ML023600226

From kanterella
Jump to navigation Jump to search
Drawing 11405-M-259, Rev. 107, Flow Diagram Portable & Service Water System P & Id. Sheet 1
ML023600226
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/19/2002
From:
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
11405-M-259, Rev 107
Download: ML023600226 (1)


Text

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.

LR-FP LR-FP LR-FP EA-FC-00-095 DF 12/01 9 of 10 FOR INFORMATION ONLY NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.