|
---|
Category:License-Operator
MONTHYEARML13007A1292013-01-0707 January 2013 Make-Up Remedial Training Plan to Reinstate Operator License ML12277A3722012-10-0303 October 2012 Requalification Program Inspection ML1106007682011-02-28028 February 2011 2011 Kewaunee Power Station Initial License Examination Final Written Examination RO & SRO ML1107407822011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Administered Written Exam Changes ML1104606532011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Examination Administered Dynamic Simulator Scenarios ML1104606632011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Examination Administered RO Written Examination ML1104606722011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Examination Administered SRO Written Examination ML1104604542011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed Dynamic Simulator Scenarios ML1104602592011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-6 Form ML1104604502011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed Control Room and In-Plant JPMs ML1104604492011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed Admin JPMs ML1104603142011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-201-1 Form ML1104602822011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination D-1 Scenario Outline Forms ML1104602662011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination ES-401-2 and Es 401-3 Forms ML1104602562011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-5 Forms ML1104602462011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-2 Form ML1104602342011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-1 Form ML1104602212011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination Random Generation Technique and K/A Suppression ML1104607062011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-401-9 Form ML1104604632011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed SRO Written Examination ML1104606242011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Administered Admin JPMs ML1104606332011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Administered Control Room JPMs ML1104606482011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Administered In-Plant JPMs ML1104607002011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-401-4 Form ML1104607092011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Outline Submission Review Comments ML1104607112011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination Operating Test Comments (Scenarios) ML1104607122011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination Operating Test Comments (Jpms) ML1104604582011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed RO Written Examination ML1120006632011-02-0707 February 2011 2011 Kewaunee Power Station, Initial Examination Administrative Files ML1120006582011-02-0707 February 2011 2011 Kewaunee Power Station Initial Examination Proposed Exam Files ML1120006542011-02-0707 February 2011 2011 Kewaunee Power Station, Initial Examination Outline Submittal ML1006200872009-08-0606 August 2009 Retake Exam 2009, As-Submitted Administrative JPMs ML1006200652009-08-0606 August 2009 Retake Exam 2009, As-Administered Administrative JPMs ML1006200592009-08-0606 August 2009 Retake Exam, Administrative JPM A5 ML1002110362009-08-0303 August 2009 2009 Kewaunee Power Station Retake Examination Administrative Files ML1002109882009-08-0303 August 2009 2009 Kewaunee Power Station Retake Examination Outline Submittal ML0916904132009-06-16016 June 2009 Confirmation of Retake Initial Operator License Examination: Kewaunee Power Station ML0914904802009-06-0808 June 2009 Ro/Sro Written Examination and Answer Keys - Kewaunee, April 23, 2009 ML0920902182009-04-27027 April 2009 2009 Kewaunee Power Station, Initial Examination Proposed Exam Files ML0921603972009-04-22022 April 2009 2009 Kewaunee, Initial Exam Proposed Operating Test ML0921604132009-04-13013 April 2009 2009 Kewaunee Initial Examination Proposed Written Examination ML0921603472009-01-14014 January 2009 2009 Kewaunee Administered Operating Test ML0702402302007-01-23023 January 2007 Various Checklists for the Kewaunee Retake Examination - August 2006 ML0702402192007-01-23023 January 2007 Miscellaneous Correspondence for the Kewaunee Retake Examination - August 2006 ML0702402082007-01-23023 January 2007 Facility Post Examination Documents for the Kewaunee Retake Examination - August 2006 ML0702401932007-01-23023 January 2007 NRC Comments to the Written Examination, ES-401-9, for the Kewaunee Retake Examination - August 2006 ML0702401852007-01-23023 January 2007 Examination Outline Submittals for the Kewaunee Retake Examination - August 2006 ML0631803752006-11-0707 November 2006 Proposed Written Exam for the Kewaunee Retake Examination - August 2006 ML0629103072006-08-31031 August 2006 Ro/Sro Initial Examination - Kewaunee August 2006 ML0509801582005-04-0808 April 2005 Re Operator License Examination Request 2013-01-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML13007A1292013-01-0707 January 2013 Make-Up Remedial Training Plan to Reinstate Operator License ML12277A3722012-10-0303 October 2012 Requalification Program Inspection ML1106007682011-02-28028 February 2011 2011 Kewaunee Power Station Initial License Examination Final Written Examination RO & SRO