Letter Sequence Other |
|---|
|
Results
Other: ML022280438, ML031070343, ML031070351, ML031070357, ML031070368, ML031070397, ML031070410, ML031070421, ML031070452, ML031070463, ML031070472, ML031080417, ML031130250, ML031130427, ML031140030, ML032160436, ML033320066, ML033430375
|
MONTHYEARML0301606982002-01-15015 January 2002 Docket Information in Support of Staffs Review of H. B. Robinson, Unit 2 License Renewal Application Project stage: Approval ML0222804382002-08-16016 August 2002 Notice of Intent to Prepare an Environmental Impact Statement & Conduct Scoping Process for License Renewal for H. B. Robinson Steam Electric Plant, Unit No. 2 Project stage: Other ML0222801252002-08-29029 August 2002 Notice of Public Meeting at Coker College to Discuss Environmental Scoping Process for Robinson, Unit 2, License Renewal Application Project stage: Meeting ML0227402602002-09-25025 September 2002 Meeting Handouts to Discuss the Environmental Scoping Process for the LRA for Robinson, Unit 2 Project stage: Meeting ML0301706392003-01-16016 January 2003 Summary of Teleconference with National Marine Fishery Service and South Carolina Department of Natural Resources in Support of the Staffs Review of the H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0303006192003-01-24024 January 2003 Summary of Teleconference with Carolina Power & Light in Support of Staffs Review of H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0304301542003-02-11011 February 2003 Docket Information in Support of the Staffs Review of the H. B. Robinson, Unit 2, License Renewal Application Project stage: Approval ML0310804172003-02-28028 February 2003 Federal Fish & Wildlife Permit, Dated 02/28/2003 & Migratory Bird Depredation Permit Standard Conditions Project stage: Other ML0310703432003-03-0606 March 2003 /Data Cover Sheet Project stage: Other ML0310703512003-03-0606 March 2003 FW: Robinson Gross Generation 01 02 (Table) Project stage: Other ML0310703572003-03-11011 March 2003 F.W. Robinson Emailing: - Emailing: peedee2K1 Project stage: Other ML0310703682003-03-14014 March 2003 2003 Federal Bird Permit, Dated 2/28/03, E-mail Date: 3/14/03 (Cvr. Sheet) Project stage: Other ML0310703972003-03-19019 March 2003 Cost of Replacement of Yokes Project stage: Other ML0308701572003-03-19019 March 2003 Summary of Teleconference with Carolina Power and Light in Support of the Staffs Review of the H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0310704102003-03-25025 March 2003 750 and 751 Cost Benefit Rev3.doc Dated 03/25/2003 (Data W/Table) (Robinson Nuclear Plant RHR Valves 750 and 751) Project stage: Other ML0310704212003-03-25025 March 2003 750 and 751 Cost Benefit Rev 3.doc (Cvr. Sheet) March 25, 2003 Project stage: Other ML0310704522003-03-26026 March 2003 Document 2 Dated 03/26/2003 Project stage: Other ML0310704632003-04-0303 April 2003 Radiant Energy Shield SAMA, Dated 4/3/03 Project stage: Other ML0310704722003-04-0808 April 2003 IPEEE Fire Analysis, Dated 04/08/2003 Project stage: Other ML0310702092003-04-15015 April 2003 Docket Information in Support of the Staffs Review of the H.B. Robinson, Unit 2, License Renewal Application Project stage: Approval ML0311304272003-04-22022 April 2003 (S. Bolden) - Biological Assessment for License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 (Tac No. MB5226) Project stage: Other ML0311302502003-04-22022 April 2003 Biological Assessment for License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Other ML0311400302003-04-30030 April 2003 Biological Assessment - H.B. Robinson Steam Electric Plant, Unit 2, (Nuclear) License Renewal Review Hartsville, South Carolina, April 2003 Project stage: Other ML0312600842003-05-0505 May 2003 Notice of Availability of the Draft Plant-Specific Supplement to the Generic Environmental Impact Statement Regarding H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Draft Other ML0312604322003-05-0505 May 2003 Request for Comments on the Draft Plant-Specific Supplement 13 to the Generic Environmental Impact Statement Regarding H.B. Robinson Steam Electric Plant, Unit 2 (Tac No. MB5226) Project stage: Draft Other ML0322706002003-06-25025 June 2003 Corrected Transcript of Proceedings, U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant, Draft EIS Public Meeting - Afternoon, Hartsville, Sc ML0321604362003-06-25025 June 2003 E-Mail from L. England to Jan Kozyra Dam Releases Project stage: Other ML0322706012003-06-25025 June 2003 Corrected Transcript of Proceedings: U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant Draft EIS Public Meeting - Evening Session, Hartsville, Sc, Enclosure 3 ML0322706042003-08-15015 August 2003 Summary of Visit to Robinson Site in Support of the Staffs Review of the H.B. Robinson, Unit 2, License Renewal Application (Tac No. MB5226) Project stage: Approval ML0322706032003-08-15015 August 2003 Summary of Meeting Held in Support of the Environmental Review for the H.B. Robinson Steam Electric Plant, Unit 2, License Renewal Application (TAC No. Mb 5226) W/Encls. 1 & 4 Project stage: Meeting ML0333200662003-10-17017 October 2003 Comment (8) of Joseph F. Cockrell, U.S. Department of the Interior Regarding License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Other ML0334303752003-12-12012 December 2003 Final Supplement 13 to the Generic Environmental Impact Statement for H.B. Robinson Steam Electric Plant, Unit 2 License Renewal Project stage: Other ML0334505172003-12-31031 December 2003 NUREG-1437 S13, Generic Environmental Impact Statement for License Renewal of Nuclear Plants. Project stage: Acceptance Review 2003-03-14
