RO. Box 63 Lycoming, New York 13093 Constellation Energy Group Nine Mile Point Nuclear Station NMP-97940 August 22, 2002 Mr. Hubert J. Miller Regional Administrator USNRC Region I 475 Allendale Road King of Prussia, PA 19406 ATTENTION: Mr. John Caruso
SUBJECT:
NINE MILE POINT UNIT 1 INITIAL OPERATOR CATEGORY B OPERATING EXAMINATION SUBMITTAL Mr. Miller:
In response to the NRC Corporate Notification Letter dated June 4, 2002, arrangements were made for the administration of licensing examinations at Nine Mile Point, Unit 1 during the week of September 30, 2002. The examinations are being prepared based on the guidelines in Revision 8, Supplement 1, of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors." To meet the examination schedule, Nine Mile Point Nuclear Station is required to furnish the examination materials for review and approval. Enclosed are the test items, outlines and quality checklists for the Category B Job Performance Measures Topics.
Please withhold these examination materials from public disclosure until after the examinations have been completed.
If you have any questions regarding the examination outline submittal, please contact Mr. Jerry Bobka (Facility Contact) at 315-349-2569 or Mr. Ron Thurow (General Supervisor of Operations Training) at 315-349-1182.
Sincerely, I'd,- Louis E. Pisano Manager Nuclear Training LEP/crr
Facility:
Nine Mile Point # 1_
Date of Examination: 9/30/02 Exam Level (circle one): SRO Operating Test No.: SRO B.1 Control Room Systems System / JPM Title Type Code*
Safety Function JPM 1 Torus Cooling Mode/ Transfer Torus Water to the Waste Collector Tank. (01 -OPS-SJE-200-1-04)
K/A 219000 A4.12 3.9/3.8;Task 2269090401/2000230501; D/S 5
N1-EOP-1 Attachment 15 JPM 2 A. C. Electrical Distribution/ Shift source of power for PB101 from R1014 to R1011.
N/S 6
K/A 262001 A4.01 3.4/3.7; Task 2620020101; N1-OP-30 Section H.10.0 JPM 3 Control Rod Drive Hydraulic System/ Switching CRD Pumps (Alternate Path).
N/A/S 1
K/A 201001 A4.01 3.1/3.1; Task 2010020101; NI-OP-5 Section F.3.0 JPM 4 Plant Ventilation Systems/ Shift Reactor Building Operating Exhaust and Supply fans from # 11 's to # 12's. (Alternate Path)
N/A/S 9
K/A 288000 A4.01 3.1/2.9; Task 2880040101; NI-OP-10 Section F.1.0 and F.2.0 JPM 5 Traversing Incore Probe/ Secure TIP on receipt of Containment Isolation. (Alternate Path)
N/A/S 7
K/A 215001 A4.03 3.0/3.1; Task 2159090401; NI-OP-39 Section H.1.0 JPM 6 Reactor Feedwater System/ Change operating Motor Driven Feedwater Pumps at power.
N/S 2
K/A 259001 A4.02 3.9/3.7; Task 2590040101; N1-OP-16 Section F.2.0 JPM 7 Main Turbine Generator and Auxiliary Systems/ Manual Turbine trip. (Alternate Path)
N/A/S/L 4
K/A 245000 A2.01 3.7/3.9; Task 2450070101; N I -SOP-4 B.2 Facility Walk-Through JPM 8 Isolation (Emergency) Condenser/ Perform initiation of EC's from the Remote Shutdown Panel #11. (01-OPS-PJE-200-1-64)
_.R 4
K/A 207000 A1.09 3.7/3.7; Task 2000140401/2079010201; NI-SOP-9.1 D/R 4
JPM 9 Low Pressure Core Spray System/ Lineup Raw Water to Core D/Rt Spray Pump.
(Used on PRA: Supply containment spray raw water to Core Spray 2000 NRC K/A 209001 A1.08 3.3/3.2; Task 2009170504; N1-EOP-1 Attachment 5 Exam)
JPM 10 Emergency Plant Evolutions/ Diesel Fire Pump Start with No Control Power.
K/A 295031 EA 1.08 3.8/3.9; Task 2009050501; N I-OP-21A Sect. H.4.4 N/R 8
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA Exam Submittal Document. No changes from original outline submittal. August 22, 2002 NM Log # 1-02-009.
JPMs 11-20 originally submitted with outlines will not be used.
Facility: _Nine Mile Point # 1 Date of Examination: 9/30/02 Exam Level (circle one): RO Operating Test No.: RO B.1 Control Room Systems System / JPM Title Type Code*
Safety Function JPM 1 Torus Cooling Mode/ Transfer Torus Water to the Waste Collector Tank. (01 -OPS-SJE-200-1-04)
K/A 219000 A4.12 3.9/3.8;Task 2269090401/2000230501; D/S 5
N1-EOP-1 Attachment 15 JPM 2 A. C. Electrical Distribution/ Shift source of power for PB101 from R1014 to R101 1.
N/S 6
K/A 262001 A4.01 3.4/3.7; Task 2620020101; N1-OP-30 Section H.10.0 JPM 3 Control Rod Drive Hydraulic System/ Switching CRD Pumps (Alternate Path).
N/A/S K/A 201001 A4.01 3.1/3.1; Task 2010020101; Ni-OP-5 Section F.3.0 JPM 4 Plant Ventilation Systems/ Shift Reactor Building Operating Exhaust and Supply fans from # I I's to # 12's. (Alternate Path)
N/A/S9 K/A 288000 A4.01 3.1/2.9; Task 2880040101; NI-OP-10 Section F.1.0 and F.2.0 JPM 5 Traversing Incore Probe/ Secure TIP on receipt of Containment Isolation. (Alternate Path)
N/A/S 7
K/A 215001 A4.03 3.0/3.1; Task 2159090401; N1-OP-39 Section H.1.0 JPM 6 Reactor Feedwater System/ Change operating Motor Driven Feedwater Pumps at power.
N/S 2
K/A 259001 A4.02 3.9/3.7; Task 2590040101; NI-OP-16 Section F.2.0 JPM 7 Main Turbine Generator and Auxiliary Systems/ Manual Turbine trip. (Alternate Path)
N/A/S/L 4
K/A 245000 A2.01 3.7/3.9; Task 2450070101; NI-SOP-4 B.2 Facility Walk-Through JPM 8 Isolation (Emergency) Condenser/ Perform initiation of EC's from the Remote Shutdown Panel #11. (01-OPS-PJE-200-1-64)
K/A 207000 A1.09 3.7/3.7; Task 2000140401/2079010201; N1-SOP-9.1 D/R 4
JPM 9 Low Pressure Core Spray System/ Lineup Raw Water to Core D/R Spray Pump.
