2011 Kewaunee Power Station, Initial License Examination D-1 Scenario Outline Forms
ML110460282
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/2011
From: Walton R
Operations Branch III
To:
References
Download: ML110460282 (4)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 1 Op-Test No.: 1 Examiners: Operators: SRO: .

ATC: .

BOP: .

Initial Conditions: 100% power EOL Equilibrium Xenon. RCS boron concentration is 77 ppm. RCS Tave is 572ºF. Generator load is 602 MWe gross, AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, TD AFW pump is OOS for corrective maintenance on its Aux Lube Oil Pump, 2 inch containment vent is in progress per NOP-RBV-002 section 5.6 Turnover: Notified by DEMI that MISO has escalated a previous Minimum Generation Alert to a Minimum Generation Warning with an actual event, KPS has agreed to Lower Power to 95%.

TS 3.7.5 (AFW system) Condition B with one AFW Train inoperable. Required Action B.1 is to restore train(s) to OPERABLE status with a Completion Time of 72 Hours. Start Time 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> before scenario start time.

TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A One or more PORVs inoperable and capable of being manually cycled. Required Action A.1 is to close and maintain power to the associated PORV Block Valve with a completion time of one hour (Completed).

Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.

DO-46113-G Pre- OFF T/D AFW Pump OOS. MS-102 in PULLOUT.

N/A Load DO-46114-G OFF MS-100A/B in CLOSE and lights OFF Pre- FW16A BOP - C AFW Pump A fails to auto start. Manual start remains available.

Load ATC - R 1 N/A Power reduction required due to Minimum Generation Warning.

BOP - N After approximately 5% load decrease, controlling PRZR pressure RX203 -

2 2500 0:30 ATC - I blue channel (III), PT-431 fails high.

Heaters de-energize and sprays open to lower PRZR pressure.

FW-7B controller output signal fluctuates resulting in unstable RX02B 3 75 15:00 BOP - C operation of FW-7B, SG B Feed Reg Valve. Value for fluctuation increases to 75% over 15 minutes.

NI05A -

4 1.2 ATC - I NI Red Channel, N41, fails low.

SG01B - ATC, SGTR occurs in SG B ramping to maximum value over a 5-minute 5.6 ramp BOP -

5 over 5 period. Crew responds to radiation alarms and rising SG level.

M minutes When the reactor trips, the SGTR goes to its maximum value, AFW Pump A fails to auto start on low SG level or SI signal. BOP 6 FW16A BOP - C establishes flow to SG A.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 2 Op-Test No.: 1 Examiners: Operators: SRO: .

ATC: .

BOP: .

Initial Conditions: IC-17: 51% power EOL Equilibrium Xenon. RCS boron concentration is 256 ppm.

RCS Tave is 558ºF. Generator load is 282 MWe gross. AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, 2 inch containment vent is in progress, N41 is OOS (failed low previous shift)

Turnover: Power initially lowered due to problems associated with Main Feed Pump 1A. Problems have been corrected and the pump is ready for retest..Plant Management has directed starting Main Feed Pump 1A and raising power to 56% at 1/2% per minute. OP-KW-GOP-106 has been completed up-to and including 5.1.12. NOP-FW-001 has been completed up-to and including step 5.1.5 Reactor Engineering has provided a reactivity plan and the plan has been reviewed and approved.

The following Tech Specs are in force: TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A; TS 3.3.1(Reactor Protection System (RPS)

Instrumentation) Condition A; TS 3.3.1 Reactor Protection System (RPS) Instrumentation)

Condition D; TS 3.3.1 Reactor Protection System (RPS) Instrumentation) Condition E Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.

NI05A - N41 Power Range NI Red Channel is OOS failed low. OTT Trip Pre-1.2 N/A bistable and Rod Stop bistable are tripped. [also pre-load: RF:

Load RP133 - Trip and RP134 - Trip]

Pre- DI-46355- Containment Sump B Supply to RHR Pumps, SI-350A and SI-CLOSE ON ATC - C 350B, fail to open [also pre-load: DI-46355-OPEN OFF Load DI-46356-CLOSE ON and DI-46356-OPEN OFF ATC - R Turbine load is increased and Main Feedwater Pump B is started 1 N/A BOP - N prior to exceeding 285 psig impulse pressure (56% turbine power)

SG A red pressure channel (PT-468) fails high to 1400 psig over 30 RX213 -

2 1400 0:30 BOP - C seconds resulting in increase in indicated steam flow to SG A, increase in feed flow to SG A and opening of SG A PORV, SD-3A RC08 - An unisolable RCS leak to containment atmosphere of 3 1.4 5:00 ATC - C approximately 20 gpm develops over a 5-minute period.

