L-17-050, Discharge Monitoring Report for December 2016

From kanterella
Jump to navigation Jump to search
Discharge Monitoring Report for December 2016
ML17031A066
Person / Time
Site: Beaver Valley
Issue date: 01/26/2017
From: Bologna R
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation, State of PA, Dept of Environmental Protection, Bureau of Water Quality Management
References
L-17-050, PA0025615
Download: ML17031A066 (60)


Text

FENOC FirstEnergy Nuclear Operating Company 1-..

Beaver Valley Power Station Route 168 P.0.Box4 Shippingport, PA 15077-0004 January 26, 2017 L-17-050 Department of Environmental Protection Bureau of Water Quality Management Attention: DMR Clerk 400 Waterfront Drive Pittsburgh, PA 15222

SUBJECT:

Beaver Valley Power Station Discharge Monitoring Report CNPDES) Permit No.

PA0025615 Enclosed is the December 2016 NPDES Discharge Monitoring Report (DMR) for FirstEnergy Nuclear Operating Company (FENOC), Beaver Valley Power Station, in accordance with the requirements of the Permit. Attachment 1 to this letter is supp,emental monitoring data for Outfall 001 (dissolved oxygen) .. Attachment 2 is the explanation of NODI codes.

A review of the data indicates no permit parameters were exceeded during the month.

Included with this report are two Supplemental Laboratory Accreditation Forms for analyses performed to support permit requirements as required by 25 Pa. Code § 252.

Should you have any questions regarding the attached and enclosed documents, please direct them to Ms. Amy Savage, at 724-682-4209.

Sincerely, Richard D. Bologna General Plant Manager

Beaver Valley Power Station, Unit Nos. 1 and 2 L-17-050 Page2 Attachment(s):

1. Weekly Dissolved Oxygen Monitoring Results at Outfall 001
2. Explanation of NODI Codes Enclosure(s)

A. Discharge Monitoring Report B. Supplemental Laboratory Accreditation Form cc: Document Control Desk US NRC (NOTE: No new US NRG commitments are contained in this letter.)

US Environmental Protection Agency Ms. Amanda Schmidt, PA DEP/Bureau of Water Quality Management

Discharge Monitoring Report Attachment for NPDES Permit No. PA0025615 L-17-050 FirstEnergy Nuclear Operating Company (FENOC)

Beaver Valley Power Station ATTACHMENT 1 Weekly Dissolved Oxygen Monitoring Results at Outfall 001 The following supplemental dissolved oxygen monitoring data for Outfall 001 is provided as agreed.

SAMPLE DATE SAMPLE TIME VALUE UNITS 04-Dec-16 10:30:00 AM 7.00 mall 12-Dec-16 10:30:00 AM 7.00 mall 19-Nov-16 10:00:00 AM 7.00 ma/L 27-Dec-16 03:20:00 PM 7.00 mall

-Attachment 1 END -

.1 Discharge Monitoring Report Attachment for NPDES Permit No. PA0025615 L-17-050 FirstEnergy Nuclear Operating Company (FENOC)

. Beaver Valley Power Station ATTACHMENT 2 Explanation of NODI Codes SAMPLE SAMPLE DOMI COMMENT PARAMETER CODE 001A CT-1 GG Clamicide not performed 010A CT-1 GG Clamicide not performed 001A Nitrogen GG Wet lay-up not done during month 001A Hydrazine GG Wet lay-up npt done during month

- Attachment 2 END -

3800-FM-WSFR0189 Rev. 3/2009 COMMONWEALTH OF PENNSYLVANIA wr4'

~

~

pennsy Vanla L .

DEPARTMENT OF ENVIRONMENTAL PROTECTION DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION SUPPLEMENTAL LABORATORY ACCREDITATION FORM 1 Permittee Name: FirstEnergy Nuclear Operating Company Address: P.O. Box4 Shippingport. PA 15077 Beaver Valley Power Station PERMIT NUMBER MONITORING PERIOD Year/Month/Day PA0025615 2016 12 01 TO 2016 12 31 Zinc C::opper 68-01120 Iron 68-01120

",.,\~~.~61120 Ammonia Chlorobenzene Test American-Canton Lab Qil and Grease . fff~tEriergy*
. .' (* '

¢qiJl:-,E3~t~. l~~.

~* ~ ~ .' ,.  ; ,~.'

':;'./~iA;:1~~4:~~~X')c . ,.. PA.tE'Xri~IVti¢a1.*se~iJ;~.

,~,;.:* !

  • .':.. . . ' . :~*+.'.;. :,:., **.**,'.;. ,.' *. *~

Total Dissolved Solids SM 2540 C *

  • 2012 EPA Method Update Rule (MUR) no longer cites Standard Method editions I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge *and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibly of fine and imprisonment for knowing violations.

Signature of Principal Executive Officer or Name/Title Principal Executive Officer Phone: 724-682-7773 1

Richard Bologna General Plant Manager Date: 0~1/=2=6~/1~7_ _ _ __

Submit this form with the first Discharge Monitoring Report (DMR), Annual Report or Recordkeeping and Reporting Form, where sample results

/d~

are submitted to the Department for compliance purposes. You do not need to send this form to the Department again UNLESS there has been a change to the lab or method of analysis.

2 For parameter(s) covered under accreditation-by-rule, submit the lab's registration number in lieu of an accreditation number.

3800-FM-WSFR0189 Rev. 3/2009 COMMONWEALTH OF PENNSYLVANIA

~ P..'L'!,'!~t!.~~~m~

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION SUPPLEMENTAL LABORATORY ACCREDITATION FORM 1 Permittee Name: FirstEnergy Nuclear Operating Company Address: P.O. Box4 Shippingport, PA 15077 Beaver Valley Power Station PERMIT NUMBER MONITORING PERIOD Year/Month/Day PA0025615 2016 I 12 I 01 I TO I 2016 I 12 I 31 i:~. ~~~**~ ,, '*\ :1 :~ >.:,il~~.:~:_. 'l~,*-'*, ~ /~~ ~k~: ,1 ~-* ~ ~ *~ t~**,' ..

1

_............_. ~.

r '

_,....,,,_ ...~;~-~-~......~4'~'t.f"_.... ,,,.-_,..,.

