FENOC' Beave r Valley Power Station

~

FirstEnergy Nuclear Operating Compan y P.O. Box 4 Shippin gport, PA 15077 Richard D. Bologna Site Vice President 724-682-5234 Fax: 724-643-8069 November 21, 2017 L-17-114 10 CFR 50.59(d)(2)

ATTN: Docu ment Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Powe r Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Report of Facility Changes, Tests and Experiments FirstEnergy Nucle ar Operating Comp any hereb y provid es notice that for Beaver Valley Power Station, Unit No. 2, there are no evaluations to repor t in accordance with 10 CFR 50.59(d)(2), for the period of April 2, 2016 to Octob er 4, 2017.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr.

Thom as A. Lentz, Mana ger -

Fleet Licensing, at (330) 315-6810.

Sincerely, Richard D. Bologna cc: NRC Region I Administrator NRC Senio r Resident Inspector NRC Project Mana ger Director BRP/ DEP Site BRP/DEP Representative