Final Submittal

CRYSTAL RIVER AUGUST

EXAM 50-302/2003-301

AUGUST 25 - 29,2003

1.

Reactor Operator Written txaminarlon

1-

Name:

Date: 08/22/03

License Level: RO

Start Time:

U.S. Nuclear Regulatory Commission

Site-Specific

Written Examination

Region:

I I

Facility/Unit: Crystal River

Reactor Type: B&W

Finish Time:

Use the answer sheets provided to document your answers. Staple this cover sheet on

top of the answer sheets. The passing grade requires a final grade of at least 80.00

percent. Examination papers will be collected six hours after the examination starts.

Applicant Certification

All work done on this examination is my own. I have neither given nor received aid.

~

Applicant's Signature

Results

Examination Value:

Points

ipplicant's Score:

Points

4pplicant's Grade:

Percent

Crystal River 2003-301

RO lnital Exam

08/22/03

1. The following plant conditions exist:

-

The reactor has been at 100% power for 12 days.

-

Rod index is 290%.

-

300 EFPD.

1 100 ppm boron.

Due to erratic indications in the CRD system engineering has requested a rod index of 260% to

perform trouble shooting activities. Determine the final boron concentration required to reach

this rod index while maintaining 100% reactor power. (disregard Xenon)

A.

1034 ppm boron

B.

1040 ppm boron

C.

1052 ppm boron

D.

1056 ppm boron

id.--

.....-,'

Crystal River 2003-301

RO lnital Exam

08/22/03

'V

2. Which of the following describes the effect on PZR conditions during a large

reactor coolant insurge?

A.

Actual liquid temperature will decrease; Tsat of the surface liquid will

decrease.

Actual liquid temperature will decrease; TSat of the surface liquid will

increase.

Actual liquid temperature will decrease; Tsat of the surface liquid will

remain the same.

Actual liquid temperature will remain the same; Tsat of the surface

liquid will increase.

B.

C.

D.

Crystal River 2003-301

RO lnital Exam

oaiz2103

L

3. A reactor startup is in progress with the reactor critical. Control rod 5-4 drops

into the core and the following parameters are noted:

-

- Tave is 524" F.

Which of the following describes the actions that should be taken and the reasons

for these actions?

The reactor is still critical.

A.

Increase Tave to 2 525" F, using secondary parameters, to maintain

instrumentation on scale.

Increase Tave to 2 525" F, using small control rod withdrawals, to

maintain the plant within analyzed accident ranges.

Fully insert all control rods to establish and maintain Mode 3 reactivity

conditions since criticality is prohibited at < 525" F.

Fully insert control rod groups 5-7 to establish and maintain Mode 2

reactivity conditions since criticality is prohibited at < 525" F.

B.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

L,

4. The following conditions are observed for the "A" Reactor Coolant Pump.

- Reactor Coolant System pressure

2150 psig

- Second stage seal cavity pressure

2100 psig

- Third stage seal cavity pressure

1055 psig

- Controlled bleedoff flow

increased

- Seal leakage flow

no change

Which of the following failures would cause the above indications?

A.

The first stage seal.

B.

The second stage seal.

C.

The third stage seal.

D.

The restriction bushing.

L'

Crystal River 2003-301

RO lnital Exam

08/22/03

5. The following plant conditions exist at 100% power:

'A' OTSG Level

80%

'B' OTSG Level

80%

'A' MFW Flow

5.4 E6 lbm/hr

'B' MFW Flow

5.4 E6 lbm/hr

Core AT

45°F

A problem develops with RCP-1C and the decision is made to run the plant back

and secure the pump. At 80% power RCP-1C trips and an ICs runback occurs to

75% power. Which of the following describes the approximate expected plant

parameters, as compared to the above values, after the plant stabilizes at 75%

power?

A.

B.

C.

D.

'A' OTSG Level

'B' OTSG Level

'A' MFW Flow

'B' MFW Flow

Core AT

'A' OTSG Level

'B' OTSG Level

'A' MFW Flow

'B' MFW Flow

Core AT

'A' OTSG Level

'B' OTSG Level

'A' MFW Flow

'B' MFW Flow

Core AT

'A OTSG Level

'B' OTSG Level

'A' MFW Plow

'B' MFW Flow

Core AT

unchanged

50% of original

unchanged

50% of original

45" F

unchanged

50% of original

unchanged

50% of original

34" F

75% of original

50% of original

75% of original

50% of original

45" F

75% of original

50% of original

75% of original

50% of original

34" F

Crystal River 2003-301

RO lnital Exam

08/22/03

6. The plant is operating at 100% power when the SW Return valve from RCP-1C

(SWV-86) closes. Attempts to reopen the valve have failed.

Which of the following describe the action required to be taken with respect to

RCP-lC?

RCP-1C:

A.

B.

C.

D.

must be shutdown within 5 minutes due to loss of motor cooling.

must be shutdown within 5 minutes due to loss of RCP seal cooling.

may continue operation as long as RCP Seal Injection is maintained.

may continue operation because cooling is maintained by internally

circulating RCS.

..

.

Cystal River 2003-301

RO lnital Exam

08/22/03

-2

7. The following plant conditions exist:

-

-

-

Plant is near EOC at 90% power.

Deborating demins are in service.

OP-304, Soluble Poison Concentration Control, calculation requires 60 gpm

letdown flow for one hour.

Due to a malfunction with MUV-51, letdown flow control valve, actual letdown flow was

80 gpm.

Which of the following describes how the plant will respond?

A.

B.

Control rods will insert; reactor power will decrease.

Control rods will insert; reactor power will remain approximately the same.

C.

D.

Control rods will withdraw; reactor power will increase.

Control rods will withdraw; reactor power will remain approximately the same.

i--

Crystal River 2003-301

RO lnital Exam

08/22/03

L

8. The following plant conditions exist:

- A LOCA is in progress.

- RCS pressure is 400 psig.

- Two High Pressure Injection Pumps are operating

- Two Low Pressure Injection Pumps are operating.

Which of the following is the correct flow path for core heat removal?

A.

Manual alignment of piggy-back flow through the Makeup Pumps with the Decay

Heat pumps taking a suction from the Reactor Building Sump prior to BWST level

decreasing to < 7 feet.

Automatic alignment of piggy-back flow through the Makeup Pumps with the

Decay Heat pumps taking a suction from the Reactor Building Sump prior to

BWST level decreasing to < 7 feet.

Manual alignment of piggy-back flow through the Makeup Pumps with the Decay

Heat pumps taking a suction from the Reactor Building Sump prior to BWST level

reaching 15 feet.

Automatic alignment of piggy-back flow through the Makeup Pumps with the

Decay Heat pumps taking a suction from the Reactor Building Sump prior to

BWST level reaching 15 feet.

B.

C.

ic

D.

