cntmt Air Particulate Monitor, per N-RM-45, step 4.1.a, using N-RM-45-CL, step 2.3.1.
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 18 JPM PERFORMANCE INFORMATION Required Materials:
Stamped and marked up copies of N-RM-45 (P&Ls, Initial Conditions) and N-RM CL (Section 1.0 initialed and section/steps 2.1; 2.2; 2.3.2 through 2.3.7; 2.4; 3.1-3.3; 4.2; 5.1,5.3 marked N/A). Section 4.2 Marked and initialed for CONT. Section 5.2 for R-11/12 items initial complete Key #290-294 available for keyswitch operations General
References:
N-RM-45, Radiation Monitoring System. Rev. 59 N-RM-45-CL, Radiation Monitoring System Prestartup Checklist, Rev. 28 47013-A RAD MONITOR SAMPLING FLOW HIGH/LOW, Rev. 0 47013-B, RAD MONITOR FAILURE, Rev. 0 Task Standards:
R-11/R-12 in service with sampling aligned to CNTMT, R-11 Tape Drive in service; R-11/R-12 Sample Pump ON and aligned to CNTMT; R-11 monitor Keyswitch to ON and R-12 monitor Keyswitch to ON Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.
[OTH 12765]
NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
EVALUATOR NOTE: N-RM-45, STEP 4.1.1.a directs, ALIGN desired channel using N-RM-45-CL.
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 18 Evaluator Cue: If the performer asks about the verification for the steps then state verification will be performed after completion of your actions Performance Step: 1 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
AS-1/CV-31383 Containment Air Sample Isolation A OPEN/AUTO Standard:
Check AS-1 AUTO/OPEN by switch position is AUTO and red light LIT and green light OFF.
Evaluator NOTE:
The control switch for AS-1 is under the CNTMT AIR SAMPLING section on the center Vertical Panel MVB. An additional indication for the valve is located on CNTMT ISOL ACTIVE panel Status Light 44911-1105, R-11/R-12 Sample Isol AS-1, LIT.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 2 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
AS-32/CV-31385 Containment Air Sample Isolation C OPEN/AUTO Standard:
Check AS-32 to OPEN/AUTO by switch position in AUTO and red light LIT and green light OFF.
Evaluator NOTE:
The control switch for AS-32 is under the CNTMT AIR SAMPLING section on the center Vertical Panel MVB. An additional indication for the valve is located on CNTMT ISOL ACTIVE panel Status Light 44911-0805, R-11/R-12 Sample Isol AS-32, LIT.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 18 Performance Step: 3 Critical Yes N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
AS-2/CV-31384 Containment Air Sample Isolation B OPEN/AUTO Standard:
Check AS-2 to OPEN/AUTO by switch position in AUTO and red light LIT and green light OFF.
Evaluator NOTE:
The control switch for AS-2 is under the CNTMT AIR SAMPLING section on the center Vertical Panel MVB. An additional indication for the valve is located on CNTMT ISOL ACTIVE panel Status Light 44911-1205, R-11/R-12 Sample Isol AS-2, LIT.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical Yes N-RM-45-CL, Step 2.3.1 - Control Room Process Radiation Monitoring Panel -
Train B. 1R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-11 Tape Drive Control switch OPERATE Standard:
Position R-11 Tape Drive Control switch to OPERATE with red OPERATE light LIT.
Evaluator NOTE:
The control switch and indications for the tape drive are located Under the R-11 and R-12 monitor displays on the left-side vertical board, MVC.
Initially the switch will be in the OFF position with the green OFF light LIT.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 18 Performance Step: 5 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
Local Control light OFF Standard:
Check R-11 Tape Drive Control LOCAL CONTROL amber light OFF.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
Torn Paper light OFF Standard:
Check R-11 Tape Drive Control TORN PAPER amber light OFF.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 18 Performance Step: 7 Critical NO N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-11/12 Sample Control switch CNTMT Standard:
Check R-11/R-12 Sample Control switch in CNTMT position with red CNTMT light LIT.
Evaluator NOTE:
The control switch and indications for the R-11/R-12 Sample Alignment are located in the center under the R-11 and R-12 monitor displays on the left-side vertical board, MVC.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
Sample Press High light OFF Standard:
Check R-11/R-12 Sample Control SAMPLE PRESS HIGH amber light OFF.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 18 Performance Step: 9 Critical Yes N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-11/12 Pump Control switch ON Standard:
Position R-11/R-12 Pump Control switch to ON position with red light LIT.
Evaluator NOTE:
The control switch and indications for the R-11/R-12 Pump Control are located to the right under the R-11 and R-12 monitor displays on the left-side vertical board, MVC.
Initially the switch will be in OFF/RESET position with the green light LIT.
Annunciator 47013-A RAD MONITOR SAMPLING FLOW HIGH/LOW clears.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 Critical Yes N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-11 Keyswitch ON Standard:
Position R-11 Keyswitch to ON position with NORM green light LIT.
Evaluator NOTE:
The Keyswitch and indications for the R-11 are located on monitor display console on the left-side vertical board, MVC.
Initially the Keyswitch will be in OFF position.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 18 Performance Step: 11 Critical Yes N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-12 Keyswitch ON Standard:
Position R-12 Keyswitch to ON position with NORM green light LIT.
Evaluator NOTE:
The Keyswitch and indications for the R-12 are located on monitor display console on the left-side vertical board, MVC.
Initially the Keyswitch will be in OFF position.
