NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses

From kanterella
(Redirected from NRC 2020-0032)
Jump to navigation Jump to search
Application for Subsequent Renewed Facility Operating Licenses
ML20329A293
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/16/2020
From: Strope M
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML20329A292 List:
References
NRC 2020-0032
Download: ML20329A293 (6)


Text

ENCLOSURE 5 CONTAINS INFORMATION REQUESTED TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION FROM ENCLOSURE 5, THIS LETTER IS DECONTROLLED.

POINT BEACH November 16, 2020 NRC 2020-0032 10 CFR 54 10 CFR 2.390 U.S. Nuclear Regulatory Commission Attention: Document Control Desk 11545 Rockville Pike One White Flint North Rockville, MD 20852-2746 Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR 27 Application for Subsequent Renewed Facility Operating Licenses Pursuant to U. S. Nuclear Regulatory Commission (NRC) regulations set forth in 10 CFR Parts 50, 51, and 54, NextEra Energy Point Beach, LLC (NEPB), owner and licensee for Point Beach Nuclear Plant (PBN) Units 1 and 2 (Facility Operating Licenses DPR-24 and DPR-27, respectively), hereby applies for the subsequent renewal of the Facility Operating Licenses for PBN Units 1 and 2. The current Facility Operating License for PBN Unit 1 expires at midnight on October 5, 2030. The current Facility Operating License for PBN Unit-2 expires at midnight on March 8, 2033. By this Subsequent License Renewal Application (SLRA), NEPB seeks to extend the term of each operating license by 20 years beyond its current expiration date. This application also seeks renewal of the source material, special nuclear material, and by-product material licenses that are subsumed in or combined with each of the Facility Operating Licenses.

The PBN SLRA is submitted in accordance with the applicable requirements of 10 CFR Part 54, 10 CFR Part 50, and Subpart A of 10 CFR Part 51. This application meets the-timeliness requirements of 10 CFR 2.109(b) and 10 CFR 54.17(c) and provides appropriate administrative, technical and environmental information sufficient to support the NRC findings required l;>y 10 CFR 54.29.

This application has been prepared, to the extent practicable, in a format compatible with NUREG-2192, "Standard Review Plan for-Review of Subsequent License Renewal Applications for Nuclear Power Plants, Regulatory Guide 1.188, Revision 2 "Standard Format and Content D

for Applications to Renew Nuclear Power Plant Operating Licenses, and the guidance provided D

by Nuclear Energy Institute (NEI) 17-01, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal."

NextEra Energy Pomt Beach, LLC 6610 Nuclear Road, Two Rivers, W1 54241

ENCLOSURE 6 CONTAINS INFORMATION REQUESTED TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION FROM ENCLOSURE 6, THIS LETTER IS DECONTROLLED.

Document Control Desk NRC 2020-0032 Page 2 The SLRA consists of five Enclosures on three optical storage media (OSM). OSM 1 includes Enclosures 1 through 4, that are publicly available. OSM 2 and OSM 3 each include a part of , the proprietary portion of the SLRA, that is to be withheld *under 10 CFR 2.390.

The files directory for each OSM is attached. The OSMs have been prepared, to the extent practicable, to conform to the NRC!s Guidan~ for Electronic Submissions to the NRG dated May 18, 2017-(Revision 8).

  • OSM 2 and OSM .3 (Enclosure 5) contain vendor information proprietary to Westinghouse Electric Company LLC and Framatome, Inc., supported by affidavits signed by these
  • vendors, the owners of the information. The affidavits are contained in OSM 1 (Enclosure 2) and set forth the basis on which the information may be withheld from public disclosure by the NRC, and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390. Accordingly, it is respectfully applied for that the information that is proprietary to these vendors be withheld from public disclosure in accordance with 10 CFR 2.390.

Correspondence with respect to the copyright or proprietary aspects of the vendor information or affidavits should be addressed to the vendor representative identified in the respective affidavit.