Crystal River 2003-301

RO lnital Exam

oa12210~

c

9. Which of the following describes the purpose and operation of the HPI Throttle valves

(MUV-590,591,592 & 593)?

To limit:

A.

B.

MUP flow to the MUT. These valves may be throttled from the Control Room.

MUP flow to the RB sump in the case of a high MUT level. These valves are fixed

in position.

C.

EDG loading and balance HPI flow. These valves may be throttled from the

Control Room.

D.

EDG loading and balance HPI flow. These valves are fixed in position.

i...:

Crystal River 2003-301

RO lnital Exam

08/22/03

i/

10. The plant is conducting a shutdown and cooldown with Reactor Coolant System

(RCS) pressure at 1200 psig and temperature at 400" F. The High Pressure

Injection (HPI) portion of the Engineered Safeguards (ES) actuation system has

been bypassed per procedure. An RCS pressure transient occurs which raises

RCS pressure to 1820 psig. How does the ES system react to this condition?

A.

The actuation and bypass bistables will automatically reset. There will

be no actuation of the HPI systems.

The actuation and bypass bistables will NOT automatically reset. There

will be a full actuation of the HPI systems.

The actuation bistable will automatically reset, but the bypass bistable

will NOT automatically reset. There will be no actuation of the HPI

systems.

B.

C.

D.

The actuation bistable will NOT automatically reset, but the bypass

bistable will automatically reset. There will be a full actuation of the

HPI systems.

LA'

Crystal River 2003-301

RO lnital Exam

08/22/03

11. The following plant conditions exist:

- Reactor coolant average temperature is 579" F.

- Reactor coolant pressure is 2100 psig and decreasing at 100 psig/min.

- Pressurizer temperature is 643" F and decreasing at 6" F/min.

- Makeup flow is 8-10 gpm higher than normal.

- The Reactor Coolant Drain Tank level and pressure are stable.

- PZR level is stable.

- Reactor power is 40%.

Which of the following is the most probable cause for the above indications?

A.

B.

Partially stuck open PORV.

C.

D.

RCS pressure transmitter tubing rupture.

Code safety valve flange leak.

MUV-567, letdown isolation valve, bonnet leak.

L

A

Crystal River 2003-301

RO lnital Exam

o a m 0 3

1 The following sequence of events have occurred

- The plant was in Mode 3 with Group 1 withdrawn and RCS pressure at 2155

- The PORV failed open and the RO closed the PORV block valve.

- RCS pressure is currently 1875 psig and increasing slowly.

- Currently Group 1 is still withdrawn.

Which of the following describes the immediate action(s) that should be taken for these

conditions?

psig.

A.

B.

C.

Enter AP-490, RCS Boration, and start emergency boration.

Enter AP-520, Loss of RCS Coolant or Pressure, to recover RCS pressure.

Depress the Rx trip pushbutton, enter EOP-2, Vital System Status Verification and,

if Group 1 is still withdrawn, open breakers 3305 and 3312.

Depress the Rx trip pushbutton, enter EOP-2, Vital System Status Verification and,

if Group 1 is still withdrawn, depress the "PI MAN ACT' pushbuttons for Trains A

and B to initiate emergency boration.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

W

13. Which of the following describes the normal method for maintaining/controlling

the level in the Nuclear Services Closed Cycle Cooling System Surge Tank

(S WT- 1 )?

A.

B.

C.

Manual control by the Primary Plant Operator.

Automatic valve control set to maintain level between two setpoints.

Manual operation of the control switch for the fill vaIve on the Main

Control Board.

Manual operation of the Demin Water transfer pumps on the Main

Control Board.

Crystal River 2003-301

RO lnital Exam

08/22/03

L

14. The following plant conditions exist:

- Reactor Coolant (RCS) pressure 2220 psia.

- Reactor Coolant Drain Tank (RCDT) pressure is 50 psia.

- The PORV is stuck partially open.

What is the approximate temperature and phase of the fluid downstream of the

POW?

A.

649°F and Superheated

B.

298°F and Superheated

C.

281°F and Saturated

D.

259°F and Saturated

-'

Crystal River 2003-301

RO lnital Exam

oai22103

L

15. The following plant conditions exist:

- A small break LOCA (SBLOCA) event is in progress.

- RCS pressure is 1500 psig.

Which of the following describes the reason or maintaining the OTSGs available

as a heat sink?

A.

To ensure RCS heat removal while RCPs are operating.

B.

C .

D.

To provide an alternate means of RCS pressure control.

RCS pressure may remain too high for adequate HPI cooling.

Boiler-condenser cooling is the primary method for heat removal during

a SBLOCA event.

Crystal River 2003-301

RO lnital Exam

08/22/03

16. While at power, a feedwater transient caused a rapid out-surge of the pressurizer

followed by a rapid in-surge. Due to a pressurizer heater control problem all

heaters are in manual and off. The following conditions exist:

- Pressurizer temperature is 630" F.

- That is 600" F.

- Tcold is 555" F.

- Pressurizer level is at 240 inches and slowly returning to normal.

With no operator action RCS pressure will stabilize at approximately:

A.

1100 psig.

B.

1550 psig.

C.

1900 psig.

D.

2155 psig.

i-

. .

Crystal River 2003-301

RO lnital Exam

oa1.22103

b'

17. A note in EOP-8, LOCA Cooldown, states the following:

"Do not open PORV or use high pressure Aux spray to depressurize RCS if ICC

Region 3 was previously entered."

Which of the following describes the reason for this note?

.

.

A.

The RCS may contain large amounts of non-condensable gasses and

opening the PORV could result in additional gas bubbles forming in the

hot legs.

Due to documented PORV failures in the industry, the risk of losing

excess additional RCS inventory if the core had previously entered

Region 3 has been determined to be unacceptable.

Engineering calculations have determined that the effectiveness of high

pressure Aux spray is greatly diminished if the core had previously

entered Region 3 and does not create a success path for this condition.

A commitment to the NRC to justify not installing the RV head vent

requires the use of the hot leg high point vents only for RCS

depressurization.

B.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

W

18. While in a plant cooldown the following conditions exist:

-

-

-

-

The "C" RPS channel is bypassed for troubIe shooting activites. The I & C

technician asks permission to pull the RCS flow module in the "C" RPS channel.

If permission is granted what will be the condition of the Control Rod Drive (CRD)

breakers?

Reactor Coolant Pressure is 400 psig.

RCS temperature is 350" F.

Control Rod Group 1 is withdrawn.

The "D" Reactor Protection System channel is tripped.

A.

B.

C.

D.

All CRD breakers are open.

All CRD breakers are closed.

The "C" breaker is open; all other CRD breakers remain closed.

The "C" and "D" breakers are open; all other CRD breakers remain

closed.

\\-A

Crystal River 2003-301

RO lnital Exam

oa122103

ii

19. The following plant conditions exist:

-

-

-

-

Which of the following statements describes AHF-1A and AHF-1B operation one

minute after the actuation?