(Used on 2
PRA: Supply containment spray raw water to Core Spray 2000 NRC K/A 209001 A1.08 3.3/3.2; Task 2009170504; N1-EOP-l Attachment 5 Exam)
JPM 10 Emergency Plant Evolutions/ Diesel Fire Pump Start with No Control Power.
K/A 295031 EAI.08 3.8/3.9; Task 2009050501; NI-OP-21A Sect. H.4.4
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA Exam Submittal Document. No changes from original outline submittal. August 22, 2002 NM Log # 1-02-008.
JPMs 11-20 originally submitted with outlines will not be used.
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Transferring Torus Water to the WCT Using CNT SP Loop 111 Task Number: 2269090401 Approvals:
General Su ervisor Date
-enera Operations Training (Designee)
Operat]
Revision:
1 I1 Supervisor Date ions (Designee) oM olUXv" Conliguration Uontrol
/ Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 15 Minutes Time Critical Task: No Alternate Path Task: No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
JPM#1 August 2002 Date:
Recommended Start Location: (Completion time based on the start location)
Unit 1 Simulator.
Simulator Set-up (if required):
- 1. IC-14 or equivalent.
Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2.
During Evaluated JPM:
Self verification shall be demonstrated.
- 3.
During Training JPM:
Self verification shall be demonstrated.
Peer verification shall be demonstrated.
References:
- 1. Ni -EOP-1, Attachment 15 Tools and Equipment:
- 1. None JPM#1 August 2002
Task Standard:
Torus Water Level is being lowered via the Containment Spray System.
Initial Conditions:
- 1. Torus Water Level is rising slowly due to a small leak inside the Drywell.
- 2. Level is 11.6 feet and EOP-4 has been entered.
- 3. Containment Spray pumps have been placed in "Pull to Lock".
- 4. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), lower Torus level by discharging water to the waste collector tank using Containment Spray Loop 111 per EOP-1, Attachment 15."
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
RECORD START TIME
- 2.
Obtain a copy of reference procedure and review/utilize the correct section of the procedure.
- 3.
Notify Radwaste of intent to pump down Torus to Waste Collector Tank.
Cue: Acknowledge as Radwaste operator
- 4.
Close valve 80-45, Cont. Spray Bypass BV 122.
- 5.
Open valve 80-118 Cont. Spray Test to Torus FCV.
- 6.
Verify 80-16, Cont. Spray Disch. Vlv.
closed.
- 7.
Verify 80-40, Cont. Spray Bypass BV 111 Open.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
N 1-EOP-1, Attachment 15 obtained and reviewed & section 1 and 2 referenced.
Radwaste notified.
80-45 control switch positioned CCW to close and/or observing green light on, red light off.80-118 control switch positioned CW to open and verifying red light on, green light off.
80-16 control switch positioned CCW to close and/or observing green light on, red light off.
80-40 control switch positioned CW to open and/or observing red light on, green light off.
JPM #1 August 2002 Sat/Unsat Sat/Unsat Sat/Unsat Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat
Performance Steps Standard Grade
- 8.
Start Containment Spray Raw Water Pump Ill.
- 9.
Start Containment Spray Pump 111.
- 10.
Open valve 80-115, Cont. Spray to Radwaste IV 12.
- 11.
Open valve 80-114 Cont. Spray to Radwaste IV 11.
- 12.
Throttle valve 80-118 Containment Spray Test to Torus FCV as required to ensure flow to Waste Collector Tank.
Cue: If necessary, Radwaste has indication of sufficient flow.
- 13.
Monitor 58-05A and 58-06A TORUS H20 level indicators for level response.
- 14.
Inform SSS that flow to the Waste Collector Tank has been established using Containment Spray Loop 111.
Raw Water Pump 111 control switch positioned CW to start and observing red light on, green light off Containment Spray Pump 111 control switch CW positioned to start and observing red light on, green light off 80-115 control switch positioned CW to open and observing red light on, green light off.80-114 control switch positioned CW to open and observing red light on, green light off.80-118 control switch jogged CCW to closed and observing dual indication red and green lights on.
TORUS H20 LEVEL indicators58-05A and 58-06A monitored for level response.
Proper communications used.
Cue: Acknowledge report.
Terminating Cue: Torus water level being lowered via the Containment Spray system RECORD STOP TIME JPM #1 August 2002 Pass/Fail Pass/Fail Pass/Fail Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat Performance Steps Standard Grade
Initial Conditions:
"1. Torus Water Level is rising slowly due to a small leak inside the Drywell.
- 2. Level is 11.6 feet and EOP-4 has been entered.
- 3. Containment Spray pumps have been placed in "Pull to Lock".
- 4. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), lower Torus level by discharging water to the waste collector tank using Containment Spray Loop 111 per EOP-1, Attachment 15."
JPM #1 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Shift Source of Power for PB101 from R1014 to R1011.
Task Number: 2620020101 Approvals:
"Ueneral S
- ldr/
.Date Operations Training (Designee)
Revision:
1 Ueneral Supervisor Operations (Designee)
IJo CNgtW\\
son Contro Contiguration Control
/
Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 10 Minutes Time Critical Task: No Alternate Path Task: No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #2 August 2002 Date
/
Recommended Start Location: (Completion time based on the start location)
Unit 1 Simulator Simulator Set-up (if required):
Power for PB101 from R1014.
Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2. During Evaluated JPM:
0 Self verification shall be demonstrated.
- 3.
During Training JPM:
Self verification shall be demonstrated.
Peer verification shall be demonstrated.
References:
- 1. NI-OP-30 JPM #2 August 2002
Tools and Equipment:
- 1. None Task Standard:
Power for PB101 shifted from R1014 to R1011.
Initial Conditions:
- 1. Electrical Maintenance has a work package to do surveillance work on RI14.4
- 2. Potential Transformers J1017, J1016, and J1015 are racked in.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), shift the source of power for PB101 from R1014 to RI 011, JAW N1-OP-30, Section H.10.0."
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-O I/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Place PB 101 Supply BKR INTERLOCK BY-PASS SWITCH in Bypass
- 4.
Turn Sync Key on.
- 5.
Confirm incoming and running voltage, normal.
- 6.
Close Breaker R 1011.
- 7.
Turn Sync Key off.
Ni -OP-30 obtained.
Precautions & limitations reviewed & section H. 10.0 referenced.
Control switch rotated to the Bypass position.
Annunciator A5-2-1, Power Bd. 101 Bkr.
Bypass Switch is received Sync Key inserted into Breaker R10 11 and rotated clockwise to the ON position.
Observe incoming and running voltages matched.
Control switch rotated clockwise to the close position.
Red light above switch illuminates, green light above switch extinguishes.
Sync Key rotated to the off position.
JPM #2 August 2002 Sat/Unsat Sat/Unsat Pass/Fail Pass/Fail Sat/Unsat Pass/Fail Pass/Fail
- 8.
Remove Sync Key.
