ML023600246

From kanterella
Jump to navigation Jump to search
Drawing SBO Figure 8 1-1, Simplified One Line Diagram of Substation/Sbo.
ML023600246
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/19/2002
From:
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
Download: ML023600246 (1)


Text

LR-SBO LR-SBO LR-SBO LR-SBO LR-SBO LR-4.16 LR-4.16 LR-4.16 LR-4.16 LR-4.16 LR-SBO LR-SBO LR-SBO LR-SBO LR-SBO

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.

FOR INFORMATION ONLY NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.

IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.

  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.

SIMPLIFIED ONE LINE DIAGRAM OF SUBSTATION/SBO SBO12234, Fig 8.1-1 (Simplified)