AHF-1A is ES selected for "A" ES Train operation.

AHF-1B is ES selected for "B" ES Train operation.

AHF-1C is tagged out due to a motor ground.

HPI actuation on 1625 psig has occurred on both trains.

A.

B.

C.

D.

AHF-1A and AHF-1B should be running in slow speed.

AHF-1A and AHF-1B should be running in fast speed.

AHF-1A should be running in slow speed and AHF-1B should be off

AHF-1B should be running in fast speed and AHF-1A should be off.

-

Crystal River 2003-301

RO lnital Exam

08/22/03

20. The following plant conditions exist:

An RBIC actuation has occurred.

One 4 psig pressure switch in the "A" train has failed in the non-actuated

position.

Two 4 psig pressure switches in the "B" train are failed in the non-actuated

position.

-

-

-

Assuming no input to any isolation valves from diverse isolation (HPI), which of

the following statements describes the status of the RBIC actuation and the RB

isolation safety function for these conditions?

A.

Both "A" and "B" trains of RBIC would actuate. The safety function

would be met.

"A" train of RBIC would actuate, "B" train would not actuate. The

safety function would be met.

" A train of RBIC would actuate, "B" train would not actuate. The

safety function would not be met.

B.

C.

D.

Neither train of RBIC would actuate. The safety function would not be

met.

c

Crystal River 2003-301

RO Mal Exam

oat22103

In the Control Rod Drive system which of the

INHIBIT when the diamond panel is in automatic control?

llowing will cause an OUT

A.

B.

C.

Asymmetric fault with reactor power less than 60%.

Loss of safety rods out limit with reactor power greater than 60%.

Loss of motor power supply with reactor power less than 60%.

D.

A sequence inhibit with reactor power greater than 60%.

Crystal River 2003-301

RO lnital Exam

08/22/03

22. During a power increase the RO notices the following NI indications. The power increase is

stopped and the plant is stabilized. The following indications are recorded.

-

NI-5 upper chamber

42.0%

NE7 upper chamber

42.4%

-

NI-5 lower chamber

43.3%

NI-7 lower chamber

44.4%

-

NI-6 upper chamber

43.3%

NI-8 upper chamber

48.0%

-

NI-6 lower chamber

44.6%

NI-8 lower chamber

49.4%

Which of the following describes the required actions, if any, for the above indications?

A.

Reduce thermal power to < 60% of the allowable thermal power within two hours

AND reduce the nuclear overpower trip setpoint to _c 65.5% of the allowable

thermal power within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

Reduce thermal power 2 2% RTP from the allowable thermal power for each 1% of

QPT greater than the steady state limit within 30 minutes AND restore QPT to less

than or equal to the transient limit within two hours.

No TS actions are required. These indications are expected due to the increased

shielding from Tcold at lower power levels.

No TS actions are required. These indications are expected due to the decreased

shielding from Tcold at lower power levels.

B.

,

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

W

23. The following plant conditions exist:

-

The plant is at 40% power with turbine control in ICSIAuto.

Turbine is selected to "A" header pressure for control.

The header pressure setpoint is currently set at 46 for maintenance trouble

-

-

shooting activities of the turbine header pressure control circuit.

Which of the following describes the plant response if the selected "A" header

pressure transmitter failed rapidly to mid-scale?

A.

SASS will swap to the unaffected transmitter. Turbine and TBV control

will not be affected.

B.

SASS will swap to the unaffected transmitter. Turbine control will not

be affected but the TBV associated with the failed transmitter must be

controlled in manual.

\\/

C.

SASS will not swap to the unaffected transmitter. The turbine and

TBVs must be controlled in manual.

SASS will not swap to the unaffected transmitter. Turbine control will

not be affected but the TBV associated with the failed transmitter must

be controlled in manual.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

24. Ten minutes after an RBIC actuation occurred a malfunction results in the

closure of SWV-36, AHF-1A Cooling Water Inlet isolation valve. Which of the

following describes the affected component(s) and required operator action(s)?

A.

Only AHF-1A's cooling coils will lose SW cooling water; cooling water

supply should be swapped to Industrial Cooling (CI) within 5 minutes.

AHF-1As cooling coils and motor cooler will lose SW cooling water;

cooling water supply should be swapped to Industrial Cooling (CI)

within 5 minutes.

E.

C.

Only AHF-1A's cooling coils will lose SW cooling water; AHF-1B should

be started in slow speed and AHF-1A should be secured.

D.

AHF-1A's cooling coils and motor cooler will lose SW cooling water;

AHF-1B should be started in slow speed and AHF-1A should be secured.

Crystal River 2003-301

RO lnital Exam

oa122103

25. The following plant conditions exist:

- Turbine is ready to sync on line.

- PZR level normal.

- Letdown flow is 75 gpm.

- Seal injection flow is 40 gpm.

- MUV-31 has failed closed.

- MUV-3 1 bypass flow indicates 20 gpm.

PZR level = 12 galhnch

Assuming no operator action approximately how long would it take for the PZR Low level

alarm to annunciate? (disregard CBO flow)

A.

8 minutes

B.

12 minutes

C.

16 minutes

D.

20 minutes

-.

Crystal River 2003-301

RO lnital Exam

08/22/03

26. When aligning the DHR system for boron precipitation, EOP-14, Enclosure 20, Boron

Precipitation Control, directs that the seal-in circuits for DHV-42 and 43 be defeated.

Enclosure 20 also directs that the valve control switch be held in the open position for 6

seconds before the DH drop-line valves are opened.

Which of the following describes a possible consequence if DHV-42 or 43 were fully open

when drop-line flow commenced?

The resulting drop-line flow could cause:

A.

B.

vortexes in the core region.

RB sump screen damage and loss of the running DHlULPI pump

C.

D.

voiding in the core region from the rapid pressure drop that would occur.

inadequate mixing of the RB sump water with the trisodium phosphate (TSP)

resulting in a higher than calculated pH required for adequate iodine removal.

L.

Crystal River 2003-301

RO lnital Exam

08/22/03

.

27. The following plant conditions exist:

- Breakers 4900 & 4902 have opened (feeders to the OPT).

- A LOCA in containment is in progress.

- RB pressure is 34 psig.

- RCS pressure is 725 psig.

Based on the above conditions which of the following describes the status of

DHP-lA, BSP-lA, DHV-110 and BSV-3? (assume sufficient time has elapsed for

all automatic actions to occur)

A.

DHP-1A

Off

BSP-1A

Running

DHV-110

Open

BSV-3

Throttled

B.

DHP-1A

< ,

BSP-1A

DHV-110

BSV-3

C.

DHP-1A

BSP-1A

DHV-110

BSV-3

D.

DHP-1A

BSP-1A

DHV-110

BSV-3

Off

Running

Throttled

Throttled

Running

Running

Throttled

Open

Running

Off

Open

Closed

Crystal River 2003-301

RO lnital Exam

08/22/03

L,

28. Multiple CRDM high stator temperature alarms are in. Which of the following

conditions could cause these indications?

