ML020310534

From kanterella
Jump to navigation Jump to search
Drawing E-23866-163-007, Rev 09, C.E.D.M. Installation Dwg
ML020310534
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/09/2002
From:
Combustion Engineering
To:
Office of Nuclear Reactor Regulation
References
E-23866-163-007 Rev 09
Download: ML020310534 (1)


Text

LR-RV LR-RV LR-RV

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.

FOR INFORMATION ONLY NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.

EA-FC-00-133 DF 12/01 EA-FC-00-133 DF 12/01