LIC-02-0007, Correction to Fort Calhoun Station'S (FCS) Discussion of Control Element Drive Mechanism (CEDM) Housing Reliability Figure 4
ML020630662 | |
Person / Time | |
---|---|
Site: | Fort Calhoun ![]() |
Issue date: | 02/07/2002 |
From: | Frans M Omaha Public Power District |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
LIC-02-0007, LIC-02-0017 | |
Download: ML020630662 (2) | |
Similar Documents at Fort Calhoun | |
---|---|
Category:Drawing
MONTHYEARML22081A0422022-03-10010 March 2022
[Table view]Independent Spent Fuel Storage Installation, DSAR Figures Section-01 - Part 2 of 4 ML22081A0432022-03-10010 March 2022 Independent Spent Fuel Storage Installation, DSAR Figures Section-02 - Part 3 of 4 LIC-22-0002, Independent Spent Fuel Storage Installation, DSAR Figures Section-12 - Part 4 of 42022-03-10010 March 2022 Independent Spent Fuel Storage Installation, DSAR Figures Section-12 - Part 4 of 4 ML20170A4522020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Appendix-F ML20170A4532020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 01 ML20170A4542020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 02 ML20170A4562020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 03 ML20170A4572020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section-07 ML20170A4582020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 08 ML20170A4592020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 09 ML20170A4602020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 11 ML20170A4612020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 12 ML20170A4622020-04-30030 April 2020 Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section 14 LIC-18-0023, Partial Site Release Survey - Background Sample Locations, Rev. 12018-06-26026 June 2018 Partial Site Release Survey - Background Sample Locations, Rev. 1 ML13256A1102013-09-12012 September 2013 Safe Shutdown Analysis (SSA) RAI Response - NFPA-805 Transition (ME7244) LIC-03-0069, Transmittal of Boundary Drawings Associated with Fort Calhoun Station Unit 1 Annual Update to Application for Renewed Operating License2003-05-16016 May 2003 Transmittal of Boundary Drawings Associated with Fort Calhoun Station Unit 1 Annual Update to Application for Renewed Operating License LIC-03-0046, Drawing, Detailed Map of Area Around Fort Calhoun Station.2003-04-25025 April 2003 Drawing, Detailed Map of Area Around Fort Calhoun Station. ML0307706812003-02-18018 February 2003 Drawing 11405-M-1, Rev 27, Containment Heating Cooling & Ventilating Flow Diagram P & Id. Sheet 2 ML0236002462002-12-19019 December 2002 Drawing SBO Figure 8 1-1, Simplified One Line Diagram of Substation/Sbo. ML0236002402002-12-19019 December 2002 Drawing CND-E-2935, Rev. 7, Seal Housing Assy. Details. ML0236002262002-12-19019 December 2002 Drawing 11405-M-259, Rev. 107, Flow Diagram Portable & Service Water System P & Id. Sheet 1 LIC-02-0136, Drawing - 11405-M-42, Rev.85, Nitrogen, Hydrogen, Methane, Propane & Oxygen Gas Flow Diagram P & Id. Sheet 12002-11-22022 November 2002 Drawing - 11405-M-42, Rev.85, Nitrogen, Hydrogen, Methane, Propane & Oxygen Gas Flow Diagram P & Id. Sheet 1 ML0236001982002-10-27027 October 2002 Drawing 11405-A-259, Rev. 34, Turbine & Office Building Plan at Elevation 1011' - 0 & 1019' - 6 P&Id. ML0307706982002-08-12012 August 2002 Drawing 11405-M-257, Rev 23, Flow Diagram Circulating Water P & Id. Sheet 2 ML0307706832002-08-12012 August 2002 Drawing 11405-M-257, Rev 23, Flow Diagram Circulating Water P & Id. Sheet 2 ML0206002212002-02-28028 February 2002 Use of Blair High School Auditorium for Public Meeting - Diagram Showing the Proposed Locations of Tables, Microphones, Etc ML0208002952002-02-27027 February 2002 Drawing RM19-1, Fort Calhoun Station, Fire Area 32, Appendix R Cable Locations LIC-02-0007, Correction to Fort Calhoun Station'S (FCS) Discussion of Control Element Drive Mechanism (CEDM) Housing Reliability Figure 42002-02-0707 February 2002 Correction to Fort Calhoun Station'S (FCS) Discussion of Control Element Drive Mechanism (CEDM) Housing Reliability Figure 4 ML0202905322002-01-0909 January 2002 Drawing 11405-M-259, Rev 107, Flow Diagram Potable & Service Water System P & Id. Sheet 1 ML0202905412002-01-0909 January 2002 Drawing 11405-M-266, Rev 24, Fire Protection Flow Diagram P & Id. Sheet 1B ML0203105342002-01-0909 January 2002 Drawing E-23866-163-007, Rev 09, C.E.D.M. Installation Dwg. ML0203105352002-01-0909 January 2002 Drawing E-23866-165-026, Rev 2, In-Core Instrument Flanges Interface. ML0203105362002-01-0909 January 2002 Drawing E-232-408-5, General Arrangement Elevation for Omaha Power 140 I.D. Pwr. ML0203105412002-01-0909 January 2002 Drawing J-23866-164-033, Rev 06, Fuel Alignment Plate. ML0203105552002-01-0909 January 2002 Drawing J-23866-164-011, Rev 11, Core Support Assy. ML0203105562002-01-0909 January 2002 Drawing J-23866-164-013, Rev 05, Core Support Barrel. ML0203105582002-01-0909 January 2002 Drawing J-23866-164-031, Rev 10 ML0203105572002-01-0909 January 2002 Drawing J-23866-164-018, Rev 02, Core Support Plate Assy. ML0203706122002-01-0909 January 2002 Drawing J-23866-164-012, Rev 04, Core Support Barrel Lower Section Assy. ML0203706142002-01-0909 January 2002 Drawing J-23866-164-016 2022-03-10 Category:Letter type:LIC MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023
[Table view]Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24 |
Text
Om mm Omaha Public Power0itrict 444 South 16th Street Mall Omaha NE 68102-2247 February 7, 2002 LIC-02-0017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (R. L. Phelps) to NRC (Document Control Desk), dated October 15, 2001, "Fort Calhoun Station (FCS) Discussion of Control Element Drive Mechanism (CEDM) Housing Reliability" (LIC-02-0007)
SUBJECT:
Correction to Fort Calhoun Station's (FCS) Discussion of Control Element Drive Mechanism (CEDM) Housing Reliability Figure 4 In Reference 2, Omaha Public Power District (OPPD) provided additional information on the factors affecting material reliability management of the CEDM housings. A transcription error has been found in Figure 4 of that submittal. The schedule of piping has been corrected from "sch. 100" to "sch.160." Attached is the replacement page correcting Figure 4.
Please contact me if you have any questions.
Sincerely, M. T. Frans Manager, Nuclear Licensing MTF/RLJ/rlj 0N Attachment c: E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector Winston & Strawn Employment with Equal Opportunity 4171
Attachment Fort Calhoun Station LIC-02-0007 Discussion of Control Element Drive Mechanism Housing Page 15 Reliability Overlay Weld -- \ I Note: C - Compression T - Tension Control Element Drive Mechanism Upper Housing Assembly Overlay & Butt Weld Geometry DWG NO DRAWN KIRBY D. WOODS Figure No. 4 IISSUED November 29, 2001 ISCALE None November29, 21131 SCALE None