_ 'l  :. ,

,,~..._'.'t ....*.;.;..1'1A-4'l ~~ ,;,-~*

1

  • .-t*~

1

... .,,4;,; .........._~-

t I

~~~.,,.:~~,,.~.....-

~ .,;

Total Residual Chlorine SM 4500-CL G [20111] Beaver Valley Power Station 04-2742 Free Available Chlorine SM 4500-CL G [20111] Beaver Valley Power Station 04-2742 pH SM 4500-H+ B [20111] Beaver Valley Power Station 04-2742

J Temperature SM 2550 B [20111] BeaverValley Power Station 04-2742

' .._:--i-Flow NA Beaver Valley Power Station 04-2742 Total Sus.pended Solids (TSS) SM 2540 D [20111] Beaver Valley Power Station 04-2742 Quaternary Amine Photometric Determination Beaver Valley Power Station 04-2742 Compounds

%-CHM-ANA-4.23H Bentonite Detoxicant Estimated using feed rate Beaver Valley Power Station 04-2742 and discharge flow rate per NPDES Permit PA0025645 Hydrazine ASTM D1385-01 Beaver Valley Power Station 04-2742 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibly of fine and imprisonment for knowing violations.

Signature of Principal Executive Officer or Name/Title Principal Executive Officer Phone: 724-682-7773

~~

~

Richard Bologna General Plant Manager Date: 01/26/17 - -

1 Submit this form with the first Discharge Monitoring Report (DMR}, Annual Report or Recordkeeping are submitted to the Department for compliance purposes . You do not need to send this form to the Department again UNLESS there has been and~eportin9FO:.W:S81Te~esults a change to the lab or method of analysis.

2 For parameter(s) covered under accreditation-by-rule, submit the lab's registration number in lieu of an accreditation number.

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved f DISCHARGE MONITORING REPORT (DMR) OMBNo. 204()-0()()4 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002561 5 001A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNITS 1&2 COOLG. TOWER BLWDN LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DlschargeD

\ TTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGEF FROM 12/ 01 / 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A N/A N/A 8.0 NIA 8.3 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITL E PRINCIPAL EXECUTIVE OFFICER I certify under penaNy of law that this document and alt attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - -- - - - - -- - - - - i dlrection or supervision in accordance with a system designed to assure that qualifi ed personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who m anage the syitem. or thos8 persons directly responslblC' for gathering the lnfonnation, the inform ation submitted It, to the best of my knowiedge and belief, true. accurate, 682-7773 01 / 26/ 2017 MANAG ER and complete. I am aware that there ara slgn111aint penalties for submitting false information, r°iii:.:;;~~~~i;:;;::;p,u;:~rnru~Sr*';'r:;j;'"""i-----~------.l.----------J 1 - - - - - - - - - - - - - - - - -- -- - i inciuding the possibility of fine and Imprisonment for knowing 'liolationo; TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lltlchmentt here)

HYDRAZINE I AM MONIA MONITORING APPLY DURING PERIODS OF WET LAYUP. REPORT DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING. THE LIMIT IS 35 MG/LAS A DAILY MAX.

Computer Generated Version of EPA Form 3320-1 (rev. 01 /06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Appr<>vod DISCHARGE MONITORING REPORT (DMR) OMBNo. 204~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 2 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 002A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPI NGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.006 0.046 MGD N/A N/A NIA N/A 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments w ere prepared under my TELEPHONE DATE t - - - - - ' - - " - - - ' - - - - - - - - ' - - " - - " - - " - - - - l dlrectlon or supervision in acoordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on my inquiry of the person or Rich ard D. Bo Iog na, GENERAL p LA NT persons w110 manage the system. or thos* p*r>on* d1rect1y respons1*1* 1or gathering th*

724 682-7773 01/ 26/ 2017 Information, the Inform ation submitted Is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penaltles for submitting false information, f-'l';.,,.,.,..,-4.,,__=-~~<.--,--..,..~~~~"'=':=-:=-:::--=-c::--I 1 - - - - - - - - - - - - - - - - - - - - - - lincludlng the possibility of fine and Imprisonment for knowing violations. 1------~--N-U_M_B_E_R_ _ _ _ _M_M_/D_D_fYYYY _ _ _- i TYPED OR PRINTED AREA Code COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 1ll lttachmenl9 here)

Computer Generated Version of EPA Form 3320-1 (rev . 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DI SCHARGE MONITORING REPORT (DMR) OMB No. 20<40-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 3 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 003A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 003 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY I I MM/DDIYYYY No DlschargeD ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS Flow, in conduit or thru treatment plant 0.107 0.148 MGD NIA N/A N/A N/A 28 I 31 EST 50050 1 0 Effluent Gross NAME!TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of lew that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - -- -- - - - - - - - - tdirectlon or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Inform ation subm itted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responsiblB for gathering the Information, the Information submitted Is, to the best of m y knov.1edge and belief, true, accurate, 724 682-7773 01/ 26/ 2017 MANAGER and complete. I am awa re that there are significant penalties for submitting false information, l - - -- - -- - - -- -- - - - - - - - - - l 1ncluding the posslblltty offlne and Imprisonment for knowing violations.

TYPED OR PRINTED AREA Code NUMBER MM/DDNYYY COMMENTS ANO EXPLANATION OF ANY VIOLATIONS (Refentnce 1ll 11Uchmenll here)

THE FLOWS FOR OUTFALLS 103, 203, 303, AND 403 ARE TO BE TOTALED AND REPORTED AS THE 003 FLOW.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Form Appmved

. DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERM ITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 4 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 004A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT ONE COOLG TOWER OVERFLOW LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DDIYYYY No Dlscharge[XJ ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 011 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residua l MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all ltlachments heni)

Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204()..00().4 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 5 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 006A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDD/YYYY MM/DD/YYYY No DlschargeD ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY

  • SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.002 0.01 6 MGD NIA N/A N/A N/A 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Refel9nce 1ll llllchmentl here)

Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 6 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002 561 5 007A ADD RESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SYSTEM LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER No Dlscharge[XJ FROM 12/ 01 / 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER 1certity urnter pen111ty ot law that this document and an attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - i direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on m v Inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system , or those pen.ens directly responsible for gathering the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledgri and belief, true, accurate, MANAGER and complete. I am aware that there are significant penattles for submitting false lnformatton, 1 - - - - - - - - - - - - - - - - - - - - - iinctudlng the possibility offlne and imprisonment for knowing violations AREA Code NUMBER MM/DD/YYYY TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference ill ll!Khments here)

MONITORING FOR FLOW, FREE AVAILABLE CHLORINE, AND TOTAL RESIDUAL CHLORI NE ARE REQUIRED ONLY DURING THOSE PERIODS OF DISCHARGE FROM THE ALTERNATE FLOW PATH OF THE REACTOR PLANT RIVER WATER SYSTEM .

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040.0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 7 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 008A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 COOLING TOWER PUMPHOUSE LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER No Dlscharge[ZJ FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - - - - - - - l d i r e c t ion or supervision in accordance with 8 system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 01/ 26/ 2017 information, the info rm ation submitted is, to the best of my know1edgc and belief, true, accurate, MANAGER and complete. 1am aware that there are signtncant penalties for submitting false Information, t - - - - - - - - - - - - - - - - - - - - - - - l including the possibility of fine and Imprisonment for knowing violations. SIGNATURE OF PRINCIP UTIVE OFFICER OR TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all lltachments here)

Computer Generated Version of EPA Form 3320-1 (rev . 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204().0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 8 NAME: FIRST ENERGY NUCLEAR OPERATI NG DMR MAILING ZIP CODE: 150770004 PA0025615 010A ADD RESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOLING WATER LOCATION: PA RO UTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DDIYYYY ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 TO 12/ 31/ 2016 No DlschargeD NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALU E UNITS VALUE VALUE VALUE UNITS pH N/A NIA NIA 7.6 NIA 8.0 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT Chlorine, total residual SAMPLE MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Refmnce 111 llllchmenb hei.)

REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MGIL AS A DAILY MAX)

Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 9 NAME : FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 011A ADDRESS: PA ROUTE 168 MAJOR SH IPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION DIESEL GEN & TURBINE DRAINS LOCATION: PA ROUTE 168 External Outfall SH IPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DD/YYYY I I MM/DDIYYYY No DlschargeD ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROMI 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VAL UE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow , in conduit or thru treatment plant 0.004 0.004 MGD N/A N/A N/A N/A 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER 1certify und"' penalty 01 law that this document and all attacllments we*e P**P"ed undo* my TELEPHONE DATE 1 - - - - - - - - - -- - -- - - - - - - - - - l dlrection or supervision in acwrdancewlth a system designed to assure that qualified personnel prop&rly gather and evaluate the Information submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledge and belief, true, aCctJrate, MANAGER and complete. I am aware that there are significant penalties for submittlng false informatkin, 1 - - - - - - - - - - - - -- - - - - - - - - - - lincluding the possibility of fine and imprisonment for knowing violations AREA Code NUMBER MM/DD/YYYY TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Referenc. 1ll lltlchmenll htre)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIO NAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERM ITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 10 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 012A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLOWDOWN FROM THE HVAC UNIT LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDIYYYY MM/DDIYYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER No DlschargeD FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A N/A N/A 8.8 N/A 8.8 SU 0 1 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper, total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT Zinc, total (as Zn) SAMPLE MEASUREMENT 01092 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total dissolved MEASUREMENT 70295 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments w ere prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - -- - - l dlrection or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or Rich ard D. Bologna, GENE RA L p LA NT persons w110 m*n*g* th* system. or those persons 01rect1y ***pons1*1" tor gathenn9 th*

724 682-7773 01/ 26/ 2017 Information, the information submitted is, to the best of my knowledge and belief, true, accurate, l-M_A_N_A_G_E_R______________-t~:~u::P::e~~s:~i l;'8:,efi~=~~d~~:~e5~~=~a:r~~:i: ~~ 1 :~:~5~ing false information. f"sK~~i"i:"OF~~:iPlU"i'iFruiit~mCE'iiiO"R"i..-----.---NU-M-B-E-R--+---M-M/D-D-/YYYY---~

TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 1ll llblchment1 here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMBNo . 204~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 11 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 013A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION OUTFALL013 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATTN: RICHARD D BOLOGNNGENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A NIA N/A 6.8 N/A 7.5 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Cyanide, total (as CN)

MEASUREMENT 00720 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper, total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorobenzene MEASUREMENT 34301 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments w~e prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER TELEPHONE DATE

~~

direction or supervision In accordance wtth a system designed to assure that quaHfied personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or

~

Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly respon s l b l ~ for gathering the Information, the information submitted Is, to the best of my knowledge and bellef, true, accurate, - - /.A 724 682-7773 01/ 26/ 2017 MANAGER tnd complete. I am aware that there are slgnlftcant penalties for submitting false infonnation, SIGNATURE OF PRINCIPAL EXECU~CER OR TYPED OR PRINTED Including the possibility of fine and lmprtsonment for knowing violation c;.

AUTHORIZED AGENT AREACode I NUMBER MM/00/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachmentl here)

THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMS No. 2041).0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 12 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 101A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 101 CHEMICAL WASTE TREATMENT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER No Dlscharge[ZJ FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT Oil & grease SAMPLE MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT Nitrogen, ammonia total (as N) SAMPLE MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTrvE OFFICER I certify under penalty of law that this document and an attachments w are prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - - - - - - l d i r e c t l o n or supervision tn accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or Rich ard D. Bologna, GENE RA L p LANT persons who manage the system, or those persons 01rec11y responsible tor gathering the 724 682-7773 01/ 26/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, l-M_A_N_A_G_E_R----------------1~:~u~~:P::e~15::i l;:,efi'~=~~:~~:~~:~;1::;:rpk~:i: ~~,:~i :~sltting falseInformation, i"+"iif~:Tii~~Piii'NriPii:li~~~~rn~i'n;--i-----~------.l---------l TYPED OR PRINTED AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all ltlachmenll here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. SAMPLES SHALL BE TAKEN AT THE DISCHARGE FROM THE CHEMICAL WASTE SUMP PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fann 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 13 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 102A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 102 INTAKE SCREEN HOUSE LOCATION : PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAM ETER VALUE VALU E UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A N/A N/A 7.9 N/A 7.9 SU 0 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAMEITITLE PRI NCIPAL EXECUTIVE OFFICER 1certify under penalty ot low that this document and all attachments were prepared under my TELEPHONE DATE t - - - - - -- -- - - - - - - - - - - - - t dlrection or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on m y inquiry of the person or Richard D. Bologna, GENERAL PLANT personswhomanagethesystem, orthoseperson s dlrectlyrespcnslble forgalheringlhe 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledge and bellef, true, accurate,

._M_A_N_A_G_E_R-----------------1~:~u::P~~*;,.,'s::i::r*fi:~~;~~:~::~;:::/:,";!1~; ~:i:~:~s~lng false information, f-AA=:,;uj:niiiFO:~iNc;ipjj:!F'Z'F~t\i.,F(im~ifiRi-----..-------+---M-M-fD-DIYYYY----l TYPED OR PRINTED AREA Code NUMBER COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 11l lllachmentt here)

SAMPLES SHALL BE TAKE N AT THE DISCHARGE OF COLLECTED PUMP BEARING LEAKAGE PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA FofTTl 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMBNo . 20'4~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 14 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 103A ADDRESS : PA RO UTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLUDGE SETTLING BASIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDD/YYYY MM/DD/YYYY No DlschargeD ATTN: RI CHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 011 2016 TO 121 311 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA NIA NIA 7.7 NIA 7.8 SU 0 3 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatme nt plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTJVE OFFICER I certify under penalty of law that this document and au attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - -- - - - ' - - - - ' - - - - - l direction or supervision In accordance with a system designed to assure that qualified personnel property gather and evaluate the information subm itted. Based on my inquiry of the person or Richard D. Bo Iog na, GENERA L p LA NT per>ons wtio manage the system. or those persons directly respons1* 10 ror gathenn 9 tne 724 682-7773 01/ 26/ 2017 information, the information subm itted is, to th e best of my knowledge and belief, true, accura te, l-M_A_N_A_G_E_R _ _ ____ ________-l ~n~u~~:~l:e~015:~il~;:fefi~~~~;~~:~~s:~~:a:rpk~:t~; ~~,:~:~~~ing fa lse info rmation, t-~~~~~~~;'jp,iJi:vi;;rl~i:;i~~ii(i;R""-1.-----..,.....------4-----------l TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 ltllchments here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE BASIN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fonn 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204()-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 15 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 111A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER {SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 111 DIESEL GENERATOR BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA NIA NIA 7.5 NIA 7.7 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT Oil & grease SAMPLE MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 llllchmentl hen!)

Computer Generated Version of EPA Form 33W-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 16 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 113A AD DRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATI ON UNIT 2 SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDD/YYYY MM/DD/YYYY No Dlscharge[ZJ ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAG ER FROM 12/ 0 11 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VAL UE UNITS VALUE VALUE VALUE UNITS pH 00400 1 0 Effluent Gross SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform, fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous, 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECU TIVE OFFICER I certtty under penalty of law that this document and all attachments "'"'" prep8'ed under my TELEPHONE DATE 1 - - - - - - - - - - - - - -- - - - - - - - - - l dlrectlon or supervision In accordance with* system designed to assure that qualified personnel property gather and evaluate the Inform ation submitted. Based on m v inquiry of the person or Rich ard D. Bologna, G ENERAL p LANT persons who manage the system. or those person* d1rac11y respons101. for gathering the 724 682-7773 01/ 26/ 2017 MANAGER ~~~::,,~~:e, i::::~:n~~tb:=~~:* ~;::c.~t;~:i:.n:~~~~tt~~g~::: ::;;:~'**

1 - - - - - - - - - - - - - -- - - - - - - - - l inctuding the possibility of fine and imprisonment for kno'Mng violations.