A.

B.

Standby SW booster pump auto-start and CRD filter delta P > 30 psid.

SWV-763, CRD Temperature control valve, fails to its maximum closed

position.

The low SW flow interlock to the SW booster pumps fails and sends a

low flow signal to the pumps.

During performance of SP-344A, RWF'-2A, SWP-1A and Valve

Surveillance, RWV-150, recirc to RW pit valve, fails full open.

C.

D.

.

, .

Crystal River 2003-301

RO lnital Exam

oa122103

L

29. With the plant operating at 65% power a 'Sudden Pressure' relay actuates on the

Startup Transformer.

Based on the above conditions which of the following electrical Iine-ups could be

used to supply power to the 'A Train PZR heaters?

A.

MTDG-1; 4160V RX AUX BUS 3; 480V RX AUX BUS 3A.

EDG-lA, ES 4160V BUS 3A; ES 480V BUS 3A; 480V RX AUX BUS 3A.

B.

C.

D.

BEST; ES 4160V Bus 3A, ES 480V Bus 3A, 480V Rx Aux Bus 3A.

EDG-1B; ES 4160V Bus 3B; 480V Plant Aux Bus; 480V Rx Aux Bus 3A.

Crystal River 2003-301

RO lnital Exam

08/22/03

ii

30. The following plant conditions exist:

-

-

Which of the following describes what effect, if any, this malfunction will have on MUV-31

(PZR level control valve) operation?

Plant is at 100% power.

The selected PZR level transmitter rapidly fails low.

MUV-3 1 :

A.

B.

C.

D.

will throttle closed in an attempt to restore PZR level.

will throttle open in an attempt to restore PZR level.

is interlocked to freeze in position without a valid PZR level signal.

operation will be unaffected because SASS will transfer to the alternate level

control signal.

L<

Crystal River 2003-301

RO lnital Exam

oam/o3

31. The following plant conditions exist

- Reactor power is 50%.

- RCS pressure is 1950 psig.

- RCS Thot is 604" F.

- FW flow is 2.6 E6 lbm/hr in each loop.

Based on the above conditions determine if an ATWS event hashas not occurred

and which of the following actions should be taken?

A.

An ATWS event has occurred. Immediate actions of EOP-2 should be

performed and a manual turbine trip is required if reactor power

remains at 50%.

An ATWS event has occurred. Immediate actions of EOP-2 should be

performed and RCS boration is required if reactor power remains at

50%.

An ATWS event has not occurred. Excessive FW has caused the RCS

pressure decrease and FW flow should be lowered.

B.

L

C.

D.

An ATWS event has not occurred. A steam leak has caused the RCS

pressure decrease and the reactor should be tripped if the leak cannot be

isolated.

Crystal River 2003-301

RO lnital Exam

08l22lO3

+

32. The plant is in Mode 5 with an RB purge in progress. High radiation in the

containment atmosphere has now resulted in RM-A1 gas and RM-A6 gas channels

going into high alarm.

Which of the following describes the expected automatic actions for these

conditions?

A.

B.

C.

D.

Both RB purge exhaust fans will be tripped by RM-A1 interlocks.

AHV-lA, lB, lC, and 1D will be closed by RM-A1 interlocks.

Both RB purge exhaust fans will be tripped by RM-A6 interlocks.

AHV-lA, lB, lC, and 1D will be closed by RM-A6 interlocks.

Crystal River 2003-301

RO lnital Exam

08/22/03

L,

33. A plant startup is in progress with the indications below. If the "C" RPS cabinet

were to lose power which of the following sets of conditions would have met

overlap requirements and allow continued power ascension?

i.

A.

B.

C.

D.

NI-3

NI-4

NI-5,6, 7 & 8

NI-3

NI-4

NI-5, 6, 7 & 8

NI-1

NI-2

NI-3

NI-4

1 x 10-5

1 x 10-5

1 x 10-5

I x 10-5

3%

12%

9 X lo5

9 X lo5

3 x 10-10

3 x 10-10

NI-1

9 X lo5

NI-2

9 X lo5

NI-3

3 x 10-11

NI-4

3 x 10-11

'...:'

Crystal River 2003-301

RO lnital Exam

08/22/03

34. RCP-1B has been secured due to an oil leak. A plant shutdown is in progress to

repair the leak. Which of the following describes how OTSG levels are controlled

once Low Level Limits are reached on the "A" OTSG?

A.

The ATc circuit ensures additional flow will be maintained to the "B"

OTSG to maintain ATc at 0" F.

B.

The RCS Flow Ratio circuit ensures additional flow wiIl be maintained

to the "B" OTSG to maintain ATc at 0" F.

C.

The Total FW Flow Control circuit ensures additional flow will be

maintained to the "B" OTSG to maintain LLL in the "A" OTSG.

The FW Temperature Compensation circuit ensures additional flow will

be maintained to the "B" OTSG to maintain LLL in the "A" OTSG.

D.

Cystal River 2003-301

RO lnital Exam

08/22/03

u

35. The crew has entered EOP-6, Steam Generator Tube Rupture, and minimized

subcooling margin by RCS depressurization as required.

Which of the following describes the reason for minimizing subcooling margin?

Minimizes:

A.

B.

RCS leakage through the leaking OTSG tube.

time required for cooldown of the RCS.

C.

D.

potential of lifting Main Steam Safety Valves.

tensile stresses on affected OTSG tubes.

Crystal River 2003-301

RO lnital Exam

08/22/03

36. The following plant conditions exist:

- A 150 gpm OTSG tube rupture has occurred on the A OTSG.

- A Loss of Off-site Power (LOOP) and Reactor trip have occurred.

- B OTSG has been isolated because of an unisolable steam leak.

- A plant cooldown and depressurization is in progress in accordance with EOP-6.

- The Reactor Coolant System (RCS) is presently at 491°F (Tincore) and 1225

- A OTSG is being maintained at its natural circulation level by EFP-3

- Initial Dose Equivalent (DE) 1-131 was 1.35 pci/g.

- Borated Water Storage Tank (BWST) level is 38.5 feet.

Based on these conditions, which of the following describes the action which should be taken?

psig.

A.

B.

The A OTSG should be isolated because TRACC limits are being exceeded.

The A OTSG should be steamed to atmosphere and cooldown rates maintained

within normal limits.

Cooldown rate should be increased to 240Fhr until B OTSG is recovered or

Off-site power is available.

J

C.

D.

Cooldown must be stopped until the B OTSG or Off-site power can be recovered.

Crystal River 2003-301

RO lnital Exam

oa122103

37. The reactor has just been taken critical when an atmospheric dump valve fails open.

Which of the following describes what will happen to Tave and nuclear power and what

operator actions should be taken?

A.

