L-2018-145, Submittal of Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departures

From kanterella
Jump to navigation Jump to search
Submittal of Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departures
ML18221A124
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/07/2018
From: Franzone S
Florida Power & Light Co
To:
Document Control Desk, Office of New Reactors
References
L-2018-145
Download: ML18221A124 (1)


Text

L-2018-145 10CFR 52 Appendix D, X.B 10 CFR 50.59 August 7, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 6 and 7 Docket Nos.52-040 and 52-041 Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departures This submission is made with regard to the Turkey Point Units 6 and 7 (PTN), in accordance with the reporting requirements of 10 CFR 50.59(d)(2) and 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b.

For the period of February 9, 2018 through July 31, 2018 there were no plant-specific departures required by 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b.

For the period April 12, 2018 through July 31, 2018 there were no changes, tests or experiments made pursuant to paragraph (c) of 10 CFR 50.59.

This letter does not make any regulatory commitments.

If you have any questions, or need additional information, please contact me at 561-691-2296.

Sincerely,

'5~

Stephan Franzone Licensing Manager - New Nuclear Projects SMF/DPM cc:

PTN 6 & 7 Project Manager, AP1000 Projects Branch 1, USN RC DNRL/NRO Director, Division of New Reactor Licensing, USNRC Regional Administrator, Region II, USNRC b oq7 Senior Resident Inspector, USNRC, Turkey Point Plant 3 & 4

_p//1

J ;f!_!J Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408