TYPED OR PRINTED AREA Code NUMBER MM/00/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 llllchmenll herw)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 0 1106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204().000-4 PERMITTEE NAME/ADDR ESS (include Facility Name/Location if Different) Page 17 NAME: FIRST ENERGY NUCLEAR OPERATIN G DMR MAILING ZIP CODE: 150770004 PA002561 5 203A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION MAIN SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPING PORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MMIDD/YYYY No Dlscharge[XJ ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGE R FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH 00400 1 0 Effluent Gross SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluen t Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, tota l residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform, fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous, 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER 1 certify under penalty ot law that this dOCYment and all attachm&nts were prepared under my TELEPHONE DATE 1 - - - - -- - - - - - - - - - -- - - - - - - !direction or supervision In aceordance with 11 system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on m v inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responslt-le for gathering the 01/ 26/ 2017 information, the information submitted Is, to the best of my knowfedg e and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting fal se information, t - - - - - - - - - - -- - - - -- - - - - - - l 1ncludlng the possibility of fine and Imprisonment for knowing violatio ns.

TYPED OR PRINTED NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Referenc1 1ll lbchrnents here)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 18 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 211A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 211 TURBINE BLDG LOCATION : PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MMIDD/YYYY I I MMIDD/YYYY I No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 01 / 2016 I TO I 12/ 311 2016 I NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA NIA N/A 7.3 N/A 7.8 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINC IPAL EXECU TIVE OFFICER I certify under penalty of taw that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - t dlrection or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on m v inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who managa the system, or those penons directly respon sihle for gathering the 724 682-7773 01/ 26/ 2017 information, the Information submitted Is, to the best of my know1edg'! and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false Information, 1 - - - - - -- - - - - - - - -- - - - - - t lncludlng th1 possibility of fine and imprisonment for knowing violations TYPED OR PRINTED AREA Code NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Rti...nct 1H 11tachrnents here)

Computer Generated Version of EPA Fonn 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 19 NAM E: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002561 5 213A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT , PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACI LITY: BEAVER VALLEY POWER STATION UNIT 2 COOL TOWER PUMPHOUSE LOCATION: PA RO UTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DDIYYYY No Dlscharge(XJ ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 I TO I 12/ 31 / 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all atbchmenll here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM THE PUMP HOUSE PRIOR TO MIXING WITH ANY OTHER WATER. NOTE: THE MONITORING OF THIS DISCHARGE IS NOT REQUIRED WHEN EFFLUENT FROM UNIT NO. 2 COOLING TOWER PUMP HOUSE FLOOR & EQUIPMENT DRAINS IS BEING RECYCLED TO THE UNIT NO. 2 WATER RECIRCULATION SYSTEM.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMBNo. 2Q.4~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 20 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 301A ADDRESS: PA ROUTE 168 MAJOR SH IPPINGPORT. PA 150770004 PERMIT NUMBER 1 DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 AUX BOILER BLOWDOWN LOCATION : PA ROUTE 168 Internal Outfall SHIPPINGPORT. PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DlschargeD ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended N/A N/A NIA N/A <4 <4 mg/L 0 2 I 31 GRAB MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 005561 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow. in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXEC UTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - t direction or supervision In aCQ)(dance with 1 system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or Richard D. Bologna. GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to tti. best of my knowledge 11nd belief, true, accurate, MANAGER and complete. I am aware that there are slgnlfteant penalties for submitting false information, 1 - - - - - - - - - - - - - - - - - - - - - <lncludlng the possibility of fine and Imprisonment fof knowing violations TYPED OR PRINTED NUMBER MMIDD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Referwnce all lttachments here)

SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF BOILER BLOWN DOWN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 21 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 303A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 OIL WATER SEPARATOR LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER No Dlscharge[KJ FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - < d l r e c t i o n or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on m y Inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledgt" and belief, true, accurate, MANAGER and complete. I am aware that there ire significant penalties for submitting false Information, 1 - - - - - - - - - - - - - - - - - - - - - t i n c l u d l n g the possibility of fine and Imprisonment for knowing violations.

TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lltlchmentl here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE OIL WATER SEPARATOR PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2().<<).0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 22 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 313A ADDRESS : PA ROUTE 168 MAJOR SHI PPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 313 TURBINE BLDG DRAIN LOCATION : PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDD/YYYY MM/DD/YYYY ATTN : RI CHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 No DlschargeD NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH N/A NIA NIA 6.8 N/A 7.5 SU 0 1 I 7 GRAB 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lttlchmentl here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #21 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 23 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 401A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CHEM.FEED AREA OF AUX BOILERS LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER No DlschargeD FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A NIA NIA 9.6 N/A 9.7 SU 0 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments wm e prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - - - - - - - l dlrection or supervision In accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT pe,.onswhomanagethesystem, orthosepa<Sonsdlredlyresponslbla forgatheringthe 724 682-7773 01/ 26/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, 1

,_M_A_N_A_G_E_R _______________. ~:~u::p::e~5:~il;a:,efi~=~~~~~:~::~;:~;~~::i: ~~r:~:~5~ing falseinformation, F-~~~~~'DC;jNr:;p,;;o;y,:~i;.,~~~;-;:;;;;-"""i.----~-------!----M-M_/O_D_/YYYY _ _ __j TYPED OR PRINTED AREA Code NUMBER COMMENTS AHO EXPLANATION OF ANY VIOLATIONS {Reference 111 lltlc:hmenll here)

SAMPLES SHALL BE TAKEN AT CHEMICAL FEED AREA DRAINS PRIOR TO MIXING WITH A NY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 20'40-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 24 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE BLOWDOWN & RIVR WAT LOCATION : PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDIYYYY MM/DDIYYYY No Dlscharge[KJ ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 011 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that tl'lls document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - = ' - - - - l dlreetion or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on m y Inquiry of the person or Richard D. Bologna, GENERAL PLANT .....n, who manage the system, ., thos* ..,..n, d;'"" ***ponstb** ,., g*th*ring th* 724 682-7773 01/ 26/ 2017 1 1 MANAGER ~":::~~!~*I i;::iv:~:"~~tb:::a~:* :~~;!: p:,::i.~n=~:~:~gb;~ 1:: :~=~~ta, 1------------------~ lncluding the possibility of fine and Imprisonment for knowing violations TYPED OR PRINTED AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 ltllehments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/LAS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM {NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204()-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 25 NAME : FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A A DDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER {SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE SLOWDOWN & RIVR WAT LOCATION: PA ROUTE 168 Internal Outfall SHI PPI NGPORT, PA 150770004 MONITORING PERIOD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM MMIDDIYYYY 12/ 01 / 2016 TO MM/DDIYYYY 12/ 31/ 2016 No Discharge [X]

NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAM ETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS Hydrazine MEASUREMENT 8131310 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE 682-7773 01/ 26/ 2017 TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 llllchmentt hm)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. {THE LIMIT IS 35 MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fonm 3320-1 (Rev. 01/06) Page2

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DI SCHARGE MONITORING REPORT (DMR) OMBNo. 204~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 26 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 413A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION BULK FUEL STORAGE DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 No DlschargeOO NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT NIA 00400 1 0 PERMIT Effluent Gross REQUIREMENT Solids , total suspended SAMPLE MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under pena lty of law that this doctJment and all attachments were prepared under my TELEPHONE DATE 1 - - - - -- - -- - -- - - - -- - - - - - < dlrectlon or supervision In accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on my inquiry of the person Of Richard D. Bologna, GENERAL PLANT persons wtio maoage the system, or those persons directly respon sible for gathering the 724 682-7773 01/ 26/ 2017 0

MANAGER ~~:r::;1~!~*, j:~r::;~: 1:~1b:::a~:* :~~:C::'p:'n~:i!":~:~:~~gb:::: ::~=~ta, f-"-..,,.,,,.,.,.,~=-=:-=:~=c.,..-:"""=::::::;:,.,..~===-=-,,,...--1

~A-R_EA_C_od-~---NU_M_B_E_R_ _ _ _ _