Tave will rise; final power will be at the point of adding heat (POAH). The ADV

should be closed and rods inserted to restore Tave.

B.

Tave will rise; final power will exceed the POAH. The ADV should be closed and

secondary parameters used to restore Tave.

Tave will lower; final power will be at the POAH. The ADV should be closed and

rods withdrawn to restore Tave.

C.

D.

Tave will lower; final power will exceed the POAH. The ADV should be closed

and secondary parameters used to restore Tave.

Crystal River 2003-301

RO lnital Exam

08/22/03

38. The plant is currently at 95% power and decreasing power due to an unisolable steam leak two

feet downstream of MSV-53, MN STM to FWP & TURB BP, STM GEN A ISOL. What

effect, if any, will closing this valve have on the "A" MFWP?

When reactor power decreases to = 80% the:

A.

swap to reheat steam can occur as normal.

B.

C .

D.

swap to auxiliary steam can occur as normal.

MFWP will trip since the swap to main steam cannot occur.

MFWP will trip since the swap to auxiliary steam cannot occur.

Crystal River 2003-301

RO lnital Exam

08/22/03

,

39. With the plant at full power the following conditions exist:

- The AULD is 00s.

-

-

Which of the following failures could have caused these conditions and what would

be the appropriate action to take?

Tave has decreased about 2" F.

Reactor power has increased about 3%.

..

A.

B.

A MSSV has failed open. The associated MSN should be closed.

A MSSV has failed open. The associated isolation valve should be

closed.

A TBV has failed open. The associated MSIV should be closed.

A TBV has failed open. The associated isolation valve should be closed.

C.

D.

L

Crystal River 2003-301

RO lnital Exam

08/22/03

40. The following plant conditions exist:

-

-

-

-

approximately 800 psig.

The "A" OTSG pressure should stabilize at approximately:

A reactodturbine trip has occurred.

The turbine governor valves indicate "CLOSED".

The turbine throttle valves indicate "OPEN".

"B" OTSG has developed a small steam leak and pressure is steady at

A.

800 psig.

B.

885 psig.

C.

1010 psig.

D.

1025 psig.

W

Crystal River 2003-301

RO lnital Exam

08/22/03

--

41. The following plant conditions exist:

-

A LOOP has occurred with the plant previously at 40% power.

EFP-3 has a red light on the control handle but no flow is indicated.

-

EFP-2 did not start.

-

Which of the following "prompt and prudent" actions should be taken?

Attempt to:

A.

start EFP-1.

E.

start FWP-7.

C .

open MSV-55 and/or MSV-56 (EFP-2 steam isolation valves).

D.

open ASV-5 and/or ASV-204 (EFP-2 steam control valves).

W

'_I

Crystal River 2003-301

RO lnital Exam

08/22/03

.-I

42. Step 3.4 of EOP-12 Station Blackout directs the operator to:

"Actuate MSLI on both OTSGs."

Which of the following describes the reason for this step?

A.

B.

Limit cooldown to aid in maintaining RCS inventory.

To prevent OTSG dryout due to the loss of Main Feedwater.

C.

To ensure OTSGs are isolated due to the loss of power to automatic

Main Steam Line Isolation logic.

To maintain greater than 100 psig in the OTSGs due to the loss of

turbine bypass valve control.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

43. The following plant conditions exist:

- A LOOP has occurred.

- 'A' EDG did not start due to an electrical lockout.

- 'B' EDG initially started and loaded on the bus and then the output breaker tripped open for

no apparent reason. The EDG engine remained at 900 rpm.

Which of the following describes the electrical lockouts, at a minimum, which must be reset if

both EDGs are to be loaded on the ES buses?

A.

'A' EDG - 86DG, generator differential current lockout relay

'B' EDG - 86B, lockout relay

B.

' A EDG - 4160V undervoltage lockout relay

'B' EDG - 4160V undervoltage lockout relay

C.

' A EDG - 86B, lockout relay

'B' EDG - 86DG, generator differential current lockout relay

' A EDG - 86DG, generator differential current lockout relay

'B' EDG - 86DG, generator differential current lockout relay

~U

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

L

44. Which of the following describes the direct signal that decreases condensate flow

demand on a loss of one MFW pump at 80% power?

A.

B.

C.

D.

A signal from the DFT high level interlock.

A runback signal from the ULD sub-section of the ICs.

A signal that compares existing CD flow with FW flow and HW level.

A signal that compares existing CD flow with FW flow and DFT level.

Crystal River 2003-301

RO lnital Exam

08/22/03

45. The plant has been in a Station Blackout for approximately three hours when Annunciator P-4-1, Inverter A Failure, comes into alarm. Which of the following is the reason for this

alarm?

A.

The inverter has lost its AC power supply due to failure of the static transfer switch

and its DC power supply due to battery depletion.

The inverter has lost its AC power supply due to the Station Blackout and its DC

power supply when the static transfer switch failed.

The inverter has lost its AC power supply due to the Station Blackout and its DC

power supply due to battery depletion.

The inverter has lost its AC power supply and DC power supply due to a static

transfer switch failure.

B.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

46. The following plant conditions exist:

- Plant is operating = 20% power.

- SUCV position = 95% open.

- LLCV position = 5% open.

I & C technicians have requested that the 'B' train SUCV and LLCV WA stations

be taken to hand in order to record some data on the proportionaVintegra1 module

supplying the input to these stations. Permission is received and these stations

are placed in manual. After the technicians are finished, with no problems noted,

preparations are made to return these stations to automatic.

Which of the following describes the appropriate actions to return these stations

to automatic?

A.

B.

C.

Place the SUCV in auto first, then place the LLCV in auto

Place the LLCV in auto first, then place the SUCV in auto.

Open the SUCV to 100% to aIlow the LLCV full control. Place the LLCV

in auto first and then the SUCV.

Close the LLCV to allow the SUCV full control. Place the SUCV in auto

first and then the LLCV.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

47. Based on the following plant conditions:

- FWV-28 (Feedwater Cross Connect) - OPEN

- "B" Main Feedwater Pump (FWP-2B) - TRIPPED

- "A" Startup Control Valve's Differential Pressure - 85 psig

- "B" Startup Control Valve's Differential Pressure - 75 psig

Which of the following statements describes the "A" Main Feedwater Pump

(FW-2A) control mode?

A.

Lowest loop FW flow error.

B.

Individual loop FW flow error.

C.

D.

Delta Pressure across the "A" loop control valves.

Delta Pressure across the "B" loop control valves.

L

Crystal River 2003-301

RO lnital Exam

08/22/03

48. A maintenance worker inadvertently hits the power supply wiring for EFV-57,

EFP-3 to 'B' OTSG control valve, pulling the wire out of the valve body. The

control room is immediately notified and a decision is made to isolate this EFW

line and ensure it cannot feed if an EFIC actuation were to occur.

Which of the following action(s), if any, could be taken to ensure this line is

isolated?