Annunciator 47013-B, RAD MONITOR FAILURE clears Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
Flow High/Low light OFF Standard:
Check R-11/R-12 Pump Control FLOW HIGH LOW amber light OFF.
Evaluator NOTE:
The indication is located with the R-11/R-12 Pump Control to the right under the R-11 and R-12 monitor displays on the left-side vertical board, MVC.
Evaluator Cue:
After action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 18 Performance Step: 13 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-11 High alarm light OFF R-11 Alert light OFF R-11 NORM light ON R-11 Fail light OFF R-11 Error Messages displayed NONE Standard:
Check:
R-11 monitor HIGH red light OFF.
R-11 monitor ALERT amber light OFF.
R-11 monitor Norm green light LIT.
R-11 monitor FAIL amber light OFF.
Check no error message displayed on R-11 monitor.
Evaluator NOTE:
The indications for the R-11 are located on monitor display console on the left-side vertical board, MVC.
Evaluator Cue:
After each action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 18 Performance Step: 14 Critical No N-RM-45-CL, Step 2.3.1 Control Room Process Radiation Monitoring Panel - Train B.
R-11/81048 Containment Particulate and R-12/81049 Containment Gas :
R-12 High alarm light OFF R-12 Alert light OFF R-12 NORM light ON R-12 Fail light OFF R-12 Error Messages displayed NONE Standard:
Check:
R-12 monitor HIGH red light OFF.
R-12 monitor ALERT amber light OFF.
R-12 monitor Norm green light LIT.
R-12 monitor FAIL amber light OFF.
Check no error message displayed on R-12 monitor.
Evaluator NOTE:
The indications for the R-12 are located on monitor display console on the left-side vertical board, MVC.
Evaluator Cue:
After each action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 Critical No Report alignment of R-11/R-12 complete.
Standard:
Inform Unit Supervisor that steps for aligning R11/R-12 (per N-RM-045-CL and N-RM-045) are complete.
Evaluator Cue:
Acknowledge report.
Evaluator Cue:
After each action taken: Second Verification is completed and initialed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When action of N-RM-04-CL are complete, This completes this JPM.
Stop Time:
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 18
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 18 During the evaluation, the trainee:
Performed the task correctly and in accordance with procedure usage and adherence requirements.
Yes No Never put anyones safety at risk.
Yes No Never put equipment reliability at risk.
Yes No Never violated radiological work practices.
Yes No Demonstrated effective use of event-free human performance tools.
Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 18 Any IC. (NOTE: Technical Specification LCO 3.3.6 will apply for R-11/R-12 out-of-service in MODES 1,2,3,4.
This JPM is NOT designed to address the ITS issue.)
INPUT
SUMMARY
Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS REMOTE FUNCTIONS OVERRIDES TRIGGERS
- 1) Reset to IC and place Simulator in RUN.
- 2) If snapped IC is used, verify initial conditions and place the Simulator in Freeze.
- 3) Remove R-11/R12 from service (N-RM-45, step 4.3.9 & 4.3.10):
a) Align R-21 to sample containment (N-RM-45, 4.2.13) i) POSITION R-11/12 Pump Control switch to OFF/RESET b) POSITION R-11 monitor Keyswitch to OFF.
c) POSITION R-12 monitor Keyswitch to OFF.
- 4) POSITION R-11 Tape Drive Control switch to OFF.
- 5) Place AS-31/SV-33622, AS-35/SV-33621 Smpl Rtn to Cntmt
- 6) PLACE the Simulator in FREEZE
- 8) When directed by the JPM Evaluator, place the SIMULATOR in RUN.
RO-045-JP01A, Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 16 of 18 TURNOVER SHEET INITIAL CONDITIONS:
You are the Reactor Operator.
R-11, CNTMT Air Particulate Monitor, has been shutdown for repairs and is now ready to be restarted for a PMT. I&C has requested the restart and only requires the monitor energized and aligned per the Prestartup checklist.
All Precautions and Limitations, and Prerequisites are met for:
N-RM-45, Radiation Monitoring System N-RM-45-CL, Radiation Monitoring System Prestartup Checklist INITIATING CUES (IF APPLICABLE):
The Control Room Supervisor directs you to start R-11/12, Cntmt Air Particulate Monitor, per N-RM-45, step 4.1.a, using N-RM-45-CL, step 2.3.1.
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 17 of 18 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
- 1.
Are all items on the signature page filled in correctly?
- 2.
Has the JPM been reviewed and validated by SMEs?
- 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
- 4.
Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
- 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
- 6.
Has the completion time been established based on validation data or incumbent experience?
- 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
- 8.
Is the Licensee level appropriate for the task being evaluated if required?
- 9.
Is the K/A appropriate to the task and to the licensee level if required?
- 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
- 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
- 12. Are all references identified, current, accurate, and available to the trainee?
- 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Chris Brandt 01/19/2011 __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date
RO-045-JP01A, Operate the Process Radiation Monitors (R-11 Startup), Rev. C Retention: Life of plant insurance policy + 10 years KPS-System JPMH-L-RO/SRO-S-01242011-108 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 18 of 18 Historical Record:
Rev. B - Change format to new JPM format.
Changed K/A number from 072A4.01 to 073A4.02. 072 is related to Area Radiation Monitoring (ARM)
System while 073 is related to the Process Radiation Monitoring (PRM) System. R-11 / R-12 are part of the effluent monitoring.
Updated to current procedures.
Rev C Added Cue to the first step to state that if the operator asks prior to performing the first step for a verification that the verification will be performed after completion of your actions.
Step 15 added cue for verification.
Changed Step 7 from critical to not critical