ML020310536

From kanterella
Jump to navigation Jump to search
Drawing E-232-408-5, General Arrangement Elevation for Omaha Power 140 I.D. Pwr.
ML020310536
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/09/2002
From:
Combustion Engineering
To:
Office of Nuclear Reactor Regulation
References
E-232-408-5
Download: ML020310536 (1)


Text

  • - ICI housings are within the scope of License Renewal Boundary in the RV System.
      • - Boundary is at valve RC-100.

LR-RV LR-RC LR-RV* LR-RV Flow skirt is covered in the Reactor Vessel LR-RV LR-RC***

Internal (RVI) EA.

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE LR-RV** LR-RV INCLUDED IN LR SCOPE TO THE LR-RC LR-RV DISCHARGE OF THE VALVE.
  • ALL INSTRUMENTATION LINES LR-RV* LR-RV NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.

EA-FC-00-133 DF 12/01 NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

FOR INFORMATION ONLY IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.