ML030770683
Jump to navigation
Jump to search
| ML030770683 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/12/2002 |
| From: | Gambhir S Omaha Public Power District |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| EA-FC-00-063 11405-M-257, Rev 23 | |
| Download: ML030770683 (1) | |
Text
FOR INFORMATION ONLY NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT
- PORTIONS OF SYSTEM WITHIN LICENSE RENEWAL SCOPE ARE BOUNDED BY LR FLAGS.
- UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
- ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
- IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
- THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.
EA EA-FC FC-00 00- 063 2/03 1 of 1 063 2/03 1 of 1 LR-RW LR-INTK LR-INTK LR-INTK LR-INTK LR-INTK LR-INTK