UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 November 22, 2010 Mr. David Graham, Chief Division of Wildlife Ohio Department of Natural Resources 2045 Morse Rd., Bldg G-3 Columbus, OH 43229-6693

SUBJECT:

REQUEST FOR LIST OF PROTECTED SPECIES WITHIN THE AREA UNDER EVALUATION FOR THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Graham:

The U.S. Nuclear Regulatory Commission (!\\IRC or the staff) is reviewing an application submitted by FirstEnergy Nuclear Operating Company (FEI\\JOC), for the renewal of the operating license for Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). DBNPS is located 25 miles east of Toledo, OH. The application for renewal was submitted by FENOC, in a letter dated August 27,2010, pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54). The NRC has established that, as part of the staff's review of any nuclear power plant license renewal application, a site-specific Supplemental Environmental Impact Statement (SEIS) to its Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, will be prepared under 10 CFR Part 51, the NRC's regulation that implements the National Environmental Policy Act of 1969, as amended. The SEIS includes an analysis of pertinent environmental issues, including endangered or threatened species and impacts to fish and wildlife. This letter is being submitted under the provisions of the Endangered Species Act of 1973, as amended, and the Fish and Wildlife Coordination Act of 1934, as amended.

FENOC stated that it has no plans to alter current operations over the license renewal period.

DBNPS, operating under a renewed license, would use existing plant facilities and transmission lines, and would not require additional construction or disturbance of new areas. According to FENOC, any maintenance activities would be limited to previously disturbed areas. The DBNPS site consists of 954 acres, of which approximately 733 acres are marshland currently leased to the U.S. Government as a national wildlife refuge.

As part of the SEIS preparation, the applicable transmission line corridors will be reviewed. The DBNPS 345 kilovolt (kV) switchyard is adjacent to the plant centrally located on the property.

From here, three 345 kV transmission lines connect DBNPS to the power grid. The transmission lines labeled Bay Shore Line, Lemoyne Line, and Beaver Line are shown on the attached enclosure. Please see the map in Enclosure 4 for further detail.

To support the SEIS preparation process and to ensure compliance with Section 7 of the Endangered Species Act, the NRC requests a list of species and information on protected, proposed, and candidate species and critical habitat that may be in the vicinity of DBNPS and its associated transmission line rights-of-way. In addition, please provide any information you consider appropriate under the provisions of the Fish and Wildlife Coordination Act.

D. Graham

- 2 Your office will receive a copy of the draft EIS along with a request for comments. The anticipated publication date for the draft EIS is August 2011.

The DBNPS license renewal application is available at:

http://www.nrc.govlreactors/operating/licensing/renewal/applications/davis-besse.html.

If you have any questions concerning the staff's review of this license renewal application,

please contact Ms. Paula Cooper, Project Manager, at 301-415-2323 or bye-mail at Paula.Cooper@nrc.gov.

Sincerely, OJ 9. a/_

David J. Wrona Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

1. Area Map, 50-mile radius
2. Area Map, 6-mile radius
3. Site Area Map
4. Transmission Line Map cc w/encls: Distribution via Listserv

DAVIS*BESSE RAILROAD STATE OR NATIONAL PARK COUNTY BOUNDARY LOCAL PARK 345 kV TRANSMISSION LINE STATE BOUNDARY NATIONAL WILDLIFE LIMITED ACCESS HIGHWAY REFUGE (NVVR)

NATIONAL BOUNDARY HIGHWAY MILITARY RESERVATION WATER BODY MAJOR ROAD Mi~E>'"

URBAN AREA 3

>6 ENCLOSURE 1

o.A\\\\,,'C...a~~~=--__

vH' J

~i ~

~/ ~

d'/ ;:j v i vO

~/~~

~v / ~

.../ /,,t::

,0 I

/

CRANE CREEK STATE PA~K (FORMER)

DAVIS-BESSE LAKE ERIE LONG BEACH

-t-+

DAVIS-BESSE NATIONAl WILDLIFE REFUGE - NAVARRE MARSH

. n TT.....*.. NWR RAILROAD (ROW)

STATE PARK 345 kV TRANSMISSION CJ SITE BOUNDARY I LINE (ROW)

NATIONAL WILDLIFE EXCLUSION AREA REFUGE (NVVR)

HIGHWAY POPULATED AREA MILITARY RESERVAnON MAJOR ROAD

"'<LEG COUNTY BOUNDARY WATER BODY Q

ENCLOSURE 2 4

SAND BEACH

... t-DUfFoWASIU\\ ROAD LAKE ERIE OTTAWA NATIONAL WILDLIFE REFUGE NAVARRE MA,RSH

\\

l'OUSSA\\M1 RiVER

\\

\\

\\

\\

HIGHWAY

~ EXISTING FACILITY 345 kV TRANSMISSION UNE ROAD BORROW PIT I POND EXCLUSION AREA RAILROAD MARSH

\\l\\t<\\TERBOOY SITE BOUNDARY I ENCLOSURE 3

'0'

.. ~

0

+

N A

oo.Jt.

0111-,.,

Oil 412.

0-111 0""

+

0 C:1y.

I I

I I I i

Legend

  • Davis-Besse 345 kV Transmission Une Miles 0 2.5 5

10 15 L-1 County Boundary ENCLOSURE 4

cc D.

- 2 Your will a copy of the draft is August 2011.

with a request for comments.

anticipated publication date for the draft license renewal application is available at:

http://www.nrc.gov/reactors/operating/licensing/renewal/applications/davis-besse.html.

any questions concerning Ms. Paula Cooper, Project Manager, this license renewal application, 301-415-22323 or bye-mail IRA!

Wrona, Chief Branch 1 of License Renewal of Nuclear Reactor Regulation Docket No. 50-346 Distribution via Listserv No:

e-mail ML102980688 RPOB:DLR

  • DWrona PM:

11 0

to David Graham from David J. Wrona November 2010 REQUEST FOR LIST OF SPECIES WITHIN EVALUATION FOR THE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource OPA

TReBly, OGC Rill MMahoney, DORL VMitlyn9, RII