Pursuant to 10 CFR 50.91 (b)(1 ), *a copy of this letter is being forwarded to the State of Wisconsin.

Should you_have any questions regarding this submittal, please contact Mr. William Maher, Director of Licensing Project Nuclear at Florida Power & Light Company, 700 Universe Blvd.

Mail Stop E1W/JB, Juno Beach, FL 33408 or (561) 691-2294 or William.Maher@fpl.com.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the ---1E_ day of November 2020.

Sincere~

-~~

Michael Strope Site Vice President NextEra Energy Point Beach, LLC cc: (w/o Enclosures) .

Administrator, Region 111, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Public Service Commission Wisconsin

l:NCLOSURE 5 CONTAINS INFORMATION REQUESTED TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION FROM ENCLOSURE 5, THIS LETTER IS DECONTROLLED.

Document Control Desk NRC 2020-0032 page 3

Attachment:

OSM File Directories E;nclosures:

OSM 1 - Public NextEra Energy Point Beach, LLC Point Beach. Nuclear Plant Units 1 and 2 Subsequent License Renewal Application November 2020 Rev. 0 Enclosure 1 Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Enclosures Summary Enclosure 2 Affidavits Supporting Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Enclosure 3 Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application (Public Version)

Enclosure 4 Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)

OSM 2 - Non-Public NextEra Energi Point Beach, LLC Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application _

Contains Information Requested to 'be Withheld From Public Disclosure Under 10 CFR 2.390 .

November 2020 Rev. 0

  • Enclosure 5 10 CFR 2.390 Withh~ld Proprietary Documents OSM 3-- Non-Public NextEra Energy Point Beach, LLC Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Contains Information Requested to be Withheld From Public Disclosure Under 10 CFR 2.390 November 2020 Rev. 0 Enclosure 5 10 CFR 2.390 Withheld Proprietary Documents

ENCLOSURE 5 CONTAINS INFORMATION REQUESTED TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION FROM ENCLOSURE 5, THIS LETTER IS DECONTROLLED.

Document Control Desk NRC 2020-0032 Attachment Page 1 of 3 OSM File Directories OSM 1 - Public NextEra Energy Point Beach, LLC Point Beach Nuclear Plant Unrts 1 and 2 Subsequent License Renewal Application November 2020 Rev. 0 IDate mocfrfied i I lype, I

Size I

v Files Currently on the Disc (5) ---- -* -- -*- ----- ... _. __ ---- --* ----------- -* - - - -- -- - **-- - - - -*

I Endosme 1 11/14/2020 2:36 PM Frie folder

[i Endosure 2 11/l4/2il20 2:36 PM File fold~

~ Endosure 3 11/14/2020 2:36 PM Fu!!! fol dB'

!iJ fndosure4 11/14/20202:3o PM Filefolder I] NRCPackingSiip.xml 11/M/2020 2:32 PM XML Document 4 KB 0- =a:.u.ya:

Name i Dm:I!! modified I 1ype

,,,_~ 001 PBN SLRA Enclosure 1 Swnmaiy.pdf 11/12/2020 5:37 PM Adobe Acrobat D... 101 KB l I i

Name , Date modified I Type i Sizl!!

v Files Currently on the Disc (1) - - ----- -* ------*----- -----*--- ----- ----- -**-- ---------

~': 002 PBN SLRA Endosure 2 Affidavits.pdf

  • 11/12/2020 6:38 PM Adohe Acrobat D... 3,494 KB Name iI Date mocflfied v Files Currently on the Disc (2),. - ---- --- ----- -- - * -- .. - .. *-- * * - * -

~ 003 PBN SLRA Enclosure 3 Attachment 1 Snfdy.pdf 11/14/2020 10:30 AM Ada he Acrobat D- 11,002KB

~ 004 PBN SLRA Endosure 3 Atlllchment 2 ER.pdf l 1/13/2020 ~5 PM Adobe Acrobat D~. 40,273KB Name IDate moifrfied v Files Currently on the Disc (1) - -- -------- *----- ---- -----* --* -- - ----*-* .. -- * * -*

i:,.": 005 PBN SLRA Enclosure 4 NonProprieta,y.pdf 11/12/20206:50 PM Ada~ Acroha:t D- 11,161 KB

ENCLOSURE 5 CONTAINS INFORMATION REQUESTED TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION FROM ENCLOSURE 5, THIS LETTER IS DECONTROLLED.