[Table View] |
Text
I-DEPARTMENT OF THE INTERIOR I&WILRIL3US FISH AND WVIUFE SERVICE FEDERAL FISH AND WILDLIFE PERMIT 1 PERMITTEE PROGRESS ENERGY CP&L P.O. BOX 327 NEW HILL, NC 27562 3-201 (1197) 2 AUTHORITY-STATUTES
'16 USC 703-712 i
REGULATIONS (Alaiched) 50 CFR Part 13 50 CFR 21.41
- 3. NUMBER MB789112-I I 4 RENEWABLE I 5 MAY COPY E
YES E. YES j
NO I
E NO 6 EFFECTIVE 7 EXPIRES 0110112003 1213112003 8 NAMEANDTITLEOFPRINCIPALOFFICER (If#1 a business)
VICTORIA K WILL DIRECTOR, ENVIRONMENTAL SER\\ICES 9 TYPE OF PERN1IT DEPREDATION 10 LOCATION WHERE AUTHORIZED ACTIVITY MAY BE CONDUCTED NORTH CAROLINA AND SOUTH CAROLINA
- 11. CONDITIONS AND AUTHORIZATIONS A GENERAL CONDITIONS SET OUT IN SUBPART D OF 50 CFR 13 AND SPECIFIC CONDITIONS CONTAINED IN FEDERAL REGULATIONS CITEDN BLOCK #2 ABOVE, ARE HEREBY MADE A PART OF THIS PERMIT ALL ACTIVITIES AUTHORIZED HEREIN MUST BE CARRIED OUT IN ACCORD WITH AND FOR THE PURPOSES DESCRIBED IN THE APPLICATION SUBMITTED CONTINUEDVALIDITY. OR RENEWAL OF THIS PERMIT IS SUBJECTTO COMPLETE AND TIMELY COMPLIANCE WITH ALL APPLICABLE CONDmONS, INCLUDINGTHE FILING OFALL REQUIRED INFORMATION AND REPORTS 8 THE VALIDITY OF THIS PERMI IS ALSO CONDITIONED UPON STRICT OBSERVANCE OF ALLAPPLICABLE FOREIGN. STATE, LOCAL OR OTHER FEDERAL LAW C. VALID FOR USE BY PERMITTEE NAMED ABOVE D. Authorized to take the following migratory birds for depredation control purposes: Relocate active nests of non-erdangered/non-threatened migratory birds. Also, permlttee must notify the Issuing office on the 15th day of each month of all relocations that occurred the previous month.
E. Permittee must also comply with Depredation Standard Conditions (copy attached).
ADDITIONAL CONDMONS ANDAUTHORIZATIONSALSO APPLY IZ REPORTING REQUIREMENTS ANNUAL REPORT DUE: 01/31 ISS D AD IR O
TIBLIE DT F
ST EE t
/{FOR.
ARD-MIGRATORY BIRDS 8 STA^TE PROGRAMS 02/2812003
( Sa
- fv
'7
, /
I
-N
United States Departmentfof the Interior
\\FISH AND WILDLIFE SERVICE' 1875 Century Boulevard Atlanta, Georgia 30345 MIGRATORY BIRD DEPREDATION PERMIT STANDARD CONDITIONS
- 1.
Any person who is under the direct control of the permittee,,or who is employed by or under contract to the permittee for purposes authorized by this permit, may carry out the activity authorized by this permit.
- 2.
Direct control of the permittee means that the permittee and the subpermittee have entered Into an identifiable relationship where there is evidence that the permittee has relayed instructions outlining the authority given to the subpermittee for activities authorized by this permit.
- 3.
Permittee and all subpermittees, shall carry a legible copy of this permit and display upon request, whenever exercising its authority.
- 4.
Failure to comply with ANY of these conditions listed may result in the immediate suspension of this permit.
S.
Authorization granted herein shall not be exercised contrary to the laws of the appropriate State, County, Municipal, Tribal, or Foreign government or any other applicable law.
- 6.
Permittee must maintain records which include the following information:
Species (common name),
month taken, location (county and state), number of birds killed or relocated, number of eggs taken or relocated, name of person taking birds and the final disposition of the birds or eggs.
- 7.
All records relating to permitted activities shall be kept at the locationts) as indicated in writing by permittee to the issuing office.
S.
This permit does not authorize trespass or the taking of birds, nests or eggs on State and/or Federal lands without written permission.
- 9.
No species may be taken which are on the United States List of Threatened and Endangered Species.
No bald or golden eagles may be taken.
- 10.
Acceptance of this permit authorizes inspection in accordance with So CFR 13.47.
- 11.
No blinds, pits, or other means of concealment, decoys, duck calls, or other devices can be used to lure or entice birds within gun or trap range.
- 12.
, If take is by shotgun, it can be no larger' than No. 10 gauge and must be fired from the shoulder.
Except when nontoxic shot is not produced in the size required, nontoxic shot must be used over open water or a wetland unless otherwise authorized in Condition D of this permit.
- 13.
Permittee is required to continually use nonlethal methods of harassment alternately with lethal control.
- 14.
Birds, nests or eggs taken under this permit must be (1) turned over to the U.S. Department of Agriculture for official purposes, (2) donated to a public educational or scientific institution as defined in So CFR 10, (3) completely destroyed by burial or incineration or (4) as directed in Condition D of this permit.^
- 15.
Any killing of game birds during the open hunting season for those species must be in accordance with all State and Federal hunting regulations unless otherwise authorized on the face of this permit.,