ML1107407822011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Administered Written Exam Changes ML1104606532011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Examination Administered Dynamic Simulator Scenarios ML1104606632011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Examination Administered RO Written Examination ML1104606722011-02-15015 February 2011 2011 Kewaunee Power Station Initial License Examination Administered SRO Written Examination ML1104604542011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed Dynamic Simulator Scenarios ML1104602592011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-6 Form ML1104604502011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed Control Room and In-Plant JPMs ML1104604492011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed Admin JPMs ML1104603142011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-201-1 Form ML1104602822011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination D-1 Scenario Outline Forms ML1104602662011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination ES-401-2 and Es 401-3 Forms ML1104602562011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-5 Forms ML1104602462011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-2 Form ML1104602342011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-301-1 Form ML1104602212011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination Random Generation Technique and K/A Suppression ML1104607062011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-401-9 Form ML1104604632011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed SRO Written Examination ML1104606242011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Administered Admin JPMs ML1104606332011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Administered Control Room JPMs ML1104606482011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Administered In-Plant JPMs ML1104607002011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination ES-401-4 Form ML1104607092011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Outline Submission Review Comments ML1104607112011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination Operating Test Comments (Scenarios) ML1104607122011-02-11011 February 2011 2011 Kewaunee Power Station, Initial License Examination Operating Test Comments (Jpms) ML1104604582011-02-11011 February 2011 2011 Kewaunee Power Station Initial License Examination Proposed RO Written Examination ML1120006632011-02-0707 February 2011 2011 Kewaunee Power Station, Initial Examination Administrative Files ML1120006582011-02-0707 February 2011 2011 Kewaunee Power Station Initial Examination Proposed Exam Files ML1120006542011-02-0707 February 2011 2011 Kewaunee Power Station, Initial Examination Outline Submittal ML1006200872009-08-0606 August 2009 Retake Exam 2009, As-Submitted Administrative JPMs ML1006200652009-08-0606 August 2009 Retake Exam 2009, As-Administered Administrative JPMs ML1006200592009-08-0606 August 2009 Retake Exam, Administrative JPM A5 ML1002110362009-08-0303 August 2009 2009 Kewaunee Power Station Retake Examination Administrative Files ML1002109882009-08-0303 August 2009 2009 Kewaunee Power Station Retake Examination Outline Submittal ML0916904132009-06-16016 June 2009 Confirmation of Retake Initial Operator License Examination: Kewaunee Power Station ML0914904802009-06-0808 June 2009 Ro/Sro Written Examination and Answer Keys - Kewaunee, April 23, 2009 ML0920902182009-04-27027 April 2009 2009 Kewaunee Power Station, Initial Examination Proposed Exam Files ML0921603972009-04-22022 April 2009 2009 Kewaunee, Initial Exam Proposed Operating Test ML0921604132009-04-13013 April 2009 2009 Kewaunee Initial Examination Proposed Written Examination ML0921603472009-01-14014 January 2009 2009 Kewaunee Administered Operating Test ML0702402302007-01-23023 January 2007 Various Checklists for the Kewaunee Retake Examination - August 2006 ML0702402192007-01-23023 January 2007 Miscellaneous Correspondence for the Kewaunee Retake Examination - August 2006 ML0702402082007-01-23023 January 2007 Facility Post Examination Documents for the Kewaunee Retake Examination - August 2006 ML0702401932007-01-23023 January 2007 NRC Comments to the Written Examination, ES-401-9, for the Kewaunee Retake Examination - August 2006 ML0702401852007-01-23023 January 2007 Examination Outline Submittals for the Kewaunee Retake Examination - August 2006 ML0631803752006-11-0707 November 2006 Proposed Written Exam for the Kewaunee Retake Examination - August 2006 ML0629103072006-08-31031 August 2006 Ro/Sro Initial Examination - Kewaunee August 2006 ML0509801582005-04-0808 April 2005 Re Operator License Examination Request 2013-01-07
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 1 Op-Test No.: 1 Examiners: Operators: SRO: .
ATC: .
BOP: .
Initial Conditions: 100% power EOL Equilibrium Xenon. RCS boron concentration is 77 ppm. RCS Tave is 572ºF. Generator load is 602 MWe gross, AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, TD AFW pump is OOS for corrective maintenance on its Aux Lube Oil Pump, 2 inch containment vent is in progress per NOP-RBV-002 section 5.6 Turnover: Notified by DEMI that MISO has escalated a previous Minimum Generation Alert to a Minimum Generation Warning with an actual event, KPS has agreed to Lower Power to 95%.
