MONTHYEARL-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 2024-09-25
[Table view] Category:Map
MONTHYEARL-18-015, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 22)2018-02-26026 February 2018 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 22) ML11131A1762011-06-0101 June 2011 Request for List of Federally Protected Species and Important Habitats within the Area Under Evaluation for the Davis-Besse Nuclear Power Station License Renewal Application Review ML11193A0942011-05-24024 May 2011 Enclosure B - Aerial Map or Site Plan (RAIs General 3 and Cultural 2) ML1029806882010-11-22022 November 2010 Request for List of Protected Species within the Area Under Evaluation for the Davis-Besse Nuclear Power Station License Renewal Application Review ML1020303192010-07-13013 July 2010 Map, Figure 1- Site Locus Map with Hydrogeologic Features ML1017501122008-10-27027 October 2008 Condensate Backwash Line Leak - Groundwater Well Sampling Week of 10/27/08 W/ Map ML11301A2362008-10-20020 October 2008 Reference: Photovoltaic Solar Resource of the United States 2018-02-26
[Table view] |
Text
FENOC' 5501 North State Route 2 Oak Harbor, Ohio 43449 RrstEnergy Nuclear Operating Company Mark B. Bezilla 419-321-7676 Vice President. Nuclear SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED February 26,. 2018 10 CFR 50.4 L-18-015 10 CFR 50.54(p)
ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 22)
The FirstEnergy Nuclear Operating Company hereby submits Revision 22 of the i'Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is being submitted in accordance with provisions of 10 CFR 50.54(p)(2). A report of the changes made is included with the revised plan.
The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager, Site Protection, at (419) 321-7253.
Sincerely, ;1(/ /
/lldi!J;fg Mark 8. Bezilla' //
//
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-18-015 Page 2 of 2
Enclosure:
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 22) cc: NRC Region Ill Administrator DB-1 NRC Resident Inspector (w/o Enclosures)
DB-1 NRR Project Manager (w/o Enclosures)
Utility Radiological Safety Board (w/o Enclosures)
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Enclosure L-18-015 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 22)
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED
SAFEGUARDS INFORMATION Unauthorized disclosure may be subject to civil and criminal
~I sanctions.
WHEN SEPARATED FROM ENCLOSURES HANDLE THIS DOCUMENT AS DECONTROLLED SAFEGU~RDS INFORMATION FIGURE 1-B Unaut~onzed disclosure may be PAGE 1-5 REV.6 sub ect ** . .
DB :04 *12-1 6 DFN *F: /SCHED /SKZB37, DGN