L-2021-248, Subsequent License Renewal Application Aging Management Requests for Additional Information (RAI) Set 14 Response

From kanterella
(Redirected from L-2021-248)
Jump to navigation Jump to search

Subsequent License Renewal Application Aging Management Requests for Additional Information (RAI) Set 14 Response
ML22006A046
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/06/2022
From: Maher W
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2021-248
Download: ML22006A046 (8)


Text

January 6, 2022 U.S. Nuclear Regulatory Commission Attention: Document Control Desk 11545 Rockville Pike One \\\\!lute Flint North Rockville, I\\1D 20852-2746 Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27

'NEXTera ENERGY ~

POINT BEACH L-2021-248 10 CFR 54.17 SUBSEQUENT LICENSE RENEWAL APPLICATION -AGING MANAGEMENT REQUESTS FOR ADDITIONAL INFORMATION (RAI) SET 14 RESPONSE

References:

1.

NextEra Energy Point Beach, LLC (NEPB) Letter NRC 2020-0032 dated November 16, 2020, Application for Subsequent Renewed Facility Operating Licenses (ADAMS Package Accession No. ML20329A292)

2. NRC Email and Attachment dated December 17, 2021, Point Beach SLRA Safety RAis Set 14 Final (ADAMS Accession Nos. ML21362A682, ML21362A681)

NEPB, owner and licensee for Point Beach Nuclear Plant (PBN) Units 1 and 2, has submitted a subsequent license renewal application (SLRA) for the Facility Operating Licenses for PBN Units 1 and 2 (Reference 1).

The attachment to this letter provides the response to the NRC's Set 14 RAI (Reference 2).

For ease of reference, the index of attached information is provided on page 3 of this letter. The attachment includes associated revisions to the SLRA (Enclosure 3Attaclunent1 of Reference 1) denoted by strikethrough (deletion) and/or bold red underline (insertion) text. Prior SLRA revisions are denoted by bold black text, with SLRA table revisions included as excerpts from each affected table.

Should you have any questions regarding this submittal, please contact me at (561) 304-6256 or William.Maher@fpl.com.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 61" day of January 2022.

Sincerely, William Maher William D. Maher Digitally signed by Will lam Maher ON: cn=William Maher, o=Nuclear, ou=Nudear licensing Projects, emall=william.maher@fpl.com, c=US Date: 2022.01.06 07:49:18 -05'00' Licensing Director - Nuclear Licensing Projects NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk L-2021-248 Page 2 Cc:

Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Public Se1vice Commission Wisconsin

Document Control Desk L-2021-248 Page 3 Attachment RAI No.

No.

1 B.3.3.2.2.8-2 Attachments Index Subject Cracking Due to Stress Corrosion Cracking in Aluminum Alloys

Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 NEPB Response to NRC RAI No. 3.3.2.2.8-2 L-2021-248 Attachment 1 Page 1 of 5 SLRA Section 3.3.2.2.8, "Cracking Due to Stress Corrosion Cracking in Aluminum Alloys" RAI 3.3.2.2.8-2 Regulatory Basis:

Section 54.21 (a)(3) of Title 10 of the Code of Federal Regulations (10 CFR) requires an applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. One of the findings that the U.S. Nuclear Regulatory Commission (NRC) staff must make to issue a renewed license (10 CFR 54.29(a)) is that actions have been identified and have been or will be taken with respect to managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis. In order to complete its review and enable making a finding under 10 CFR 54.29(a), the staff requires additional information in regard to the matters described below.

Background:

NextEra submitted an annual update to the Point Beach SLRA by Subsequent License Renewal Application - First Annual Update|letter dated November 30, 2021]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21334A293). The update included revisions to SLRA Table 3.3.2-15, "Plant Air - Summary of Aging Management Evaluation," which added aging management items for loss of material of aluminum valve bodies exposed internally to dry air (GALL-SLR item 3.3-1, 235) and loss of material and cracking of insulated aluminum valve bodies exposed externally to uncontrolled indoor air (GALL-SLR items 3.3-1, 245 and 3.3-1, 233, respectively).