A.

No action is necessary. EFV-57 has failed closed due to the loss of

power.

B.

Select manual and closed at EFV-57's control station and select closed

EFV-33, block valve for EFV-57, on the main control board.

Select closed EFV-33, block vaIve for EFV-57, at the controI board and

de-energize its power supply at DPDP-8C.

Select closed EFV-33, block valve for EFV-57, at the control board and

de-energize its power supply at DPDP-8D.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

49. The following plant conditions exist:

RWP-1 is in operation.

to the bus.

A steam leak occurs in the RB and pressure increases to 5 psig.

-

SP-354B, Monthly Test of EDG-lB, is in progress with the diesel paralleled

Which of the following describes the response of the RW system?

A.

B.

C.

RWP-1 trips due to an ES trip command.

RWP-2A starts on low RW pressure due to the loss of RWP-1.

RWP-2B starts on low RW pressure due to the loss of RWP-1.

D.

RWP-3A starts due to an ES start command.

i-

Crystal River 2003-301

RO lnital Exam

08/22/03

L

50. With RCS temperature at 190" F which of the following conditions would require

entry into a Technical Specification?

A.

B.

C.

D.

VBDP-7 is aligned to its alternate AC power supply.

Total stored EDG lube oil inventory of 260 gallons.

The Offsite Power Transformer is 00s due to an oil leak.

" A EDG is 00s due to a turbo charger failure.

Crystal River 2003-301

RO lnital Exam

oam103

\\-,

51. The following plant conditions exist:

- A Loss of Offsite Power has occurred.

- RB pressure is 32 psig.

- RCS pressure 900 psig.

- Adequate subcooling margin does exist.

- A 480V overcurrent lockout has occurred on breaker 3310 (feeder breaker for

the 'B' ES bus).

Which of the following describes all running equipment that must be secured

because of these conditions? (assume all components have sequenced on as

designed)

A.

BSP-lB, MUP-1C and RWP-3B.

B.

RWP-2B and RWP-3B.

\\-

C.

BSP-lB, MUP-1B and RWP-3B.

D.

DHP-lB, MUP-lC, BSP-1B and RWP-3B.

Crystal River 2003-301

RO lnital Exam

oa12zm

W

52. The following readings were taken on the A battery charger following a

BATTERY A DISCHARGE HIGH alarm in the control room:

- 120 volts

- 75amps

Shortly after these readings were taken the amp meter increases to 360 amps.

Which of the following action(s) will occur following this increase?

A.

B.

C.

D.

The A and C inverter will trip.

The A battery charger will trip and the battery will supply bus loads.

The A and C inverter will not trip but will swap to the AC input.

The Af

battery charger will trip and the C battery charger will

automatically be placed in service.

L

Crystal River 2003-301

RO lnital Exam

08/22/03

53. SP-354A, Monthly Functional Test of EDG-lA, is in progress.

"A" ES 4160 V Bus

"A" EDG

4160 volts

60 hz

4190 volts

60 hz

i-'

Based on these conditions which of the following indications are expected when the EDG-1A

output breaker is closed and what action should be taken?

There will be:

A.

B.

C.

D.

VARS out. Excitation voltage should be decreased.

VARS out. Excitation voltage should be increased.

VARS in. Excitation voltage should be decreased.

VARS in. Excitation voltage should be increased.

Crystal River 2003-301

RO lnital Exam

oa122103

54. With the plant at full power which of the following conditions would require entry

into a Technical Specification LCO?

A.

B.

C.

D.

EFP-1 has excessive packing leakage. EFP-2 & 3 are operable.

AHF-1C motor bearing has seized. AHF-1A & 1B are operable.

MUP-1A has a large oil cooler leak. MUP-1B & 1C are operable.

AHV-1A leakage is outside its limit. AHV-lB, 1C & 1D are operable.

Crystal River 2003-301

RO lnital Exam

oa122103

ii

55. A small leak has just occurred in the Waste Gas Decay Tank area. Which of the

following describes the first radiation monitor that should detect this leak and the

automatic actuations that should occur?

A.

RM-A4; trips AHF-10

B.

C.

RM-A3; trips AHF-1lAlB and closes AHD-29 & 36.

RM-A3; trips AHF-llAB, closes WDV-393,394, & 395 (recycle isolation

valves) and closes WDV-439 (common waste gas isolation).

RM-All; closes WDV-393, 394, & 395 (recycle isolation valves) and

closes WDV-439 (common waste gas isolation).

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

'4

56. The following plant conditions exist:

-

SWP-lA, RWP-2A and MUP-1B are running.

Computer points for three CRDM stators have reached their "Hi Warning"

MUP-1B lube oil temperature is slowly trending up.

RWP-2A discharge is currently 56 psig and has increased 4 psig over the

Spent Fuel pool level has increased 1 inch over the last four hours.

-

setpoint of 113°F and are slowly trending up.

-

-

last four hours.

-

Which of the following could cause these indications and what actions should be

taken?

A.

Enter AP-330, Loss of Nuclear Service Cooling, ensure both SW Booster

pumps are running and place the spare CRDM filter in service. The

on-line CRDM filter is clogged.

%..

B.

Use OP-408,

Nuclear Services Cooling System, and isolate SW flow to

the Spent Fuel coolers. The leak has caused decreased SW flow to other

components.

Enter AP-330, Loss of Nuclear Service Cooling, place the standby SWHE

in service and remove the fouled one. At least one of the in service

SWHEs is excessively fouled.

Use OP-408, Nuclear Services Cooling System, and close the discharge

valves on RWP-1 and RWPSB. Backflow through the standby RWPs

has decreased RW flow.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

W

57. With IAP-3C running as the Lead compressor, IAP-3B running as the First Lag

and IAP-3A running as the Second Lag compressor the power supply to the

compressor motors should be as follows:

A.

IAP-3A powered from 480V Rx Aux Bus 3A

IAP-3B powered from 48OV Rx Aux Bus 3B

IAP-3C powered from the 12kV line

B.

IAP-3A powered from 480V Rx Aux Bus 3A

IAP-3B powered from the 12kV line

IAP-3C powered from 480V Rx Aux Bus 3B

C.

IAP-3A powered from the 12kV line

W - 3 B powered from 480V Rx Aux Bus 3A

IAP-3C powered from 480V Rx Aux Bus 3B

D.

IAP-3A powered from 480V Rx Aux Bus 3B

IAP-3B powered from 480V Rx Aux Bus 3A

IAP-3C powered from the 12kV line

c

Crystal River 2003-301

RO lnital Exam

oa122103

v

58. The Halon system has actuated. Multiple cable spreading room smoke detectors

still detect smoke. What operator actions must be taken, if any, to ensure both

banks of Halon have discharged?

A.

B.

The operator must select the alternate Halon bank.

The operator must select the alternate Halon bank and actuate the pull

station located in the control room.

C .