Sync Key removed from Breaker RI 011.
Sat/Unsat
- 9.
Open Breaker R 1014.
Control switch rotated counter-clockwise to Pass/Fail the open position.
Green light above switch illuminates, red light above switch extinguishes
- 10.
Place PB 101 Supply BKR INTERLOCK Control switch rotated to the Normal position.
Pass/Fail BY-PASS SWITCH in Normal Annunciator A5-2-1, Power Bd. 101 Bkr.
Bypass Switch clears
- 1.
Notify ASSS/SSS that power is shifted Proper communications used.
Sat/Unsat from R1014 to RIOl 1.
Cue: Acknowledge report.
Terminating Cue: Power for PB101 shifted from R1014 to R1011.
RECORD STOP TIME JPM #2 August 2002
Initial Conditions:
- 1. Electrical Maintenance has a work package to do surveillance work on R1014.
- 2. Potential Transformers J1017, J1016, and J1015 are racked in.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), shift the source of power for PB101 from R1014 to RIO 1, IAW N1-OP-30, Section H.10.0."
JPM #2 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Switch CRD Pumps from #12 to I 1 (Alternate Path)
Task Number: 2010020101 Approvals:
General Supervisor Date Operations Training (Designee) nigra ContA-r SlCq.2!
Configuration Control Revision:
1 NJA-c--Av icvý General Supervisor Operations (Designee)
/
Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
10 Minutes Time Critical Task: No Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #3 August 2002
/
Date
Recommended Start Location: (Completion time based on the start location)
Unit 1 Simulator Simulator Set-up (if required):
- 1. Place CRD Pump #12 in service.
- 2. I/O Override 05M181-AO-056, (F5 Panel, switch, page 19 of 21), V= 400 (high pump amps on CRD Pump 11) assigned to a Function key.
- 3. I/O Override 05M181-AO-056, (F5 Panel, switch, page 19 of 21) removed when CRD Pump is shutdown.
- 4. Crywolf annunciator F3-02 assigned to same Function key as #2 above.
Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2. During Evaluated JPM:
Self verification shall be demonstrated.
- 3. During Training JPM:
"* Self verification shall be demonstrated.
"* Peer verification shall be demonstrated.
References:
- 1. NI-OP-5
- 2.
F3-1-2 Annunciator JPM #3 August 2002
Tools and Equipment:
- 1. None Task Standard:
Identify high operating amps on CRD Pump 11, and place CRD Pump 12 back in service.
Initial Conditions:
- 1. CRD Pump 11 is in standby.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Place CRD Pump 11 in service JAW Ni -OP-5, Section F.3.0, Step 3.1" Performance Stens Standard
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Place CRD Pump 11 control switch to START.
- 4.
Verify Backfill System shifted.
Cue: As AO, inform candidate backfill has been shifted.
- 5.
Place CRD Pump 12 control switch to STOP.
Note:
Insert 11O for high CRD pump amps and Vibration Annunciator F3-1-2
- 6.
Acknowledge and report annunciator F3-1 2, "CRD Pump #11 Trip - Vibration" NI-OP-5 obtained.
Precautions & limitations reviewed & section F.3.0 referenced.
Control switch rotated to the start position and observe red indicating light on, green indicating light off.
Annunciator A3-1-2, RPS UPS 162 Trouble may alarm on voltage transient Contact AO to verify Backfill shifted.
Sat/Unsat Pass/Fail Sat/Unsat Control switch rotated to the stop position and Pass/Fail observe green indicating light on, red indicating light off.
Proper communications used.
Sat/Unsat JPM #3 August 2002 Standardrl.
11 Sat/Unsat
- r*Ap
Performance Steps Standard Grade
- 7.
Enter Annunciator Procedure N 1-ARP-F3 and verify pump running current between 200 - 240 amps, flow between 28 - 32 X 103 lbm/hr, and filter DP normal..
- 8.
Inform ASSS of high amps on CRD Pump
- 11.
- 9.
Recommend switching to CRD Pump 12 and securing CRD Pump 11 Cue: As ASSS, direct candidate to switch from CRD Pump 11 to CRD Pump 12 in accordance with Step 3.2.
- 10.
Place CRD Pump 12 control switch to START.
- 11.
Verify Backfill System shifted.
Visually verify the following:
"* pump motor current 400 amps
"* flow between 28 - 32 X 103 Ibm/hr
"* CRD FILTER DIFF PRESS not alarming Proper communications used ASSS acknowledges recommendation.
Pass/Fail Sat/Unsat Pass/Fail Control switch rotated to the start position and Pass/Fail observe red indicating light on, green indicating light off.
Annunciator A3-1-3, RPS UPS 172 Trouble may alarm on voltage transient Contact AO to verify Backfill shifted Sat/Unsat Cue:
As AO, inform candidate backfill has been shifted.
- 12.
Place CRD Pump 11 control switch to Stop.
Remove 11O override for high CRD pump amps when pump is stopped.
- 13.
Confirm system flow on FIC 44-146B, CRD FLOW CONTROL.
- 14.
Notify ASSS/SSS that CRD Pump 12 has been returned to service and flow is normal.
Control switch rotated to the stop position and Pass/Fail observe green indicating light on, red indicating light off.
Visually observe flow between 64 and 66 gpm Sat/Unsat (32-33 x l0 LB/HR)
Proper communications used.
Sat/Unsat Cue:
Acknowledge report.
Terminating Cue:
High operating amps identified on CRD Pump 11, and CRD Pump 12 placed back in service.
RECORD STOP TIME JPM #3 August 2002 Performance Steps Standard Grade
Initial Conditions:
- 1. CRD Pump 11 is in standby.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Place CRD Pump 11 in service IAW N1-OP-5, Section F.3.0, Step 3.1" JPM #3 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Shift Reactor Building Operating Exhaust and Supply Fans From #11 to #12. (Alternate path)
Task Number: 2880040101 Approvals:
era~b
- /
IA;,2Z/AL--
(General Supervisor Date Ue Operations Training (Designee)
Op Revision:
1 ii4 6y,,a, d+..
nerat Supervisor erations (Designee)
Configuration Control
/
Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 15 Minutes Time Critical Task: No Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if anycritical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #4 August 2002
/
Date
Recommended Start Location: (Completion time based on the start location)
Unit I Simulator Simulator Set-up (if required):
- 1. RX Building Supply and Exhaust Fans #11 in service.
- 2.
RB VENT JPM SETUP Event trigger - set ET02 to algorythm variable ZDHVF02T with equation A EQ FALSE Overrides I I S068-DI-049-12, RB Supply Fan 12 & Inlet Damper, POS_ I ET02 11M004-AO-003, React Bldg supply Fan 12 AMP, 5 ET02 I 1DS229-LO-B-062-04, Reactor Bldg Supply Fan 12 OFF-G OFF ET02 S1 1DS230-LO-B-062-05, Reactor Bldg Supply Fan 12 SLOW-R ON ET02 11 DS216-LO-B-061-07, Reactor Bldg Supply Fan 12 Inlet Damper, Closl OFF ET02 TUA= 15sec 1 1DS217-LO-B-061-08, Reactor Bldg Supply Fan 12 Inlet Damper, OPENL ON ET02 Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a JPM #4 August 2002
- 2.
