ML030770698

From kanterella
Jump to navigation Jump to search
Drawing 11405-M-257, Rev 23, Flow Diagram Circulating Water P & Id. Sheet 2
ML030770698
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/12/2002
From:
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
EA-FC-00-100 11405-M-257, Rev 23
Download: ML030770698 (1)


Text

LR-INTK LR-RW LR-RW LR-RW LR-RW LR-RW

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN EA--FC EA FC--00 00--100 02/03 8 of 8 LR SCOPE TO THE DISCHARGE OF THE VALVE.
  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS
SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.