No additional operator actions are required. Both banks will

automatically discharge to ensure a Halon concentration of at least 5%.

D.

No additional operator actions are required. After the selected bank

discharges a preset timer will start. Once this time has elapsed, and

smoke is still detected by at least one detector in each zone, the other

bank will automatically discharge.

Crystal River 2003-301

RO lnital Exam

08/22/03

L,

59. The following plant conditions exist:

- A small break LOCA has occurred in the RB.

- RB pressure is 4.6 psig.

- ES status lights are as indicated.

Component

AHV- 1A

AHV-1B

AHV-1c

AHV-1D

LRV-70

LRV-71

LRV-72

LRV-73

Light

AMBER

AMBER

AMBER

AMBER

GREEN

GREEN

GREEN

GREEN

Component

swv-79

swv-80

SWV-81

swv-82

SWV-83

swv-84

SWV-85

SWV-86

Light

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

Based on the above conditions which of the following describes the status of these

containment isolation valves?

The AH valves are indicating:

-.-

A.

open and should be closed; all other components are in their expected

position.

closed and should be open; all other components are in their expected

position.

open and should be closed; the SW valves are indicating closed and they

should be open.

closed and should be open; the SW valves are indicating open and they

should be closed.

B.

C.

D.

Ctystal River 2003-301

RO lnital Exam

08/22/03

v

60. The following plant conditions exist:

- Plant is at 70% power.

- MFW Booster pump 1A suction valve receives a false signal and strokes 10% in

the closed direction and then stops.

Which of the following describes the required operator actions for this condition?

A.

B.

C.

D.

Ensure plant runback to 52% power.

Manually trip one MFWP and ensure plant runback to 52% power.

Reduce power to 45% and manually trip MFW Booster pump 1A.

There will be sufficient flow through the valve since it is still 90% open.

Troubleshooting efforts should be initiated immediately.

Crystal River 2003-301

RO lnital Exam

08122103

L

61. The following plant conditions exist:

The plant is at 15% power.

-

The turbine is latched.

-

The "A" MFWP is on turning gear.

Condenser vacuum has just decreased to 5 in/HgA coincident with a loss

of the "B" MFWP.

-

Which of the following describes the operator's immediate actions and the expected plant

response?

A.

Ensure the turbine is tripped. TBVs will control steam pressure at 885 psig.

B.

Ensure the reactor and turbine are tripped. TBVs will control steam pressure at 885

psig.

Ensure the turbine is tripped. Due to the low condenser vacuum the ADVs will

control steam pressure at 1025 psig.

Ensure the reactor and turbine are tripped. Due to the low condenser vacuum the

ADVs will control steam pressure at 1025 psig.

C .

.*

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

62. The plant is at 70% power with the following maintenance activities in progress:

-

-

The "Cond. Pump Pit Sump Level High" alarm has just annunciated in conjunction with the

SPO reporting water coming out of the SCHE and that CWV-5, "B" SCHE inlet valve from

CWP-ID, has failed partially open. Water level in the CDP pit is about 1' and rising slowly.

Based on these conditions which of the following actions are required?

"E" SCHE shoot and clean activities.

"E" CWP breaker investigation (breaker tripped open for no apparent reason).

A.

B.

C.

D.

Trip the reactor and transition to EOP-02; then stop all CWPs.

Trip the reactor and transition to EOP-02; then stop CWP-ID.

Concurrently perform AP-510; when reactor power is < 60% stop CWP-ID.

Concurrently perform AP-510; when reactor power is < 45% trip the turbine; stop

CWP-1D and transition to AP-660.

Crystal River 2003-301

RO lnital Exam

08/22/03

63. The following plant conditions exist:

- An Inadequate Heat Transfer event is in progress due to a loss of Main and

- HPJPORV cooling has been established in accordance with EOP-4, Inadequate

- The Subcooling Margin Monitor now indicates -7 SC.

- AFW restoration is expected.

- OTSG integrity does exist.

Based on these conditions which of the following describes the actions that should

be taken?

Emergency Feedwater.

Heat Transfer.

A.

B.

C.

D.

Remain in EOP-4, Inadequate Heat Transfer.

Transition to EOP-3, Inadequate Subcooling Margin.

Transition to EOP-7, Inadequate Core Cooling.

Transition to EOP-8, LOCA Cooldown.

.. ,

Crystal River 2003-301

RO lnital Exam

08/22/03

64. The plant has just experienced a spurious reactor trip from 100% full power. Due to control

signal interference the output voltage signal from the high select module associated with

NI-5/6 remains at 100% reactor power. Select the statement below which describes the

operator's actions with the above conditions.

Perform EOP-2, Vital System Status Verification, Immediate Actions and:

A.

continue with the followup actions in EOP-2. No adverse conditions were created

with the above failure.

due to the above failure transitioning to EOP-3, Inadequate Subcooling Margin,

would be necessary.

due to the above failure transitioning to EOP-4, Inadequate Heat Transfer, would be

necessary.

B.

C.

D.

due to of the above failure transitioning to EOP-5, Excessive Heat Transfer, would

be necessary.

,

Crystal River 2003-301

RO lnital Exam

08/22/03

v

65. The following plant conditions exist:

- The RCS has suffered a Small Break LOCA and a reactor trip has occurred.

- RCS pressure has stablilized at 1450 psig.

- RB pressure is 20 psig and increasing slowly.

- The Operator has carried out actions of EOP-13,

Rule #2, HPI Control, for

BypassingBesetting ES actuations for the A train of ES but has NOT done

B train.

Which of the following statements correctly describes the response of BSP-1A &

1B when RB pressure reaches 30 psig? (assume no other operator actions taken)

A.

BSP-1A & 1B will NOT auto start.

B.

C.

D.

BSP-1A & 1B will auto start.

BSP-1A will auto start but not BSP-1B.

BSP-1B will auto start but not BSP-1A.

\\ ,

Crystal River 2003-301

RO lnital Exam

08/22/03

L'

66. The following plant conditions exist:

-

-

-

-

Based on the above conditions which of the following could cause these

indications?

RCS pressure is 1500 psig and slowly lowering.

PZR level is slowly lowering.

Feedwater flows and OTSG levels are normal.

"RB Fan A Condensate High alarm is in.

A.

An OTSG tube leak.

B.

C.

A main steam leak inside containment.

A loss of coolant accident inside containment.

D.

A loss of coolant accident outside containment.

W

Crystal River 2003-301

RO lnital Exam

08/22/03

67. A LOOP, concurrent with a SBLOCA, has resulted in a loss of adequate subcooling margin.

The A EDG has not started and the A 4160V ES bus is dead.

When the operator verifies proper HPI discharge flowpath the following is observed:

MUV-23 (HPI Injection valve to A RCP discharge) has no power and is closed.

MUV-24 (HPI Injection valve to B RCP discharge) has no power and is closed.

MUV-25 (HPI Injection valve to C RCP discharge) is open.

