2011 Kewaunee Power Station, Initial License Examination ES-301-2 Form
ML110460246
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/2011
From: Walton R
Operations Branch III
To:
References
Download: ML110460246 (3)


Text

KPS-ES-301-2-L-S-11052010-076 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Kewaunee Power Station________

Date of Examination: 02/07-14/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: ____1_______

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ESFAS / RO-E00-JP012 - Failure of ICS to Automatically Initiate A,D,E,EN,S 2
b. Rod Control/Perform Control Rod Exercise RO-049-JP01D D,S 1
c. Pressurizer Pressure Control / RO-E00-JP011 - Pressurizer Pressure Control Malfunction A,D,E,S 3
d. Main Turbine Generator / RO-054-JP061 - Rapid Power Reduction to Approximately 570 MWe A,D,E,P,S 4
e. Containment Cooling / RO-018-JP011 - Respond to Containment Fan Coil Unit Emergency Discharge Damper Open A, E,EN,N,S 5
f. AC Electrical Distribution / RO-039-JP02A - Transfer 4160 V AC Bus 1 From RAT To MAT N,S 6
g. RHR / RO-034-JP04A - Respond to a Shutdown Loss of Coolant Accident E,L,N,S 4
h. Process Radiation Monitoring / RO-045-JP01A - Operate the Process Radiation Monitors (Startup R-11)

D,S 7

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. CVCS / AO-036-JP09A - Locally Isolate Dilution Flow Paths D,E,P,R 1
j. Fire (RCS) / RO-E07-JP01H - Remove Pressurizer PORV Fuses D,E 8
k. Diesel Generator / AO-010-JP021 - Emergency Shutdown of Diesel Generator B A,D,E 6

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1

- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1

KPS-ES-301-2-L-S-11052010-076 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Kewaunee Power Station________

Date of Examination: 02/07-14/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: ____1_______

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ESFAS / RO-E00-JP012 - Failure of ICS to Automatically Initiate A,D,E,EN,S 2
b. Rod Control/Perform Control Rod Exercise RO-049-JP01D D,S 1
c. Pressurizer Pressure Control / RO-E00-JP011 - Pressurizer Pressure Control Malfunction A,D,E,S 3
d. Main Turbine Generator / RO-054-JP061 - Rapid Power Reduction to Approximately 570 MWe A,D,E,P,S 4
e. Containment Cooling / RO-018-JP011 - Respond to Containment Fan Coil Unit Emergency Discharge Damper Open A, E,EN,N,S 5
f. AC Electrical Distribution / RO-039-JP02A - Transfer 4160 V AC Bus 1 From RAT To MAT N,S 6
g. RHR / RO-034-JP04 - Respond to a Shutdown Loss of Coolant Accident E,L,N,S 4
h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. CVCS / AO-036-JP09A - Locally Isolate Dilution Flow Paths D,E,P,R 1
j. Fire (RCS) / RO-E07-JP01H - Remove Pressurizer PORV Fuses D,E 8
k. Diesel Generator / AO-010-JP021 - Emergency Shutdown of Diesel Generator B A,D,E 6

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1

- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1

KPS-ES-301-2-L-S-11052010-076 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Kewaunee Power Station________

Date of Examination: 02/07-14/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: ____1_______

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a.
b.
c.
d.
e. Containment Cooling / RO-018-JP011 - Respond to Containment Fan Coil Unit Emergency Discharge Damper Open A, E, EN, N, S

5

f.
g. RHR / RO-034-JP04 - Respond to a Shutdown Loss of Coolant Accident E,L,N,S 4
h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. CVCS / AO-036-JP09A - Locally Isolate Dilution Flow Paths D,E,P,R 1
j. Fire (RCS) / RO-E07-JP01H - Remove Pressurizer PORV Fuses D,E 8
k. Diesel Generator / AO-010-JP021 - Emergency Shutdown of Diesel Generator B A,D,E 6

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1

- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1