TS 3.7.5 (AFW system) Condition B with one AFW Train inoperable. Required Action B.1 is to restore train(s) to OPERABLE status with a Completion Time of 72 Hours. Start Time 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> before scenario start time.
TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A One or more PORVs inoperable and capable of being manually cycled. Required Action A.1 is to close and maintain power to the associated PORV Block Valve with a completion time of one hour (Completed).
Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.
DO-46113-G Pre- OFF T/D AFW Pump OOS. MS-102 in PULLOUT.
N/A Load DO-46114-G OFF MS-100A/B in CLOSE and lights OFF Pre- FW16A BOP - C AFW Pump A fails to auto start. Manual start remains available.
Load ATC - R 1 N/A Power reduction required due to Minimum Generation Warning.
BOP - N After approximately 5% load decrease, controlling PRZR pressure RX203 -
2 2500 0:30 ATC - I blue channel (III), PT-431 fails high.
Heaters de-energize and sprays open to lower PRZR pressure.
FW-7B controller output signal fluctuates resulting in unstable RX02B 3 75 15:00 BOP - C operation of FW-7B, SG B Feed Reg Valve. Value for fluctuation increases to 75% over 15 minutes.
NI05A -
4 1.2 ATC - I NI Red Channel, N41, fails low.
SG01B - ATC, SGTR occurs in SG B ramping to maximum value over a 5-minute 5.6 ramp BOP -
5 over 5 period. Crew responds to radiation alarms and rising SG level.
M minutes When the reactor trips, the SGTR goes to its maximum value, AFW Pump A fails to auto start on low SG level or SI signal. BOP 6 FW16A BOP - C establishes flow to SG A.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 2 Op-Test No.: 1 Examiners: Operators: SRO: .
ATC: .
BOP: .
Initial Conditions: IC-17: 51% power EOL Equilibrium Xenon. RCS boron concentration is 256 ppm.
RCS Tave is 558ºF. Generator load is 282 MWe gross. AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, 2 inch containment vent is in progress, N41 is OOS (failed low previous shift)
Turnover: Power initially lowered due to problems associated with Main Feed Pump 1A. Problems have been corrected and the pump is ready for retest..Plant Management has directed starting Main Feed Pump 1A and raising power to 56% at 1/2% per minute. OP-KW-GOP-106 has been completed up-to and including 5.1.12. NOP-FW-001 has been completed up-to and including step 5.1.5 Reactor Engineering has provided a reactivity plan and the plan has been reviewed and approved.
The following Tech Specs are in force: TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A; TS 3.3.1(Reactor Protection System (RPS)
Instrumentation) Condition A; TS 3.3.1 Reactor Protection System (RPS) Instrumentation)
Condition D; TS 3.3.1 Reactor Protection System (RPS) Instrumentation) Condition E Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.
NI05A - N41 Power Range NI Red Channel is OOS failed low. OTT Trip Pre-1.2 N/A bistable and Rod Stop bistable are tripped. [also pre-load: RF:
Load RP133 - Trip and RP134 - Trip]
Pre- DI-46355- Containment Sump B Supply to RHR Pumps, SI-350A and SI-CLOSE ON ATC - C 350B, fail to open [also pre-load: DI-46355-OPEN OFF Load DI-46356-CLOSE ON and DI-46356-OPEN OFF ATC - R Turbine load is increased and Main Feedwater Pump B is started 1 N/A BOP - N prior to exceeding 285 psig impulse pressure (56% turbine power)
SG A red pressure channel (PT-468) fails high to 1400 psig over 30 RX213 -
2 1400 0:30 BOP - C seconds resulting in increase in indicated steam flow to SG A, increase in feed flow to SG A and opening of SG A PORV, SD-3A RC08 - An unisolable RCS leak to containment atmosphere of 3 1.4 5:00 ATC - C approximately 20 gpm develops over a 5-minute period.