During Evaluated JPM:
Self verification shall be demonstrated.
- 3. During Training JPM:
Self verification shall be demonstrated.
Peer verification shall be demonstrated.
References:
- 1. NI-OP-10 Tools and Equipment:
- 1. None Task Standard:
Identify low flow on Supply Fan #12, and place Supply Fan #11 back in service.
JPM #4 August 2002
Initial Conditions:
- 1. Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan # 11 are in service.
- 2. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW NI-OP-10 Section F. 1.0 and F.2.0.
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-Ol /Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Verify operating RX Building supply and exhaust fans in SLOW.
- 4.
Start REACTOR BLDG EXHAUST FAN 12 on SLOW
- 5.
Confirm damper 202-07, REACTOR BLDG EXHAUST FAN 12 OUTLET DAMPER open.
- 6.
Stop REACTOR BLDG EXHAUST FAN
- 11.
- 7.
Confirm damper 202-08, REACTOR BLDG EXHAUST FAN 11 OUTLET DAMPER closed.
- 8.
Confirm normal system flow.
NI-OP-10 obtained.
Precautions & limitations reviewed & section F.1.0 and F.2.0 referenced.
Visually observe REACTOR BLDG SUPPLY FAN 11 and REACTOR BLDG EXHAUST FAN 11 t-fas in SLOW red slow light illuminated.
Rotate REACTOR BLDG EXHAUST FAN 12 control switch CW to the slow position observe red slow light illuminated, green light off.
Observe 202-07 open red light on, green light off.
Rotate REACTOR BLDG EXHAUST FAN 11 control switch CCW to the Off position.
Observe REACTOR BLDG EXHAUST FAN 11 OUTLET DAMPER closed green light on, red light off.
Observe annunciator L1 5 RB VENT EXH FLOW LOW is clear.
JPM #4 August 2002 Sat/Unsat Sat/Unsat Sat/Unsat Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat
Performance Steps Standard Grade
- 9.
Start REACTOR BLDG SUPPLY FAN 12 on SLOW.
- 10.
Confirm damper FCV 202-04, REACTOR BLDG SUPPLY FAN 12 INLET DAMPER open.
Cue: Candidate may not notice amps low and continue in procedure to secure Fan 11 if this occurs continue at step 15.
Note: There are 2 success paths.
- 1. Low amps identified after Supply Fan 12 start. Candidate performs steps 11,12,13 and 18, with step 13 a critical step.
- 2.
Low amps not identified after Supply Fan 12 start. Candidate performs steps 14,15,16,17,18, with step 16 a critical step.
- 11. Identify low amps on REACTOR BLDG SUPPLY FAN 12.
.12.
Inform ASSS of low amps on REACTOR BLDG SUPPLY FAN 12.
- 13.
Secure REACTOR BLDG SUPPLY FAN
- 12.
- 14.
Secure REACTOR BLDG SUPPLY FAN 11
- 15.
Report abnormal indication to ASSS Rotate REACTOR BLDG SUPPLY FAN 12 control switch CW to the Slow position observe red slow light illuminated, green light off.
Observe 202-04 open red light on, green light off Observe low amps on Fan 12 (5-10 amps) with Fan 11 amps remaining at normal (-30 amps).
Recommend Fan II remains in service.
Rotate REACTOR BLDG SUPPLY FAN 12 control switch CCW to the Off position.
Rotate REACTOR BLDG SUPPLY FAN 11 control switch CCW to the Off position and observe red slow light off, green light illuminated.
Observe annunciator L1-3-4 and LI-2-4 alarm Observe RB dp indication rises indicating high negative dp Recommend returning Fan II to service and securing Fan 12 JPM #4 August 2002 Pass/Fail Sat/Unsat Sat/Unsat/
NA Sat/Unsat/
NA Pass/Fail/
NA Pass/Fail/
NA Sat/Unsat/
NA Performance Steps Standard Grade
Cue: Acknowledge report
- 16.
Start REACTOR BLDG SUPPLY FAN II on SLOW.
- 17.
Secure REACTOR BLDG SUPPLY FAN 12
- 18.
Notify ASSS/SSS that REACTOR BLDG SUPPLY FAN 11 has been returned to service with normal dp and REACTOR BLDG supply FAN 12 is secured.
Rotate REACTOR BLDG SUPPLY FAN 11 control switch CW to the Slow position observe red slow light illuminated, green light off.
Rotate REACTOR BLDG SUPPLY FAN 12 control switch CCW to the Off position and observe red slow light off, green light illuminated.
Observe annunciator LI-3-4 and LI-2-4 alarm clear Observe RB dp indication returns to normal Proper communications used.
Cue: Acknowledge report.
Terminating Cue: Low amps/flow identified on Supply Fan #12, and Supply Fan #11 placed back in service or remains in service.
RECORD STOP TIME JPM #4 August 2002 Pass/Fail/
NA Pass/Fail/
NA Sat/Unsat Performance Steps Standard Grade
Initial Conditions:
- 1. Reactor Building Exhaust Fan #11, and Reactor Building Supply Fan 11 are in service.
- 2. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Place Reactor Building Exhaust and Supply Fans #12 in service IAW NI-OP-10 Section F.1.0 and F.2.0.
JPM #4 August 2002
NINE MILE PO[NT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Secure TIP on receipt of Containment Isolation (Alternate Path)
Task Number: 2159090401 Approvals:
General Supervisor Operations Training (Designee)
Contfiguration Control Dat6 Revision:
I Ueneral Supervisor Operations (Designee)
/ Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 15 Minutes Time Critical Task: No Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
JPM #5 August 2002
/
Date Date:
Recommended Start Location: (Completion time based on the start location)
Unit 1 Simulator Simulator Set-up (if required):
- 1. Initialize the simulator to any IC
- 2. Select and drive TIP Machine #1 into core location 12-09 at the Core Top position
- 3. Place TIP control switches in the following positions:
Mode switch in MAN Channel 12-09 selected Low switch in ON Manual switch in OFF MAN Valve Control in CLOSED Core Limit in BOTTOM Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2.
During Evaluated JPM:
Self verification shall be demonstrated.
- 3. During Training JPM:
JPM #5 August 2002
Self verification shall be demonstrated.
Peer verification shall be demonstrated.
References:
- 1. N1-OP-39 Tools and Equipment:
- 1. None Task Standard:
Squib fired, SQUIB MONITOR and SHEAR VALVE MONITOR lights lit.
Initial Conditions:
- 2.
