IR 05000302/2003301

From kanterella
Jump to navigation Jump to search
August Exam 50-302/2003-301 Summary Sheet Letter
ML033070167
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/11/2003
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Robert Davis
Progress Energy Florida
References
50-302/03-301 50-302/03-301
Download: ML033070167 (5)


Text

ber 11, 2003

SUBJECT:

EXAMINATION RESULTS SUMMARY - CRYSTAL RIVER NUCLEAR PLANT EXAM REPORT NO. 50-302/2003-301

Dear Mr. Davis:

The purpose of this letter is to inform you of the individual examination results of the applicants that participated in the initial examination conducted at your facility August 25 - 29, 2003. This complies with the intent of ES-501, Section E.1.a., of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Draft Revision 9.

Enclosure 1 is a copy of the Power Plant Examination Results Summary, Form ES-501-2, Draft Rev. 9.

Copies of the licenses for the individuals who passed the examination are included as Enclosure 2.

Included as Enclosure 3 are copies of the individual Operator Licensing Examination Report (Form ES-303-1) packages. This will enable you to evaluate the individual weaknesses and provide appropriate remedial training for those operators as necessary.

It takes approximately 90 days to generate and process the operator license certificates. Region II encourages licensees to plan certificate presentation ceremonies for licensed operators. Regional management will be available to participate in such ceremonies, if possible. Please call Mr. Joel Munday, Chief, Reactor Projects Branch 3, at (404) 562-4560, to discuss your plans.

If you have any questions, please contact Michael E. Ernstes at (404) 562-4638.

Sincerely, Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch September 11, 2003

SUBJECT:

EXAMINATION RESULTS SUMMARY - CRYSTAL RIVER NUCLEAR PLANT EXAM REPORT NO. 50-302/2003-301

Dear Mr. Davis:

The purpose of this letter is to inform you of the individual examination results of the applicants that participated in the initial examination conducted at your facility August 25 - 29, 2003. This complies with the intent of ES-501, Section E.1.a., of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Draft Revision 9.

Enclosure 1 is a copy of the Power Plant Examination Results Summary, Form ES-501-2, Draft Rev. 9.

Copies of the licenses for the individuals who passed the examination are included as Enclosure 2.

Included as Enclosure 3 are copies of the individual Operator Licensing Examination Report (Form ES-303-1) packages. This will enable you to evaluate the individual weaknesses and provide appropriate remedial training for those operators as necessary.

It takes approximately 90 days to generate and process the operator license certificates. Region II encourages licensees to plan certificate presentation ceremonies for licensed operators. Regional management will be available to participate in such ceremonies, if possible. Please call Mr. Joel Munday, Chief, Reactor Projects Branch 3, at (404) 562-4560, to discuss your plans.

If you have any questions, please contact Michael E. Ernstes at (404) 562-4638.

Sincerely,

/ RA /

Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-302 License No. DPR-72 Enclosures: 1. Examination Results Summary (ES-501-2)

2. Copies of Licenses 3. Individual Examination Packages (ES-303-1)

Distribution w/encl 1: See page 2

PEC 2 Distribution w/encl 1:

E. Barnhill, IOHS, IROB, NRR Exam Report File (orig. conc.)

Summary Sheet File OFFICE RII:DRS RII:DRS SIGNATURE NAME KODONOHUE:BTM MERNSTES DATE 11/ /2003 11/ /2003 E-MAIL COPY? NO NO OFFICIAL RECORD COPY DOC NAME: C:\ORPCheckout\FileNET\ML033070167.wpd

ES-501 Power Plant Examination Results Summary Form ES-501-2 PRIVACY ACT INFORMATION - FOR Examination Report No. 50-302/2003-301 POWER PLANT EXAMINATION RESULTS SUMMARY Facility:Crystal River Circle Plant Status: Hot Written Examination Date: 8/29/03 Operating Test Date(s): 8/25-28/03 NRC Examiners: R. Baldwin, G. Hopper, K. ODonohue OVERALL RESULTS Applicants: Total # # Passed % Passed # Failed % Failed RO 3 3 3 0 0 SRO 2 2 2 0 0 INDIVIDUAL RESULTS Name Docket # Type Written Grade Operating Test(2)

55-( ) (1)

RO / SRO / TOT W-T ADM SIM William R. Oakley 55-22738 1 89.33 / NA /89.33 P P P Tony L. Renier 55-22739 1 89.33 / NA /89.33 P P P Brandon L. Webster 55-22740 1 85.33 / NA / 85.33 P P P Jonathan D. Huecker 55-22737 2 94.67 / 84.00 /92.00 P P P Mary B. Warren 55-22286 3 92.00 / 92.00 /92.00 P P P

/ /

/ /

/ /

/ /

/ /

/ /

NOTES:

(1) 1=RO; 2=SRO-I; 3=SRO-U; 4=RO-Retake; 5=SRO-I-Retake; 6=SRO-U-Retake; 7=SRO-Fuel (2) P=Passed; F=Failed; W=Waived PRIVACY ACT INFORMATION - FOR