Issue:

GALL-SLR item 3.3-1, 233 was omitted from SLRA Table 3.3-1, but NextEra stated in the response to RAI 3.3.2.2.8-1 (ADAMS Accession No. ML21242A230) that this item is not applicable because there are no insulated aluminum piping, piping components, or tanks exposed to air or condensation in the Auxiliary Systems. For GALL-SLR item 3.3-1, 245, SLRA Table 3.3-1 states that it is not applicable because there are no insulated aluminum piping, piping components, or tanks in the Auxiliary Systems. Since the annual update states that GALL-SLR items 3.3-1, 233 and 3.3-1, 245 are now applicable for Point Beach SLR, SLRA Table 3.3-1 states that these items require further evaluation in SLRA Sections 3.3.2.2.8 and 3.3.2.2.10, respectively. The annual update did not include any other revisions to the SLRA to indicate that these items are now considered applicable for SLRA and have been evaluated in Sections 3.3.2.2.8 and 3.3.2.2.10. Consequently, the annual update is inconsistent with the SLRA and the response to RAI 3.3.2.2.8-1 with respect to the Table 3.3-1 discussions for GALL-SLR items 3.3-1, 233 and 3.3-1, 245.

Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 NEPB Response to NRC RAI No. 3.3.2.2.8-2 L-2021-248 Attachment 1 Page 2 of 5 Request:

Provide a basis for not updating the discussions of GALL-SLR items 3.3-1, 233 and 3.3-1, 245 in SLRA Table 3.3-1 and for not updating SLRA Sections 3.3.2.2.8 and 3.3.2.2.10 to evaluate these GALL-SLR items. Alternatively, revise SLRA Table 3.3-1 to indicate that GALL-SLR items 3.3-1, 233 and 3.3-1, 245 are applicable and revise SLRA Sections 3.3.2.2.8 and 3.3.2.2.10 to evaluate these GALL-SLR items.

NEPB Response:

SLRA Table 3.3-1 has been revised to indicate that GALL-SLR items 3.3-1, 233 and 3.3-1, 245 are applicable and SLRA Sections 3.3.2.2.8 and 3.3.2.2.10 have been revised to evaluate cracking and loss of material for insulated aluminum piping components.

References:

None

Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 NEPB Response to NRC RAI No. 3.3.2.2.8-2 L-2021-248 Attachment 1 Page 3 of 5 Associated SLRA Revisions:

SLRA Table 3.3-1 (page 3.3-74) is revised as follows:

Table 3.3-1: Summary of Aging Management Evaluations for the Auxiliary Systems Item Component Aging Aging Management Further Number Effect/Meehan ism Program Evaluation (AMP)/TLAA Recommended 3.3-1, 233 Insulated aluminum Cracking due to SCC AMP Xl.M29, Yes {SRP-SLR QiQing, QiQing "Outdoor and Section 3.3.2.2.8}

comQonents, tanks Large AtmosQheric exQosed to air, Metallic Storage condensation Tanks," AMP Xl.M32, "One-Time lnsQection," AMP Xl.M36, "External Surfaces Monitoring of Mechanical ComQonents," or AMP Xl.M42, "Internal Coatings/Linings for ln-ScoQe PiQing, PiQing ComQonents, Heat Exchangers, and Tanks" Discussion Not applicable.

There are no insulated aluminum piping, piping components, or tanks exposed to air, condensation in the Auxiliary Systems.

Consistent with NUREG-2191.

The External Surfaces Monitoring of Mechanical ComQonents {B.2.3.23} AMP is used to manage cracking of insulated aluminum QiQing comQonents exQosed to air.

Further evaluation is documented in Section 3.3.2.2.8.

Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 NEPB Response to NRC RAI No. 3.3.2.2.8-2 L-2021-248 Attachment 1 Page 4 of 5 SLRA Table 3.3-1 (page 3.3-77) is revised as follows:

Table 3.3-1: Summary of Aging Management Evaluations for the Auxiliary Systems Item Component Aging Aging Management Number Effect/Mechanism Program (AMP)/TLAA 3.3-1, 245 Insulated aluminum Loss of material due to AMP Xl.M29, piping, piping pitting, crevice "Outdoor and Large components, tanks corrosion Atmospheric Metallic exposed to air, Storage Tanks," AMP condensation Xl.M32, "One-Time Inspection," AMP Xl.M36, "External Surfaces Monitoring of Mechanical Components," or AMP Xl.M42, "Internal Coatings/Linings for In-Scope Piping, Piping Components, Heat Exchangers, and Tanks" Further Evaluation Discussion Recommended Yes (SRP-SLR

~Jet a1313lisaele.

Section 3.3.2.2.10)

+ReFe aFe Ae iAsulateel aluA:iiAUA'l 13i13iA§, 13i13iA§ 69ffij39AeAtS, 9F taAks iA the Auxiliary SysteA=is.

Consistent with NUREG-2191.

The External Surfaces Monitoring of Mechanical ComQonents {B.2.3.23} AMP is used to manage loss of material of insulated aluminum QiQing comQonents exQosed to air.

Further evaluation is documented in Section 3.3.2.2.10.

Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 NEPB Response to NRC RAI No. 3.3.2.2.8-2 L-2021-248 Attachment 1 Page 5 of 5 SLRA Section 3.3.2.2.8 (page 3.3-28) is revised as follows:

Auxiliary Systems contain aluminum piping and piping components exposed to uncontrolled indoor air. A review of PBN OE confirms halides are potentially present in the indoor environment at PBN. Additionally, insulated piping components located indoors, particularly those in standby or periodically operated systems, could conservatively see an accumulation of contaminants from water intrusion through or beneath insulation. As such, all aluminum components exposed to uncontrolled indoor air in the Auxiliary Systems are susceptible to cracking due to sec and require management via an appropriate program.

Consistent with the recommendation of GALL-SLR, cracking of these components will be managed by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (B.2.3.25) and the External Surfaces Monitoring of Mechanical Components (B.2.3.23) AMPs for components exposed to air internally or externally, respectively. These AMPs provide for the management of aging effects through periodic visual inspection. Any visual evidence of cracking will be evaluated for acceptability. Deficiencies will be documented in accordance with the 10 CFR Part50, Appendix B Corrective Action Program. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (B.2.3.25) and External Surfaces Monitoring of Mechanical Components (B.2.3.23) AMPs are described in Sections B.2.3.25 and B.2.3.23, respectively.

SLRA Section 3.3.2.2.10 (pages 3.3-30 to 3.3-31) is revised as follows:

Auxiliary Systems contain aluminum piping and piping components exposed to uncontrolled indoor air. A review of PBN OE confirms halides are potentially present in the indoor environments at PBN. Additionally, insulated piping components located indoors, particularly those in standby or periodically operated systems, could conservatively see an accumulation of contaminants from water intrusion through or beneath insulation. As such, all aluminum components exposed to uncontrolled outdoor indoor air in the Auxiliary Systems are susceptible to loss of material and require management via an appropriate program.

Consistent with the recommendation of GALL-SLR, loss of material of these components will be managed by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (B.2.3.25) and the External Surfaces Monitoring of Mechanical Components (B.2.3.23) AMP for components exposed to air internally or externally, respectively. These AMPs provide for the management of aging effects through periodic visual inspection. Any visual evidence of loss of material will be evaluated for acceptability. Deficiencies will be documented in accordance with the10 CFR Part 50, Appendix B Corrective Action Program.

The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (B.2.3.25) and External Surfaces Monitoring of Mechanical Components (B.2.3.23) AMPs are described in Sections B.2.3.25 and B.2.3.23, respectively.

Associated

Enclosures:

None.