The TIP trace was completed in the MANUAL mode.
- 3. The TIP detector is located at the core top location in channel 12-09 and needs to be withdrawn to the in shield position in accordance with Step F.3.6 ofN1-OP-39.
- 4. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), withdraw the TIP detector in the Manual Mode to its in-shield position in accordance with Step F.3.6 of N1-OP-39."
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Set MODE Switch to MAN
- 4.
Set MANUAL Switch to REV and verify TIP Detector is withdrawn to Chamber Shield (IN-SHIELD light is lit.)
N 1-OP-39 obtained.
Precautions & limitations reviewed & section F.3.6 is referenced.
Verify MODE switch is in the MAN position.
Sat/Unsat Rotate MANUAL switch to REV, TIP detector starts moving out of the core.
JPM #5 August 2002 Sat/Unsat Sat/Unsat Pass/Fail
PromneSesStanda~rd r
Note:When the detector has moved for 1 minute, insert malfunction NM-33 Cue: Approximately 1 minute after the detector is stuck, inform the candidate that drywell pressure has exceeded 3.5 psig due to a coolant leak in the drywell.
- 5.
When the containment isolation setpoint (3.5 psig) is reached, refer to NI-OP-39, section H. 1.0, "Securing TIP on receipt of Containment Isolation."
- 6.
Confirm TIP Machine #1 Detector withdraws and Ball Valve closes.
- 7.
Determine if detector is stuck.
- 8.
Attempt to free the detector using FWD and REV positions on the MANUAL Selector Switch.
- 9.
Notify SSS of stuck detector on TIP Machine #1.
Cue: Role play as SSS and direct the squib circuit to be fired to isolate TIP Machine
- 1.
- 10.
Select associated keylock squib fire switch to FIRE.
- 11.
Confirm SQUIB MONITOR Light for 36 151 is lit.
- 12.
Confirm SHEAR VALVE MONITOR Light for 36-151 is lit.
- 13.
Notify SSS Squib valve has been fired.
When NM-33 is inserted, the detector will be stuck where it is in the core. All actions to move the detector will be unsuccessful.
Section H. 1.0 ofNI-OP-39 is referenced.
Identify detector has not withdrawn for TIP Machine #1, and ball valve remains open.
Visually observe position of detector on position display for TIP Machine #1 and recognize it is not changing.
Position the MANUAL Selector Switch for TIP Machine #1 alternately from the FWD to REV positions.
Consult with SSS and determine if squib valve should be fired.
Rotate the squib fire keylock switch to the FIRE position for 36-151.
Visually observe SQUIB MONITOR amber Light is lit Visually observe SHEAR VALVE MONITOR amber Light is lit.
Proper communications used.
Cue: Acknowledge report.
Terminating Cue: Squib fired, SQUIB MONITOR and SHEAR VALVE MONITOR Lights lit for 36-151.
RECORD STOP TIME JPM #5 August 2002 Sat/Unsat Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat Performance Steos Standnrd
Initial Conditions:
- 2. The TIP trace was completed in the MANUAL mode.
- 3. The TIP detector is located at the core top location in channel 12-09 and needs to be withdrawn to the in-shield position in accordance with Step F.3.6 ofN1-OP-39.
- 4. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), withdraw the TIP detector in the Manual Mode to its in-shield position in accordance with Step F.3.6 of N1-OP-39."
JPM #5 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Changing Motor-driven Feedwater Pumps at Power (From #12 to #11)
Revision:
I Task Number: 2590040101 Approvals:
General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
Configuration Control Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time:
15 Minutes Time Critical Task:
NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #6 August 2002
Recommended Start Location: (Completion time based on the start location)
Unit I Simulator Simulator Set-up (if required):
- 1. Initialize simulator to IC-24 or equivalent
- 2. RFP 13 and 12 are in service.
- 3. RFP 11 is in standby.
Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2. During Evaluated JPM:
0 Self verification shall be demonstrated.
- 3. During Training JPM:
"* Self verification shall be demonstrated.
"* Peer verification shall be demonstrated.
References:
- 1. NI-OP-16 JPM #6 August 2002
Tools and Equipment:
- 1. None Task Standard:
RFP 11 online feeding the RPV with RFP 12 secured.
Initial Conditions:
- 1.
- 2.
- 3.
- 4.
- 5.
6.
Plant is at 100% power.
RFP 13 and 12 are in service.
RFP 11 is in standby RFP 11 oil levels are in the normal range RFP 11 Lubrication and cooling water flows are normal Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Shift operating feedwater pumps from RFP 12 to RFP 11 per N I-OP-16, Section F.2.0."
Performance Steps Standard Grade I.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Verify one of the following:
- RFP 13 VALVE CONTROL M/A station in AUTO and the combined flow for RFP 11 and 12 is less than or equal to 1.5 x 106 Ibm/hr NI-OP-16 obtained.
Precautions & limitations reviewed & section F.2.0 referenced.
Verifies FWP 13 Controller mode switch in AUTO or BAL position AND RFP 12 flow is less than or equal to 1.5 x 106 Ibm/hr OR e MCPR greater than 1.59 Cue: If asked identify MCPR is 1.57 JPM #6 August 2002 Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat
PromneSesStandard fZ1
- 4.
Verify the following for the oncoming feedwater pump (FWP 11);
"* Flow Control M/A station in MANUAL and demand output of zero
"* BYPASS Valve M/A station in MANUAL and demand output of zero
- 5.
Using local indication, verify FWP 11 FLOW Control Valves FCV 29-141 and 29-49 are closed Cue: As operator dispatched, report FCV 29-141 and 29-49 are closed
- 6.
Using local indication, verify open 6 inch recirc blocking for 11 and 12 FWP:
- 29-55, BV-FW PUMP 11 6" RECIRC
- 29-57, BV-FW PUMP 12 6" RECIRC Cue: As operator dispatched, report 29-55, BV-FW PUMP 11 6" RECIRC valve, and 29-57, BV-FW PUMP 12 6" RECIRC valve are open
- 7.
Verify operating motor-driven feedwater pump VALVE CONTROL M/A station in MANUAL
- 8.
Monitor vessel level AND response of 13 FWP VALVE CONTROL controller while changing motor-driven feedwater pumps (Continuous action while performing subsequent steps)
- 9.
Start selected feedwater pump AND confirm the following for the pump started:
"* FCV 29-23 and 29-51, 11 FWP recirc valves open
"* Annunciator H3-1-7 and H3-1-8, clear FWP I 1 Flow Control M/A station in MAN and output meter indicates 0.
FWP 11 BYPASS Valve M/A station MANUAL PB "MAN" light illuminated and output meter indicates 0.