MUV-26 (HPI Injection valve to D RCP discharge) is partially open (amber light).

MUV-586 (HPI Crosstie valve) is open.

MUV-587 (HPI Crosstie valve) is open.

What of the following describes the appropriate operator actions per EOP-3?

A.

B.

C.

D.

Align alternate power to MUV-23 and 24 and open them.

Send the PPO to attempt to manually open MUV-26.

Send the PPO to attempt to manually open MUV-23 and 24.

Continue on; a proper HPI flowpath exists with the B Train

- ,

Crystal River 2003-301

RO lnital Exam

08/22/03

I

-l

  1. I CONTACT

CLOSED BY

ail CONTACT

CCNOITION

IN1 T IAT [NO

i

TO VAUVE

HOTOR CIRCUIT

K3 RELAY

- - I - - - - - -

TYPICAL VALVE CONTROL CIRCUIT

68.

Using the above drawing which of the following will close the valve?

(initial valve position is open) (drawing shown in shelf state)

A.

Loss of 125 VDC.

B.

C.

D.

Both #1 and #2 contacts open.

Either #1 or #2 contact opens.

Depressing the S1 pushbutton with the initiating condition present.

Crystal River 2003-301

RO lnital Exam

oa122103

69. The following plant conditions exist:

-

-

Which of the following describes a required operator action in regard to the LPI

ES actuation bistables?

A plant heatup and pressurization are in progress.

LPI ES actuation bistables are currently bypassed.

A.

Manually reset the LPI actuation bistables when RCS pressure is

greater than 500 psig and increasing.

Manually reset the LPI actuation bistables when RCS pressure is

greater than 900 psig and increasing.

Verify automatic reset of the LPI actuation bistables when RCS

pressure is greater than 500 psig and increasing.

Verify automatic reset of the LPI actuation bistables when RCS

pressure is greater than 900 psig and increasing.

B.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

70. The following plant conditions exist:

-

Plant shutdown in progress.

-

Reactor power at 2%.

-

-

OTSG pressure is 885 psig.

Shutdown Margin is -4.6% A k k from a calculation using -3.62% A k k reactivity

from xenon.

Which of the following statements will apply? Assume that the xenon reactivity

will decay to O%Akk.

Section 6 of Enclosure 1 in SP-421:

A.

must be completed. Sufficient shutdown margin will be preserved even

when xenon decays to zero.

must be completed. Insufficient shutdown margin will result when

xenon decays to zero. Boron must be increased to maintain adequate

shutdown margin.

need not be completed. Sufflcient shutdown margin will be preserved

even when xenon decays to zero.

need not be completed. Insufficient shutdown margin will result when

xenon decays. Boron must be increased to maintain adequate shutdown

margin.

B.

i/

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

71. Which of the following defines a "VERY HIGH RADIATION AREA" and describes the

control requirements for this type of area?

A.

An area, accessible to individuals, in which radiation levels could result in an

individual receiving an absorbed dose in excess of 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 1 foot from

a radiation source or from any surface that the radiation penetrates and the area

must be locked and controlled in such a manner that an individual cannot walk or

climb into it.

B.

An area, accessible to individuals, in which radiation levels could result in an

individual receiving an absorbed dose in excess of 1000 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 1 foot

from a radiation source or from any surface that the radiation penetrates and the

area must be conspicously posted and contain a flashing light.

An area, accessible to individuals, in which radiation levels could result in an

individual receiving an absorbed dose in excess of 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 1 meter

from a radiation source or from any surface that the radiation penetrates and the

area must be locked and controlled in such a manner that an individual cannot walk

or climb into it.

An area, accessible to individuals, in which radiation levels could result in an

individual receiving an absorbed dose in excess of 1000 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 1 meter

from a radiation source or from any surface that the radiation penetrates and the

area must be conspicously posted and contain a flashing light.

C.

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

ii

72. As a radiation worker you are expected to keep your radiation exposure as low as

reasonably achievable. Which of the following shows a radiation exposure that is

outside CR-3's administrative limits for a radiation worker with a current dose

history (NRC form 5 ) on file? (Note: This is the first exposure of the year for each

radiation worker).

A.

A 20 year old worker receives a TEDE exposure of 1 rem during work

inside an OTSG which brings his total lifetime TEDE exposure to 22

rem.

B.

A 40 year old worker receives a TEDE exposure of 1.8 rem during the

week while completing a reactor vessel ISI. This brings his lifetime

exposure to 25 rem.

A 45 year old worker receives a SDE-WB exposure of 25 rem after

cutting open a reactor coolant system pipe to complete a maintenance

work order.

A 35 year old chemist receives a LDE exposure of 5 rem while sampling

the reactor coolant system for indication of failed fuel.

C.

i,

D.

Crystal River 2003-301

RO lnital Exam

08/22/03

73. The following plant conditions exist:

- The plant is at 30% power.

- Turbine vibration on bearing #7 is 10 mils.

- Hydrogen Cooler outlet temperature is 60" C.

Based on the above conditions which of the following action(s) should be taken?

A.

B.

C.

D.

Enter AP-510, Rapid Power Reduction, and perform a plant shutdown.

Enter OP-204, Power Operations, and perform a plant shutdown.

Enter EOP-02, Vital System Status Verification, and trip the reactor.

Enter AP-660, Turbine Trip, and trip the turbine.

Crystal River 2003-301

RO lnital Exam

08/22/03

.,

74. The following plant conditions exist:

- The plant is in Mode 3 with RCS pressure at 2150 psig.

- AP-990, Shutdown from Outside the Control Room, has been entered and

transfer to the Remote Shutdown Panel is complete.

- MUV-31 has failed.

- The CRS directs that PZR level be maintained at an indicated = 100 inches.

Which of the following actions should be taken and what would be the

approximate actual PZR level for these conditions?

A.

Open MUV-27 and direct the PPO to open MUV-30, bypass around

MUV-31; = 160 inches.

Use an available HPI valve; = 160 inches.

B.

C.

Open MUV-27 and direct the PPO to open MUV-30, bypass around

MUV-31; = 40 inches.

Use an available HPI valve; = 40 inches.

W

D.

Crystal River 2003-301

RO lnital Exam

oa122103

75. AP-990, Shutdown from Outside the Control Room, has been entered. After

control has been transferred to the RSP a followup step directs the RO to ensure

BSP-1A is tripped by opening the DC knife switch and depressing the manual trip

pushbutton.

Which of the following describes where this action is performed and its purpose?

A.

The "A" ES 4160V switchgear room; to protect the pump from loss of

essential support functions.

The "A" ES 480V switchgear room; to protect the pump from loss of

essential support functions.

The " A ES 4160V switchgear room; to ensure RCS inventory control

problems are not created by component failures.

The "A" ES 480V switchgear room; to ensure RCS inventory control

problems are not created by component failures.

B.

C.

D.

i,