9 f--------TY-P_E_D_O_R-PR-l-NT_E_D--------l1ncluding the possibility of fine and Imprisonment for knowing vloleUon s M_M_/O_D_/YYYY

_ _ _---l COMMENTS ANO EXPLANATION OF ANY VIOLATIONS (Rdmnce 1ll llllchment1 hare)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #24 PRIOR TO MIXING WITH ANY OTHER WATER Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 27 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 501A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 GENRTR BLWDWN FILT BW LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No Dlscharge[KJ ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared unde< my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - ! directlon or supervision in accordance with a system designed to essure that qualified personnel properly gather and evaluate the lnform1tlon submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responstb!e for gathering the 682-7773 01/ 26/ 2017 Information , the information submitted Is, to the t>Mt of my knowledg1> and belief, true, accurate, MANAGER and complete. I am aware that there are slgnH'leant penattles for submitting false Information, l - - - - - - - - - - - - - - - - - - - - - - - l1ncluding the possibility of fine and Imprisonment for knowing vk>lations OFFICER OR AREA Code NUMBER MM/OD/YYYY TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reltfence 1ll 11tachments here)

SAMPLES SHALL BE TAKEN AT INTERNAL MP 501 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1(Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No . 204~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 001A A DDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNITS 1&2 COOLG. TOWER BLWDN LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DDIYYYY No DlschargeD

\TTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGEF FROM 121 01 1 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA NIA NIA 8.0 NIA 8.3 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen , ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT CLAMTROL CT-1, TOTAL WATER SAMPLE MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, tota l residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT NAMEfTITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE r - - - - - - - -- - - -- - - - - - - - - i direction or supervision In accordance 'Nith a system designed to assure that qualified personnel properl y gather and evaluate the Inform ation submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who m anage the system, or l hos8 persons directly responsible for gathering the Information, the information submitted Is, to the best of my knowledge and belief, true, accurate, 682-7773 01/ 26/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, r - - - - - - - - - - -- - - - -- - - - - i includlng the possib.ility of fine and imprisonment for knowing vtolations.

TYPED OR PRINTED NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 llllchmentl here)

HYDRAZINE I AM MONIA MONITORING APPLY DURING PERIODS OF WET LAYUP. REPO RT DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGI NG. THE LIMIT IS 35 MGIL AS A DAILY MAX.

Computer Generated Version of EPA Fonn 3320- 1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 2 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 002A ADDRESS: PA ROUTE 168 MAJOR SHIPPI NGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION INTAKE SCREEN BACKWASH LOCATION: PA RO UTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATIN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 01 1 2016 TO 121 311 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.006 0.046 MGD NIA NIA NIA NIA 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments w ore prepared under my TELEPHONE DATE

> - -- - - - - - - - - -- - - - - - - - - t dlrectlon or supervision in accordance with a system designed to assure that qual!fied personnel properly gat her and evaluate the Inform ation submitted. Based on my Inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system. or t hose persons directly responsible for gathering the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledge and belief. true, accurate,

,_M_A_N_A_G_E_R----------------l~:~;:p;:*~,:~il;a:,*n~:~:~~:~::~~:,7~~rpk:::1:; :1:~~~s~lng false Information, f"'~~~iiiF~~fiiNir.ii;t.'7i~~it;:~:Fi(~i'Oi~i--A-R_EA_C_od_e....,---N-U_M_B_E_R_ _+---M-M/D--D-/YYYY---~

TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lltachmenll here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DI SCHARGE MONITORING REPORT (DMR) OMB No. 2Q.4~04 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 3 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 003A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 003 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATIN : RI CHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS Flow, in conduit or thru trea tment plant 0.107 0.148 MGD N/A N/A N/A NIA 28 I 31 EST 50050 1 0 Effluent Gross NAME!TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attacliments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - -- - - - - - - - - - - t directlon or supervision in aceordance 'Nith a system designed to assure that qualified personnel properly gather and evaluate the inform ation submitted. Based on m y inquiry of the person Of Richard D. Bo Iog na, GENERAL p LA NT pe<sons wtio manage the system. or those pe.. ons drrectry responsrbr* ror gathering the 724 682-7773 01/ 26/ 2017 Inform ation. the Inform ation submitted Is, to the best of my knowledge and belief, tru e, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting fa lse Information, 1----~,.,,;-=--:-:.,....:;.._..,...._____"""'"""P""'"'r:=-:=-:-::---i 1------'----TY-P_E_D_O_R_PR_l_N_T-ED---------lrncludlng the possibility or nne end Imprisonment for knowing Yioletlons. _ _ _---1 1--A-R_EA_C_od_e_ _ _N_U_M_B_E_R---+----M-M_/D_D_/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reftrence 1ll llllchmenll here)

THE FLOWS FOR OUTFALLS 103, 203, 303, AND 403 ARE TO BE TOTALED AND REPORTED AS THE 003 FLOW.

Computer Generated Version of E PA Form 3320-1 (rev. 01/06) Page 1

NATI ONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMBNo . 204~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 4 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 004A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT ONE COOLG TOWER OVERFLOW LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDIYYYY MMIDDIYYYY No Dlscharge[XJ ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 011 2016 TO 12/ 311 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH NIA 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine , total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE NUMBER MM/OD/YYYY TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lltlchments here)

Computer Generated Version of EPA Form 33W-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMBNo . 2~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 5 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 006A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 011 2016 TO 121 311 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS Flow, in conduit or thru treatment plant SAMPLE 0.002 0.01 6 MGD NIA NIA NIA NIA 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE 24 682-7773 01/ 26/ 2017 TYPED OR PRINTED AREA Code NUMBER MM/00/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachmenl1 here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved

'* DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 6 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002 561 5 007A A DDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACI LITY: BEAVE R VALLEY POWER STATION AUX. INTAKE SYSTEM LOCATION: PA ROUTE 168 External Outfall SH IPPINGPORT, PA 150770004 MONITORING PERIOD MMIDD/YYYY MM/DD/YYYY ATTN: RI CHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 TO 12/ 31/ 2016 No Dlscharge[ZJ NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VAL UE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow , in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free availa ble MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - -- -- - - - - -- - - - - - - l direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Inform ation submitted. Ba sed on m 'I inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 01/ 26/ 2017 information, the information submitted Is, to the best of my knowledgo and belief, true, accurate, MANAGER and complete. I am aware that there are significant penaltles for submitting false information, 1 - - -- - - - - - - -- - -- - - - - - - lincluding the possibility of fine and imprisonment for knowing violations.

TYPED OR PRINTED AREA Code NUMBER MM/DDIYYY'(

COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 llllachmenb here)

MONITORING FOR FLOW, FREE AVAILABLE CHLORINE, AND TOTAL RESIDUAL CHLORIN E ARE REQUIRED ONLY DURING THOSE PERIODS OF DISCHARGE FROM THE ALTERNATE FLOW PATH OF THE REACTOR PLANT RIVER WATER SYSTEM.

Computer Generated Version of EPA Form 3320-1 (rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204().0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 7 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 008A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 COOLING TOWER PUMPHOUSE LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No Dlscharge[ZJ ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this doe\Jment and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - l d i r e c t i o n or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on mv inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage th e system, or those persons directly responsible fo r gathering th e 724 682-7773 01/ 26/ 2017 information, the Information submitted Is, to the best of my knowledg r and bel!ef, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false Information, 1 - - - - - - - - - - - - - - - - - - - - - - - lincludlng the posslbility of fine and Imprisonment for knowing violations.

TYPED OR PRINTED AREA Code NUMBER MM/00/YYYY COMMENTS AND EXPLANATION OF ANYVIOLATIONS (Reference 111 attachmenl1 here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM {NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204().Q00.4 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 8 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 010A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOLING WATER LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DD/YYYY No DlschargeD ATTN : RICHARD D BOLOGNNGENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALU E UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A N/A NIA 7.6 N/A 8.0 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 500641 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Relmne11111 ltlachmenll here)

REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/LAS A DAILY MAX)

Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FonnApproved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADD RESS (include Facility Name/Location if Different) Page 9 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 011A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION DIESEL GEN & TURBINE DRAINS LOCATION : PA ROUTE 168 External Outfall SHI PPINGPORT, PA 150770004 MONITORING PERIOD MMIDD/YYYY MMIDD/YYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or th ru treatment plant MGD NIA NIA NIA NIA 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER 1 certify under penatty or 1aw that this document and an attachments were prepared under my TELEPHONE DATE 1 - - - - - - -- - -- -- - - - - - - - - - idlrectlon or supervtslon in accordance with I system designed to assure that qualified personnel prope<ly gather and evaluate the Information subm itted. Based on m y Inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons d irec::tly responsible for gathering the 724 682-7773 01/ 26/ 2017 Inform ation, the inform ation submitted Is, to the best of my knowledgf' and belief, true. accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, t - - - - - - - - - - - - - - - - - - - - - l 1nc1udlng the possibility of fine and imprisonment for knowing violations AREA Code NUMBER MM/00/YYYY TYPED OR PRINTED COMMENTS ANO EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATI ONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Appmved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-000ol PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 10 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 012A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLOWDOWN FROM THE HVAC UNIT LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDNYYY MM/DDNYYY No DlschargeD ATIN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA N/A N/A 8.8 N/A 8.8 SU 0 1 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper, total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Zinc, total (as Zn)

MEASUREMENT 01092 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total dissolved MEASUREMENT 70295 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - - - - - i dlrectlon or supervision In accordance with a system designed to assure that qualifted personnel property gather and evaluate the Information submmed. Based on my inquiry of the person or Rich ard D. 8 olog na, GEN ERAL p LA NT person* wno man*g* the system. or those pe,.on* directly respons1* 1* *o* gathenno the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledge and belief, true, accurate, t-M_A_N_A_G_E_R----------------t~n~u::P:~:*~~:~il;a:,efi~=~~~~:~e1:~~1::~rpk~:1: :,:~:~5~ ing false information, r"'siC~FTi"i~CiF~fNc:ii>iili:E'iEru'*i~mCE'ii'ORi-----~------+--------~

TYPED OR PRINTED NUMBER MM/DDIYYYY COMMENTS ANO EXPLANATION OF ANY VIOLATIONS (Reference 1ll lltlchment1 here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204G-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 11 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 013A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION OUTFALL 013 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/D DIYYYY I I MM/DDIYYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROMI 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A N/A N/A 6.8 N/A 7.5 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Cyanide, total (as CN)

MEASUREMENT 00720 1 0 PERMIT Effluent Gross REQUIREMENT Copper. total (as Cu) SAMPLE MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT Chlorobenzene SAMPLE MEASUREMENT 34301 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments w~e prepared under my TELEPHONE DATE

~~-*-r-NAME/TITLE PRINCIPAL EXECUTIVE OFFICER dlrection or supervision In accordance with a system designed to assure that qualified personnel property gather and evaluate the lnformaUon submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the

~ 724 682-7773 01/ 26/ 2017 information. the information submitted Is, to the be9t of my knO'Hledge and belief, true, accurate, MANAGER and complete. ta m aware !hat there are significant penalties for submitting false information, lncludlng the possibility of fin e and Imprisonment for knowing vlolatlono;. SIGNATURE OF PRINCIPAL EXECU~CER OR TYPED OR PRINTED AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lttachments here)

THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERM ITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 12 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 101A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 101 CHEMICAL WASTE TREATMENT LOCATIO N: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeIBJ ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMpLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen , ammo nia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments w ere prepared under my TELEPHONE DATE t - - - - - - - - - -- - - -- - - - - - - t direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or Rich ard D. Bologna, GENE RA L p LANT persons who man*** thesystem. o' those pOBons d;°Y ,.. pons;b10 10, o*lh*dno the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of m y knowledge and belief. true, accurate,

,_M_A_N_A_G_E_R_______________, ~:~;;p::e~1s:~il~;fefi~:~~::~:~es:~~:a;:r~nn;:1: :~,:~:~~~ing false Information, ~cw~~;gi~p;;:;;;;;::;p,Ui~~~Ffimr.Fiii'nQ""-j.__A_R_EA_C_od_e~---NU_M_B_E_R_ __J__ _M_M_/D_D_/YYYY

_ _ ___j TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 1ll 11tachment1 here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. SAMPLES SHALL BE TAKEN AT THE DISCHARGE FROM THE CHEMICAL WASTE SUMP PRIOR TO MIXING WITH ANY OTHER WATER Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 13 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 102A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT. PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 102 INTAKE SCREEN HOUSE LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATTN : RI CHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALU E UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A NIA N/A 7.9 N/A 7.9 SU 0 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT Oil & grease SAMPLE MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow. in condu it or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachm ents wNe prepared under my TELEPHONE DATE

~-------------------id irectlon or supervision tn accordance with a system designed to assure that qualtfied personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person Of Richard D. Bologna. GENERAL PLANT persons who manage the system, Of those persons dlrectty responsibl(' for gathering the 724 682-7773 01/ 26/ 2017 Information, the Information submitted Is, to t t'le best of my knowledge aind bellef, true, accurate, MANAGER and complete. I am aware that there are significant penaltles for submitting false Information, fs:imiAriJRECi:"/i~iCiiW:"'EiEC~iiE°OFiFlciEROR-~----,.--------1---------l 1 - - - - - -- - - - -- - - - - - - - - - t lneludlng the possibility of fine and Imprisonment for knowing violation-;

TYPED OR PRINTED AREA Code NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Remence 111 llllchmentl here)

SAMPLES SHALL BE TAKE N AT THE DISCHARGE OF COLLECTED PUMP BEARING LEAKAGE PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FonnApproved DISCHARGE MONITORING REPORT (DMR) OMBNo . 2~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 14 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 103A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLUDGE SETTLING BASIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDIYYYY I I MM/DDIYYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROMI 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAM ETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A NIA N/A 7.7 N/A 7.8 SU 0 3 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - t directlon or supervision In accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted. Based on my inquiry of the person or Richard 0 . Bologna, GENERAL PLANT penonswhomanogothosystom, orthosepe,.onsdlrectlyresponsiblo forgotheringtt.o 724 682-7773 *01/ 26/ 2017 Information, the inform ation submitted Is, to the best of my knowledge and belief, true, accurate, MANA GER and complete. I am aware that there are significant penalties for submitting false Information, 1-~::-:-:===~-=~=-=:7""':=%~;:-:::',;;==-::::::=--f 1 - - - - - - - - - - - - - - - - - - - - - - t1ncludlng the possibility of fine and Imprisonment for koowlng violaOons. 1-----~---N-UM_B_E_R---+---M-M_/O_D_""""' _ _ _---4 TYPED OR PRINTED AREA Code ** * *

  • COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Refef9nce 111 lltlchmentt hm)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE BASIN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fonn 3321).1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 15 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 111A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 111 DIESEL GENERATOR BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DlschargeD ATIN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA NIA NIA 7.5 NIA 7.7 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE 724 682-7773 01/ 26/ 2017 COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Refmnce all attachmentt hen!)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 16 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 113A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 SEWAGE TMT PLANT LOCATIO N: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY I I MM/DDNYYY No Dlscharge[ZJ ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01 / 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform , fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous , 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - ; ; . . . _ _ ; ; . . . _ _ . . ; . ; . . . _ - - l d l rectlon or supervision in accordance wtth a system dnlgned to assure that qualified personnel properly gather and evaluate the Inform ation *ubmltted. Based on m v inquiry of the pen on or Richard D. Bologna, GENERAL PLANT persons w11o manage th* system, or thos* persons 01rect1y respons1*1* ror gathering t11e 724 682-7773 01/ 26/ 2017 MANAGER ~~::::,~:e, '::::~:n~~t~=~~:* ~;::c.~t~~~==:~:~~g~~~:: ::~::,te.

1 - - - - - - - - -- - - -- - - - - - - - - l indudlng the possfbility of fine and Imprisonment for knowing violations.