Dispatches operator to locally verify FWP 11 FLOW Control Valves FCV 29-141 and 29 49 are closed Acknowledges report Dispatches operator to locally verify 29-55, BV-FW PUMP 11 6" RECIRC valve open 29-57, BV-FW PUMP 12 6" RECIRC valve open Acknowledges the report FWP 12 VALVE CONTROL M/A station observed in MAN position Observes vessel level and 13 FWP VALVE CONTROL controller RFP 11 control switch rotated CW to Start position and observe red light energized and green light extinguished Observe dual indication on FCV 29-23 and 29-51, 11 FWP recirc valves Annunciators H3-1-7 and H3-1-8 clear JPM #6 August 2002 Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat Performance Stevs Standard
PromneSesStandard
(-- A
- 10.
Transfer load between FWP 11 and 12 by performing the following concurrently:
"* Slowly open oncoming FWP VALVE CONTROL manually
"* Slowly close offgoing FWP VALVE CONTROL manually
- 11.
WHEN offgoing FWP VALVE CONTROL M/A station indicates valve is closed, stop feedwater pump:
"* Confirm Aux Oil Pump running by observing red light lit
"* Confirm pump shaft is NOT rotating backwards Cue: As the operator dispatched, report that the FWP 12 shaft is NOT rotating backwards
- 12.
Report that RFP I 1 is running feeding the RPV and RFP 12 is secured Concurrently:
Rotate manual control knob on 11 FWP VALVE CONTROL CW to open valve AND Rotate manual control knob on 12 FWP VALVE CONTROL CCW to close valve Such that turbine control valves do not oscillate, and RPV water level hi and low annunciators DO NOT alarm.
When 12 FWP VALVE CONTROL indicates 0 position rotate 12 FWP control switch CCW to the STOP position Observing 12 FWP Aux Oil Pump (center) red light lit Contacts AO to confirm shaft is NOT rotating backwards Acknowledges report Proper communications used Cue: Acknowledge report Terminating Cue:
RFP 11 running and feeding the RPV with RFP 12 secured RECORD STOP TIME JPM #6 August 2002 Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat Performance Steos Standard
Initial Conditions:
S1. Plant is at 100% power.
- 2. RFP 13 and 12 are in service.
- 3. RFP 11 is in standby
- 4. RFP 11 oil levels are in the normal range
- 5. RFP 11 Lubrication and cooling water flows are normal
- 6. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Shift operating feedwater pumps from RFP 12 to RFP 11 per NI OP-16, Section F.2.0."
JPM #6 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Manual Turbine Trip (Alternate Path)
Task Number: 2450070101 Approvals:
General Supervisor Date Operations Training (Designee)
Configuration Control Date Revision:
1 General Supervisor Operations (Designee)
Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 15 Minutes Time Critical Task: No Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #7 August 2002
Recommended Start Location: (Completion time based on the start location)
Unit I Simulator Simulator Set-up (if required):
- 1. IC-20
- 2. Main Turbine startup in progress, Generator ready to be synchronized, Sync switch is in R915 and turned ON, incoming and running voltages are matched.
- 3. Complete NI-OP-32 through Step E.3.4. Candidate will start JPM with Step E.3.5.
- 4. Annunciator A7-26 crywolf for A7-4-2, "Main Generator Lockout 86G 1" on a pre-determined function key.
Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
I. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2.
During Evaluated JPM:
0 Self verification shall be demonstrated.
- 3. During Training JPM:
"* Self verification shall be demonstrated.
"* (Independent/Peer/No other) verification shall be demonstrated.
References:
JPM #7 August 2002
- 1. Alarm Response A7-4-2
- 2.
N1-SOP-4
- 3. NI-OP-31
- 4. NI-OP-32 Tools and Equipment:
- 1. A copy of NI-OP-32 marked up through Step 3.4, with the synch key for R915 turned ON.
Task Standard:
Main Turbine tripped, TCV's, TSV's and Combined Reheat Valves closed.
Initial Conditions:
- 1. A plant startup is in progress.
- 2.
Reactor power is approximately 20%.
- 3. NI-OP-43A Step E.5.7 is in progress to synchronize and load the turbine and generator.
- 4. The Main Generator is ready to be synchronized to the grid.
- 5. NI-OP-32 is completed through Step E.3.4.
- 6. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), complete synchronizing the Main Generator to the grid by starting at Step E.3.5 ofNl OP-32.
Performance Steps Standard Stadar
('rnlrýA
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-O1/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Adjust GOVERNOR switch UNTIL synchroscope is rotating slowly in the FAST direction.
- 4.
When INCOMING and RUNNING voltages are matched, AND synchroscope is indicating 3 to 5 degrees lead time, close R915 (R925).
NI-OP-32 obtained.
Governor control switch adjusted CCW (RAISE) and/or CW (LOWER) to attain slow rotation of the synchroscope in the FAST direction.
Verifies INCOMING and RUNNING voltages are matched. When synchroscope indicates 3 to 5 degrees lead time, places control switch for R915 (R925) in the CLOSE position. Red light above the switch illuminates and the green light above the switch extinguishes.
JPM #7 August 2002 Sat/Unsat Sat/Unsat Sat/Unsat Pass/Fail C.rnAo
a pGrade
- 5.
Immediately load generator to 40-60 MWe OR UNTIL all Turbine Bypass Valves close.
Cue: As ASSS, direct the candidate to load the generator until the Turbine Bypass Valves are closed.
- 6.
Continues to load generator.
NOTE: When generator load reaches 80 MWe, insert annunciator crywolf for A7-4-2
- 7.
Reports and acknowledges annunciator A7 4-2, "GENERATOR LOCKOUT 86G I" Cue: W03 1, "GEN LOCKOUT TRIP RELAY 1" is in on the computer
- 8.
Verify TSV's, TCV's and Combined Reheat Valves closed.
Cue: Acknowledge report of failure of turbine to trip, and direct the Main Turbine tripped.
- 9.
Trip the Main Turbine.
- 10.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 11.
Verify Main Turbine tripped.
Places governor control switch in the RAISE position until generator load is at least 40 Mwe.
Acknowledges direction from the ASSS.
Places governor control switch in the RAISE position.
GENERATOR LOCKOUT 86G1 annunciates.
Proper communications used.
Visually observe TSV's, TCV's and Combined Reheat Valves open, and turbine speed is not coasting down.
Report to ASSS valves failed to close and the turbine is not tripped.
Depress the UNIT EMERGENCY TRIP pushbutton.
NI-SOP-4 obtained.
SOP-4 flow chart referenced.
Visually observe the following:
Turbine Stop Valves closed Turbine Control Valves closed Combined Reheat Valves closed Turbine Bypass Valves open to control reactor pressure JPM #7 August 2002 Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat Performance Steps Standard Grade
Performance Steps
- 12.
Verify Electrical Distribution status.
- 13.
Restore and maintain RPV level between 53 and 95 in. using one or more of the following:
"* Condensate/FW
"* CRD
"* Core Spray
- 14.
