LR-N21-0060, Supplement to Change Implementation Date - License Amendment Request to Amend the Salem Unit 1 Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer

From kanterella
Jump to navigation Jump to search

Supplement to Change Implementation Date - License Amendment Request to Amend the Salem Unit 1 Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer
ML21216A070
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/04/2021
From: Duke P
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR S20-05, LR-N21-0060
Download: ML21216A070 (2)


Text

10 CFR 50.90 LR-N21-0060 LAR S20-05 August 04, 2021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station Unit 1 Renewed Facility Operating License No. DPR-70 NRC Docket No. 50-272

Subject:

Supplement to Change Implementation Date - License Amendment Request to Amend the Salem Unit 1 Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature Limits Report

Reference:

PSEG letter to NRC, License Amendment Request to Amend the Salem Unit 1 Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature Limits Report, dated December 6, 2020 (ADAMS Accession No. ML20343A128)

On December 6, 2020, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) to Renewed Facility Operating License No. DPR-70 for Salem Generating Station Unit 1 to revise and relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature Limits Report.

In the referenced LAR, PSEG requested that the amendment be issued with implementation required within 60 days of the issue date. PSEG hereby requests that the required implementation be changed to no later than February 15, 2022.

LR-N21-0060 Page 2 LAR S20-05 There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Mr. Lee Marabella at 856-339-1208.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on ____08/04/2021_________

(Date)

Respectfully, Duke, Paul Digitally signed by Duke, Paul R.

R. Date: 2021.08.04 08:59:23 -04'00' Paul Duke Manager - Licensing PSEG Nuclear, LLC cc: Administrator, Region I, NRC NRC Project Manager NRC Senior Resident Inspector, Salem Ms. A. Pfaff, Manager, NJBNE PSEG Corporate Commitment Tracking Coordinator Station Commitment Tracking Coordinator