Letter Sequence Other |
|---|
|
Results
Other: ML022280438, ML031070343, ML031070351, ML031070357, ML031070368, ML031070397, ML031070410, ML031070421, ML031070452, ML031070463, ML031070472, ML031080417, ML031130250, ML031130427, ML031140030, ML032160436, ML033320066, ML033430375
|
MONTHYEARML0301606982002-01-15015 January 2002 Docket Information in Support of Staffs Review of H. B. Robinson, Unit 2 License Renewal Application Project stage: Approval ML0222804382002-08-16016 August 2002 Notice of Intent to Prepare an Environmental Impact Statement & Conduct Scoping Process for License Renewal for H. B. Robinson Steam Electric Plant, Unit No. 2 Project stage: Other ML0222801252002-08-29029 August 2002 Notice of Public Meeting at Coker College to Discuss Environmental Scoping Process for Robinson, Unit 2, License Renewal Application Project stage: Meeting ML0227402602002-09-25025 September 2002 Meeting Handouts to Discuss the Environmental Scoping Process for the LRA for Robinson, Unit 2 Project stage: Meeting ML0301706392003-01-16016 January 2003 Summary of Teleconference with National Marine Fishery Service and South Carolina Department of Natural Resources in Support of the Staffs Review of the H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0303006192003-01-24024 January 2003 Summary of Teleconference with Carolina Power & Light in Support of Staffs Review of H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0304301542003-02-11011 February 2003 Docket Information in Support of the Staffs Review of the H. B. Robinson, Unit 2, License Renewal Application Project stage: Approval ML0310804172003-02-28028 February 2003 Federal Fish & Wildlife Permit, Dated 02/28/2003 & Migratory Bird Depredation Permit Standard Conditions Project stage: Other ML0310703432003-03-0606 March 2003 /Data Cover Sheet Project stage: Other ML0310703512003-03-0606 March 2003 FW: Robinson Gross Generation 01 02 (Table) Project stage: Other ML0310703572003-03-11011 March 2003 F.W. Robinson Emailing: - Emailing: peedee2K1 Project stage: Other ML0310703682003-03-14014 March 2003 2003 Federal Bird Permit, Dated 2/28/03, E-mail Date: 3/14/03 (Cvr. Sheet) Project stage: Other ML0310703972003-03-19019 March 2003 Cost of Replacement of Yokes Project stage: Other ML0308701572003-03-19019 March 2003 Summary of Teleconference with Carolina Power and Light in Support of the Staffs Review of the H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0310704102003-03-25025 March 2003 750 and 751 Cost Benefit Rev3.doc Dated 03/25/2003 (Data W/Table) (Robinson Nuclear Plant RHR Valves 750 and 751) Project stage: Other ML0310704212003-03-25025 March 2003 750 and 751 Cost Benefit Rev 3.doc (Cvr. Sheet) March 25, 2003 Project stage: Other ML0310704522003-03-26026 March 2003 Document 2 Dated 03/26/2003 Project stage: Other ML0310704632003-04-0303 April 2003 Radiant Energy Shield SAMA, Dated 4/3/03 Project stage: Other ML0310704722003-04-0808 April 2003 IPEEE Fire Analysis, Dated 04/08/2003 Project stage: Other ML0310702092003-04-15015 April 2003 Docket Information in Support of the Staffs Review of the H.B. Robinson, Unit 2, License Renewal Application Project stage: Approval ML0311304272003-04-22022 April 2003 (S. Bolden) - Biological Assessment for License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 (Tac No. MB5226) Project stage: Other ML0311302502003-04-22022 April 2003 Biological Assessment for License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Other ML0311400302003-04-30030 April 2003 Biological Assessment - H.B. Robinson Steam Electric Plant, Unit 2, (Nuclear) License Renewal Review Hartsville, South Carolina, April 2003 Project stage: Other ML0312600842003-05-0505 May 2003 Notice of Availability of the Draft Plant-Specific Supplement to the Generic Environmental Impact Statement Regarding H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Draft Other ML0312604322003-05-0505 May 2003 Request for Comments on the Draft Plant-Specific Supplement 13 to the Generic Environmental Impact Statement Regarding H.B. Robinson Steam Electric Plant, Unit 2 (Tac No. MB5226) Project stage: Draft Other ML0322706002003-06-25025 June 2003 Corrected Transcript of Proceedings, U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant, Draft EIS Public Meeting - Afternoon, Hartsville, Sc ML0321604362003-06-25025 June 2003 E-Mail from L. England to Jan Kozyra Dam Releases Project stage: Other ML0322706012003-06-25025 June 2003 Corrected Transcript of Proceedings: U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant Draft EIS Public Meeting - Evening Session, Hartsville, Sc, Enclosure 3 ML0322706042003-08-15015 August 2003 Summary of Visit to Robinson Site in Support of the Staffs Review of the H.B. Robinson, Unit 2, License Renewal Application (Tac No. MB5226) Project stage: Approval ML0322706032003-08-15015 August 2003 Summary of Meeting Held in Support of the Environmental Review for the H.B. Robinson Steam Electric Plant, Unit 2, License Renewal Application (TAC No. Mb 5226) W/Encls. 