Maintain RPV pressure below 1080 psig using one or more of the following:
"* Main Turbine Bypass valves
"* Emergency Condensers
"* ERVs
"* RWCU
"* Main Steam Line drains
- 15.
If ATS Gross Failure lights ON:
0 determine cause of ATS lights notify SSS with SSS permission, reset ATS Gross Failure lights Cue: Inform candidate that ATS Gross Failure lights are NOT lit.
- 16.
Perform the following:
0 Verify ON, Aux. Oil pumps 0
0 Reset Generator 86 relays Restart Stator Water Cooling Start bearing lift pumps
- 17.
Shutdown turbine per NI-OP-3 1.
Visually observe:
"* 345Kv Breakers R915, R925 TRIPPED
"* MOD18OPEN
"* PB 11, PB12 supplied from Reserve Power Sat /Unsat RPV water level is stable at the pre-trip value Sat/Unsat (reactor did not scram due to the turbine trip scram bypassed below 45%)
Reactor pressure is stable and is being maintained with the bypass valves.
ATS Gross Failure lights are NOT lit Rotates Aux. Oil Pump switches clockwise to start pumps. Red lights illuminate, green lights extinguish 86 relays cannot be reset due to fault stator cooling cannot be restarted due to tripped 86 relays Bearing lift pump switches rotated clockwise to start the pumps. Red lights illuminate, green lights extinguish Sat /Unsat Sat /Unsat Sat /Unsat Sat/Unsat Sat/Unsat Pass/Fail Sat /Unsat Cue: Inform candidate that another operator will be tasked with turbine shutdown.
- 18.
Report Main Turbine tripped Proper communications used Sat/Unsat JPM #7 August 2002 Standard Grade
Terminating Cue: Main Turbine tripped, TCV's, TSV's and Combined Reheat Valves closed.
RECORD STOP TIME JPM #7 August 2002
Initial Conditions:
- 1. A plant startup is in progress.
- 2. Reactor power is approximately 20%.
- 3. NI-OP-43A Step E.5.7 is in progress to synchronize and load the turbine and generator.
- 4. The Main Generator is ready to be synchronized to the grid.
- 5. N1-OP-32 is completed through Step E.3.4.
- 6. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), complete synchronizing the Main Generator to the grid by starting at Step E.3.5 ofNl-OP-32.
JPM #7 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Perform Initiation of ECs from Remote Shutdown Panel 11 Task Number: 2000140401 Approvals:
General Supervisor Daie Ge Operations Training (Designee)
Op Configuration Control Revision:
neral Supervisor Date erations (Designee)
/ Date Performer:
(RO/S RO/AO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 10 Minutes Time Critical Task: No Alternate Path Task: No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given iflanycritical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #8 August 2002 I
Recommended Start Location: (Completion time based on the start location)
Turbine Building Simulator Set-up (if required):
None Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.
Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
I. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a 0*.
- 2. During Evaluated JPM:
0 Self verification shall be demonstrated.
- 3. During Training JPM:
"* Self verification shall be demonstrated.
"* Peer verification shall be demonstrated.
References:
- 1. NI-SOP-9.1, Control Room Evacuation Tools and Equipment:
- 1. VA-I Key JPM #8 August 2002
Task Standard:
Emergency Cooling Loop 11 in service.
Initial Conditions:
- 1. You are the Control Room E.
- 2. Control Room evacuation has occurred due to a fire.
- 3. The reactor has been scrammed and all control rods have been verified full in.
- 4. Time did not permit initiating ECs from the Control Room.
- 5. Reactor Pressure is 900#
- 6. Cooldown and depressurization of the Reactor is required using the Emergency Condensers.
- 7.
Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), "Place Emergency Cooling Loop 11 in service and establish a cooldown rate below 100 °F/hr. from Remote Shutdown Panel 11."
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Go to Remote Shutdown Panel #11.
NOTE:
Instructor to provide VA-I Key.
All other keys are simulated Cue: "CONTROL RODS IN" white light is lit.
Cue: ASSS directs EC 11 placed in service.
- 4.
Place the Channel 11 CONTROL TRANSFER keylock switch in EMER.
- 5.
Verify Open EC Steam Supply Valves 39 07R and 39-09R.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
NI-SOP-9.1 obtained.
Control Room E actions referenced.
Rotate control switch clockwise to the emergency position.
Verify Red lights energized and Green lights extinguished.
Cue: 39-07R and 39-09R are open.
JPM #8 August 2002 Sat/Unsat Sat/Unsat Pass/Fail Pass/Fail Sat/Unsat
PromneSesStandard C-r-ide
- 6.
Open 39-05, EMERGENCY CONDENSER COND. RTN IV 11.
Cue: 39-05 is Open, Rx pressure is now 780#
and lowering.
- 7.
Place EC 111-112 Level Control Transfer Switch to Local.
Cue: EC 111/112 Level Control Transfer Switch in Local.
- 8.
Verify Auto Control functions.
Rotate control switch for valve 39-05 clockwise to the Open position and verified by Red light energized, Green light extinguished.
Rotates EC 111-112 Level Control Transfer Switch to Local.
Observe "A" is illuminated in Status Display Panel.
Cue: "A" Status Light lit, EC Lvl = 6.5'.
- 9.
Inform ASSS that EC loop 11 is in service.
Proper communication used.
Cue: Acknowledge report.
Terminating Cue:
Emergency Cooling Loop 11 in service.
RECORD STOP TIME JPM #8 August 2002 Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat Performance Steps Standard nrncto
./
Initial Conditions:
- 1. You are the Control Room E.
- 2. Control Room evacuation has occurred due to a fire.
- 3. The reactor has been scrammed and all control rods have been verified full in.
- 4. Time did not permit initiating ECs from the Control Room.
- 5. Reactor Pressure is 900#
- 6. Cooldown and depressurization of the Reactor is required using the Emergency Condensers.
- 7. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), "Place Emergency Cooling Loop 11 in service and establish a cooldown rate below 100 TF/hr. from Remote Shutdown Panel 11."
JPM #8 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Lineup Raw Water to Core Spray per NI-EOP-1, Attachment 5 Task Number: 2009170504 Approvals:
/
NA General Supervisor Date (Genera Operations Training (Designee)
Operat Revision:
I I1 Supervisor Date ions (Designee)
Contiguration Control Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time:
10 min.
Time Critical Task:
No Alternate Path Task: No Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if anycritical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
JPM #9
- I -
August 2002
Recommended Start Location: (Completion time based on the start location)
At the Scram Discharge Volume, Pillar N-5, 237' level of the Reactor Building.
Simulator Set-up (if required):
N/A Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2.
During Evaluated JPM:
0 Self verification shall be demonstrated.
- 3. During Training JPM:
Self verification shall be demonstrated.
Peer verification shall be demonstrated.