TYPED OR PRINTED AREA Code NUMBER MM/ODFYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attac:hmenta ht19)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMBNo . 204~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 17 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002 5615 203A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION MAIN SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDIYYYY I I MM/DDIYYYY No DlschargeIBJ ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 011 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH 00400 1 0 Effluent Gross SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine. total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform , fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous , 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my DATE f - - - - - - - - - - - - - - - - - - - - - - - i d lrectlon or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the lnformatton submitted. Based on m y inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system , or those persons d irectly responsit>te for gathering the 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submrttlng false information, 1 - - - - - - - - - - - - - - - - - - - - - l i n c t u ding the possibility ofnne and imprisonment for knowing vk>lations.

MM/DD/YYYY TYPED OR PRINTED COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Referenc. 111 lllachmentl here)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PR IOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 18 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 211A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SU BROS)

FACI LITY: BEAVER VALLEY POWER STATION 211 TURBINE BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No DlschargeD ATTN: RICHAR D D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VAL UE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A N/A N/A 7.3 NIA 7.8 SU 0 1 I 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - i dlrection or supervision In accordance with a system designed to assure that qualified personnel property gather and evaluate the infonnatlon submitted. Based on mv inquiry of the person or Richard D. Bologna, GENERAL p LANT persons wno manage th* system. or those persons *1rect1y respons1*r* tor gathering .,,.

724 682-7773 01/ 26/ 2017

~n~~::;~:~el ::r::~: 1~~tbt~=~.~:* :~~~::'p:'n~~!"::~::~gb;~::~ ::i~;:~~e.

1 0 MANAGER 1 - - - - - - - - - - - - - - - - - - - - - - lincludlng the possibility of fine and imprisonment for knowing violations.

AREA Code NUMBER MM/DD/YYYY TYPED OR PRINTED COMMENTS ANO EXPLANATION OF ANY VIOLATIONS (Refentnce 111 llllchmentt hent)

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204()..()()()4 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 19 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 213A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOL TOWER PUMPHOUSE LOCATION: PA RO UTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No DlschargeOO ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 I TO I 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAM ETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 1ll ltllchmenll here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM THE PUMP HOUSE PRIOR TO MIXING WITH ANY OTHER WATER. NOTE: THE MONITORING OF THIS DISCHARGE IS NOT REQUIRED WHEN EFFLUENT FROM UNIT NO. 2 COOLING TOWER PUMP HOUSE FLOOR & EQUIPMENT DRAINS IS BEING RECYCLED TO THE UNIT NO. 2 WATER RECIRCULATION SYSTEM .

Computer Generated Version of EPA Fonn 33W-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No . 2~

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 20 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 301A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 AUX BOILER SLOWDOWN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDIYYYY I I MM/DDIYYYY I ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 01/ 2016 I TO I 12/ 31/ 2016 I No DlschargeD NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended NIA NIA NIA N/A <4 <4 mg/L 0 2 I 31 GRAB MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAMEfTITLE PRINCIPAL EXECUTIVE OFFICER 1certify und" penelly of law that this document and an attachments we'" prep"ad under my TELEPHONE DATE f - - - - - - - - - - - - - . ; . . . _ _ . ; ; . . . . . ; . . ; . . ; . . " ' - ' - - - - - l d i rection or supervision In accordance wfth a system designed to assure that quallfied personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons dlrectty respon sible for gathering the 724 682-7773 01/ 26/ 2017 Information, the information submitted Is, to the best of my knowtedge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, l - - - - - - - - - - - - - - - - - - - - - i1ncluding the possibility of fine and Imprisonment for know1ng violations TYPED OR PRINTED NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all atlachments here)

SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF BOILER BLOWN DOWN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-000'4 PERMITTEE NAME/ADDR ESS (include Facility Name/Location if Different) Page 21 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002561 5 303A ADD RESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATI ON UNIT 1 OIL WATER SEPARATOR LOCATION: PA ROUTE 168 Internal Outfall SH IPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER No Dlscharge[X]

FROM 12/ 01 / 2016 TO 121 31 / 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that th is document and a ll attachments were prepared under my TELEPHONE DATE 1 - - - - - - - -- - - - - - -- - - - - - - < directlon or supervision in accordance with

  • system designed to assure that quali"ed personnel properly gather and evaluate the Information submitted. Based on m v inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who manage the system, or those persons directly responslble for gathering the 724 682-7773 01/ 26/ 2017 Informa tion, the Information submitted It, t o the best of m y knowledgr> and belief, true, accurate, MANAGER and complete. I am aware that there are significa nt penalties for submitting false information, t - - -- - - - - - - - - - - -- - - - - - - lincludlng the possibility of tine and Imprisonment for knOYtlng v+olations TYPED OR PRINTED AREA Code NUMBER MMIDDfYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reltrtnce all altlchrnents here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE OIL WATER SEPARATOR PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fonn 332(}.1 (Rev. 01 /06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 22 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 313A ADDRESS : PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 313 TURBINE BLDG DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DDIYYYY No DlschargeD ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH NIA NIA N/A 6.8 NIA 7.5 SU 0 1 I 7 GRAB 00400 1 0 Effluent Gross Solids , total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in condu it or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/00/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #21 PRIOR TO MIXING WITH AN Y OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 23 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 401A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CHEM.FEED AREA OF AUX BOILERS LOCATION : PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MMIDDIYYYY I I MMIDDIYYYY I ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 121 011 2016 I TO I 121 311 2016 I No DlschargeD NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA NIA N/A 9.6 NIA 9.7 SU 0 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE 724 682-7773 01/ 26/ 2017 TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 1ll lltachmentt here)

SAMPLES SHALL BE TAKEN AT CHEMICAL FEED AREA DRAINS PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELI MINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 24 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA002561 5 403A ADD RESS: PA ROUTE 168 MAJOR SHIPPINGPORT. PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE SLOWDOWN & RIVR WAT LOCATIO N: PA ROUTE 168 Internal Outfall SHIPPINGPORT. PA 150770004 MONITORING PERIOD MM/DD/YYYY MMIDD/YYYY ATTN: RICHARD D BOLOGNA/GENERAL PLANT MANAGE R FROM 12/ 01 / 2016 TO 12/ 311 2016 No Dlscharge[XJ NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT Oil & grease SAMPLE MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen . ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow. in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine. total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT NAMEfTITL E PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments w ere prepared under my TELEPHONE DATE i - - - - - - - - - - - - - - -- - - - - - - 1 dlrectlon or supervision In accordance with a system dMlgned to assure that qualified personnel property gather and evaluate the Information submitted. Based on my Inquiry of the person or Richard D. Bologna, GENERAL PLANT personswhoma"'gethe*ystem, o,thosepenons dkect1y,..pon*;b10 10,gathenngthe 724 682-7773 01/ 26/ 2017 MANAGER ~~~::~~!~*I j::::~:n~~b:::.::* ~~~;!:';:~.:":~~~~~gb~il~ :~~:~~~te, 1 - - - - - - - - - - - - - - - - -- - - l inctuding the possibility offtne and imprisonment for knowing violations TYPED OR PRINTED AREA Code NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERI ODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 W HEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/LAS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING W ITH ANY OTHER WATER.

Computer Generated Version of EPA Form 332()-1 (Rev. 01 /06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 204<1-000-4 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 25 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE SLOWDOWN & RIVR WAT LOCATION: PA RO UTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No Dlschargec:z:J ATIN: RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOA DING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAM ETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE 682-7773 01/ 26/ 2017 COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 111 lltlchmentt here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. RE PORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/L AS A DAI LY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fann 3320-1 (Rev. 01106) Page2

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 26 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 413A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION BULK FUEL STORAGE DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DDIYYYY ATTN : RICHARD D BOLOGNNGENERAL PLANT MANAGER No Dlscharge[ZJ FROM 12/ 01/ 2016 TO 12/ 31/ 2016