1 & 4 Project stage: Meeting ML0333200662003-10-17017 October 2003 Comment (8) of Joseph F. Cockrell, U.S. Department of the Interior Regarding License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Other ML0334303752003-12-12012 December 2003 Final Supplement 13 to the Generic Environmental Impact Statement for H.B. Robinson Steam Electric Plant, Unit 2 License Renewal Project stage: Other ML0334505172003-12-31031 December 2003 NUREG-1437 S13, Generic Environmental Impact Statement for License Renewal of Nuclear Plants. Project stage: Acceptance Review 2003-03-14
[Table View] |
Text
United States Department of the Interior FISH AND WILDLIFE SERVICE 176 Croghan Spur Road, Suite 200 Charleston, South Carolina 29407
§7g/' )3 October 17, 2003 6 s
§&
7 Mr. Pao-Tsin Kuo U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Re:
License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 (RNP)
TAC No. MB5226, Docket No. 50-261 FWS Log No. 4-6-03 -I-491
Dear Mr. Kuo:
The U.S. Fish and Wildlife Service (Service) has reviewed the Biological Assessment and your letter requesting our concurrence regarding the above referenced action in Chesterfield, Darlington, Florence, Lee, and Sumter Counties, South Carolina. We are submitting the following comments under provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.) and the Endangered Species Act of 1973 (Act), as amended (16 U.S.C. 1531 etseq.).
According to the information provided, the renewed operating license would allow 20 additional years of plant operation beyond the current RNP licensed operating period of 40 years. No major refurbishment or replacement of important systems, structures, or components are expected during the RNP license renewal period. In addition, no construction activities are expected to be associated with the license renewal.
Based on our review and the information provided, the Service concurs with your determination that the proposed action is not likely to adversely affect the federally-listed red-cockaded woodpecker, Candby's dropwort, American chaffseed, or the rough-leaved loosestrife. We also concur with your determination that the proposed action will have no effect on the additional federally-listed species, under the jurisdiction of the Service, that were identified to have potential to occur within the project area. 'Therefore, the requirements of Section 7 of the Act have been fulfilled relative to the proposed action, and no further consultation is necessary at this time. However, obligations under Section 7 of the Act must be reconsidered if: (1) new information reveals that the proposed project may affect listed species in a manner or to an extent not previously considered, (2) the proposed project is subsequently modified to include activities which were not considered during this consultation; or (3) new species are listed or critical habitat designated that might be affected by the proposed project.
This is your future. Don't leave it blank. - Support the 2000 Census.
a=-,@A,
,§ w) 3 2A -,)/ X Ax,(
tcAf4 Cal 3)
In accordance with provisions of the Fish and Wildlife Coordination Act, the Service has also reviewed the subject project with regard to the effects the proposed action may have on waters of the U.S. and related fish and wildlife resources. Information provided revealed the presence of several streams within the proposed area. Erosion and sedimentation problems are likely to be exacerbated at areas where clearing removes deep-rooted vegetation. Therefore, to maintain the integrity of these aquatic resources during transmission line corridor maintenance, we recommend that at least a 25-foot buffer be lefi on both sides of any stream crossed or paralleled by a transmission line.
The above views and recommendations constitute the report of the Department of the Interior. If you require additional assistance, please contact Phil DeGarmo of my staff at 843-7274707 x21.
Sincerely yours, Joseph F. Cockrell Acting Field Supervisor JFC/PMD/km.