References:
- 1. Ni-EOP-I, Attachment 5 JPM #9 August 2002
Tools and Equipment:
- 1. None Task Standard:
Perform the in plant actions to lineup the Containment Spray Raw Water to Core Spray and inject into the RPV per NI -EOP-1, Attachment 5.
Initial Conditions:
- 2. Because of the unavailability of Core Spray, the SSS has determined that Containment Spray Raw Water will be aligned to Core Spray in accordance with N1-EOP-1, Attachment 5.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), perform the in plant actions to lineup Containment Spray Raw Water to Core Spray loop 11 and inject water into the RPV."
Performance Steps Standard Grade
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction ifnecessary.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
Cue: As the control room operator, direct the operator to close 93-14, 111 Containment Spray Raw Pump Discharge Valve in the screenhouse then open the valve 4 to 6 turns.
- 3.
Close 93-14, 111 Cont. Spray Raw Water Pump Disch. Valve in the screenhouse.
Cue: Handwheel is rotating clockwise and valve stem is going in. Valve stem is fully in and handwheel resistance is felt.
- 4.
Opens 93-14 four to six turns.
N1-EOP-1, Attachment 5 obtained.
Section 1 and 2 referenced.
Unlock 93-14, 111 Cont. Spray Raw Water Pump Disch. Valve using a VA1 key.
Rotate 93-14 handwheel clockwise observing stem goes in, until valve is closed.
Rotates 93-14 valve handwheel counter clockwise counting the turns or number of thread flats on the valve until the valve is open four to six turns.
JPM #9 August 2002 Sat/Unsat Sat/Unsat Pass/Fail Pass/Fail Pass/Fail
Performance Steps Standard Grade
- 5.
Reports to the control room operator that valve 93-14, Cont. Spray Raw Water Pump Disch. Valve, is open four to six turns.
Cue: As the control room operator, acknowledge the report that valve 93-14, 111 Containment Spray Raw Pump Discharge Valve, is open 4 to 6 turns.
Cue: Direct the operator to standby at valve 93 14 while several control room actions are performed.
Cue: Inform the operator that the control room actions EOP-1, Attachment 5 (steps 2.3.4 through 2.3.11) have been performed and Containment Spray Raw Water Pump 111 is running.
- 6.
While maintaining CSRW Pump 111 motor amps less than 76 amps, throttle 93 14 as necessary to maximize flow rate.
Cue: After 93-14 has been opened one additional turn, inform the operator CSRW Pump 111 motor amps are 75 amps.
Correct communications used.
Slowly rotate 93-14 handwheel counter clockwise.
Operator should stop opening 93-14 to maintain CSRW Pump motor amps less than 76 amps.
Cue: Inform the operator that CSRW Pump 111 flow rate is at maximum and to return to the control room.
Terminating Cue:
In plant actions to align Containment Spray Raw water to Core Spray are performed as directed by the Control Room Operator.
RECORD STOP TIME JPM #9 August 2002 Sat/Unsat Pass/Fail Performance Steps Standard Grade
Initial Conditions:
- 2. Because of the unavailability of Core Spray, the SSS has determined that Containment Spray Raw Water will be aligned to Core Spray in accordance with Ni-EOP-1,.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), perform the in plant actions to lineup Containment Spray Raw Water to Core Spray loop 11 and inject water into the RPV."
JPM #9 August 2002
NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE
Title:
Diesel Fire Pump Start with No Control Power Task Number: 2009050501 Approvals:
"Genera Supervisor Operations Training (Designee)
NgA-onro Contiguration Uontrol Revision:
1 PA/
General Supervisor Date Operations (Designee)
/ Date Performer:
(RO/SRO/AO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time:
15 Minutes Time Critical Task:
NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE:
A JPM overall rating of fail shall be given if anycritical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
JPM#10 August 2002 Date:
Recommended Start Location: (Completion time based on the start location)
Turbine Building Simulator Set-up (if required):
N/A Directions to the Instructor/Evaluator:
Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
- 2. During Evaluated JPM:
0 Self verification shall be demonstrated.
- 3. During Training JPM:
Self verification shall be demonstrated.
Peer verification shall be demonstrated.
References:
- 1. N1-OP-21A, H.4.4 JPM #10 August 2002
Tools and Equipment:
- 1. None Task Standard:
Diesel Fire Pump running Initial Conditions:
- 1. A LOCA is in progress.
- 2. Alternate systems are being lined up to augment RPV level control
- 3. DC control power is unavailable to the diesel fire pumps
- 4.
Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Start the Diesel Fire pump per N1-OP-21A section H.4.4."
Performance Steps Standard
- 1.
Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary.
Proper communications used for repeat back (GAP-OPS-O 1/Operations Manual)
RECORD START TIME
- 2.
Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.
- 3.
Request a qualified person be stationed at the Diesel Fire Pump to monitor engine condition Cue: Another operator is standing by at the pump
- 4.
Place Diesel Fire Pump control switch to Off.
Cue: control switch is in Off position
- 5.
Manually open 100-1211, Solenoid Operated Inlet Valve, to the Woodward Governor NI -OP-21A obtained.
Precautions & limitations reviewed & section H.4.4 referenced.
Individual requested Rotate switch CW to Off position.
100-1211 opened Cue: Valve open JPM #10 August 2002 Grade Sat/Unsat Sat/Unsat Sat/Unsat Pass/Fail Pass/Fail
Perfrmane Stps Sandad Gra de
- 6.
Manually close 100-1212, Outlet Blocking 100-1212 closed Valve, from Woodward Governor Cue: Valve closed
- 7.
Manually open 100-1213, Pump Lubrication Solenoid Valve.
100-1213 opened Cue: Valve open
- 8.
Open 100.4-04 (IA-222) OR 100.4-03 (IA 223), Starting Air Bypass valves to provide starting air supply Cue: Valve Opened engine starts and continues to run
- 9.
Close 100.4-04 (IA-222) OR 100.4-03 (IA-223), Starting Air Bypass valves to provide starting air supply Selected valve 100.4-04 (IA-222) OR 100.4 03 (IA-223) opened Selected valve 100.4-04 (IA-222) OR 100.4 03 (IA-223) opened Cue: Valve closed.
- 10.
Report to control room that Diesel fire Pump is running Cue: Acknowledge report Terminating Cue:
t RECORD STOP TIME Control Room notified
)iesel fire Pump Running JPM#10 August 2002 Pass/Fail Pass/Fail Pass/Fail Pass/Fail Sat/Unsat Performance Steps Standard
- rndo
Initial Conditions:
- 1. A LOCA is in progress.
- 2. Alternate systems are being lined up to augment RPV level control
- 3. DC control power is unavailable to the diesel fire pumps
- 4. Instructor to ask operator for any questions.
Initiating Cues:
"(Operator's name), Start the Diesel Fire pump per NI-OP-21A section H.4.4."
JPM #10 August 2002