Document Control Desk NRC 2020-0032 Attachment Page 2 of 3 OSM File Directories OSM 2 - Non-Public NextEra Energy Point Beach, LLC Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Contains Information Requested to be Withheld From Public Disclosure Under 10 CFR 2.390 November2020 Rev.a I

Name ' ! Date modified  : Type v Files Currently on the Disc (2) - - - -- -- -- -- ------ - ------ - ---- ------- -------- -------

[i Enclosure 5 11/13/2020 9:33 AM FIie folder D NRCPackingSrip.xml 11/12/20207:10 PM XML Document .2 KB

'i* Size v Files Currently on the Disc (1) -

- ~-- 006 PBN SlRA Enclosure 5 Proprietmy.pdf 11/i2/2020 6:35 PM Adobe Acrobat D-. 5,507KB

ENCLOSURE 5 CONTAINS INFORMATION REQUESTED TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION FROM ENCLOSURE 5, THIS LETTER IS DECONTROLLED.

Document Control Desk NRC 2020-0032 Attachment Page 3 of 3 OSM File Directories OSM 3 - Non-Public NextEra Energy Point Beach, LLC Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Contains Information Requested to be Withheld From Public Disclosure Under 10 CFR 2.390 November 2020 Rev. 0

vfilesCurrentlyontheDisc(2J- ------------------ - - ---~- -------- ----*---

, ...!..

  • J ~- -

tf \Encf6sure*$ *-*i"** .,.._.

1 Ic:.* .. ,,,;v** ' jl/9/2020.3:lll>r,;r. File.fold~

D nrcpadcingslip.xml 11/9/2020 2:59 PM XML Document 5 KB v Files Currently on the Disc (10) - --- - - - - -* - -- - - -- -- - ----- - -- - --- -- ---- -- -- -- - -* -- - -

'.~ oii p~~~ra--~~~e-5 pr~p-~df --- ---11/9/2020 2:48-PM-- - ~

Adobe Acroba:t o_

19KB:


,,._. - _..__ _ _ -- * - ---* -- - 1. - **** ' - * .:. - - - * * * * * - _ _, * * ,_ - -* -

- ------ .. - -- .... *--' J

' [ 002 wcap-18554-p rev 1.pdf 11/9/2020 1:50 PM Adobe Acrobat o_ 2,346 KB

-,_ 003 ltr-&ia-ii-20-05-p rev 2.pdf 11/9/2020 1:51 PM Adobe Acrobat o_ 347KB

~ 004 ltr-sda-ii-20-08-p rev 1.pdf 11/9/20201:51 PM Adobe Acrobat D_ 479KB

~- 005 ltr-sda-ii-20-13-p rev 2.pdf 11/9/2020 1:52 PM Adobe Acrobat o_ 699KB

~ 006 ltr-sda-20--064-p rev 1.pdf 11/9/2020 1:53 PM Adobe Acrobat o_ 612KB

"'1' 007 wcap-14439-p rev 4.pdf 11/9/20201:53 PM Adobe Acrobat o_ 1,951 KB

~ 008 ltr-pafm-OS-58-p rev 3.pdf 11/9/20201:54 PM Adobe Acrobat D- 513 KB

~- 009 ltr-sda-20-020-p rev 1.pdf f1/9/2020 1:55 PM Adobe Acrobat o_ 421 KB

~ 010 ltr-rea-20-29-p rev Q.pdf 11/9/2020 1:55 PM Adobe Acrobat D- 431 KB