ATC, RC03A - BOP -

4 RCS leak propagates into a large-break LOCA.

10%, 0:30 M MCB DI-CVC-211 and CVC-212 fail to close on Containment Isolation [also 5 46211- ATC -C OPEN pre-load: CVC-211 OPEN andMCB DI-46214-OPEN CVC-212]

SI-350A and SI-350B, CNTMT Sump B Supply To RHR Pump A/B, DI-46355- fail to open in ES-1.3, Transfer To Containment Sump 6 CLOSE ON ATC - C Recirculation, requiring transition to ECA-1.1, Loss of Emergency Coolant Recirculation [also pre-load: DI-46355-OPEN OFF DI-46356-CLOSE ON and DI-46356-OPEN OFF]

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1 KPS-ES-D-1-Scenario1-2-A-L-11022010-050

Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 3 Op-Test No.: 1 Examiners: Operators: SRO: .

ATC: .

BOP: .

Initial Conditions: 75% power EOL Equilibrium Xenon. RCS boron concentration is 162 ppm. RCS Tave is 557ºF. Generator load is 423 MWe gross. AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, 2 inch containment vent is in progress per NOP-RBV-002 section 5.6, Turnover: Maintain 75% Power, TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A One or more PORVs inoperable and capable of being manually cycled. Required Action A.1 is to close and maintain power to the associated PORV Block Valve with a completion time of one hour (Completed).

Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.

DI-46230-Pre- CLOSE ON ATC - C CVC-440, Emergency Boration to Charging Pumps, fails closed Load DI-46230-OPEN OFF Pre- SI05B &

SI05A ATC-C Failure of SI pumps to Auto Start Load SG tube leak of approximately 15 gpm in SG B entered over 5 SG03B ATC - R 1 minutes 30 5:00 BOP - N Crew initiates a power reduction to 45% power DI-46230-CLOSE ON 2 DI-46230- ATC - C CVC-440, Emergency Boration to Charging Pumps, fails closed OPEN OFF MS03B 1.0 ATC, B steam line leak outside Containment. EO calls in. - ATC the 3 BOP -

3:00 Controls Trip the Reactor and BOP Initiate Main Steam Isolation M

Steam Generator B Safety Opens when the crew closes the MS-4 MS04B BOP-C 1B - Operator Isolate Feed Flow to Steam Generator B SI05A, 5 SI05B ATC-C Failure of Safety Injection Pumps to Auto Start

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1 KPS-ES-D-1-Scenario1-3-A-L-11022010-052

Appendix D Scenario Outline Form ES-D-1 Facility: Kewaunee Power Station Scenario No.: 4 Op-Test No.: 1 Examiners: Operators: SRO: .

ATC: .

BOP: .

Initial Conditions: 100% power EOL Equilibrium Xenon. RCS boron concentration is 77 ppm. RCS Tave is 572ºF. Generator load is 602 MWe gross, AS-31/AS-35 R-11 & R-12 Sample Return Aligned to Containment, PR-1A PRZR PORV Block Valve is closed with power maintained due to PR-2A seat leakage, 2 inch containment vent is in progress per NOP-RBV-002 section 5.6, N41 is OOS (failed low previous shift)

Turnover: Maintain 100% power The following Tech Specs are in effect: TS 3.4.11 (Reactor Coolant System Pressurizer Power Operated Relief Valves) Condition A; TS 3.3.1(Reactor Protection System (RPS)

Instrumentation) Condition A; TS 3.3.1 Reactor Protection System (RPS) Instrumentation)

Condition D; TS 3.3.1 Reactor Protection System (RPS) Instrumentation) Condition E Event Malf. Event Event No. No. Type* Description Pre- PR-2A CAUTION tagged CLOSED due to seat leakage. PR-1A Load closed TS LCO3.4.11, ACTION A.1.

N41 Power Range NI Red Channel is OOS failed low. OTT Trip bistable and Rod Stop bistable are tripped. [also pre-load: RF:

Pre- NI05A -

N/A Load 1.2 RP133 - Trip RP134 - Trip]

CC Pump B will not start (Auto or Manual) [also pre-load: DI-46302-CC04B STOP - ON Pre-ATC - C Load RT - OFF DI-46302-START - OFF DI-46302-NA-STA]

ATC - R Heater Drain Pump B trip. Turbine load is decrease required to 1 FW19B BOP - N 520 psig on first stage impulse pressure.

SW02A - Piping leak on Containment Fan Coil Unit A Service Water supply 2 BOP - C 30%, 1:30 line.

RC10B Pressurizer PORV PR-2B fails partially open resulting in PRZR 3 ATC - C 10% pressure decreasing.

Component Cooling Water Pump A trip on overcurrent. The ATC Operator will stop both RXCPs after reactor trip. [also pre-load:

CC04B CC05A DI-46302-STOP - ON 4 ATC - C DI-46302-START - OFF DI-46302-NA-START - OFF]

CC Pump B will not start (Auto or Manual)

ED01 ATC, Loss of all AC power - LOOP and lockout of Bus 5 and EDG B fail 5 ED08E BOP -

to start.

EG06B M