ATC, RC03A - BOP -
4 RCS leak propagates into a large-break LOCA.
10%, 0:30 M MCB DI-CVC-211 and CVC-212 fail to close on Containment Isolation [also 5 46211- ATC -C OPEN pre-load: CVC-211 OPEN andMCB DI-46214-OPEN CVC-212]
SI-350A and SI-350B, CNTMT Sump B Supply To RHR Pump A/B, DI-46355- fail to open in ES-1.3, Transfer To Containment Sump 6 CLOSE ON ATC - C Recirculation, requiring transition to ECA-1.1, Loss of Emergency Coolant Recirculation [also pre-load: DI-46355-OPEN OFF DI-46356-CLOSE ON and DI-46356-OPEN OFF]
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1 KPS-ES-D-1-Scenario1-2-A-L-11022010-050
Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 3 Op-Test No.: 1 Examiners: Operators: SRO: .
ATC: .
BOP: .
Initial Conditions: 75% power EOL Equilibrium Xenon. RCS boron concentration is 162 ppm. RCS Tave is 557ºF. Generator load is 423 MWe gross. AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, 2 inch containment vent is in progress per NOP-RBV-002 section 5.6, Turnover: Maintain 75% Power, TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A One or more PORVs inoperable and capable of being manually cycled. Required Action A.1 is to close and maintain power to the associated PORV Block Valve with a completion time of one hour (Completed).
Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.
DI-46230-Pre- CLOSE ON ATC - C CVC-440, Emergency Boration to Charging Pumps, fails closed Load DI-46230-OPEN OFF Pre- SI05B &
SI05A ATC-C Failure of SI pumps to Auto Start Load SG tube leak of approximately 15 gpm in SG B entered over 5 SG03B ATC - R 1 minutes 30 5:00 BOP - N Crew initiates a power reduction to 45% power DI-46230-CLOSE ON 2 DI-46230- ATC - C CVC-440, Emergency Boration to Charging Pumps, fails closed OPEN OFF MS03B 1.0 ATC, B steam line leak outside Containment. EO calls in. - ATC the 3 BOP -
3:00 Controls Trip the Reactor and BOP Initiate Main Steam Isolation M
Steam Generator B Safety Opens when the crew closes the MS-4 MS04B BOP-C 1B - Operator Isolate Feed Flow to Steam Generator B SI05A, 5 SI05B ATC-C Failure of Safety Injection Pumps to Auto Start
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1 KPS-ES-D-1-Scenario1-3-A-L-11022010-052
Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 4 Op-Test No.: 1 Examiners: Operators: SRO: .
ATC: .
BOP: .
Initial Conditions: 100% power EOL Equilibrium Xenon. RCS boron concentration is 77 ppm. RCS Tave is 572ºF. Generator load is 602 MWe gross, AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, 2 inch containment vent is in progress per NOP-RBV-002 section 5.6, N41 is OOS (failed low previous shift)
Turnover: Maintain 100% power The following Tech Specs are in effect: TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A; TS 3.3.1(Reactor Protection System (RPS)
Instrumentation) Condition A; TS 3.3.1 Reactor Protection System (RPS) Instrumentation)
Condition D; TS 3.3.1 Reactor Protection System (RPS) Instrumentation) Condition E Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.
N41 Power Range NI Red Channel is OOS failed low. OTT Trip bistable and Rod Stop bistable are tripped. [also pre-load: RF:
Pre- NI05A -
N/A Load 1.2 RP133 - Trip RP134 - Trip]
CC Pump B will not start (Auto or Manual) [also pre-load: DI-46302-CC04B STOP - ON Pre-ATC - C Load RT - OFF DI-46302-START - OFF DI-46302-NA-STA]
ATC - R Heater Drain Pump B trip. Turbine load is decrease required to 1 FW19B BOP - N 520 psig on first stage impulse pressure.
SW02A - Piping leak on Containment Fan Coil Unit A Service Water supply 2 BOP - C 30%, 1:30 line.
RC10B Pressurizer PORV PR-2B fails partially open resulting in PRZR 3 ATC - C 10% pressure decreasing.
Component Cooling Water Pump A trip on overcurrent. The ATC Operator will stop both RXCPs after reactor trip. [also pre-load:
CC04B CC05A DI-46302-STOP - ON 4 ATC - C DI-46302-START - OFF DI-46302-NA-START - OFF]
CC Pump B will not start (Auto or Manual)
ED01 ATC, Loss of all AC power - LOOP and lockout of Bus 5 and EDG B fail 5 ED08E BOP -
to start.
EG06B M
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1 KPS-ES-D-1-Scenario1-4-A-L-11022010-054