~~~~~~~~

NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH SAMPLE N/A MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT Solids , total suspended SAMPLE MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT Flow, in conduit or thru treatment plant SAMPLE MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE 724 682-7773 01/ 26/ 2017 TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AHO EXPLANATION OF ANY VIOLATIONS (Reference 1ll 1ttaehrnents here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #24 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 332().1 (Rev. 01106) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Fonn Approved DISCHARGE MONITORING REPORT (DMR) OMB No. 2040-00().4 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 27 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 501A ADDRESS: PA ROUTE 168 MAJOR SHI PPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 GENRTR BLWDWN FILT BW LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MMIDD/YYYY ATTN : RICHARD D BOLOGNA/GENERAL PLANT MANAGER FROM 12/ 01/ 2016 TO 12/ 31/ 2016 No Dlscharge[KJ NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - i dlrection or supervision in accordance with* system detigned to assure that qualified personnel property gather and evaluate the inform1tlon submitted. Based on my inquiry of the person or Richard D. Bologna, GENERAL PLANT persons who m anage the system , Of those persons directly rnponslble for gathering the 682-7773 01/ 26/ 2017 Inform ation, th e information subm itted Is, to the best of my knowledge and belief, tru e, accurate, MANAGER and complete. I am aware that there are signiflc.nt penalties for submitting false Information, t - - - - - - -- - - - -- - - - - - - - - - - i1ncluding the possibility of fine al'Mf Imprisonment for knowing violations OFFICER OR TYPED OR PRINTED AREA Code NUMBER MM/00/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference 1ll llllchmenta here)

SAMPLES SHALL BE TAKEN AT INTERNAL MP 501 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 {Rev. 01106) Page 1