ML020290541

From kanterella
Jump to navigation Jump to search
Drawing 11405-M-266, Rev 24, Fire Protection Flow Diagram P & Id. Sheet 1B
ML020290541
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/09/2002
From:
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
11405-M-266 Rev 24
Download: ML020290541 (1)


Text

LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.

LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP LR-FP EA-FC-00-095 DF 12/01 LR-FP LR-FP LR-FP FOR INFORMATION ONLY NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.